Transportation Conformity
inNorth Carolina
![Page 2: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/2.jpg)
Transportation Planning FrameworkTransportation Planning Framework
Required by NCGS §136‑66.2. In MPOs, includes 20 year fiscally constrained LRTP and any additional projects (illustrative or vision) required to address transportation deficiencies
Developed by MPOs and submitted to FHWA, includes fiscal constraint. Transportation conformity is demonstrated on the LRTP
20-30 Year20-30 YearComprehensiveComprehensive
Transportation PlanTransportation Plan
20-Year MPO20-Year MPOLong Range Long Range
Transportation PlanTransportation Plan
10-Year Program10-Year Program& Resource Plan & Resource Plan
(5 Year Plan & STIP)(5 Year Plan & STIP)
4-Year4-YearSTIP/TIPSTIP/TIP
Approved by FedsApproved by Feds FHWA Approval of STIP (including MPO TIPs) and conformity determinations for non-attainment areas
NCDOT Adoption, including all projects, programs and services (and full STIP)
![Page 3: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/3.jpg)
The Clean Air Act (CAA)The Clean Air Act (CAA)
• Sets the framework and goals for improving air quality to protect public health
• Sets provisions for the attainment and maintenance of National Ambient Air Quality Standards (NAAQS)
• In North Carolina, the pollutants of concern are Ozone (O3),
carbon monoxide (CO) and particulate matter (PM2.5)
• Ensures that the State Implementation Plan (SIP) meets goals to protect human health, coordinates transportation and air quality planning processes and improves data and planning assumptions
![Page 4: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/4.jpg)
Conformity Basics
![Page 5: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/5.jpg)
What is What is TransportationTransportation Conformity? Conformity?
• A process that ensures that Federal funding and approval goes to transportation projects that are consistent with air quality goals
• It applies in areas where transportation-related pollutants:• Are currently violating the NAAQS• Have violated the NAAQS in the past
• It’s a way to meet CAA requirements and ensure that transportation plans, programs and projects do not:• Create new violations of the NAAQS• Increase the frequency or severity of NAAQS violations• Delay timely attainment of the NAAQS
![Page 6: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/6.jpg)
Transportation Conformity…Transportation Conformity…
• Connects air quality and transportation planning
SIP
TransportationPlan
&TIPCONFORMITY
![Page 7: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/7.jpg)
Transportation Conformity…Transportation Conformity…
• Applies to • Long Range Transportation Plans (LRTPs)
• Transportation Improvement Programs (TIPs)
• Projects funded by Federal Highway Administration (FHWA) or Federal Transit Administration (FTA) in nonattainment or maintenance areas
![Page 8: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/8.jpg)
Conformity Determination FrequencyConformity Determination Frequency
• For existing nonattainment or maintenance areas:• Every four years • Whenever an LRTP or TIP is updated
• For newly designated areas:• Within one year after the effective date of designation
![Page 9: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/9.jpg)
Who Makes a Conformity Determination?Who Makes a Conformity Determination?
• Metropolitan Planning Organizations (MPOs) • In metropolitan areas
• North Carolina Department of Transportation (NCDOT)• Areas outside of MPOs called Donut Areas
• Federal Highway Administration – Eastern Federal Lands Highway Division• Federal Lands such as the Great Smoky Mountains National
Park
![Page 10: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/10.jpg)
Who Else is Involved in the Conformity Who Else is Involved in the Conformity Process?Process?
• Interagency consultation process involves many groups:
• Environmental Protection Agency (EPA)• Federal Highway Administration (FHWA)• Federal Transit Administration (FTA)• NC Department of Transportation (NCDOT)• Metropolitan Planning Organizations (MPOs)• Rural Planning Organizations (RPOs)• NC Division of Air Quality (NCDAQ)• Other Local Transportation or Air Quality Agencies
![Page 11: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/11.jpg)
How is conformity determined?How is conformity determined?
• Regional emissions analysis • Performed to show that the transportation
plans/TIPs are consistent with the SIP motor vehicle emissions budgets
• Must include all regionally significant projects and Federally-funded projects
![Page 12: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/12.jpg)
How is conformity determined?How is conformity determined?
