TRELLEBORG NJORDGUARD™ CABLE PROTECTION SYSTEM TEST CASE STUDY National Renewable Energy Centre Albert Street, Blyth, Northumberland, NE24 1LZ T: +44 (0)1670 359 555 Fife Renewables Innovation Centre (FRIC) Ajax Way, Leven, KY8 3RS T: +44 (0)1670 357 649 Inovo 121 George Street, Glasgow, G1 1RD T: +44 (0)333 004 1400 ore.catapult.org.uk @ORECatapult [email protected] The test results provided a greater understanding of potential installation issues that our customers might face...we also gained valuable insights into the dynamics of the system that will help further refine and optimise our designs to accelerate performance for our customers’ critical applications. John Deasey, Renewables Sales Manager at Trelleborg Offshore ENABLING CONTROLLED WET TESTING FOR INNOVATIVE CABLE PROTECTION SYSTEM With developers under increasing pressure to reduce costs and de-risk offshore wind farm power cable installaon, Trelleborg’s innovave NjordGuard™ soluon required a series of wet tests to prove its capability of installing and removing offshore cables into both monopile and J-tube openings, without the need for intervenon by remotely operated vehicles (ROVs). Using ORE Catapult’s controlled tesng environment, Trelleborg was able to develop a test procedure to represent the pulling and locking of cables into an offshore foundaon, under the same loads potenally experienced during offshore installaon. With the Catapult’s support, Trelleborg installed a simulated tesng foundaon into the dock, using a crane and winch assembly to replicate a cable-laying vessel. As a result of the test, Trelleborg was able to successfully perform eight full-scale wet tests of NjordGuard™, covering a range of installaon scenarios, without the associated me, effort and costs of going offshore. Trelleborg, a world leader in engineered solutions that protect critical applications in demanding environments, utilised ORE Catapult’s open-access shallow water testing facilities to prove NjordGuard™, its latest innovation in cable protection. The client conducted eight successful, full-scale wet tests of the NjordGuard™ system in controlled subsea conditions. Undertaking verification in a controlled environment removed the time, effort and costs of testing offshore. Supporting the transition of client technology and expertise from oil and gas into offshore renewable energy.

Upload: duongque

Post on 09-Mar-2018

219 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: TRELLEBORG NJORDGUARD™ CABLE PROTECTION SYSTEM TEST · PDF fileTRELLEBORG NJORDGUARD™ CABLE PROTECTION SYSTEM TEST CASE STUDY National Renewable Energy Centre Albert Street, Blyth,

TRELLEBORG NJORDGUARD™CABLE PROTECTION SYSTEM TEST

CASE STUDY

National Renewable Energy CentreAlbert Street, Blyth, Northumberland, NE24 1LZT: +44 (0)1670 359 555

Fife Renewables Innovation Centre (FRIC)Ajax Way, Leven, KY8 3RS T: +44 (0)1670 357 649

Inovo121 George Street, Glasgow, G1 1RDT: +44 (0)333 004 1400

ore.catapult.org.uk @[email protected]

The test results provided a greater understanding of potential installation issues that our customers might face...we also gained valuable insights into the dynamics of the system that will help further refine and optimise our designs to accelerate performance for our customers’ critical applications.John Deasey, Renewables Sales Manager at Trelleborg Offshore

ENABLING CONTROLLED WET TESTING FOR INNOVATIVE CABLE PROTECTION SYSTEM

With developers under increasing pressure to reduce costs and de-risk offshore wind farm power cable installation, Trelleborg’s innovative NjordGuard™ solution required a series of wet tests to prove its capability of installing and removing offshore cables into both monopile and J-tube openings, without the need for intervention by remotely operated vehicles (ROVs).

Using ORE Catapult’s controlled testing environment, Trelleborg was able to develop a test procedure to represent the pulling and locking of cables into an offshore foundation, under the same loads potentially experienced during offshore installation. With the Catapult’s support, Trelleborg installed a simulated testing foundation into the dock, using a crane and winch assembly to replicate a cable-laying vessel.

As a result of the test, Trelleborg was able to successfully perform eight full-scale wet tests of NjordGuard™, covering a range of installation scenarios, without the associated time, effort and costs of going offshore.

Trelleborg, a world leader in engineered solutions that protect critical applications in demanding environments, utilised ORE Catapult’s open-access shallow water testing facilities to prove NjordGuard™, its latest innovation in cable protection.

The client conducted eight successful, full-scale wet tests of the NjordGuard™ system in controlled subsea conditions.

Undertaking verification in a controlled environment removed the time, effort and costs of testing offshore.

Supporting the transition of client technology and expertise from oil and gas into offshore renewable energy.