transportationconverter solutions - reo · the clearance and creepage distances are realized...

32
TransportationConverter Solutions Efficient components from REO

Upload: trantuyen

Post on 21-Apr-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

TransportationConverter SolutionsEfficient components from REO

Page 2: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-2-

Page 3: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-3-

Content:

•Fromdevelopmenttofinalproduct...............................................................S.7

•Factors-pollution,humidity,acoustics,position,fire,overvoltagecategory....S.8

•Materialselection...........................................................................................S.9

•Analysistechniques,normsandstandards....................................................S.10

•Fullprototype...............................................................................................S.12

•Typetest......................................................................................................S.12

•Componentsforauxiliaryconverter..............................................................S.15

•OverviewofProducts..................................................................................S.16

•Inductiveandohmiccomponentsforauxilaryconverters..............................S.18

•OverviewofProducts...................................................................................S.20

•REOplus-globalqualityandlocalservice.....................................................S.22

•Productionsitesandsalesoffices..................................................................S.24

•Shortdescriptionofeachsite.......................................................................S.25

•Water-cooledcomponentsforrailway..........................................................S.27

•Water-cooledchokes....................................................................................S.28

•Water-cooledresistors..................................................................................S.30

Page 4: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-4-

TransportationConverter Solutions Efficient components from REO

Precision

Safety

Robustness

Reliability

Page 5: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-5-

Rail,High-Speedtrainsormetroliners,oneofthesafestmeansoftransport,isadvancingintoevermoreremotecornersoftheEarth.Therailwaynetworkisconstantlyexpanding,helpingcountriescometogether,andisanenginedrivingeconomicgrowthandprosperity.

REOhassetitselfthetaskofcontributingtomakingtrainseversafer,todayandinthefuture.Withmainsfilters,inductorsandtransformers,weensurethatEMCproblemsareeliminateddirectlyatthesource.Theresultisthatvoltagechanges,short-circuitsandanyotherproblemsassociatedwithelectricitycannotpresentahazardtorailwaypersonnelorpassengers.Compliancewithinternationalnorms,theexploitationofthelatesttechnologiesanddecadesofexperiencemakeREOastrongpartner.

REO manufactures components for two main areas of railway technology:

A) Auxilary converters: • Transformers from 16 2/3 up to 30 kHz• Boost-/Buck converters• EMC-Filter• Sinusoidal filter• Current transformers• Charging resistors from IP 00 - IP 65, available for watercooled systems, too.

B) Main drive:• EMC HV chokes• Leakage transformers• Flow Controls• FE-chokes• Absorption circuit chokes• Onboard power supplies• Damping resistors• Current transformers• Filter chokes

InitsCentreofCompetenceinBerlin,REOtodaydevelopsrailwayengineeringcomponentstomeettherequirementsofworldwiderailwayorganizationsand,thankstopartnershipswithcompaniesintheUSA,China,IndiaandGermany,theyareabletobemanufacturedquicklyandefficientlywiththehigheststandardsofquality.Inconjunctionwithitsworldwidesalesnetwork,REOcanrespondquicklyatanytime.

Withgreatattentiontomodernproductionmethods,efficientworkflow,closecooperationwithuniversitiesandtheconstantfurtherdevelopmentandimprovementofprocesses,everydayREOprovideselectricrailwaylinebuilderswithproductsthatcontributetothesafety,functionalityandglobalgrowthofrailtechnology.

WiththeIRIScertificationofthesubsidaryinBerlin/HennigsdorfandtheISOcertificationinChinaandtheU.S.,REOdemonstratesqualityatthehighestinternationalstandards.

IRIS-Cer

ifiCATE

D

EN 1508

5 CL 1

CerifiC

ATED

Page 6: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-6-

Content:

•Fromthedevelopmentstagetotheendproduct.................................P.7

•Influencingfactors-pollutiondegree,moisture,position,

firebehaviour,overvoltagecategory......................................................P.8

•Selectionofmaterials............................................................................P.9

•Analyticaltechniques,normsandstandardsapplied................... P.10,P.11

•Completeprototypeconstruction........................................................P.12

•Typetesting........................................................................................P.12

Keypoints Influence factors Material selection

Tailor-made components right up to the end product

Page 7: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-7-

Key points

Allrailwaytechnologycomponents-fromtransformerstolineinductorsandfilters-aredevelopedtomeetthestandardorspecialrequirementsofourclients.Noproductcangointooperationwithoutthesefundamentallydefinedrequirements:

• Safety: Trainshavebeeninuseasameansoftransportformorethanacentury.Thedemandsplacedon materialsbecomeevergreater,inpacewithongoingtechnicaldevelopment.Toensurethatthe safetyandcomfortofpassengersarenotimpaired,everycomponentusedinatrainmustmeetthe currentnormsandstandards.Owntestsandaccreditedtestinglaboratoriesprovethesafetyofour components.

