DATE: PLACE: TIME: PRESENT: JEFFERSON PROVING GROUND RESTORATION ADVISORY BOARD January 7, 1997 Salvation Army Headquarters 331 East Main Street Madison, IN 47250 7:00 P.M. Mr. Paul Cloud, Co-Chairperson Mr. Richard Hill, Co-Chairperson Audience Members Sharon Shields, Court Reporter s.rts. SHARON SHIELDS, REPORTER 3650 N. Old SR 62 MADISON, INDIANA 47250 (812) 265-2994

Upload: others

Post on 04-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

DATE:

PLACE:

TIME:

PRESENT:

JEFFERSON PROVING GROUND RESTORATION ADVISORY BOARD

January 7, 1997

Salvation Army Headquarters 331 East Main Street Madison, IN 47250

7:00 P.M.

Mr. Paul Cloud, Co-Chairperson Mr. Richard Hill, Co-Chairperson Audience Members Sharon Shields, Court Reporter

s.rts. ~ s{!/t~ SHARON SHIELDS, REPORTER

3650 N. Old SR 62 MADISON, INDIANA 47250

(812) 265-2994

Page 2: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

A public hearing of The Jefferson Proving

Ground Restoration Advisory Board meeting was held in The

Salvation Army Headquarters, 331 East Main Street,

Madison. IN at 7:00P.M. on January 7. 1997.

OPENING STATEMENTS BY MR. PAUL CLOUD:

Okay. Good evening. Let's get

started. I'd like to welcome everyone to the Jefferson

Prcv1ng Ground Restoration Advisory Board meeting. This

1s our first meeting in 1997. I don't have much in the

way of introductory remarks. I hope everyone had a n1ce

Christmas and a Happy New Year. Without further ado I

w1ll turn 1t over to Richard and let him w~lcome you and

we can get on with the agenda.

OPENING REMARKS BY MR. RICHARD HILL:

0kay thanks Paul. I wculd. like to

welcome everybody here ton1ght and I de want to

apolcg1=e. We had an overhead proJector but the l1ght

burned out so we won't be able to use that thls evening.

I think maybe the handouts will suffice though. And we

have several presentations ~hat we are going to have

tor.:.ight th1nk it be best if we JUSt go ahead and get

:.Jl th :na:.

- / -

·-------------···-- -

Page 3: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

MR. PAUL CLOUD:

I'm up first. A couple of things I

would like to insure is that you did sign in on the

attendance sheet so tha~ we have your name and address on

our ma1ling l1st. And we can keep you advised as to

future meet1ngs and information as perta1ns to the

Jefferson Proving Ground clean up. What I would

~alk cf Richard'~ statement of trouble with the

l .. .lKe to

projecto~. is the leasing and the transfer of the various

parcels of properties in a cantonment area at Jefferson

Proving Ground. I hope that everyone picked up a copy of

the handout there. The first few items are basically

historical information from the units, the documents that

we have in fact initiated and have signed. The first one

- again they just go in chronological order, first to

text and so on, was the pump station for the pump station

here downtown. As soon as we had a- I believe it's a

legal description of the property with the rights of way

for the pipeline that formal transfer should be complete.

The actual FOST, find~ng of su1tab~l1ty to transfer,

which is an envi~onmental document has been signed and it

was signed in February of last year. And the other paper

work 1s at the Corps of Engineers real estate office in

~ouisv~ile. The nex~ 1tern is the finding of su1tabi!ity

J -

Page 4: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Not only has that FOST been signed out the actual

transfer of the deed has been accomplished. It was

finalized on the 18th of November. Ms. Cathy Hale is now

the proud owner as she represents the Madison Port

AuthorltY of o~ilding 2l6 and the ra1lroad trackage on

the Proving Ground. The next item we have is the FOSL,

finding the suitability to lease for the cantonment area.

This was thirty-four (34) - approximately thirty-four

hundred (3400) acres in the cantonment area that went

through the property screening process and also went

through the invitation to b1d process. Mr. Ford of Ford

Lumber and Bu1lding Supply Company. was the successful

bidder on that in December of 1995. His high bid of five

point one ($5.1) million dollars was the h1gh bid on

that. We dld s1gn a FOSL with the follow on lease of

furtheran~e of conveyance. Last year the F0SL was Slgned

May lst. The lease was signed about two (2) weeks later.

Mr. Ford lS currently in th~ process of slowly sublett~ng

out some of the bulldings to some of the businesses here

1n town and we are star~1ng co see some econom1c ce-use

of the various fac1lities at the ?rov1ng Ground now. The

next document we had was later on last year just before

Thanksgiving and I'm sure you saw a number of articles in

the paper about the park parcel. That document was

Slgned c& the 5th of November and :~ currently is at the

·--- ---- --------·- -

Page 5: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Corps of Engineers real estate office in Louisville also.

The next step in there will be to have a deed or transfer

document prepared. The Corps of Engineers is going to

meet with the County Commissioners to work out the

details on some of the specifics in that document. And

then they will be signing the deed sometime later this

year. It's not clear yet exactly what date we have for

that. The last one (1) is approximately a forty (40)

acre parcel that is for lack of a better description

bounded by Paper Mill and Woodfield Road in the Proving

Ground in the cantonment area. Mr. Ford has asked us to

transfer that to him. It contains six (6) buildings and

about forty (40) acres. And so we are in the process of

getting that document ready to be put out for review.

It's expected right now that either January or sometime

early February we will get that out for a thirty (30) day

review. That will come to all the RAB members. We will

have some copies at the Proving Ground if anyone would

like to come in and get a copy of it and take a look at

it and provide us any feedback on that. After that

thirty (30) day review we will look at resolutlon and

incorporation of any comments, put it back out for about

two (2) weeks for identification of what we call

outstanding issues, issues that cannot be incorporated

into the document for whatever reason. And that would be

Page 6: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

attached to the document and it would go up and be

reviewed by the person that has the authority to sign it.

In this case this document would be signed by

headquarters that is above my headquarters which would be

the Army Material Company in Alexandria. Right now we

expect that that document will probably be signed

7 sometime mid March. And then it would go to real estate

8 division in the Corps at Louisville again and they would

9 prepare the transfer documents to Mr. Ford. That is our

10 current schedule on that. Mike?

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

MR. MIKE EARLY

Paul that is a FOST?

MR. PAUI. CLOUD:

That is a FOST yes. That's for

transfer of that approximate forty (40) acres bounded on

the two (2) sides by Woodfield and Paper Mill Road.

MS. I.AURA HODGES:

Does he have a specific purpose for

that area?

MR. PAUL CLOUD:

I'm told he does but I don't know all

- 6 -

Page 7: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

~ 14

15

16

17

18

19

20

21

22

23

24

25

the details of it yet. Yes sir?

MR. JOHN HOLMES:

Where do these parcels lie in terms

of their relationship to the whole site?

MR. PAUL CLOUD:

The pump station is down - downtown

Madison basically on the river. The building 216 is in

the cantonment area. It's just south of the firing line.

It's in Jefferson--

MR. JOHN HOLMES:

Is it south of the main gate?

MR. PAUL CLOUD:

No it's north of the main gate. But

it's in the cantonment area. It's in Jefferson County.

The cantonment area is all in Jefferson County and it's

south- it's basically everything south of the firing

line. Krueger Lake area which was basically just as you

come in the main gate there was on the left of Woodage

Drive, approximately two hundred and thirty (230) acres

in a rectangular area there. That's in the cantonment

area. And then the Paper Mill and Woodfield Road par~el

- 7

Page 8: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

is if you are familiar with the cantonment area at all -

it's just slightly northeast of where our Site Management

Team is currently located, building 125, which is the old

fire station. Cathy?

MS. CATHY HALE:

The pump station. Could you talk a

little bit more about where that stands? Because the

last time I thought that a little more along.

HR. PAUL CLOUD:

We - we thought it was too. There

was an easement granted to the Army back when that pump

station was originally built back many, many years ago.

MS. CATHY HALE:

Right.

HR. PAUL CLOUD:

By the - I think it was the state but

it had some unique language in it. It said to the Army

only.

MS. CATHY HALE:

Has that been resolved now?

- 8 -

Page 9: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

MR. PAUL CLOUD:

I'm not sure that it has although I

understand that it should be shortly. As soon as it is

then paper work for the actual transfer should - what it

has to do is that when that issue is resolved then the

deed would go through the Army to have the Army sign it.

It would go through the City sponsor which in this case

is Health and Human Services and they would pass the

title to the City. The City similarly to Madison Port

Authority would then be the title nolder. Yes sir?

MR. DON BARNES:

In regards to that easement to the

State Hospital I have - I have provided a letter to the

Corps of Engineers from the State permitting the State in

allowing us an easement through their property when a

route is decided on.

MR. PAUL CLOUD:

Okay.

MR. DON BARNES:

At this point we don't know where the

easement should be because of the Veteran's

Administrat1on cemetery that's being put in there. So

- c. -

------------

Page 10: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

we're going to have to take on a different route. So I

would think that that letter should be sufficient.