• Regionally significant projects • Transportation projects that serve regional transportation needs
• Major activity centers• Major planned developments• New retail malls• Sports complexes• Transportation terminals• Principal arterials• All fixed guide way transit facilities
• The MPO/RPO/NCDOT determines what projects are regionally significant
• The interagency consultation partners review the list and negotiate agreement on list of regionally significant projects
![Page 13: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/13.jpg)
What if conformity determination cannot What if conformity determination cannot be made?be made?• The use of Federal aid funds is stopped
• Impacts design work, right-of-way acquisition, construction, permitting and approval of environmental documents
![Page 14: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/14.jpg)
What initiates the need for a conformity What initiates the need for a conformity determination?determination?• Designation of a new non-attainment area
• Must be made within one year after designation
• Adoption or amendment of a LRTP
• Adoption or amendment of a local TIP or Statewide Transportation Improvement Program (STIP)
• Modification to the SIP
• End of the four-year required update clock
![Page 15: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/15.jpg)
When Do The Requirements for When Do The Requirements for Transportation Conformity End?Transportation Conformity End?
• After a nonattainment area is redesignated to a maintenance area AND
• maintenance area has successfully performed conformity for a minimum 20 year period
![Page 16: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/16.jpg)
Maintenance Areas in NCMaintenance Areas in NC
• 8-Hour Ozone• Metrolina: Cabarrus, Gaston, Iredell(p), Lincoln, Mecklenburg,
Rowan, Union
• Triangle: Chatham(p), Durham, Franklin, Granville, Johnston, Orange, Person, Wake
• Rocky Mount: Edgecombe and Nash
• Great Smoky Mountain National Park: National Park Boundary of Haywood and Swain
![Page 17: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/17.jpg)
Maintenance Areas in NCMaintenance Areas in NC
• CO• Metrolina: Mecklenburg• Triangle: Durham and Wake• Triad: Forsyth
• PM 2.5• Triad: Guilford and Davidson • Hickory: Catawba
![Page 18: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/18.jpg)
![Page 19: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/19.jpg)
![Page 20: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/20.jpg)
![Page 21: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/21.jpg)
Conformity Process
![Page 22: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/22.jpg)
Long Range Transportation PlanLong Range Transportation Plan
Developed by the MPO (2 to 4 year process)
• Transportation Advisory Committee endorsement of LRTP pending conformity determination
• Conformity work begins at year 3 of this process
![Page 23: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/23.jpg)
Interagency Interagency ConsultationConsultation Meeting Meeting
• Lead by MPO/NCDOT/FHWA
• MPO, RPO, Local AQ Agency, NCDOT, NCDAQ, FHWA, EPA, FTA
• Consensus Plan documents conformity parameters
• LRTP horizon years, conformity analysis years, Motor Vehicle Emission Budgets, mobile model, Travel Demand Model, non-modeled area analysis, etc.
• Conformity schedule
![Page 24: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/24.jpg)
Transportation ModelingTransportation Modeling
• Model run by MPO and/or NCDOT
• 70 Days• Travel Demand Model (TDM)• Extract Vehicle Miles Traveled (VMT) and Speeds
• Used to develop emission factors
![Page 25: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/25.jpg)
Emission Factor DevelopmentEmission Factor Development
• Mobile Model Run by NCDAQ • 15 Days
![Page 26: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/26.jpg)
Draft Conformity Determination Draft Conformity Determination Report (CDR)Report (CDR)
• Report is drafted by MPO and NCDOT• Report Generation takes approx. 10 Days
![Page 27: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/27.jpg)
Review and Comment of Draft Review and Comment of Draft CDRCDR
• NCDAQ Reviews the report
• 21 Days
• Mandated by State Law• Document is also reviewed by EPA, FHWA, FTA,
Local Air Quality Agency, RPO and NCDOT• Major conformity issues addressed/resolved
![Page 28: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/28.jpg)
Final Conformity Determination Final Conformity Determination ReportReport
• Interagency Consultation Meeting between FHWA, NCDOT, and MPO
• Discuss review comments and agency responses• Issue resolution
• “Clean” review letter provided by NCDAQ • Final CDR is written by MPO and NCDOT
• Adds about 5 Days to the schedule
![Page 29: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/29.jpg)
Final CDR Public Review and Final CDR Public Review and Comment PeriodComment Period
• Hosted by MPO and RPO• 30 Day Minimum
• Address comments and document responses
• Interagency Consultation Meeting (if necessary) (MPO/NCDOT/FHWA)
• MPO TAC makes conformity determination and adopts LRTP/TIP (MPO/NCDOT)
![Page 30: Transportation Conformity in North Carolina](https://reader036.vdocuments.us/reader036/viewer/2022070410/56814654550346895db369eb/html5/thumbnails/30.jpg)
Federal Review of Final CDR and Federal Review of Final CDR and LRTPLRTP
• Reviewed by FHWA, EPA, and FTA• 30 Days• “Clean” Review Letter (EPA)• USDOT Conformity Determination
(FTA/FHWA)
• Process Complete• 9 to 12 months