•Weight: Trainsarebeingusedevermorerapidlyandevermoreextensively,insufficientlyoptimized equipmentmeansstressonthetrain,fewerpersonscanbetransportedandspeedandeconomy isreduced.IntelligentmethodsinmaterialsselectionandFEM-calculationmeanthatREO componentsareofparticularlylowweight. • Space requirements: Manycomponentshavetobedevelopedinsuchawaythat,togetherwithotherproducts,theyfit intotheavailablespace.Theoptimaluseofspace,andcompliancewithspecifiedmechanicaland electricalrequirements,formthebasisofourdevelopmentwork.

• Costs: Theoptimizationofoperatingcostsplaysaparticularlyimportantroleinrailwayengineering.To remaincompetitive,trainmakershavetorationalizecostsbutwithoutendangeringpassenger safetyintheprocess. Withthelatestsoftware,simulationandtestingtechniques,weensurethatthenecessary developmentworkisalreadyoptimallyusedinadvance.

Tests/Analyses technologies Full prototype Type test Final product

Page 8: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-8-

Influencing factors

Besidesunitsizeandweight,therearemanyotherfactorsthatinfluenceacomponent,suchas:

Environmental conditionsIfacomponentisusedontheoutsideofthetrain,thedegreeofpollutionitisexposedtoisanimportantfactor.Dirtcangetintocomponents,impairingtheirfunctionalityandshorteningtheirusefullifetime.REOcomponentscanbedesignedforapollutiondegreeofuptoPD4andatemperatureof-50°Corworse.TheclearanceandcreepagedistancesarerealizedaccordingtoDINEN50124-1.

MoistureWetnessandmoisture,inconjunctionwithtypicalrailwaycontaminationandhightemperatures,canimpairfunction.Ifmoisturegetsintoelectricalwindingsorcablingsystems,short-circuitsandthermaloverloadingmayoccur.Withtheaidofaspecialcoatingandvarioussealingtechniques,REOproductsachieveahighprotectionclassandareparticularlyresistanttodirt,moistureandotherenvironmentaleffects.

AcousticsEspeciallyinthefieldofrailwaytechnologyacousticsplaysagrowingrole.REOdevelopsandusestechnologies,processesandmaterialsthatallowtomeetandexceedtheacousticrequirementsandstandards(DINEN60076-10).Thus,evenlevelsbelow85dBsoundpressurelevelcanberealized.Asstandard,theairbornesoundismeasured,andifdesiredastructure-bornenoisecanbedone,too.

Position of equipmentThepositionofrailwaycomponentsplaysanequallyimportantroleintheirdesigncalculation.Factorslikeweightmanagementandtrainconstructionareimportantissues.

Preventive fire safetyThebehaviourofmaterialsinafireplaysacrucialroleinpassengersafety.Allmaterialsusedarepreparedincompliancewiththeapplicablenormsandaretestedbyaccreditedtestlaboratoriesfortheirbehaviourwhensubjecttoafireanditssideeffects.Thetestreportsandthecorrespondingdocumentationaremadeavailabletoclients.StandardssuchasEN45545,DIN5510andNFF16101areself-evident.

Protection grades:IP00 - IP65 Pollution level:PD1 - PD4

Fire protection standards: EN 45545, DIN 5510, NF F 16-101 / NF F 16-102

Tailor-made components

Choke,developedaccordingtocustomerspecificationsandusedunderthefloor.

Specialsiliconecoating

Forasinusoidalcurrent,andimprovedacoustics

Keypoints Influencefactors Materialselection

Page 9: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-9-

Selection of materials

Theoptimizationofunitsizeandweightisdependentontheselectionofthecorematerialsandwindingmaterials.REOhasmanyyearsofexperienceinthemanufactureofinductorsandtransformersandcanselecttheoptimalmaterialsforaspecificproject.Directandfocussedanalysisoftherequiredmaterialpropertieshelpsminimizethecosts.

Thefollowingoptionsareavailable: • aluminium • copper • iron • amorphousandnanocrystallinematerials • carbonfibre-reinforcedplasticsandinsulatingmaterials

Inaddition,theselectedproductdesignhasasubstantialinfluenceonmechanicalandelectricalcharacteristics:

• cylindricalair-coreinductors • iron-coreinductors • toroidalair-coreinductors

Thetypeofcoolingshouldalsobedecidedinadvance.REOoffersvarioustypesofcooling:

• AN,AFaircooling • watercooling

Protection grades:IP00 - IP65 Pollution level:PD1 - PD4

Fire protection standards: EN 45545, DIN 5510, NF F 16-101 / NF F 16-102

Specialsiliconecoating

Tests/Analyses technologies Full prototype Type test Final product

Page 10: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-10-

Tests/analytical techniques

Tests/analyticaltechniquesAfterelectricaldesigncalculation,andduringmechanicaldesign,thecomponentsundergovarioustestswiththeassistanceofsimulationtoolsandanalyticaltoolsbeforetheygointoprototyping.