MR. PAUL CLOUD:

We will check with the Corps and see

where it stands.

MR. DON BARNES:

Mr. Williamson has a copy of that

letter.

MR. PAUL CLOUD:

Mr. Williamson was back here today

talking with us and we will follow up with him. Mike?

MR. MIKE EARLY:

Will you ask him where we're at in

that?

MR. PAUL CLOUD:

We will check into that and we will

be able to get back with Ken and be able to provide him

with actually where that stands. Any other questions on

where the various leases and transfers with the various

sections of the cantonment area stand? Okay. I would

- 10 -

Page 11: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

~

23

24

25

like to now introduce Ms. Karen Mason-Smith from Region

5 of the EPA in Chicago who will introduce the next two

(2) speakers. Thank you. Karen?

MS. KAREN MASON-SMITH:

Good evening. I'm Karen Mason-Smith

and I'm with the United States Environmental Protection

Agency Region 5 office which is located in Chicago,

Illinois. And I would like to introduce the next two (2)

speakers. One (1) of the speakers is Dr. Mark Johnson.

And Mark is currently a toxicologist in our Superfund

office and he's been with EPA for approximately two and a

half (2 l/2) years. And the next speaker is Ms. Brenda

Jones. And Brenda has been an ecologist ecological risk

assessor for in our Superfund office also. And she's

been with EPA for approximately two (2) years. And

Brenda has about ten (10) years experience with a

consulting firm and Mark has done post doctoral research

at Columbia University. So I would like to present Dr.

Mark Johnson and after him would be Ms. Brenda Jones.

MR. MARK JOHNSON:

Thank you Karen. As Paul mentioned

we don't have an overhead projector so I'm going to have

to try to reconstruct some of these for you. In the

- 11 -

Page 12: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

handout materials I did have an outline though of the

presentation. And so we will try to go through that.

There's also following that a fact sheet that EPA put

together about the methods that we use within EPA to

assess environmental risk. You might find that of value

to you at some point after the meeting today to read

through. The last part of the handout is a glossary of

terms we use in the risk assessment field. And you might

also find this of use value if you're reading any

documents related to JPG, particularly the risk

assessment portion, and you're uncertain about a term you

might want to use it to look that up and to understand

some of the terms that are used. I will try to make sure

that my presentation will minimize some of the technical

terms but I will use some terms that I will try to define

for you. If at any point anything that I've said is

unclear please raise your hand and I will try to verify

that okay? If there's any questions don't hesitate to

interrupt me and I will try to answer those questions as

they tend to come up. Okay. The first portion is to

define what is risk. We can define risk in the very

simple terms of the likelihood of injury, disease or

death. The definition of environment risk is that

injury, death or disease ~hat's related to environmental

contamination. Sc for example in the case of JPG where

- 12 -

Page 13: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

- 2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

it's undergoing a series of environmental investigations,

we're using the information we obtained from the sampling

of both the soil and ground water as a means of

predicting what might be the risk of that exposure to

those contaminated soil and water sources that result

from exposure. And so what we do in risk assessment then

is to attempt to predict what might be that risk. We are

not actually measuring the effects that maybe have

occurred in the past, but rather try to predict with the

information we have available what might be the risk of

any future exposure. Now in the second part I've - I've

itemized the proposed risk assessment process. And there

are four (4) steps that were defined by the actual

Academy of Sciences a number of years ago. And EPA has

adopted them as the peridine that we use for assessing

environmental risk. And the four (4) components listed

there are hazard identification, toxicity assessment,

exposure assessment and risk characterization. We will

go through each one of those in detail so you may

understand some of the basic steps in that assessment

process. So hazard identification is the first step. So

we have this information about contamination that's found

in the field. We assess what is the - the hazard that

may result from that exposure. And the source of

information that we try to extract from that we obtained

- 13 -

Page 14: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

from a number of areas of investigation. EPA maintains a

series of data bases on toxicity information about

specific chemicals. And one (1) of them is called Iris.

I-R-I-S, which stands for integrated risk information

system. This is a public access data base that we

maintain. It contains information about the toxicity of

over six hundred (600) chemicals that we commonly find in

environmental investigations. And we use that as a

resource then to evaluate what are the hazards that would

result from public exposure? We also have another -

other data bases. Another one is called Hiast, H-I-A-S­

T, which is one (1) that's used in Superfund. It's

called Health Index Assessment Summary Tables and that

also is again a data base that is a bit more expansive

than Iris. And information in those data bases is

derived from a number of sources. One (1) is the result

of investigation about human exposure that are usually

the result of investigation of occupational exposures.

For example a couple like Benzene that is commonly found

is an industrial solvent is easy to precursor in the

synthesis of many organic compounds used in a variety of

manufacturing processes. It's also a component of

gas. The information we have of the hazards of Benzene

as a result of occupational studies of industrial workers

have identified the association of leukemia with Benzene

- 14 -

Page 15: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

exposure. Other examples might be - for example

vinyl chloride which is use as a precursor for the

production of poly plastics, PVC pipe. The examples were

evidence of the hazards of.vinyl chloride with the result

of the studies of workers and PVC in the -- industry

showing that the association of certain type of liver

cancer with vinyl chloride exposure. Things like arsenic

or mercury that results in studies of people being

exposed to contaminated food stuffs with arsenic and

mercury. So we use that information as a means of

evaluating what the hazards might be. We also have some

information about some animal studies that we use that

allow us to look at more quantitative aspects of hazard.

For example when we do an animal study we can control the

dose that we give an animal. We have some sense of what

the toxicity level might be. So we can distinguish a

safe level from a toxic level. So a lot of or a portion

of our data bases, Irish and Hiast, contain information

about animal studies. There is also other information

that we use that add more confidence that we have in this

information. There's also studies on how the body deals

with chemicals that we use in work or phonokinetics.

Those examples are where we have information about how

dividing a cow has certain chemicals. That gives us

important information about predicting the toxicity. So

- 15 -

Page 16: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

that's sort of a summary then of the components of the

hazard section. The next section is the toxicity

assessment where we can answer a question how toxic are

the components? How much do we need of a certain

chemical to induce a toxic effect? And here we are

relying on information and we generate what is called a

dose response curve. So dose certainly means the

concentration, the amount of chemical that you would take

in your body. And we're looking at the response.

Response could be death. Response could be liver damage

or kidney failure or some kind of chronic effect of

exposure. We try to find out what's in the relationship

of the dose as we present the dose with the effect. And

oenerally we've seen this type of relationship sort of

curve. Would there be a plateau? Would there be a

maximum response for a very high dose? We would also

have a point where there would be no effect. And a

number of points in between. And for each chemical that

we evaluate we try to construct a dose response curve so

we distinguish what's a safe level from that particular

amount. So we would call this point then the no effect

level. But in many cases we rely on animal data to make

this dose response curve. There's a lot of uncertainty

about trying to predict the results of dose response

curves in animals to actual human exposure. Animals tend

- 16 -

·-----

Page 17: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

to be very genetically similar whereas human populations

are quite varied. There are a lot of differences between

people's sensitivity to chemicals either related to age.

Elderly and children are much more sensitive to effects

of chemicals. There may be genetic difference between -

amongst us which affects the toxicity of chemicals in our

bodies. So we do that to - to bumper ourselves. To make

sure that we're making sure that we can make - make an

accurate assessment of what is safe in humans and provide

safety factors. And we call those uncertainty factors.

Why we did that was to modify this safe no effect level

and we come up with a term called a reference dose.

That's simply defined as the no effect level in humans.

And we derive that again by taking the no effect level we

find in the animal study on safety factors and come up

with safe dose in humans. And so for each chemical in

these data bases we have a reference dose that we

consider to be safe. Can be an exposure to that dose.

Any questions about that concept? Okay. Now there's

another - what I have described for you here is - applies

to chemicals that cause chronic effects or chronic

diseases but not related to cancer. We evaluate cancer

in a very different way. The reason for that is for

chemicals that cause cancer we do not assume any no

effect level. We assume that there is a lower cancer

- 17 -

Page 18: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

.... 2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

risk associated with dropping the dose, but there is not

a level which there is no effect. So in that case our

dose response curve never actually reaches a no effect

level. It is rather a straight line. So for chemicals

that cause cancer we use the term called slope line and

the document that I've handed out to you will describe in

a bit more detail about the - about that concept. The

points raised here is that cancer - there's not

considered a safe level but rather a slope process used

in assessing the risks. Okay. The third component is

the exposure assessment where we try to evaluate who is

being affected, who is being exposed, and by how much.

And there are a number of criteria that we use in

assessing the exposure in individuals that might be

exposed at a site like JPG. We would first look at the

critical criteria that we use. First of all is that

there has to be a source of the contamination either in

the ground or a contaminated chemical that has leaked out

and contaminated the soil or ground water. There has to

be a source of the chemical. The second component in

this area has to be in a media. It has to be in the

soil, the air, water, food stuffs that may result in

contaminated soil. So it has to be a means of spreading

the contamination in a way that we would be exposed to

that. The difference on it is that there has to be a

- 18 -

Page 19: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

point of contact. We have to have some way of coming in

2 contact with the contamination for there to be a risk.

