Transport Provisioning FIFA 2010. Positioning of Services for FIFA 2010 for PGWC. and COCT. Initiation of process. November 2009 (previous processes stalled) Motivated by WCPTC (Santaco) Creation of the Transport Consortium (pd operators) Well received by PGWC - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Transport Provisioning FIFA 2010

Transport ProvisioningFIFA 2010

Page 2: Transport Provisioning FIFA 2010

Positioning of Services for

FIFA 2010for

PGWCand

COCT

Page 3: Transport Provisioning FIFA 2010

Initiation of process

• November 2009 (previous processes stalled)– Motivated by WCPTC (Santaco)• Creation of the Transport Consortium (pd operators)

– Well received by PGWC• Recognition of potential transport issues for FIFA 2010• Lack of budget

– Much less so by CoCT, discussions masked by• IRT issues• A lack of consultative processes• A lack of transparency

Page 4: Transport Provisioning FIFA 2010

Transport Consortium

• Minibus taxi industry– Santaco (WCPTC)

• Metered taxi industry– WCMTC– Touchdown

• PD independent bus operators– Masephatisane– others

Page 5: Transport Provisioning FIFA 2010

Positioning of Services for

FIFA 2010for

PGWC

Page 6: Transport Provisioning FIFA 2010

Outline Approach

• Fleet Capability and Capacity• Determination of requirements to deliver to

agreed service levels• Establishment Costs and Support

Requirements from PGWC (and CoCT)• Business Plans and Modelling • Plans and Actions

Page 7: Transport Provisioning FIFA 2010

The legacy

• There could have been a considerable legacy left post event with the central control room environment, along with the technology, which can be leveraged to provide logistical support for any future event transport requirements, whilst also fulfilling a need for the metered taxi industry for such directed services. The on vehicle tracking devices could be redeployed to any modes of transport (GABS contract) that may require monitoring re usage, kilometres covered etc.

Page 8: Transport Provisioning FIFA 2010

Availability• Metered Taxis and Mini bus taxis – for charter or

contract for short/medium/long-haul – The availability of vehicles and drivers is good – subject to

contract – Training will be pivotal– Considerations must address a turn key service to the

Western Cape both in the short term to meet 2010 requirements, as well as utilisation in longer term IRT/other transport programmes

• Long and short haul buses, coaches and luxury vehicles (25, 44 and 60 seat capacity)

• Some (new) vehicles could be made available (in SA) given the right financial terms

Page 9: Transport Provisioning FIFA 2010

Capacity available across Province • Buses 400• Minibuses 3000• Metered taxis 500(Dedicated transport available) • Other vehicles available during off peak 10.00 till 15.00

hours for PVA activities• Full fleet availability post 19.00 hours until

commencement of morning commuter activities around 05.00 hours, roughly double the above figures

Page 10: Transport Provisioning FIFA 2010

Capacity is dependent on various (constraints):

• the vehicle is fit for purpose • will it be licensed in time

• Assumptions based on following:• All buses from 25 + seats – current valid operating licence

and roadworthy• Minibus and other taxis – less than 3 years old; current

valid operating licence and roadworthy

Capacity exists to deliver services between George and Eastern Cape – but this will require further discussion and positioning with the local area service providers

Page 11: Transport Provisioning FIFA 2010

Service offering - Scheduled

– Inter City buses (luxury; semi luxury)• Medium; long journeys

– Regional • bus - Short to medium journeys• Mini-bus taxis/sprinters etc - short to medium journeys

– Park and Ride support• bus - Short to medium journeys• Mini-bus taxis/sprinters etc - short to medium journeys

– Local• Sedan metered taxis• Mini-bus taxis

– Charters

Page 12: Transport Provisioning FIFA 2010

Service offering – Non-Scheduled– Regional

• Mini-bus taxis • Buses (depends on cost of contingency)

– Local• Sedan metered taxis• Supported by (Mini-bus taxis)

– Park and Ride• bus - (depends on cost of contingency and if Fan Jols are to be for

every game or Bafana only?)• Mini-bus taxis/sprinters etc - short to medium journeys

– Able to supply various technology support including• Ticketing systems• Booking, scheduling, fare management, payment, on-board systems• Control room and call centre technology

Page 13: Transport Provisioning FIFA 2010

Requirements to deliver to agreed service levels

The consortium will need to work with PGWC (and COCT) to plan the• Operational establishment• Operator Licensing and potential constraints imposed• Operation of the fleet (funding of technology is a fundamental

requirement)– Vehicle scheduling; Driver scheduling; Vehicle/driver dispatch; vehicle

automated monitoring; driver communications– Vehicle maintenance– Vehicle signage– Vehicle and driver accreditation– Driver villages or temporary accommodations