SuchsimulationtechniquesasFEManalysisbasedonsolid3Dmodelsgiveinformationaboutphysicalmagnitudes.Thesearefurtheranalysedasaconsequenceofdesigncalculation,andproductoptimizationmeasuresareundertaken,ifrequired.

Thesevarioussimulationtechniquespermitworkingwiththeoptimizationoftimeandcost,sincethefindingsaccumulatedinthesimulationprocesscansubsequentlybeimplementedintheprototyping.Thisprocedureenablesthoseproblemsthatmaycrop

Here is an overview of some of the main types of analysis:

3D magnetic-field simulationComprehensiveelectromagneticandthermalcalculationscanbeperformedbasedonthethree-dimensionalfinite-elementmethod(3DFEM).

FEM thermal simulationBesidestheelectromagneticthree-dimensionalfieldcalculation,thermaldesigncalculationbasedonFEMisalsoofgreatsignificanceforREO,becauseitpermitsalookinsideanactualproductandsubsequentlysuppliesimportantfindingshereaboutlocalhotspotsthatcouldendangertheexpectedusefullifetimeofaproductinthemediumterm.

Thismakesitpossibletodesignproductsthermallyinthedevelopmentphasebeforeproductionbegins.Thisensuresthatthefinishedproducthasalonglifespan.

FEM analysis of structural mechanicsPhysicalfactorsinfluencingthecomponentaresimulatedusingtheFEManalysis,basedon3DCADmodeldesignedusingSolidWorks.

Thisenablesthefollowingcalculationstobemade:

• staticanddynamiclinearandnonlinearstressanalysis • frequencyanalysis • analysisoflifetime • designcalculationofscrewstrength • weldingseamcalculation

Tailor-made components

Keypoints Influence factors Material selection

Page 11: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-11-

Norms and standards used by REO: - IRIScertified(Rev02,V2.2) - EN15085CL1 - DINEN60310/VDE0115Part420/IEC60310:Railwayapplications-Traction transformersandinductorsonboardrollingstock - EN12663-1:Railwayapplications-structuralrequirementsofrailwayvehiclebodies - EN15085-1bis-5:Weldingofrailwayvehiclesandcomponents - IEC61373:Rollingstockequipment–Shockandvibrationtests. - EN50125-1:Railwayapplications–environmentalconditionsforequipment - DINEN60076-10:Determinationofthenoiselevel - EN50124Railwayapplications-insulationcoordination(basicrequirements -clearancesandcreepagedistancesforallelectricalandelectronicequipment) - IEC60085:Electricalinsulation-thermalevaluationanddesignation - DINEN61378and60076:Convertortransformersandpowertransformers - UnderwritersLaboratoriesInc.(UL)certificationforREOsystemsofinsulatingmaterials inthermalclassesF(155°C)andH(180°C)inaccordancewiththeUL1446standard. - ULandTÜVcertificationforREOEMCfilters,inductorsandbrakingresistors - Fireprotectionstandard:EN45545,DIN5510,NFF16-101/NFF16-102,BS6853

Tests/Analyses technologies Full prototype Type test Final product

Page 12: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-12-

Construction of prototypesAftertheanalysisandtestingphaseissatisfactorilyconcluded,theproductismanufacturedasasampleusingtheresultsderivedfromtheFEManalysis.Thisisacompletein-houseprototype.AllprototypescanbecompletelymanufacturedintheproductionfacilitiesinHennigsdorfandKyritzutilizingin-housemetalwork,CNCmachiningcentre,insulatingmaterialsworkshopandweldingbays.

Type testing

AtREO,everyrailwaycomponentundergoescompletetypetestinginaccordancewithEN60310.Thisincludesthecompleteverificationandvalidationofthedesign,partiallybyexternalaccreditedcompanies.Testing in accordance with EN 60310 includes the following tests, among others:

• acoustics measurement • temperature test • partial discharge measurement • high potential test and high-current test • shock and vibration testing (external) • salt and mist testing (external) • EMC testing

Componentssubmittedbyaclient,suchasfrequencyconvertersetc.,canbeintegratedwithourspeciallyfittedtestingstationswiththeirmodularunits.

Safetyhasabsolutepriorityinrailtravel:faultsinthisexactingfieldofengineeringcanhavecatastrophicconsequences.Sorailwaysaresubjecttospecialadditionalnormsdealingwithmechanicalstability,shockadvibration,andresistancetoEMC.

Millionsofpeopleusetrainsastheirmeansoftransporteveryday.Forthisreason,countlessinternationalstandardsandnormsareapplicabletorailwaystoensurepassengerssafety.Ourengineersdevelopreliablerailwaycomponentsbasedonthesenormsandthosedemandedbyclients.

Thedifferentstages:Constructionphase,3-Dmodel,finalproduct.

Tailor-made components

Keypoints Influence factors Material selection

Page 13: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-13-

Thedifferentstages:Constructionphase,3-Dmodel,finalproduct.