3 Either by touching contaminated soil, by ingesting it or

4 by breathing contaminated air. The call is that there

5 has to be a route, some way, but there has to be a

6 routing, a way for the chemical to get into our bodies.

7 And if any of these components are not present at the

8 site then there really is no risk. There has to be what

9 is called a complete pathway. All these have to be

10 complete in order for us to do this assessment risk. So

11 for example if ground water were to be contaminated, but

12 the ground water is never in use for drinking water, is

13 never brought to the surface, there really is no purpose

14 of evaluating the risk because there's no exposure. So

15 this is the four criteria that we have to fulfill in

16 order for us to view it in a risk assessment. Once we've

17 completed that then we look at the - who is being

18 exposed. And we have a number of different scenarios one

19 might consider. One (1) might be a resident, someone who

20 will be living in the area who will be there virtually

21 the entire year and may be there many, many years. The

22 things we would look at would be the things like the

23 exposure rate how much air we breathe per day, how much

24 soil that we come in contact with in our everyday

25 activities, how much water we drink per day. Those are

- , Q -·-

Page 20: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

great determinations that we use. And we have some -

some statistical studies that give us some information

about the average amount of soil that people come in

contact with during the day, objectivity. Now for

someone who might be involved in industrial activity

work, maybe a maintenance worker, maybe a construction

worker, they might have more intensive kind of contact

with soil. We also have values that we use for

determining exposure rates. Those have to be included.

The second parameter we use is exposure frequency. How

frequently is someone exposed? If someone is living on

the property then we would assume that their exposure

would be for the entire year. So if there is a worker he

might be exposed on an average of two hundred and fifty

(250) days per year or so. If someone was there just for

recreational you would have a different value for

determining that. We want to make sure that we're -

we're appropriately characterizing the frequency of that

exposure for the activity. The third component that is

exposure duration. How long is someone exposed? Is it

thirty (30) years? Is it two (2) years? What is the -

the duration of that exposure? And that is an important

part of our charts. And the final one is the

concentration of the contaminant. Is it something that's

widespread? Is it very localized? What is the average

- 20 -

Page 21: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

concentration of that contamination that someone ought to

be exposed to either in water or in soil? So we factor

all these together to get an exposure estimate for each­

each individual that might.be exposed. The final step

then is - would be risk characterization where we try to

integrate all that information, the hazard in with the

identification information and the toxicity of the

chemical. We estimate the exposure of individuals and we

try to calculate then what is the risk of that exposure?

And we come up with two (2) estimates. One (1) is called

a hazard index which simply is a ratio then of the

exposure that you have relative to the toxicity of the

chemical. If that is greater than one point o (1.0) we

see that as unacceptable. If it's less than one (1) we

consider that to be acceptable risk. That simply then

indicates that if it's above one (1) it means that it's

greater than we would expect to be a safe level. Below

that we would consider it to be safe. And the handout

does include a bit more information about the details of

how the hazard index is calculated.

MR. PAUL CLOUD:

Mark maybe you could explain what

would happen to the number if this particular chemical

came up greater than one (1) exposure? What would be the

- 21 -

Page 22: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

next step then?

MR. HARK JOHNSON:

Okay. The implications of an

assessment which came up with an estimate greater than

one (l) might be a requirement for the- for a clean up.

That includes soil that would need to be removed and

treated. If it was water that may mean that it would

have to be removed from the - no longer be used for

drinking water purposes. Whether it would also institute

perhaps a clean up of the ground water. If it was air

they would require that a containment for that exposure

so that it would no longer be released in the air and not

be available for breathing. So we consider this a

regulatory criteria that we use in screening data in a

risk assessment. And I mentioned that for cancer causing

chemicals we use different criteria. Now for cancer

risks I mentioned that we assume that there is no safe

level of exposure to a cancer causing chemical. But

rather what we have determined as a policy with the EPA

is that a value of one (1) in ten thousand (10,000)

exposed individuals - excuse me. An acceptable risk for

cancer is considered to be no greater than one (1) case

in ten thousand (10,000) exposed individuals. And that's

excess hazard cases. Now for the average population in

- 22 -

·---------

Page 23: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

B

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

the United States one (1) out of three (3) people will

get cancer. So we set a fairly conservative estimate of

1:10,000 cannot be related to this site exposure. We are

being quite conservative in doing that. Okay? You may

also see that term as =10-4. We also have a term that

1:1,000,000 or =10-6 to because that would be a very safe

level. If the risk is that or below we consider that not

to be an issue. It's only above this level (indicating)

that we are concerned about it. If it's between these

two (2) ranges then we consider that to be a management

decision that the BCT would make on whether or not they

were willing to accept that risk. So those are the main

components. What we do in addition to the calculation

for the risk that I've shown you here, we also describe

some of the details of the methods that we use, some of

the assumptions that we use, the assessments, some of the

uncertainties that we have, which there are many. Making

these estimates of risk involve a lot of assumptions and

uncertainties that we disclose in the risk assessment

document. And those are all debatable and things that

are - can be challenged. But we need to disclose what

goes on in the process. Yes please.

AUDIENCE MEMBER:

How many chemicals have you actually

- ~3 -

·-.-. ·---- --·-·- -------------- ---·-------

Page 24: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

established as cancer risks before? You spoke of six

hundred (600) chemicals?

MR. MARK JOHNSON:

Right.

AUDIENCE MEMBER:

We probably create more than six

hundred (600) new chemicals every day that we go forward.

MR. MARK JOHNSON:

You're absolutely ri9ht. And that is

- those brings up an important point. There are probably

in existence maybe over ten million (10,000,000)

chemicals that are - have been used in production, have

been used in synthetic processes. The information that

we have about the toxicity of those is very low in terms

of the percentage of chemicals that we are now

potentially exposed to. Most of those that I've

mentioned in the data bases about a hundred (100) or so

we have values for cancer slope factor. There are many

chemicals that you can be exposed to them but don't have

any way of quantifying the risk. And there is another

uncertainty.

- 24 -

Page 25: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

ri 1

2

3

4

5

6

7

B

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

AUDIENCE MEMBER:

You have your two (2) curves there.

MR. HARK JOHNSON:

Right.

AUDIENCE MEMBER:

The straight line curves. How - how

do they for instance we have an epidemic of asthmatic

individuals in this country probably due to a multitude

of things. But how do you fit a sensitizing material

that would cause something resembling an asthmatic in for

instance the iso-sinades? How do you put that in those

curves?

MR. MARK JOHNSON:

The issue to sensitization may be the

results of multiple chemicals exposure.

AUDIENCE MEMBER:

Or individual - individual chemicals.

MR. MARX JOHNSON:

Okay but there are two (2) aspects of

that. The individual sensitivity is something we

- 25 -

Page 26: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

·- . -----····---· ---

certainly would acknowledge. That's another reason that

we justify the uncertainty, that bumper I mentioned.

That may be people who are particularly sensitive to

certain chemicals for a number of reasons that we need to

include and make sure that we're protecting the more

sensitive individuals. The second part of that, as

sensitization relates, people that miy be exposed to

certain chemicals and sensitizes them to other chemicals.

And that exposure to mixtures is more than you would

predict based on individual exposures. And that is a

severe uncertainty. And I acknowledge the fact that a

doubt in the evaluation of risk. We assume that their

attitude, their participation - maybe they're greater

than that. And that is something that we are more - we

are concerned about and EPA is beginning to fund some

studies to look at the effects of multiple chemical

exposures so we can try and get a handle on it, for an

example gasoline products. You know there are a whole

host of chemicals present in those petroleum products.

So if we assess the risk of each component individually,

we may under estimate the risk of exposure to the entire

mixture. So that's an example for where that may lead up

to. Does that answer your question?

- 26 -

Page 27: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

··-- ·-- .. -- ----

AUDIENCE MEMBER:

You can't answer it. It's not

answerable I'm sure.

MR. MARK JOHNSON:

The other point about iso-sinades.

There are end points that we have not evaluated. Usually

we have a - we try to predict the most sensitive effect

we can identify. But if we don't have quantitative

information about that fact, for example an induction of

asthma, we can't really incorporate that into the

assessment. We all - we are now usin9 the phrase we have

quantitative toxicity information. Any questions about

that? If I had had the projector overhead I would have

gone through a site - or a case study where we applied

information about a site and gone through that to give

you some information about the formulas we used. But I

don't want to confuse you further by trying to reproduce

those on the board. But we do have the handouts we

mentioned. If there's any questions you have on any

point in the future, my phone number and address are on

the handout. Please contact me. The final point I want

to make was the implications of the risk assessment for

making decisions. And I want to make the point that the

risk assessment we do is only one (1) component to making

- 27 -

---------

Page 28: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

decisions. That - the results of the risk assessment has

to be placed into contact with other criteria. For

example the cost of - or economic consideration. There

may be community concerns that affect a final clean up

decision. There are also a host of other factors that

play into that and risk of the- risk is only one (l) of

those components. And we try to be - we consider the

risk assessment process to be a scientific process. We

try to make it as strict as possible with scientific

methods. And that we constantly up date the information

we have available. Okay. Any questions about what I've

covered so far?

