trca 2016 budget presentation peel region · malton integrated flood analysis . 12 ... partners in...
TRANSCRIPT
1
TRCA 2016 Budget PresentationPEEL REGION December 3, 2015
2
3
WATERSHEDCLIMATEINFRASTRUCTURE 2016 PROJECTIONS
4
• Special Policy Area technical updates• Dynamic stream classification methodology
193 watershed monitoring/assessment sites• 100 ha of natural heritage inventory• 2 monitoring / inventory Site Reports• 28 volunteers engaged through Terrestrial
Volunteer Monitoring Program• 4 post construction fluvial geomorphic
monitoring to measure success of natural channel projects
• 8 new high priority Spring Creek restoration sites identified from Master Plan EA ready for implementation
• 80 floodplain maps (Humber River)• 8,300 participants engaged school programs• 2800 English as Second Language (ESL)
learners will be engaged• 14 new farmers engaged through Urban• Agriculture Program• 113.5 acres of urban farming on TRCA lands
in Peel.• 10 Environmental Assessments • 500 m of Malton Flood Control Channel to be
restored
Watershed Plan priorities
State of the science policy
Reduced erosion
Improved public safety
Improved water quality
Flood management capacity
Better data and tools
Public investment priorities
Near urban agriculture
Output
Outcomes
WATERSHED - 2016 PROJECTIONS
46Projects
/Programs$4,436,000
Activities
Input
5
ApplewoodSPA
Dixie-DundasSPA
Watershed - Demonstrated Outcomes
Etobicoke Creek Floodplain Maps
23 maps updated
10 new maps developed
Dundas Connects Study – SPA Review
6
Wetland Water Balance Tool
Urban Agriculture
11 new community farmers engaged
1 Local food procurement pilot program -International Centre and McVean Farm
Watershed - Demonstrated Outcomes
7
CLIMATE - 2016 PROJECTIONS
36Projects
/Programs$7,056,000
• 3 flood remediation projects (Bolton, Malton, Downtown Brampton)
• Climate Information Database• Adaptation plan & priority setting • Interim guideline on thermal mitigation of
stormwater ponds• Update to LID planning and design guide• 1 on-line interactive stormwater BMP
monitoring database• 2 high priority Spring Creek Naturalization
Projects • 4 erosion works• 20.3 ha restoration natural cover • 5,580 m stream / shoreline restoration• 16 SNAP community events and training
workshops• Extension of electric vehicle network to 90
more stations • 10 sustainable technology monitoring
evaluations, 4 new LID demonstrations and 4 sustainable technology best practice case studies
• 20 training events for professionals and homeowners
Understanding of extreme weather risks
Climate resilience strategies
Urban flooding solutions
Flood mitigation priorities for FVA's
Sustainability technology market acceleration
Climate mitigation
Carbon sequestration
Resilient ecosystem
Input
Activities
Output
Outcomes
8
Climate Risk and Vulnerability
Natural systems
Agricultural-Caledon
Community assets-Port Credit
Water infrastructure (with CVC)
Synthesis of Vulnerabilities & Resilience Options
Stakeholder Engagement
Annual Climate Science Symposium 200+ attendees
Climate - Demonstrated Outcomes
9
Low Impact Development and Stormwater Innovation
7 LID field evaluations
2 Best Practices Guides- LID Inspection & Maintenance and Stormwater Pond Sediment Maintenance
20 knowledge transfer training events
Climate - Demonstrated Outcomes
County Court Boulevard Bioswale–Brampton
10
Restoration Restored Cover Type Projected Deliverables
Wetland 3.5 ha
Riparian 2500 m / 6 ha
Forest 3 ha
Meadow 2 ha
Stream 2000 m
Shoreline 3000 m
Climate-Demonstrated Outcomes
11
Flood Remediation
Climate - Demonstrated Outcomes
Dixie Dundas SPA Modelling
Malton Integrated Flood Analysis
12
Valleywoods Bridge Removal
McVean Farm Culvert
Snelgrove Infrastructure Protection & Channel Restoration
Erosion Management
101 structures inspected
3 infrastructure sites protected Snelgrove Drainage ChannelHumber Meadows SWMPMcVean Farm Road Culvert