Tests/Analyses technologies Fullprototype Typetest Final product

Page 14: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-14-

Content:•Componentsforauxilaryconverters................ p.15

•Overviewofproducts...................................... p.16

Our product range Components for auxiliary converter

Keypoints Influence factors Material selection

Page 15: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-15-

Components for auxiliary converter

Electricrailwayshaveanextraordinaryenergydemand,e.g.forheating,airconditioning,lightingorcookinginthebistrocar.Alloftheseperipheralapplicationsnormallyrequireasupplythatisdifferentfromtheavailableelectricitysource.Inadditiontoprovidingoptimumpowertothesefacilitiesthereisalsoanimportantrequirementtoensureelectromagneticcompatibilityfortheprotectionofpassengers.Theseauxiliaryconvertersmustmeetthetoughrequirementsofrailwaytechnology:shockandvibrationresistance,highprotectionlevelsandalonglifearejustafewexamplesofthesedemands

REOdevelopsandmanufacturescomponentsforthispurpose,oftenavailableasstandardproductsbutalsoprovidingfastturnaroundofspecialdesigns-foreveryapplicationtherightsolution!

©Urbanhearts-Fotolia.com

Tests/Analyses technologies Full prototype Type test Finalproduct

Page 16: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-16-

REOChargingresistors(upto3kW)*

–highpowerdensity,widevarietyofconnectionoptionsandpossiblecombinationsof

severalresistorsinoneprofile(typeofprotectionuptoIP67)

REOmainschokes750V-1500V*

–incastdesignforingressprotectionuptoIP65;Usedforreducingcommutation

lossesandharmonics;veryrobustandgoodheattransfer

REOEMC-Filter*

withhighattenuation(upto100dBfromsimpletobroadspectra)inapracticalprofile

housingforvariableinstallationandwithlowheatingguaranteed

Many REO components are also available in a liquid-cooled design (direct cooling).Alternatively, a water-cooled sub-element can be used (indirect cooling), which is combined with the REO-component.

In this simple way, a liquid-cooled system can be easily achieved with all the benefits of a modern water cooling.For more information on water cooling in rail technology, see page 26

1

1

2

DC

3AC 230V

ConverterInput filter HF- transformers

3-Phase-Converter

Sinusoidalfilter

Vorladewiderstand

Precharging resistor

3

4

5

6

Input

or

2

Our product range Multitude of applications

Page 17: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-17-

REOdv/dt-filter(690V/to150A)*

–forlimitingthevoltageriseattheoutputfromtheconverterwithhighinductance,

lowtotallossesandminimalleakagefield(typeofprotectionuptoIP65)

REOSinusoidalfilter(690V/1200A)*

–forgivingsinusoidalformtocurrentandvoltage.Forexample,usedinairconditioning

systemsagainstnoise(protectionuptoIP65)

REOCurrenttransformers(0-1000A)*

–insuitabledesignforAC/DCmeasurementsupto150kHzinrailwayapplications,

distinguishedbyshortresponsetimesandexcellentlinearity.

*higherperformancesonrequest

3

4

5

6

Output

DC-link

or

or

or

REOBoost/Buckconverter

ThechokeisusedinapplicationswhereDCvoltagesareconvertedintoanother

(higherorlower)DCvoltageinavehiclepowersupplyandisoperatedatavoltageof

500V..1100.

Chokesaremanufacturedwithcopperwindingsandamorphouscore.

REOHF-Transformer

TheHFtransformerisusedforexampleatavoltagesupplyasanisolating

transformer.Asafeseparationandlowpartialdischargevoltagesare

characteristic.

Page 18: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-18-

Content:

•Componentsforsafetyinrailway....................... S.19

•Overviewofproductsforauxiliaryconverters..... S.20

Our product range for auxiliary converter Inductive and resistive components for railway engineering

Page 19: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-19-

Excellent components for safety in railway technology

Withtheuseofmoderninverterengineeringinelectrictrains,techniquessuchaspulse-widthmodulationareused,generatingvoltagepulseswithashortrise-timetoachievehighpowerratings.Howeverthistechniquehasseveralissueswhichcancauseundesirableeffects,suchasthelossofmotorpower.Someoftheseproblemsare:

•EMCissues •Harmonicdistortion •dv/dtproblems •Voltagesurges •Short-circuitcurrents •Interferencecurrents

Inadditiontothesephenomenathereisalsotheneedtoabsorbexcessiveenergysuchasswitch-onortransientcurrentsurges,causedbystarting-upandslowing-downatrain,toprovidethemostefficientmotorperformance.

Solutions from REO

Sincemostoftheseproblemsoccursimultaneously,itismostimportantforREOtoatakeaholisticviewofthesystem.REOprovidesclosely-matchingsolutionsforinductiveandresistivecomponentsusedaroundthetrain’sdrivemotorsystemandforauxiliaryapplications;fromasinglesource–thisensuresthatthemostefficientdesignfortheapplicationandan

overallawarenessduringtheearlystagesofthedevelopmentphase,areavailable.AsaleadingsupplierofcompleteinductiveandresistivesolutionsREOoffersawiderangeofcomponentsfortheenhancedperformanceofrailwaydrivesandtrainelectricalequipment.