HR. JOHN HOLMES:

In relation to this site, what

processes have you gone through in terms of the

assessment, this specific site?

MR. MARK JOHNSON:

Right. It's gone through and Paul

and Karen can speak to this in more detail. But what I

reviewed on the site was a remedial investigation or RI

phase which is certainly the first step in assessing the

site. And we've gone through rounds - two (2) rounds of

sampling information abo~t the number of sites and that's

- 28 -

Page 29: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

•• 2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

been with the inclusions about risk for each of those

sites. But I will refer you to the BCT though in terms

of the conclusions of those for each of the JPG sites. I

just wanted to give you a feel for the basic methods that

we use in assessing this.

MR. JOHN HOLMES:

Taking that a step further I think

you made a comment but you didn't answer my desires here.

The second part is have you found any contamination as a

result of these studies?

MR. MARK JOHNSON:

Well we have found contamination.

There's no question about that. In some cases it's what

we consider to be in acceptable range. In other cases we

find that it falls in a range to where we need to make a

decision. Is there a clean up required? In some cases

that is justified. And in other cases there may be other

options besides the clean up.

MR. JOHN HOLMES:

How do we get a reading on these as

it relates to portions of this project?

- 29 -

Page 30: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

MR. MARK JOHNSON:

That information I think maybe Paul

could touch on.

MR. PAUL CLOUD:

Let me try and answer that to the

7 best of my ability. The cantonment area which is the

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

portion of the Proving Ground that has been made

available for economic redevelopment, the Army's

commitment to the environmental clean up of that portion

of the facility was to a life time re-use similar to when

the Army used the base as an active facility. In other

words we're looking at light, medium industrial with some

agriculture and possibly some residential. We are not

looking for unrestricted re-use clean up criteria where

we could have a complete residential development from

fence line to fence line. ~nd that not only includes the

environmental contaminants like the heavy metals or the

solvents that Dr. Jones (Johnson) was talking about but

that also applies in a similar context to the UXO i~ the

cantonment area. The Army made a commitment several

years aqo from the Secretariat's office that there would

be a clean up of the UXO and cantonment area down to the

four (4) foot below surface level. And we are in

the process of doing that now. Does that answer your

- 30 -

------- '""- -------------·---------------.:..:=....==

Page 31: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

question'?

.MR. JOBH HOLMES:

Not directly but we will let it lie.

MR. PAUL CLOUD:

Well if you have any further

questions I would be glad to discuss them with you.

Again that decision was made sometime ago and part of it

is due to economics. There is only so much money

available. If we cleaned up JPG to unrestricted re-use

- and Congressman Hamilton has been here and talked about

this also - if he were to introduce legislation that were

to provide money for JPG, either the cantonment area or

the whole facility for unrestricted re-use for all

contaminants down to bedrock basically which in some

places could be twenty (20) or thirty (30) feet - the

natural reaction would be for every other facility in

every other state well me too. And it just physically

isn't enough money for that.

MR. JOHN HOLMES:

Let me phrase my question a little

bit differently. If you were presented with a map of

certain portions of this site could you tell us whether

- 3l -

···-···--· -·-·· ·-----------------

Page 32: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

it was acceptable or not acceptable?

2

3 MR. PAUL CLOUD:

4 That depends on what portion of the

5 facility you are talking about. South of the firing line

6 the facility - the Army has entered into a lease

7 furtherance conveyance to the successful high bidder in

8 this case Mr. Ford. North of the firing line due to the

9 extensive UXO contamination and the depleted uranium two

10 thousand (2,000) acre parcel in the center, the Army

11 currently is retaining that property because currently

12 it's against the law, federal law, to transfer property

13 with UXO contamination on it.

14

15 MR. JOHN HOLMES:

16 That's two thousand (2,000) acres in

17 the center?

18

19 MR. PAUL CLOUD:

20 Two thousand (2,000) acres

21 essentially in the center of the Proving Ground has

22 depleted uranium, yes sir, that was used for depleted

23 uranium testing the last few years the Proving Ground was

24 open. And right now the Nuclear Regulatory Commission is

25 in the process of issuing - generating and then issuing

-~ - .) .;, -

Page 33: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

- 2

3

4

5

6

7

8

9

10

11

12

13 ..... 14

15

16

17

18

19

20

21

22

23

24

25

environmenta1 impact statement on the Army's request for

what we call a restricted re-use termination of the

permit that the Army currently holds with the Nuclear

Regulatory Commission on that two thousand (2,000) acres.

If you need any more information on this I would be - I

would be more than glad to talk to you about it.

MR. JOHN HOLMES:

Okay.

MR. PAUL CLOUD:

Okay thank you.

MR. MARK JOHNSON:

Any other questions? Thank you.

Brenda?

MS. BRENDA JONES:

Hi you all. As Karen said earlier my

name is Brenda Jones. I wanted to clear up something on

the agenda just for Mark's sake. Mark and I are not

related. On the agenda Mark - Mark's last name is

Johnson, not Jones. So make sure that we clarify that on

the agenda. Mark and I are not related. As Karen said

my name is Brenda Jones. And first of all I would like

- 33 -

Page 34: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

• 2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

to thank Karen for that introduction. I would like to

thank the RAB for inviting me here this evening. I would

like to thank you all for staying and stopping by and

listening to this. Tonight - it's going to be a little

bit difficult without having an overheard projector but

can everyone hear me?

AUDIENCE MEMBER:

Yes.

MS. BRENDA JONES:

Everyone can hear me fine?

AUDIENCE:

Yes.

MS. BRENDA JONES:

Great. One ( l) thing I'm a 1 it tl e

bit luckier than Mark tonight in that I made copies of

all my overheads so you all should have copies, two (2)

handouts that we use. One (1) handout has a box in it

that says ecology and ecological effects. If you have

that handout that is for your information. You can take

that with you and read at your leisure. You don't have

to read it tonight. That's just an extra handout with

- 34 -

-·----·-----------=

Page 35: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

some information on basic ecology. Information on things

like what is a species? How do you define population?

How do you define communities? That's just kind of a

background information on ecology in case anyone didn't

doesn't remember their lOth grade Biology. The other

handout where it starts out with a box and says

ecological assessment. Does everyone have a copy of

that? It would help if you had a copy of that in front

of you because those are copies of my overheads. So I

can talk directly off of those if you have that right in

front of you. Okay Carol is going to pass a few out.

And like Mark I want - would like to say that if you have

any questions don't hesitate to interrupt me. I think

it's easier to answer questions or to ask questions as

you think about them rather than wait to the end. So do

not hesitate to raise your hand if you have any

questions. But within -within the Environmental

Protection Agency we are tasked I suppose to protect both

human health and the environment. What Mark has talked

to you about was the basis of a human health risk

assessment but I'm going to talk to you a little bit

about what is the basis of ecological risk assessment.

The first page of my handout defines what an ecological

risk assessment is. And that is it can be qualitative or

quantitative. It doesn't matter. You can calculate the

- 35 -

Page 36: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

risk numbers in a manner similar to the way Mark is

talking about here or you can make a sort of qualitative

observational type risk assessment where you go out there

and you make observations of what's going on and how it

happens. We tended not to do the qualitative

assessments. As time goes on we get a little bit more

sophisticated in what we do. And we've all got computers

and everything so if you have a computer you want to use

it so we try to do things more quantatively as opposed to

qualitatively. But what it is in essence is an

evaluation of potential for actual adverse affects or

negative type affects on contaminants at a hazardous

waste site on anything basically other than people. It

says in this definition that we don't cover domesticated

species but that is in our regulations. But certainly if

we were going to - we wouldn't - we wouldn't ignore cows

or dogs or anything like that. So if we had - if we had

that as an issue on a particular site we would certainly

take a look at domesticated species. So that's the basis

- the basic difference between an ecological risk

assessment and a human health risk assessment. With an

eco risk assessment we look at bad affects on everything

other than people. So we look at plants, animals, fish,

birds, the whole shooting match. So in essence I think

Mark has a much easier. job because he only looks at one

- 36 -

Page 37: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

(1) thing to value and I look at everything else.

Although I think he would probably argue with me on that.

The next page. Why do we do an ecological risk

assessment? Well first of.all we do it because our

regulations require us to do it. Second of all we do it

because as EPA we are required to protect both human

health and the environment. Some of the reasons - some

of the things that we want to look at in terms of

ecological risk assessment is to help define the extent

of contamination on the site. How much of an area - if

it's contaminated how much of that area is contaminated?