3 public safety hazards mitigatedHumber Meadows TrailMcVean Farm Road Culvert ReplacementValleywoods Bridge Removal
2 drainage improvements completedHumber Meadows TrailAlbion Hills CA (in progress)Claireville CA (in progress)
Climate - Demonstrated Outcomes
13
Partners in Project Green
82 EV charging stations committed/installed
8000 Employees - People Power Challenge
10 Materials exchanges-44,000 Kg+ diverted
1000 Business representatives engaged
Sustainable Neighbourhoods Retrofit 3rd SNAP Initiated in Jaffrey's Creek BoltonUpper Nine SWM pond retrofit initiated in Brampton LID demonstration in Burnhamthorpe- Mississauga
Conservation Youth Corp
180 students engaged
234 Eco-Schools
Climate - Demonstrated Outcomes
14
Climate - Demonstrated Outcomes
Emerald Ash Borer
2,550 identified moderate to high risk ash trees have been removed
231 high value ash trees treated in TRCA's Peel jurisdiction
15
INFRASTRUCTURE – 2016 PROJECTIONS
11Projects
/Programs$4,685,000
• Albion Hills CA Master Plan finalized
• Heart Lake Trail Plan Update
• 103 km of trails maintained
• 400 m boardwalk constructed
• 2,000 ha of property audited @ 9
properties
• 100 km of trails inventoried @ 9 properties
• 4,001 ha of conservation lands monitored
and managed
• 7 km trail formalized
• 400 m boardwalk constructed
• 15 + employees relocated to Swan Lake
• 300,000+ visitors to CAs in Peel.
State of good repair
Operational efficiencies
Improved accessibility
Improved customer experience
Community health and well being
Sustainability -innovation in infrastructure design, energy, waste and water efficiencies
Youth employment and training
Input
Activities
Output
Outcomes
16
Bolton Camp Project
Infrastructure - Demonstrated Outcomes
Bolton Resource Management Tract boardwalk 450m
Claireville Conservation Area site securement
TRCA Head Office
17
THE NUMBERS
18
2016 General Levy Municipal Apportionment
Municipal FundersApportionment*
%
Funding
(000s)
Change Over 2015
%
Peel 12.8 $1,741.0 3.3
Adjala – Tosorontio 0.0 $1.0 2.0
Durham 4.1 $554.0 3.4
Mono 0.0 $2.0 2.0
Toronto 60.6 $8,256.0 2.5
York 22.5 $3,072.0 4.0
TOTAL 100.0% $13,626.0 2.9%
* Based on latest CVA data provided by MNR applicable to the 2015 fiscal year as adjusted by TRCA policy.
19
2016 Draft Operating Budget Funding Sources ($40,519 Million)
Peel 12.8%
20
High Level SummaryPeel Portion ($000s)
Levy FundingBy Peel
2015 Approved
Budget$
2016 Proposed
Budget$
Variance2016 vs. 2015
Budget$ %
General Levy 1,685 1,741 56 3.3%
Special Levy 15,700 15,822 122 0.8%
Sub-total TRCA – Levies 17,385 17,563 178 1.0%
Other One-Time CostSpecial Levy – EAB - 355 355
TOTAL 17,385 17,918 533 3.1%
21
2016 General Levy Budget Pressures –Peel Portion ($000s)
2015 Approved General Levy Budget $ 1,685
Operating Pressures:
• Inflation: Labour costs 56
2016 Proposed General Levy Budget $1,741
22
2016 Special Levy Budget Pressures –Peel Portion ($000s)
2015 Approved Special Levy Budget $15,700
Existing Special Levy Project Funding Requests:
• Watershed
• Climate Change
• Infrastructure
Other One-Time Costs (Special Levy):
• EAB
438
-394
78
355
2016 Proposed Special Levy Budget $16,177
23
C.A. Budget & Forecast Peel Portion($000s & % change)
Note; Costs to address impact of EAB fully funded by Regions tax supported reserves with no tax impact recognizing its’ temporary nature
PeelFunding
2016Budget
2017Forecast
2018Forecast
2019Forecast
General Levy$1,741 $1,798 $1,857 $1,918
3.3% 3.3% 3.3% 3.3%
Special Levy$15,822 $15,434 $16,169 $19,985
0.8% -2.5% 4.8% 23.6%
Sub-Total $17,563 $17,232 $18,026 $21,903
Other One-Time Cost (Special
Levy) EAB355 215 85 50
TOTAL 17,918 17,447 18,111 21,953
24
Asset Management
Future Pressures
Flood Management
Land Care Climate
25
Thank YouFifty nine years of excellence
protecting, enhancing and restoringRegion of Peel