•AC-chokes •Dampingresistors •Filterresistors

•Short-circuitResistors •Groundingresistors •Interferencechokes

•Invertertransformers •Chopper-Chokes •Absorptioncircuitchokes

•AC-Transformers •Powertransformers •Auxilarytransformers

•Combinations •Brakingresistors

•Assembliesofspecialcomponentsforenergyregeneration

REOdemonstratesaparticularstrengthacquiredthroughlongexperiencewithinductors.Thebroadbaseofcompletedprojectsinrailwaytechnology,guaranteesagoodresult,particularlyforcustomizedsolutions.

Page 20: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-20-

REOthree-phasetransformer

–iscompletelyimpregnatedandmountedinarobustcasing

toprotectofthewindingagainstexternalinfluencingfactors.

Thistransformerisusedforsupplyingvoltagetokitchen

appliancesinahigh-speedtrain.

REOdampingresistor

TheNTTR159resistorisusedasadampingresistorinserieswithafilter

capacitorinatractionpowerconverteronthe3-kVDCmains.

Customer-specific components

Besidesthestandardcomponentsforuseintheconverter,REOofferscustomer-specificproducts-asindividualcomponentsorasacompletesolutioninacontainer.

Theoverridingcriteriainrailwayengineeringareavailabilityforoperationandpassengersafety.Here,REOofferscustomizedsolutionsthatwedevelopstepbystepinclosecooperationwithourclient.

ThisguaranteesthatREOlineinductorsandtransformersareoptimallysuitedtoyourapplication.Ourdevelopmentmethodsemphasizemaximumusefullifetime,cost/benefitoptimizationandsafety.

REOthree-phaseconvertertransformer

–isemployedinauxiliaryconvertersforthe

galvanicseparationoflinkDCvoltageup

to2000VDC.Specialimpregnationserves

toprotectthetransformeragainstexternal

influencingfactors.

Our product range for auxiliary converter Inductive and resistive components for railway engineering

Page 21: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-21-

REOaircorelinechokes

–isdesignedforuseinelectricrailways

operatedonDCnetworks.

Thespecialconfigurationoftheinductor

permitsfullfunctionalityevenunderextreme

conditions.

REODCfilterchoke

–asacomplete,ready-to-useunitconsistingofchoke,

cooling-airduct,suspensionandconnections.

REOREOLeakagetransformer

TheREOleakagetransformerensuresharmonizedcurrentandvoltage

outputs,filteringharmonics,andlimitingtheripplecurrent.Withthe

spatialseparationoftheprimaryandsecondarywindingsandthe

resultingintentionalincreaseinthemagneticleakagefield,theREO

leakagetransformerachievesaloosemagneticcoupling.

REOTransformerwithsupportframe:

Arrangementformountingonthevehiclerooforunderthefloorto

supplyvariouskitchenappliances.

REOabsorptioncircuitchoke:

Absorptioncircuitinductorforamulti-systemvehicle(25kV,50HzAC

mains,5kV,16.7HzACmains,3kVDCmains,1.5kVDCmains)

Theinductorisemployedincombinationwithacapacitorinthecooling

systemoftheconvertercontainertocreatearesonantcircuitfora

specificresonantfrequency.

Therobustconstructionisdesignedforsecureassembly,withspecial

dampingelementsabsorbingvibrations.

Page 22: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-22-

• REO Unity • REO at your side• REO Service

Inhalt:

•REOplus-globalqualityandlocalservice.................. S.22

•Productionsitesandsalesoffices............................... S.24

•Briefdescriptionofeachsite..................................... S.25

REOplus Global quality and local service

Page 23: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-23-

• From the simulation model to mature end product

• Taking into account international certifications and standards

• Verification of all technical parameters, long-term measurements

• Documentations and tests with all products

REO at your side• Certified production processes

• 1:1 production transfer• Same test and production

equipment

REO Unity• All from one single source :

Components in and around the frequency converter - as stand-alone

products or designed as a complete system (including housing, fan, etc.)

• Customized solutions

REO Service

Worldwide sales network

Withaworldwidesalesnetworkandaverycomprehensiveproductportfolio,REOcanreactrapidlytoyourwishesanywhereintheworld-nomatterwhatlanguageyouspeak.Besidesourwideselectionofstandardproducts,wecanofcourseofferyoutailor-madesolutions,developedspeciallytomeetyourwishes.

OurproductionfacilitiesinChina,IndiaandtheUSAareequippedinexactlythesamewayasthoseinGermany,andcanmakeeveryproduct1:1.