What effects would that have on wildlife or on habitat

that the animals actually live in? What effects? Are

they positive effects? Are they negative effects? We

can look at both. We also want to document ecological

impacts as part of the remedial investigation. I think

- I think there's been some introduction to the Superfund

process. I realize this is not a Superfund site but we

are following some of the rules and regulations of

Superfund. Remedial investigation is one (1) of the

first steps that you do at a site to determine if there

is part - if there lS going to be something hazardous on

it or not. So we do an eco risk assessment and a human

health risk assessment as part of the remedial

jnvestigation. After we've done our remedial

- 3 7 .•

Page 38: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

investigation we have to come up with decisions as to

whether something needs to be cleaned up or not. And as

part of the clean up activities you can in fact impact

the habitats of the animals that are living there.

Sometimes we have to make a decision do we have to cut

down all the trees to save the forest? Now if those

trees are contaminated what are we going to do with them

and by cutting them down we're destroying a habitat too.

So is it better to leave the contamination in place and

not destroy the habitat? Or is it better to destroy the

habitat and maybe save it for later generations or re­

plant it or re-vegetate it or take the wetland from here

13 and maybe try to create another one over here? So we

14

15

16

17

18

19

20

21

22

23

24

25

have to - we do ecological risk assessments not only to

determine whether clean up is necessary but also what

effect the actual clean up activities may have on the

habitat. We also can do an ecological risk assessment

over the long term looking at the animals and the plants

of this particular habitat over twenty-five (25), thirty

(30), maybe fifty (50) years after the remedial

investigation has occurred to monitor whether the

remedial investigation was effective. I don't think I'm

going to be around for the next thirty (30) years or so

to monitor this. I haven't really been involved in this

but there's certainly a potential for eco risk assessment

- .30< -

Page 39: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

• 2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

to be used in that way. The next page is our frame work

for ecological risk assessment. This is very similar to

the frame work that Mark talked about earlier, the human

health risk assessment. Ecological risk assessment is in

the big box in the middle of the page. It would be nice

if I had my colored slides but I don't. Needless to say

the eco risk assessment itself consists of three (3)

parts; the problem formulation, the analysis phase and

the risk characterization. The analysis phase in the

middle as you see is made up of two (2) different

sections where we characterize exposure and we

characterize effects. That's very similar to the four

(4) phases that Mark talked about in human health risk

assessment. So the frame work where the - the bounds

within which we do an eco risk assessment and the way we

do human health risk assessment are very similar. So

many of the things that Mark touched on I'm not going to

discuss. He talked about no effect levels. We do no

effect levels. He talked about reference doses. We deal

with references doses. So there's many similarities that

I won't go into in detail because Mark has already done a

wonderful job discussing those. So what I would like to

do is go into a little more detail on this box, the whole

thing, the problem formulation, the analysis and the risk

characterization. So if you turn to the next page

- 39 -

·------------------

Page 40: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

.. 2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

problem formulation, review of existing site data to

define the objectives and scope the risk assessment.

What that really means is that we take a look at the

information that we have now and find out what we have

out there. Are we dealing with a forest? Are we dealing

with a river? Or are we dealing with a lake or a pond?

Are we dealing with wetlands? Are we dealing with a

prairie? Take a look at what's out there. We also take

a look at the past information that we have maybe from

past sampling events, from historical records of the

site. We pull everything together and we try and define

okay what is the scope? What is the total that we're

going to be looking at? Are we going to be looking at

just one (1) area? Are we going to be looking at

multiple areas? Obviously a site as big as JPG we will

probably be looking at multiple areas. So we're going to

be looking at a lot of different habitats in multiple

areas. The next page we talked a little bit about the

elements of a problem formulation. These are the things

that have to be considered when we're doing our problem

formulation. You have to look at what are the

contaminants of concern. You know what is of concern to

animals and plants may be very different than what's of

concern to people. So the contaminants of concern, a

list of contaminants of concern Mark may come up with mav

- 40 -

··-------

Page 41: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

.. 2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

be very different than a list of contaminants of concern

that I would come up with. There's probably going to be

a whole lot overlap but the list could be different. so

we go through a processing.in the eco risk assessment to

develop our list of contaminants of concern different

than Mark's list. We also look at the contaminant

release, migration and feed. Mark erased it but he did a

good discussion on that. You've got the source. Maybe

not necessarily on this site but you may have a leaking

drum so you've got your source of this drum is leaking

materials into the soil or it's leaking into the ground

water or it's leaking into the surface water, it's

spreading into the air. How does this - how does the

contaminant go from that source? Does it migrate to

someplace else where the critters could be exposed to it?

Okay? Exposure pathways. How are the critters exposed

to it? How are the plants, we keep saying critters but

we also take a look at plants too. How are the plants

exposed to it? Is it in the soil? Do they take it up

through their roots? De they - is it a burrowing animal

that burrows down through the soil? Is it taken up in

one (1) animal and then maybe a hawk or a fox comes along

and eats that animal and it moves up the food chain? So

there's numerous different ways that an animal could be

exposed tn it. Then there's also the receptors. What

- 41. -

Page 42: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

are the receptors? In a human health risk assessment

there's one (1) receptor. Humans. What are- what's the

focus? With the ecological risk assessment everything

else is a potential receptor. All the plants, all the

animals, all the trees, the birds, the fish, those are

all potential receptors. So we're looking at what

effects may occur to each one of those different

receptors. What are the ecological effects? Do we know

- as Mark said for a lot of the human health scope most

of the human health toxic information is based on animal

studies. So we've got a lot of animal data. We

certainly know - I mean I think everyone knows that

there's a lot of studies done on rats and mice. So we

know how to protect rats and mice. We may not want to

but we certainly know how to protect rats and mice

because we know what's toxic to rats and mice. So

bec~use we know how to protect lab rats we can also take

that information and apply it to any endangered mouse

that might be out in the field. Or an endangered rabbit

or some sort of other mammal that might be out in the

field. Deer, quail, pheasants, all sort of things we

might have out in the field because we have a basis of

some information, a lot of information for - especially

for rats and mice. And what are the end points that

we're looking at? The end points are- the end points

- 42 -

---·---------·-

Page 43: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

.. 2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

are essentially the characteristic of concern that we're

looking at. Are we looking at - aY.e we looking at our

reproductive input? Maybe a particular chemical when a

mink is exposed to PCB's for example, polychlorinated

biphenyls - we know that PCB's affect mink. We know that

they're reproductive - they are a reproductive inhibitor

And we know that there's a certain concentration of PCB's

but if a mink is exposed to that a mink can't reproduce.

It doesn't kill the mink but it won't be able to

reproduce. Okay so if you had a population of mink out

on the site and you had PCB's and I'm not - I don't think

you do but I'm just giving you an example on this

particular site, or not on this particular site, but a

general sort of example, because I'm not real sure what

you have out there other than the unexploded ordinance.

But if you had - if you had PCB's and you had mink out

there the adults might be happy. We see adult mink

partying around. They may all be happy and healthy which

for their sake they are, but you won't see any youngsters

coming up. So that would have a population effect

because that population wouldn't be able to reproduce.

So that's the sort of things that we're looking at in

terms of ecological influence. So how do we determine

our contaminants of concern? Well first we look at the

concentration. What 1s the concentration in the soil and

- 43 -

Page 44: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

the sediments in the surface waters? And much like Ma.rk

had but he's erased it, but much like Mark had he looked

at the frequency of occurrence. How often is the animal

exposed to it? Is it an animal that lives here all the

time or is it a migratory bird that spends six (6) months

of the year here and spends six (6) months of the year

down in South American somewhere? So how often is that

animal exposed to it? !s it something in the soil that

the animal is exposed to in the summer time and as soon

as it sn~ws then it's covered and is no longer exposed to

it? We have to take into frequency of the occurrence.

We also look at background levels. Many chemicals

especially metals have a background level in soils.

Arsenic is naturally occurring. Some of the things that

we think of as being pretty nasty chemicals naturally

occur in soil. So how do we distinguish what may be due

to contamination or what may be due to background? It's

always a big concern. Bio-availability. Just because a

- just because an animal is exposed to a particular

chemical doesn't mean it will actually harm it. And the

best example I can think of that is in the atmosphere.

We all breathe in air. We take in air, we breathe it

out. we breathe it in, in and out all day long. Vast

majority of air is nitrogen. Nitrogen is to~ic to us so

we breath~ lD this toxic subst.ancl?. We !neat he it o'"t.

- 44 -

-··- ·------····-·----·- ----------

Page 45: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13 - 14

15

16

17

18

19

20

21

22

23

24

25

we breathe it in. we breathe it out. But it's not bio­

available to us because the chemical form that it's in in

the air is not a form that's toxic to us. So we have to

go out and look at the soils and the sediments and the

surface water to find out what form of that particular

chemical it's in and see if it's actually bio-available.

Even though the critter is exposed to it doesn't mean

it's in the form that will cause a caustic effect. We

also look at physical properties of it. Is it a gas? Is

it a liquid? And you look at chemical properties of it.

