Introduction
• The process contains a Concept Development Phase and a Final Design Phase before project goes into Construction.
• TSM Procedure Manual
• Projects• Traffic Signal
• Adaptive • Signal Optimization
• ITS• Camera Surveillance Systems (CSS)• Dynamic Message Signs (DMS)• Truck Safety Warning Systems (TSWS)• Travel Time Systems (TTS)• Fiber Optic Network
![Page 3: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/3.jpg)
![Page 4: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/4.jpg)
Initiate CD
• Obtain Management System and Stakeholder input
• Update PRS• Update with all available information. PM responsible to
update regularly.
• Tier Assignment• If traffic signal project, tier is assigned to proposed
corridor based off the COAST-NJ study.
![Page 5: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/5.jpg)
Data Collection & Analysis
• Perform Environmental screening
• Gather information needed such as As-builts, ROW information
• Field visit to verify and evaluate existing conditions
• TSM CD Checklist
• Identify existing utilities
• ITS Site location flexibility
![Page 6: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/6.jpg)
Alternatives Analysis & CD Report
• Develop Alternatives• The alternatives should provide cost effective quality
solutions.
• Preliminary Preferred Alternative (PPA) is chosen.
• Designer develops a preliminary location plan based off the chosen PPA.
• OIT/IT Coordination
• Systems Engineering Review Form (SERF)
• CD Report
![Page 7: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/7.jpg)
Obtain Approvals
• FHWA reviews the CD Report for all federally funded projects.
• Project Manger presents the PPA to Capital Program Screening Committee (CPSC).
• CPC approves advancement of project to Final Design.
• Designer updates the report indicating CPC approval, CD Report is Finalized.
![Page 8: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/8.jpg)
Final Design
• Conduct Surveys
• Conduct Gap Assessment
• Utility Engineering• Subsurface Utility Engineering
• Agreements
![Page 9: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/9.jpg)
Traffic Signal Optimization
• COAST – Ranking
• Concept Development
• Data Collection
• Modeling
• Optimization
• Final Implementation / Design & Construction
• Studies and Performance Measures
![Page 10: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/10.jpg)
Systems Engineering
• Systems Engineering Review Forms
![Page 11: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/11.jpg)
Design
• ITS Facilities Layout Plan
• Confirm Service Provision
• HUB/TOC As Built Confirmation with ITS Maintenance
• Coordination with OIT • System Architectural Review (SAR)
• Review and Update ITS Architecture
• Network Diagram
![Page 12: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/12.jpg)
![Page 13: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/13.jpg)
![Page 14: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/14.jpg)
Submission
• Interim Submission
• Final Design Submission
• FHWA Submission (for PODI projects)
• PS&E Submission
![Page 15: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/15.jpg)
Construction
• Software Integration
• Device Testing
• Burn in Period
• Virtual and Physical Servers
![Page 16: Transportation Systems Management Engineering Design …...•TSM Procedure Manual •Projects •Traffic Signal •Adaptive •Signal Optimization •ITS •Camera Surveillance Systems](https://reader034.vdocuments.us/reader034/viewer/2022042807/5f82414558ede045d8227083/html5/thumbnails/16.jpg)
Links
Mobility & Systems Engineering http://www.state.nj.us/transportation/eng/elec/ITS/
TSM Procedures Manualhttp://www.state.nj.us/transportation/eng/elec/ITS/design.sht
m
TSM Limited Scope Processhttp://www.state.nj.us/transportation/eng/elec/ITS/tsmproces
s.shtm
FHWA Systems Engineering https://ops.fhwa.dot.gov/publications/seitsguide/section3.htm