Evenafterthe1000thproductionrun,aREOproductalwayshasthesamequality,everywhereintheworld.Usingthesamesoftware,withdevelopmentanddesigninGermanyandintensivecommunicationsbetweenourlocations,weensurethatREOproductsarealwaysuptothelateststateoftheart.

TheREOgroupismadeupofcompanieswithmanyyearsofexperienceasmanufacturersofinductivewindings,locatedallaroundtheworld.BasedinGermanyandwithitstechnicalengineeringknow-howhousedinitsCentreofCompetenceinBerlin,theREOGroupprovidesitsrailwayengineeringclientswithalltheadvantagesofacompanyproducinglocally.

Page 24: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-24-

WithproductionlocationsintheUSA,China,IndiaandGermany,REOoffersdecisiveadvantagesworldwide.

Technology: REOisareliablesourceofmaturetechnologyfortheworld.WithdevelopmentfocusedattheCentreofCompetenceinBerlin,manufacturingmeetsthesamequalitystandardsateveryproductionlocation.Productionmonitors,standardizedproductionequipmentandtheuseofthesamesoftwareworldwideensure1:1manufactureeverywhereintheworld.

Finance: Asagroupofcompaniesoperatingworldwide,REOhasastrongfinancialbackgroundthatmakeslong-termcooperationsecure.

Cost-efficiency: REObenefitsfromlocalsiteconditions,whichenableittofunctionsubstantiallymoreefficientlyandflexiblyasregardsthepricing.

Speed: Localproductioneliminateslongtransportationroutes.SoREOcanalsomeetshort-termdeliverydeadlines.

Service: Anengineerwhocansolveaclient‘sproblemsinthelocallanguageandonsite,ismuchmoreefficientthanonewhooperatesacrossgeographicalandculturaldivides.REO‘sbranchesworldwideenableittodojusticetothisrequirement.

Manufacturing Sales office

REOplus Production locations and field sales offices

Page 25: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-25-

REO-GPDInductiveComponentsPVT.LTD.isajointventurebetweenREOandGUJARATPLUG-INDEVICESPVT.LTD.GUJARATPLUG-INDEVICEShasbeenoperatingontheIndianmarketsince1985andisanactiveproducerofwindingsthere.

REO USA, inc: REOhasbeenrepresentedbyafieldsalesofficeintheUSAsince2000;Weinvestedina2118-m²productionhallin2010.REOUSAhasalsobeenISO-certifiedsinceJuly2011.

Themainfocusatthe„CentreofCompetence“inBerlinisondevelopmentandonsalesinthedomainoftransportationconvertersolutions.DevelopmentworkisdoneforinternationalmanufacturinginAmerica,China,IndiaandGermany(Hennigsdorf).TheCentreofCompetenceisaffiliatedtoastrategicglobalpurchasingdepartmentfortheareaofrailwayengineering.

REOSHANGHAIINDUCTIVECOMPONENTSCO.,LTD.OurpartnerfortheChinesemarket–specializesintheproductionofrailwaycomponents,inclosecooperationwiththeCentreofCompetenceinBerlin.Componentsforrailwayengineering(chokes,filters,transformersandcomponentsinandaroundthefrequencyconverter)foruseindrivetechnologyandinthedomainofrenewableenergysourcesareproducedinChinaA1577-m2productionhallandidenticalproductionandtestingequipmentensureexcellentquality.

IRIS-Zer

ifiziert

EN 1508

5 CL 1

zertifi

ziert

Page 26: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-26-

Content:

•DevelopmentsatREO..................................... S.27

•Watercooledchokes........................................ S.28

•Watercooledresistors...................................... S.30

Solutions of REO Watercooled components in railway technology

Page 27: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-27-

Watercooling

Usingwater-cooledsystems,onecanconvertsignificantlyhighercapacitiesusingthesamesurfacearea-fromwhichincreasedcoolingefficiencyarises.

REOhaslongsincerecognizedthetrendtowardswatercoolingandhasoperateddevelopmentsinthewatercoolingareaforinductiveandresistivecomponents.ThishasenabledREOtobuildupacomprehensiveknow-howandawidespectrumofwater-cooledproducts.

Watercoolingisanexcellentsolution,especiallyfortheuseofinductiveandresistivecomponents,astemperaturebehaviorplaysamajorrolehere.Watercoolingenablesthetemperatureofthecomponentstobekeptatanoptimumlevelinauniqueway,ashighpowerlossesaredirectlytransportedoutofapplicationviathecoolinglines.Thisensuresalongerlifetimeforthecomponentsaswellasincreasedperformance.