Is it soluble in water, not soluble in water. We also

look at potential for bio-accumulation. Bio-accumulation

means if it gets into a fish and then a Great Blue Heron

comes along and eats that fish, bio-accumulation is the

concept where it goes from the fish to the Great Blue

Heron or from the sediments into a craw fish into a

bigger fish into the Great Blue Heron. So it's a food

chain effect where it may actually - the Great Blue Heron

is not directly exposed to the chemical in the sediments

but it is exposed to the contaminated food that it eats.

So those are all things that we take a look at when we

determine our contaminants and concern. Any questions?

We also take a look at contaminant release, migration,

food, ground water if it d1scharges from surface water.

We look at transported contaminated sediments say in a

- 45 -

Page 46: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

• 2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

creek or a river. We may have contamination up stream

but if those sediments move down stream we could end 11p

with depositional areas down stream. So it maybe wind up

concentrating it down stream miles away from the source.

So we have to take a look at what is the transport of

contaminant sediments if there is any. Also look at run

off, erosion, as well as leaching. Under certain

circumstances things can leach. Leach in the surface

water or leach in the ground water. And also this is

still under the problem formulation and take a look at

our exposure pathways. And this is - again Mark talked

about this real well. He talked about exposure pathway

in terms of the four (4) components. But what you have

to look at with your exposure pathways is there a route

from the contaminated material to the critter? Or from

the contaminated material to the - to the point? Is

there - 1s there a !ink in this direct connectinn? If

there is no direct connection then you're done. There's

no problem. So you have to take a look at all potential

sources. And again the next page is identification

receptors. And I think I've talked about this a litt.le

bit. A receptor could be a single individual. It could

be a population. It could be a community or an eco

3ystem. In this other handout that T gave you it talks a

iittle b1t about what pop11!atl.ons and coromunit.y ecr_,

... -··--·-··-----------------····-----~==-----------

Page 47: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

systems are. So if you don't remember your lOth gr~de

Biology as well as the - as well as the rest of us, maybe

you could take a look at this. If not the other thing

too I guess is if you have.any questions I would be glad

to give you my card and my phone number and you could

give me a holler any time you wanted. When we take a

look at an ecological risk assessment alsn we have to

know what are the effects of these contaminants. And

Mark talked about lris and Hiast as data bases. And ~n

the eco risk assessment we also have several data bases.

We've got AWQC is the Ambiavent Water Quality Criteria

documents. The EPA produces a series of documents for -

gosh I don't know - much less than Mark said. I don't

really have a figure. Maybe a hundred (100) to two

hundred (200) Ambiavent Water Quality Criteria. That's

a data base we can draw from. We have other data bases.

There's a data base that's maintained by the EPA at

Duluth which is called a AQUIRE, which is a aqua.tic

to~i~ity data base. We have terrestrial data bases.

There's also an incredible amotmt of informat1on

developed for agricultural resources. So much work has

been done on pesticides. Maybe the agricultural work has

been done so there's - if pesticides are ever of concern

there's a lot of information available through that. You

can also look Rt investigations that we've done in other

.. 47 ..

--------

Page 48: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

situations. We rated investigations as well as luok1ng

at what I have written down here, structure activity

relationships. That's comparing a chemical structure of

one (1) chemical to another. Say we have a whole lot of

information about this chemical but that's not the

chemical that's on our site. This is the chemical that's

on our site. We want to compare those two (2) and

physically the two (2) chemical structures are all right.

We may be able to make some extrapolations from this

chemical to that chemical. We look a little bit again

about our selection of end points. We have an assessment

end point which is an ecological trait of concern. Say

for instance we have a trout stream and we're interested

in reproduction of trout. That's our assessment. A

measurable characteristic may be the toxicity of a

particular contaminant on trout reproduction. So when

we're doing the eco risk assessment we always come up

with an assessment end point and a measuring end point.

What 1s our concern that we a~e trying to protect? ~rout

reproduction. And how can we go out in thP field and

measure what's going on with the trout reproduction 1n a

given situation? So we've got an assessment end point

and measurement ~nd point. So the ultimate purpose of

problem formulation is to identify the preliminary

objectives. O~ay. We'•re get thro~gh all this at t~is

- 45 -

--- --------------

Page 49: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

• 2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

point. That's JUSt the fJrst bcx. Okay. We ~orne u~

with problems - we come up with a problem formulation.

We've got the scope. We know what we're going to do

after completing the problem formulation. In fact I

would like to say too is that this process is to get more

information. We may go back and up date some of this

previous information that you have with the new

information. I think on this- on JPG we have one (1) or

two (2) phases worth of sampling out there. So if we do

an eco list assessment after phase one (1) and we go back

and look at it again after phase two (2) there would be

additional information and this could present changes.

So this whole process is - I don't want to say circular

because it's not circular, but you can go back and take a

look at updating the information so you can decrease the

uncertainty.

MR. KEN KNOUF:

Brenda? I guess the question I have

is is this a process that n~ver ends once it beg1ns?

MS. BRENDA JONES:

Well that's why I didn't want to say

it was circular. I probably should~'t have used that

word. WhAt it- ,+ certainly has an end. It is a finite

- 49 -

Page 50: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

process when you can - when you have enough information

to make a decision with an uncertainty level that

everything is moving. There's always going to be

uncertainty associated with decision but you're not going

to be able to make a final decision where everyone -

every bit of information is known. So at some point

they're going to be able to make a decision and there's

enough uncertainty associated with that that everyone can

still look at that uncertainty.

MR. KEN KNOUF:

Now would the focus of this effort be

south of the firing line fence in the cantonment area?

Or would you sometimes expend your effort north of the

fence? How wou}d tJXO temper your - your approach here?

MS. BREND~ JONES:

You know as far as - as far as my

knowledge of the gate it's been primarily south of the

firing line. I guess I would defer to Karen as to answer

the question as to whether - where it rnlght fall an•i

mi9ht be north of the firing line.

MS. ~AREN MASON-SMITH:

I think th•t answer is up to funding

.. -' 1.,.

Page 51: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

MR. KEN KNOUF:

Funding?

MR. PAUL CLOUD:

No it actually has to do with the

fact that the property Bouth of the firing line is the

focus because it's being made available for public re-use

and r~developrnent whereas the property north of the

firing line does have contamination and the Army is gojng

to retain that property title that the effort there js

not presently planned for.

MS. CAROL WITT-SMITH:

And may I add to that also north of

the firing line it depends too on both the EPA and DOD

are going through this massive rule making process right

now. The EPA is using the munition~ rule and the DOD is

using what is called the range rule. And this is go1ng

to be the new way of regulating areas like north of the

f1ring line where there is ~anges that are inactive or

closed and how it's going to be managed. And there will

be - eventually once the two (2) rules fall out - some

sort of risk assesswent type of process of the

investigation that will make a judgment on what to do

with these areas. So the ott1er things that you do get

Page 52: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

involved in is w1th the closure activities, the reg1tlate•i

unit, either north or south of the firing line. If you

are attempting to clean close something then you

automatically do the human and ecological risk

assessments to get closure and establishes part of your

clean up numbers if you decide not to go all the '4ay on

the background. But if you decide to close in place and

you are kind of keeping into more the using it as a

landfill. So you don't necessarily have to go through

the full risk assessment for if you're closing the plac~.

but what you may have to work at is what kind of impact

the construction and maintenance of that landfill would

have to be an impact on human way of life.

MS. KAREN MASON-SMITH:

I was just wanting to say too I think

that still funding is going to be a big issue.

MR. PAUL CLOUD:

Funding is part of it but I don't - T

don't want anyone to misunderstand me that the Army is

not intending to do anything north of the firing line.

As Carol from the ha~ard waste branch of the Region 5 EPA

has said ther~ are thes~ two (2) rules that are in ~he

process of ccm1ng o•1t. On..:- (1'~ is EPP-.'s rule a~:d th~

- 52 -

--------------"-'-= ---

Page 53: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

- 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

other i& the DOD's rule. At a futur~ date, hopefully

this year, but I don't have any guarantee on it, hut whe1~

those rules are final and everyone in the agency, the

EPA, the DOD are satisfied.with that, I would expect that

Region 5, the State IDEM and the Army will get together

to discuss what types of actions are appropriate north of

the firing line. An example might he instead of clean up

we might erect like in the open detonation area north of

the firing line by the Air National Guard area, we might

erect some type of erosion control. Put some hay b~les

down at the bottom of the foothill by where the street is

so that any run off from water that would rain onto there

and wash the explosive residues and the heavy metals into

that stream and then ultimately get off the property

would be contained. In addition to that we may erect or

install a number of monitoring wells around the perimeter

of the Proving Ground to monitor for the explosives and

metals and depleted uranium. And use that as a basis to

say okay we're sampling right now. We have no

indication, no elevated levels of any of these materials

are coming forth right now. We don't believe there is ~

reason to go do anything more. But as we continue to

sample basically forever as long as we own the property,

if we get an indication that there is an increase in the

levels of thP materials then thet would prompt us to do

- 5.3 -

Page 54: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

something else whether i! wouid be removal of the

contaminant or some other erosion control mechanism. So

I don't want anybody to think that the Army is never

going to do anything north of the firing line. It's just

that that is not the primary focus right now. We're alsn

waiting for these other rules. There is a funding issue

that would be factored into it. And it's factored into

it because north of the firing line is such a large area

and it has such a heavy concentration of UXO and deplet~d

uranium. But it's not to say that the Army will not do

anything. That is not correct. So don't walk away from

here thinking that north of the firing line the Army will

never do anything.