• Fleet branding, corporate signage, livery etc• Training

Page 14: Transport Provisioning FIFA 2010

Requirements to deliver to agreed service levels

• Planned facilities (hubs; depots; Park and Rides; temporary operations; cash handling; administration etc)

• Other Human Resources (marshals; CRM; ticket sales; coordinators)• Maintenance and support of the fleet and fleet related services• Bulk fuel, parts, tyres etc supply services• Technology support, integrations to existing systems etc• Communications• Marketing; fare structures; pre-booking (national/international);

on-demand • Transport Serving Concept and Legacy to be acceptable to all

stakeholders– Business model– Profit share– Future opportunities

Page 15: Transport Provisioning FIFA 2010

In order to establishment

• Consortium performed various financial modelling processes to establish the minimum criteria for a feasible service that delivers an acceptable level of profit share for members to distribute.

• In any event the business urgently required bridging finance to enable it to participate.

• The following funding was required to support the establishment• Split into two key categories;

– capital costs to establish the appropriate infrastructure centrally, on-vehicles and at key points of presence within each region

– operating costs to cover pre event establishment costs and expense, to allow for planning, preparation, complete set-up and training etc.

• The breakdown and monthly requirements associated with these costs are available in detail but to summarise;

Page 16: Transport Provisioning FIFA 2010

Establishment Cost R

• a) central operational and control room environment 7,100,000• b) on vehicle technology to facilitate monitoring 9,000,000• c) Points of presence technology (for ticket issuance) 825,000• d) Contingency costs 4,000,000• Total capital costs 20,925,000

Pre event operating costs (key costs) R• a) salaries (key expense relates to R3,600,000 for POP)5,088,000• b) training 3,000,000Total pre event operating costs 10,892,822

Total 31,817,822(early Feb)

Page 17: Transport Provisioning FIFA 2010

Obstacles to progress were• PGWC perspective– Who/what are you?– Who do you represent?– funding • None available• If available then tender processes need to be followed

• Consortium perspective– Funding could be available (mixed signals from

various levels, hence revised budget)– Lack of information and responsiveness

Page 18: Transport Provisioning FIFA 2010

Revised Establishment Cost R

• a) central operational and control room environment 7,100,000• b) on vehicle technology to facilitate monitoring nil• c) Points of presence technology (for ticket issuance) 1,000,000• d) Contingency costs nil• Total capital costs 8,100,000

Pre event operating costs (key costs) R• a) salaries (key expense relates to R3,600,000 for POP) 4,000,000• b) training 3,000,000Total pre event operating costs 7,000,000

Total 15,100,000(mid March)

Page 19: Transport Provisioning FIFA 2010

Business Plan and modelling

• The Consortium must be in the position to manage and control it’s service offering – the business model has to be structured to ensure commitment to service offering:

• Guarantee value to operator individual and organisation• Market related revenue derived through participation in

service (contract - daily rate)• Bonus through profit share (NB. Profit in proportion to

delivery and sufficient to share across organisation including non-participants)

• Be in a position to exclude and discipline any operator/s who attempt to take selective advantage of the offering

Page 20: Transport Provisioning FIFA 2010

Important precursors

• The offering needs to be looked at with a view to sustainability after the World Cup

• Up to what point are the assumptions (numbers) no/low risk.

• After which as the service / contingencies are added then the contract must be underwritten. How?

Page 21: Transport Provisioning FIFA 2010

Risks

• NLTA• DRM and SAPS requirements etc• Impact of IRT pricing (airports etc)• Industry disruption – non-involvement• Turf wars

Page 22: Transport Provisioning FIFA 2010

Following is critical

• Collect fares – minimise/no cash• Control pricing • Administer payments• Enforce standards in SLA’s

Page 23: Transport Provisioning FIFA 2010

Technology and Infrastructure– Control room

• Inbound and outbound call centre• Fleet management

– Vehicle hubs (contingency fleet, maintenance and support)– Booking Engine

• Web based• Via agents• Direct to public• To call centre

– Scheduling Engine• On board GPS and communications• Central database at control room• Access for call centre• Access for public

Page 24: Transport Provisioning FIFA 2010

Technology and Infrastructure– Payment Engine– Website and other integrated marketing tools

• Service promotion (schedules; signage; pricing; non schedule)

• Promote 087 Call centre• Information

– Via call centre– Printed and distributed

» At arrivals» At hubs

– Integrations to other resources (Call Centres; websites; booking engines etc)

Page 25: Transport Provisioning FIFA 2010

Now what is the industry left with?

