1

Transport vs. Transmission:

Comparative Hybrid LCA

Joule BergersonCEIC SeminarTuesday March 11th 2003

Page 2: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

2

OverviewPolicy Problem: Should energy be transported

from the source to the demand as fuel or electricity?

¨ Importance of Research¨ Method¨ Economic Results¨ Environmental Results¨ Implications of Research

Page 3: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

3

US Electricity Breakdown (% based on generation)

Coal52%

Nuclear20%

Gas16%

Hydro7%

Oil3%

Other2%

US DOE 2001

Page 4: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

4

US Coal Supply

Page 5: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

5

Page 6: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

6

Life Cycle of Coal-Fired Electricity

Page 7: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

7

Input Requirements for Model

n Coal type (heating value, sulfur content, cost)

n Existing Rail?n Existing Transmission?n Distancen Terrainn Grade Crossings

Page 8: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

8

Structure of Analysis

1. Build base cases2. Verify assumptions3. Identify and estimate all costs for each case4. Categorize costs in eiolca sectors5. Estimate environmental emissions (eiolca)6. Supplement emissions estimates with specific

data for sensitive parameters

Page 9: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

9

Price of Coal • Mine mouth $5 / ton• Texas $23 / ton

• 350 million tons of coal from WY / year• 30% of US coal production in Powder River Basin

• 30,000 unit trains per year

http://nasc.uwyo.edu/coal/WyomingCoal/customers.asp

Page 10: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

10

Base Case Assumptions¨ Power Plants identical (SUPC – 40% efficiency, 75%

capacity factor) ¨ 1000 MW (transmission -more for 14% losses)¨ Approximately 1000 miles from PRB to TX¨ No siting difficulties ¨ Capital

n Rail – minimal new track capacity, new trainsn Transmission – new HVDC lines, substationsn Amortized over life of investment

(cost of capital 8%)

Page 11: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

11

Base Case Economic Results

0

20

40

60

80

100

120

140

Capital O&M Fuel/Coal Externalities Total

An

nu

al C

ost

($m

illio

n)

Rail Transmission

Page 12: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

12

Scenario: New Rail Construction

0

50

100

150

200

250

0 5 10 15 20

Percent of System Requiring New Rail (%)

An

nu

al C

ost

($ m

illio

n)

Page 13: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

13

Scenario: Grade Crossings

50

70

90

110

130

150

170

190

210

0 5 10 15 20

Percent of Grade Crossings Requiring Upgrade (%)

An

nu

al C

ost

($ m

illio

n)

Page 14: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

14

Scenario Analysis - Other

as little as $5/ton$0 Carbon Tax

600 - 700 miles1000 milesDistance

3-4%8%Cost of Capital

$6-7/gallon$0.9/gallonFuel Price

Break Even Value Base CaseScenario

Page 15: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

15

Size of Project

0

1000

2000

3000

4000

5000

6.6 9.6 19 120 230

Delivered Power (million MWh)

Ann

ual C

ost (

$ m

illio

n)

Rail Transmission

Page 16: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

16

Environmental Emissions (30 years)

0

10

20

30

40

50

60

70

80

SO2 CO NO2 VOC PM10 GWP(millions

MT CO2e)

Thou

sand

sE

mis

sio

ns

MT

Rail Transmission

Page 17: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

17

Environmental Externalities (Social cost calculated for each emission)

0

50

100

150

200

Base Case Low Social CostEstimates

Mean Social CostEstimates

High Social CostEstimates

To

tal A

nn

ual

Co

st ($

mill

ion

)

Rail Transmission

Page 18: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

18

Annual Energy ComparisonCO2

Coal - Base

(million tons)

Diesel (million gallons)

Coal (BTU)

Diesel (BTU) Total BTU

(million tons)

Rail 3.3 9.2 5.60E+13 1.30E+12 5.80E+13 8.7 84

Transmission 3.9 - 6.70E+13 - 6.70E+13 9.7 20

Rail - 9.2 - 1.30E+12 1.30E+12 0.4 8.3

Transmission 0.61 - 1.00E+13 - 1.00E+13 1.3 3.1

Fuel$

millions spent on fuel

Energy

Total Power Plant + Transport/TransmitJust energy to transport /transmit

Page 19: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

19

0

10

20

30

40

50

60

70

80

SO2 CO NO2 VOC PM10 GWP (millionsMT CO2e)

Thousa

nds

Em

issi

on

s M

T

Rail Transmission

Environmental Emissions – 7% Losses

Page 20: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

20

Other Considerations

n Coal to Methane or Hydrogenn Coal Slurry Pipelinen AC Transmissionn High Temperature Superconductorsn Barge

Page 21: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

21

Conclusions

n From the current case there is no economic/environmental gain in switching to minemouth generation¨ Some scenarios change this result

n Cost and environmental emissions from existing system are significant¨ Other methods of transporting energy should be

investigated

n Contribution is made from developing a method to compare alternative transport/transmission scenarios in terms of economic and environmental impact

Page 22: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

22

Policy Implicationsn New rail and transmission being consideredn Building new generation¨ Existing rail¨ Distance¨ Environmental Emissions

n Reliabilityn Watern Equity

Page 23: Transport vs. Transmission - CMU · 2021. 4. 7. · Joule Bergerson CEICseminar03110302.ppt Author: Jay Apt Created Date: 6/18/2003 9:35:43 AM

23

Questions…