Water cooling is a technique that pays off

WatercoolingisatechniquethatpaysoffConstructingthiskindofsystemmaybeinitiallyconnectedwithhighercoststhanwithregularforcedaircooling,however,theseinvestmentspayoffintheend.Variousbenefitscanbeachievedbywatercooling: • Highefficiencyandlownoiselevels • Minimizationofconstructionsizesupto80%withresistors • Effectivecoolingwithhighambienttemperatures • Verylowexcesssurfacetemperature • Increaseoflifetimewithnormaloperation • Constant,highperformance,astemperatureisdirectlydissipated • Onlycoolingtypeduringwhichthetemperaturemayfallbelowtheambient temperature • Verywellsuitedforindustrialapplicationsinwhichcomponentswithlowsurfacetemperaturesarerequired(woodandtextileindustriesorinexplosion-protectedenvironments,windturbines)

Page 28: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-28-

ThechokesareavailableinprotectivetypesIP00toIP65.REO-canrealizevarioustypesofwatercoolingforthesecomponents.Thismeansthetargeteddischargeoflossesviathecoolingcircuit-thelossesarenotdischargedintotheenvironment.Byusingwatercooling,thetemperaturesinthecomponentscanbegreatlyreduced-thismeanslessstressontheinsulationmaterialsandalongerlifetime.

Series CNW MC - for smaller components

•Reactorcastonametalplate,withintegratedcoolingchannels.Thiscomponentenablestargetedand optimizedcoolingforsmallerpowerlevelsandischaracterizedbyitssimpleintegrationintoexisting coolingsystems •Availablein4versions(IP00,IP20,IP20+EMVandIP64) •Current3-70A

Series CNW MD - for medium to larger power levels

•Chokeinanopendesign,forwhichthecoolingprofileisintegratedintothewinding.Withthistechnology,theheat canbedirectlytiedtoitssourceandcanberemovedeasily. •Completelyencapsulatedchokes,forwhich„waterpockets“,areconnectedtoawatercoolingsystem.Theseare constructedwithinthewindingsandencapsulatingcompounds.Thistechnologyunitestheadvantagesof encapsulationtechnologytoachieveahighprotectiveclassandtheeffectiveheatdissipationatitssource..

Open design: •Type: CNWMD •Current: 100-1200A •Protection:IP00...IP40 •Inductance: 5-147mH

Watercooled chokes A specialty of REO

Page 29: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-29-

Encapsulated version with water-pockets •Type: CNWMD •Current: 100-3000A •Protection: IP00...IP65 •Inductance: 5-200mH

Advantages of water-cooled chokes

•Max.temperatureCNW953/180air-cooled: 205°C•Max.temperatureCNWD953/180water-cooled: 120°C•Max.temperatureCNWMD953/180water-cooledandpoured: 68°C

Theadvantagesofthewatercoolingmethodcanbeclearlyseenbasedonthemeasurements.All3variantsweretestedwiththesameload;whendoingso,theopenwater-cooledreactorhadatemperatureadvantageof52K.IntheCNWMDversion,thetemperatureinthereactorcouldevenbeloweredby137K.ThisadvantagewasachievedduetospecialencapsulationtechniquesandaspecialREOconstruction.Inaddition,thebehavioratdifferentinlettemperatureswasresearchedtotestthebehavioratdifferentoperatingconditions.

Water-cooled chokeThisthree-phaselinechokeutilizesasinglecastingofthecoilsandprovidesverygoodinductanceandminimalphysicaldimensions.

Page 30: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-30-

Areavailablewithpowerlevelsfrom1to100kW.Coolingchannelsintroducedintotheheatsinkenableefficientcoolingandthespatialseparationoftheelectricalconductors-andcoolant-enablingsafeapplication.InadditiontothegeneraladvantagesoftheREOHMbrakingresistors,suchasmodularconstructiontoattainhigherpowerlevelsorthecompactdesign,thebrakingresistorshaveanoptimalstructureandpowerconsumption,enablingthemtoalsowithstandvibrationandshocktests.REOHMbrakingresistorsareanoptimizedcombinationofprovenandinnovativetechniques,sothatnothingstandsinthewayofitsusewithhighpowerclassesunderconditionsoflimitedspaceespeciallywhenusingwatercooling.

Series REOHM BW D158 /1600 • Brakingandloadresistanceforthedrivetechnology,industrialapplications. • Power:5–100kW • CoolingchannelsseriesBWD158:Aluminum(AlMgSi0.5)Di=10.5mm • CoolingchannelsseriesBWD160:CopperorstainlesssteelDi=10mm

Type: BW D 158 •Power: 1–100kW •Protection: IP20...IP65 •Resistancevalues: 0,2-850Ohm

Type: BW D 160 •Power: 5–100kW •Protection: IP20...IP65 •Resistancevalues: 0,2-850Ohm

Comparison of an air-cooled braking resistor with a liquid-cooled braking

BW 155/3000 BW D 158/3000 aircooled watercooledDimensions(LxWxH): 762mmx175mmx75mm 320mmx50mmx68mmSpacerequired: 0,134m² 0,05m²-60 % PlatzersparnisSurfacetemperaturewithafullload: 387°C 35°C 90 % smalle surface temperature

Water cooled resistors Ideal for railway technology

Page 31: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

-31-

Series REOHM BW D330

• ThisseriesBWD330isavailableasloadingordampingresistororbrakingresistorforrailway technologywithcapacitiesupto100kW. Liquidcoolingenablesspacesavingsupto88%.Asaspecialbonus,theresistorcanbeconnected easilyvianon-dripquickconnectors.