• Nothing at present–Plenty of discussion–But no formal

contract/arrangement

Page 26: Transport Provisioning FIFA 2010

Positioning of Services for

FIFA 2010for

CoCT

Page 27: Transport Provisioning FIFA 2010

Initial involvement

• Unsolicited approach from Consortium (November 2009) when funding challenges occurred around IRT, these were to supply– The shortfall of buses• New vehicles (fit for purpose) • Short term nearly new vehicles to support 2010

requirements

– Fully funded

• To operate the IRT routes– By empowering affected operators

Page 28: Transport Provisioning FIFA 2010

Process of engagement

• Initial meeting with Mayor• Thereafter pedestrian progress being stalled

and obstructed• Lack of information• Lack of clarity around policy• Lack of transparency• Inaccurate minutes (non-distribution of notes)• Being paid lip service

Page 29: Transport Provisioning FIFA 2010

Next stage

• Vehicle contracts awarded– Still insufficient vehicles to do the job

• No information around operating contracts– Company A emerges but information confidential

• Now let’s talk about FIFA 2010– What could we do for the City?– Or more to the fact ……what will we be allowed to

participate in?

Page 30: Transport Provisioning FIFA 2010

What the industry wanted to participate in

• All operating contracts– Inner City– Part of West Coast route– Stadium shuttle– Airport shuttle

• All other services– Park n Ride– Fan Fest– PVA’s

Page 31: Transport Provisioning FIFA 2010

Implications of the NLTA – interpretation and application

• Contracts can be issued without tender• Lack of clarity around – What is an affected operator

– participation in contracts• Disenfranchises PD operators

Page 32: Transport Provisioning FIFA 2010

CoCT contract/s awarded• Without tender to Trans Peninsula (PTA/CUTA)• Without transparency• Includes

– Inner City (partially affecting PTA and CUTA)– Stadium shuttle (new route not any affected party)– Airport shuttle (existing route operated by metered taxis

but not seen as affected operators)– UCT Park n Ride (not part of PTA/CUTA)– Hout Bay route (??)

• To single company that has changed its shareholding and participation structure since initial discussions

Page 33: Transport Provisioning FIFA 2010

Now - what is the industry left with?

• Specific services– PVA’s– The last mileIn other words the crumbs

• Where should the industry have been involved– Across the board

• 2010 specific contracts• Airport shuttle• UCT Park and Ride• Etc.

Page 34: Transport Provisioning FIFA 2010

Capacity available

• Minibus taxis 200 (during day)1,500 (after hours)

• Metered taxis on call• Buses ??

To/from Stadium/Fan Fest• 19,000 inbound• 85,000 outbound

Page 35: Transport Provisioning FIFA 2010

CoCT Establishment Cost R

• a) central operational and control room environment 2,000,000• b) on vehicle technology to facilitate monitoring nil• c) Points of presence technology (for ticket issuance) 1,000,000• d) Contingency costs nil• Total capital costs 3,000,000

Pre event operating costs (key costs) R• a) operational costs (incl salaries) 2,500,000• b) training 1,000,000Total pre event operating costs 3,500,000

Total 6,500,000

Page 36: Transport Provisioning FIFA 2010

Public Viewing Areas

expected• Fan Fest Park 50,000• Khayelitsha 7,500• Mitchells Plain 2,000• Bellville 8,000• Athlone 2,500 (replaced)• Vygieskraal 8,000

Page 37: Transport Provisioning FIFA 2010

Fare structures and contracts

• Last mile service– What can be charged?– No contractual commitment?– Is it really worth it?

• The Silverware has been sold without fair and competitive tender processes

• Who should profit? (a few? Or all?)

Page 38: Transport Provisioning FIFA 2010

Now what is the industry left with?

• Nothing presently– Plenty of discussion•Working group to sit within 7 days on PVA/last mile services

– with 48 days to go!!!!

Page 39: Transport Provisioning FIFA 2010

So in total……. how is the industry (in its broadest

sense) participating in FIFA 2010

Not a lot…….but not for the want of trying…..

Page 40: Transport Provisioning FIFA 2010

•Thank you•Questions please

Page 41: Transport Provisioning FIFA 2010
Page 42: Transport Provisioning FIFA 2010

Possible MB Taxi incomes

• Assuming last mile fares at R5 per trip– Pre match R225 per vehicle per hr

(3 trips per hr)

– Post match R75 per vehicle per hr (1 trip per hr)

• Assuming Stadium/Fan Fest Fares at R15– Pre match R450 per vehicle per hr

(2 trips per hr)

– Post match R225 per vehicle per hr (1 trip per hr)

Page 43: Transport Provisioning FIFA 2010

ACTION PLAN

• Signature to a Letter of Intent with PGWC based on commercial plans will enable us to go on a road-show to present joint plans and benefits in detail to regions and various associations and sign-off on their mandate

• Discussion and Approval of Budgets; payment – minimum within 7 working days

• Contract development– Establish a joint Task team– The Task team initiates a process and assigns resources to assess and

deliver a turnkey Management & Operation Solution that synchronises with existing plans and commitments

– Develop and implement the Solution – commence within next 14 days– Continue with (an ongoing) feasibility study to deliver long-term

contracts and identify business opportunities