MS. BR~~DA JONES:

Any other questions? Okay. That

really was the tough part. The problem formulatiou is

the basis for the whole eco risk assessment. There'~ a

lot of information that I threw at you. ! think th<-L the

20 most important thing to realize is that once you get the

21

22

23

24

25

scope of your analysis set up, once you know exactly wha~

you are going to do with it, that kind of falls in place.

We can go through the rest of this fairly quickly. The

next part is the erposQre assessment where you look at -

try to characterize the contami~ants nut therP. Exactly

•• ~ -1. -

-·--·---

Page 55: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

.. 2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

what contaminants are there and what concentrations are

they at? If you go through the receptor

characterization, once you've chosen your receptors you

have to determine where are they on site? And you go

through some of the same sorts of calculations that Mark

talked about. We talked about the frequP.ncy of

occurrence. We talked about the duration. We talked

about area, use factors. in terms of for example I us~d

the Great Glue Heron before. The Great Blue Heron may

have a feeding range of several hundred acres. But

you're only looking at a site that's a half an acre. So

how do you take that into account that this Great Blue

Heron may be feeding on this whole area and your site is

only a small portion of its feeding range? So those are

the sorts of things that you look at in exposure

assessment. You come up with variables for that. And

then you look at your ecological eff~cts of the

chemicals. There's a lot of different ways you can do

that. You can go to the Jjterature and look at the

information that's in that literature or you can go out

into the field and you could look at all the specieP that

are there, what's the diversity of those species? Are

the species that are present are they typical of a

!?Olluted area? Are they typically found in clean areas?

You can do all sorts of community structurE> analys1s

- 55 -

Page 56: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

... 2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Are there a lot of adults? Are thete a lot of this

particular species compared to that particular species?

You can also go out there and collect individuals and

look at their tissues, look at their liver development,

look at their - you can go out and do all sorts of things

depending on what particular contaminant {s that you're

looking at. You can do toxicity testing. You can take

the soil back into the laboratory. Or you can take the

sediment back to the laboratory and expose the critters

in the laboratory to those soils or sediments directly

from your site. There are a lot of different wayA that

you can come up with your effects information. So you

combine your effects information and your exposure

information to come up with a risk characterization.

Basically the risk characterization is what is the

ecological significance of everything you've been doing?

Do~s it mean anything? Is it going to have an effect <Jn

the individual? Is it going to have an effect on the

population or the community or the eco system? ll_nd what

sort of effect is it going to have and what does that

effect really mean? Is 1t something that is harmful

enough to cause a clean up or to take a look at some sor.t

of a clean up type activ1ty? Or get it? Or can we get

to the decision of we want to destroy the habitat to save

it? Do we w~nt to dig ~P a wetland, contaminated

- 'i6 -

---~--~~-~---"~-----------------=

Page 57: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

wetland, to save that con•am1nated wPt!and? Thos~ are

hard questions that we have to answer. And thos~ are the

things that we deal with in terms of risk

characterization assessment. So you pull together the

exposure and the effects data and take a look at what is

the ecological significance of that risk

characterization? Also in the risk characterization Mark

talked quite a - Mark talked - talked about uncertainty

analysis. Everything that we do there's a lot of

uncertainty. We don't know things for sure. We're

making extrapolations from one (1) species to another.

We are making extrapolations from laboratory studies to

field studies. All sorts of good things. So we have

some uncertainty associated with that. That uncertainty

is something that we have to live with but we also have

to state it in a document. What are the uncertainties

and \>lhat are the assumptions that we gave and what effect

do those uncertainties actually have on the decisions

that we make? Finally we try and describe the risk in

terms of - terms of what does it really mean in the real

world? We can come up with whole table after table aft@r

table of numbers but what does it really mean in our

work? Where does an eco - these last two (2) slides

I have I just wanted to review again. Where does an ecc

risk assessment fall 1nto the proce~s? We ~an do Jt

Page 58: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

during the remedial investigation phase. You can do it

during site characterization. You can do it during your

analysis of different clean up alternatives. You can do

an ecological risk assessment while you are designing

your clean up a~tecnatives. You might also do an

ecological risk assessment after you've don~ a clean up.

Like I said earlier you could do that to determine how

effective your clean up was. Did your clean up actually

remove the contamination and remave exposure? So there's

a number of different points within an investigation

where you can do ecological risk assessment. And the

last page again is a - is a copy of the first one is why

do we do an ecological risk assessment? One (1) because

EPA has tasked us to protect both human health and the

environment. But we wanted to find the extent of

contamination and we want to estimate th~ effects on the

wildlife and th~ plants and the ~nimals that are now

living out there. So that was - that was a lot. And I

thank you all for listening. If there are any questions

I would be giad to answer.

MR. TIM MOORE:

What - w~'ve listened to the way the

EPA studies and gathers infcrmation. But what - what

invcl•rement is the EPA been inv~lved jn JPG? w~ know

--·--····--·--------------------'-'=== ---·-----

Page 59: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

that the Fish and Wildlife Service has been involv~d in

some studies, did an environmental impact study wJth them

and the EPA. Where are we at? You have shown us how to

gather this information and what to do with it. Is

there anything that amounts to the EPA at Jefferson

Proving Ground?

MS. BRENDA JONES:

I can't - an environmental impact

statement is something- that's a little hit different

than what I talked about. This is an ecological risk

assessment. So I can't actually speak to an

environmental impact statement. I don't - I would have

to defer to these guys (indicating). In terms of the

ecological risk assessment what I've had involvement in

so far is there are I think eighteen (18) sites south of

the firing line? I'm not sure.

MR. PAUL CLOUD:

MS. BRENDA JONES:

Fifteen (15) sites south of the

firing line okay where we have doce a preliminary risk

assessment on. And all the preliminary risk assese~ent

- 59 -

Page 60: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

..... 2

3

4

5

6

7

8

9

10

11

12

13 - 14

15

16

17

18

19

20

21

22

23

24

25

does is that it kind of screens out sites that we know

aren't a problem. And makes us take a look at these

other sites saying okay we have to take a look at these

to see if there really is a problem or not. So that's

where we stand right now as far as my involvement in it.

I would have to defer to these guys to see if there is

any other work. That's all I've been involved with so

far.

MR. TIM. MOORE:

Okay. So you've been involved to 3

minor degree so far?

MS. BRENDA JONES:

Well on the eco risk assessment yeah.

MR. PAUL CLOUD:

Brenda is a technical expert in her

field. People like Karen and John and I are more

general1sts that have a lot of in~0rmation - a little

information on a lot of things. Brenda has a lot of

information 1n one (l 1 focus similar to Dr. Jones

(Johnson). And W?- because we are the decision makers

as to ~hat would be acceptable on levels we will clean up

to rely on the~r te~hnica! @Xp•rtise 1n thPir area~ r1f

- so -

Page 61: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

<;>Y.pertise to pt ov1de us w:i th intorrr.at i rJn +.hat we .,~ ll

need to be able to come up with what levels are

acceptable tor that portion of the Proving Ground we will

clean up.

MR. TIM MOORE:

Yet to me characterizing it as the

environmental impact study or ecological risk assessment

is splitting hairs.

MR. PAUL CLOUD:

Well it's kind of like talking about

oranges and forts. I mean they are not even the same

thing. ~n ecological risk assessment evaluates the risks

for everything other than human essentially. Wherea~

environmental impact statement addresses what will - wha.t

are the potential consequences of an action that the

federal gave~nment would like to take? ~nd specif1cally

there was an environmental impact statement done for th~

disposal and re-use of JPG. It came out in December of

1995 and that evaluated a medium, a light, and a heavy

industrial re-use development to use as a standard, just

a care taker function where nothing was ever done, ,::>,nd

that's mandstory reference backaround to help evaluate.

- Cl -

·------------....:::::____:-==-----------

Page 62: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

into a numbPr of different studied areas based on

potential levels of re-use light, medium and heavy

industrial and how that might affect the environment in

those areas. That's what environmental impact statement

~s. And thos~ - if any of those levels of re-use are

unacceptable then you can either not do them or you might

have to do something in addition before you could do a

certain level of re-use at JPG. Maybe that ~xplains

environmental impact statement a little better.

MR. TIM MOORE:

Yeah I realize it.

MS. BRENDA JONES:

Any other questions? Yeah?

MS. DOTTIE REINDOLLAR:

Does anyone have the key for this

ouilding to lock it up?

MR. PAUL CLOUD:

I have a key. I always take out a

key for the night that we have our meetings.