• 88%spacesavings • driplessquick-connections • Watercooling • electroniccontrol

Type: BW D 330 •Power: 10-100kW •Voltage: 900V •Resistancevalues: 0,1-30Ohm

Page 32: TransportationConverter Solutions - REO · The clearance and creepage distances are realized according to DIN EN 50124-1. Moisture Wetness and moisture

Headquarters - GermanyREO ELEKTRONIK AGBrühlerStraße100·D-42657SolingenTel.:+49(0)21288040·Fax:+49(0)2128804188

REO INDUCTIVE COMPONENTS AGBrühlerStraße100·D-42657SolingenTel.:+49(0)21288040·Fax:+49(0)2128804188

E-Mail: [email protected]: www.reo.de

Divisions - GermanyREO INDUCTIVE COMPONENTS AG

TrainTechnologies DivisionCentre of Competence BerlinErasmusstraße14·D-10553BerlinTel.:+49(0)3036702360·Fax:+49(0)30367023610E-Mail:[email protected]·Internet:www.reo.de

Fertigung/ProductionTrainTechnologies DivisionEduard-Maurer-Straße13·D-16761Hennigsdorf

IBK Drives DivisionHolzhausenerStraße52·D-16866KyritzTel.:+49(0)339714850·Fax:+49(0)3397148590E-Mail:[email protected]·Internet:www.reo.de

Setzermann Medical DivisionSchuldholzingerWeg7·D-84347PfarrkirchenTel.:+49(0)856198860·Fax:+49(0)8561988640E-Mail:[email protected]·Internet:www.reo.de

Test and PowerQuality DivisionBrühlerStraße100·D-42657SolingenTel.:+49(0)21288040·Fax:+49(0)2128804188E-Mail:[email protected]·Internet:www.reo.de

ChinaREO Shanghai Inductive Components Co., LtdNo.536ShangFengRoad·Pudong,201201Shanghai·ChinaTel.:+86(0)2158580686·Fax:+86(0)2158580289E-Mail:[email protected]·Internet:www.reo.cn

FranceREO VARIAC S.A.R.L.ZACDuClosauxPois1·6/8ruedelaCloserie-LISSES·F-91048EvryCédexTel.:+33(0)169111898·Fax:+33(0)169110918E-Mail:[email protected]·Internet:www.reo.fr

Great BritainREO (UK) Ltd.Units2-4CallowHillRoad·CravenArms·ShropshireSY78NT·UKTel.:+44(0)1588673411·Fax:+44(0)1588672718E-Mail:[email protected]·Internet:www.reo.co.uk

IndiaREO GPD INDUCTIVE COMPONENTS PVT. LTD2/202LunaRoad·VillageLuna·TalukaPadraVadodara-391440·IndiaTel.:+91(2662)221723,+91(265)2396148·Fax:+91(265)2396971E-Mail:[email protected]·Internet:www.reo-ag.in

ItalyREO ITALIA S.r.l.ViaTreponti,29·I-25086Rezzato(BS)Tel.:+390302793883·Fax:+390302790600E-Mail:[email protected]·Internet:www.reoitalia.it

PolandREO CROMA Sp.zo.oul.Pozaryskiego28,bud20·PL-04-703WarszawaTel.:+48(0)228123066·Fax:+48(0)228156906E-Mail:[email protected]·Internet:www.croma.com.pl

RussiaREO RUSSIA Ltd.17/2,Dorozhnayast.,·Voronezh394062·RUSSIATel.:+7(0)4732202453·Fax:+7(0)4732707011E-Mail:[email protected]·Internet:www.reo-russia.ru

SpainREO ESPAÑA 2002 S.A.C/ManuelVenturaiCampeny21B·local9·E-08339VilassardeDalt(Barcelona)Tel.:+34937509994·Fax:+34937509995E-Mail:[email protected]·Internet:www.reospain.com

SwitzerlandREO ELEKTRONIK AGImHalbiacker5a·CH-8352ElsauTel.:+41(0)523632820·Fax:+41(0)523631241E-Mail:[email protected]·Internet:www.reo.ch

TurkeyREOTURKEY ELEKTRONIK San. ve Tic. Ltd. Şti. HalilRıfatpasaMah.·DarülcezeCDPerpaTicMerkeziBBlokKat8No:1095·TR-34384Sisli–IstanbulTel.:+90(0)2122215118·Fax:+90(0)2122215119E-Mail:[email protected]·Internet:www.reo-turkey.com

USAREO-USA, Inc.8450E.47thSt·USA-Indianapolis,IN46226Tel.:+1(317)8991395·Fax:+1(317)8991396E-Mail:[email protected]·Internet:www.reo-usa.com

©SvenHoppe-Fotolia.com

Version10_09_2012_DE