- ;:, -~~ -

-------------~--------------=-= ---------

Page 63: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

.,

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

MS. BRENDA JONES:

Well that's two (2) questions I can't

answer. Anybody else?

AUDIENCE MEMBER:

Brenda you said an effort is being

done at thi& lnstallatinn and other facilities that Are

open. Or is it always closed type of facility?

MS. BRENDA JONES:

Carol is shaking her head no back

there. I personally don't work on open facilities. I

have only been involved in Superfund sites with base

closures.

MS. CAROL WITT-SMITH:

hny human and ecological risk

assessment is done basically in the RCRA program where we

deal with hazardous waste. That's reA!ly ~ny time a

corrective action is proposed we automatically as part cf

this investigatcion process have to do nne (1\ of these.

It might be a very simplified one (1) or it might be an

elaborate one (1). So then the level of detail depends

on the contamination at the individual site. But it is

also - it has to be done not only at the ahandoned or

- (.•.: -

----- --.... "' ______ ,_ _____ .. _ ----

Page 64: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

Superfund type of s1te but it's also at operattng

facilities. And one ( 1) close by is Naval Center at

Crane, Indiana. We are actually doing two (2) human and

ecological risk assessments going on right now at ten

(10) sites. And we are in the phase of beginning one (l)

and we have another one (1) that we are actually doing

biological substance work. So it is part of even the

process of not only looking far contamination at sites

but it's now leaning toward actual operational issues

like if you have an incinerator and want a permanent

incinerator. It's now becoming a human and ecological

risk assessment portion to the incinerator. In order for

you to get a permit to operate you would have to go

14 through this process also. So they're looking at all the

15

16

17

18

impacts as how someth1ng might affect the environment.

MS. BRENDA JONES:

Three (3) for. three (3). I didn't

19 answer a single question. Anything else? It you h;~v., -

20

21

22

23

24

25

if you have Any questions like I s~y that one (1) h~ndaut

that I had I think gives a good background on ecology

And I'd be happy to give you my card after the meeting if

anyone wants to step ~nd b~ able to call my office 1n

Chicago. Thanks.

- 64 -

----------------------------~~=====-------- -------

Page 65: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

A-PPLAUSE )

MR. PAUL CLOUD:

In addition to Brenda's card I have

left a number of my cards I recently had printed up. If

anyone would like to take one (1) of those! encourage

that. If there's not enough there I have gi,ren Ken

Knauf, our site manager, an additional number they can

pick up at the Proving Ground. If you would like to get

one (l) for one of your friends it does have a toll free

number that you can get ahold of me in Maryland if you

have a question and would like to raise an issue, have

something you would like to see on the agenda. So don't

feel bashful if you don't want to bring the issue up

here. Take one (1) of my cards and you can give me a

call. There is a toll free number. You just dial it and

then ask for one (1) of the extensions and they will

route the number to me. If I am not there you can leave

a message on the voice mail and I can get back to you

that way. As part of that effort for improved and re-

1 ook at our community relations plan that the hrrr.y has to

keep the community informed and involved with the

envi ronmentaJ clean up of the Proving Ground, back in

late 1994 in Flugust we had our contractor with the Army

- "· ') ·-

·----------------====== -------

Page 66: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

interviews with the citizens. And ~s a result we use

that information to generate what's called a CRP or

Community Relations Plan. And it's now called a

Community Involvement Plan. That was a plan that came

out in early 1995. It's now early 1997 and the Proving

Ground has b~en closed for over a year. And the Army has

discussed the issue with the EPA and the State and we

believe it's time to go revise the plan. And I would

like to introduce Ms. Corrine Buoni from SA!C who will

now give you a brief overview of where we're going to go

with this revised Community Relations Plan. Corrine?

MS. CORRINE BUONI:

As Paul indicated my name is Corrine

Buoni. That's my real name. I go by no other aliases.

Unfortunately ! was not able to get a poster made and

th~refore I'm net subject to the use cf the overhead

projector tonight so I'm going to try and walk you

through what we're going to be doing over th~ next few

months for the Army. But first l~t ~~ take a sid~ steo

here. This will 5ort cf set the frame w~rk for wh~t we

are going to he doing. Maybe. As Paul indicated the

Army came out with the Community Relations Plan in '95

to b9.sic3lly set O'tt the r>.rmy's plan for keeping the

public 1nfor~ed a11d iJlvo\ved in the activjti.es

------------

Page 67: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

"" 2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

associated with the closure of JPG. Jt had two (2)

basic objectives. One (1) to inform the community on

all the activities and plans for. closure of the

installation. And second.of all to obtain input into

the Army's plans and activities and decisions regarding

what to do ~ith the land and how they should proceed.

By community we m~an the local residents here in the

City of Mad1son, the county officials in the three (3)

counties that encompass JPG, the media, feder~.J and

state regulators, community groups, environmental

groups. We're meeting the collective sum of

organizations and people that are involved or impacted

by the activities of JPG. This plan came out in '95

although that doesn't mean that activities are not going

on prior to that time. What my company is going to be

doing in suppot"t of the Army is updating this plan to

insure that it's being responsive to the community's

needs. Now to date the community has been involved

through prim~rily the R~storation A~vjaory Board

pro0ess. To a much mor~ limited ~xtent there have been

media updates, press releases, fact sheets released and

perhaps there may have been a few community group

reaching type activities. But primarily to date the

Restoration Advisory Board has been the primary

mechanism for inform1ng the public on what's been going

- b 7 -

---·-·-

Page 68: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

on at JPG and for getting input into the process Nov

we are at a juncture we're going to try and see where

are we today? Are we doing a good job? Given to where

the installation is in the closure process do we need to

adjust the plan? So this is the opportunity for you as

a community to provide input as to how well the Army is

doing in terms of informing the public and then taking

input into the decision making process. Over the next

month and a half or so, probably February or March time

frame, weather permitting, we will be coming out here to

the installation and conducting a series of interviews

with the community. We're going to begin with a list of

people that are included in the community relations

panel, I think it's about a hundred (100) folks that

have expressed an interest in the past to be informed

and involved for the closure process. We will start

with that list and try to weed them out and try to

identify as large an audience as possible to interview

and get their input on how well we've been doing. If

any of you tonight wculd like tn particularly be certain

that you're called out please give me a call. We woulrl

like to get you involved. But basically we will be

going through an interview proce~s for about four 14) to

six ( 6) weeks in cornbinati•:m of course interview and a

te} ephone call. A.nd then we ...,ill take str.:r.Y. ol' ~<~her:"! ·-~~

- 68 -

----------------------------------~~~~~~-----------

Page 69: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

are and what we've learned a11d try to reshape the

program in response to the community needs. ~nd

probably come out with a plan within two (2) months

after completion of that activity. So we are looking

probably May t1me frame we are going to draft thi~. Do

you have any questions?

MR. TIM MOORE:

Your plan will do what? A plan to

accomplish what?

MS. CORR.INE BUONI:

Basically to you know make sure that

the community is informed as to what's going on with

closure process in terms of for instance I believe you

have asked questions about what is going on which in

te~ms of the site is risk assessment and the clean up.

So that to me says we're not doing a good job. So mayb~

you might have some comments in how- how can you tell me

more of what's going on? This may not be the only form

that WE! communicate. Maybe there are other ways that we

can do it, We would like to get your ideas. Also do you

feel like you have an input and a say in the process? Do

you feel lik~ your questions are be1ng answered? So

tbnse are the k~'lcif- of things that that plan will

-------------

Page 70: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

address. Yes?

MS. LAURA HODGES:

I'm a little puzzled about in the

center section there about how th~ community 1s Cllrrently

involved in JPG? I'm a member of the media. The second

point says media update and informing the public about

8 closure progress and upcoming meetings? Is that - are

9 you talking about press releases that go to the media or

10 are you talking about what the media is doing?

11

12

13

MS. CORRINE BOON!:

No, no, no. This is - this is the

14 Army's way of getting to you folks on what's going on in

15 terms of when the meetings are and things of that nature.

16

17

18

19

20

21

22

23

MS. LAURA HODGES:

T do get notices of the meetings but

I don't remember at any time during the past year getting

any informat1on aside from the agenda.

MS. CORRINE BOON!:

You are probably correct and as I

24 sa1d these are very limited to date. These are the

25 me~hanisms that - these have been limited access.

- 7 i) -

Page 71: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

- 1 MR. PAUL CLOUD:

2 Since the Proving Ground has closed

3 the number of press releases have basically fallen to

4 zero. That was one (l) of the factors that we considered

5 when we talked with the State EPA to advise them of the

6 Community R~lations Plan. Maybe that's something we need

7 to come out with on a roore periodic basis ~ow. Even if

B the Proving Ground :i.s closed does not necessa t:i l y mean

9 that we shouldn't come out with periodic press releases.

10 Whether that's a fact sheet and memo or in the form of

11 press release or some other type mechanism. So I do

12 understand that since the Proving Ground has closed that

13 particular method to get information out has not been

14 used.

15

16 MR. DAVID NOVAK:

17 I was wondering when or what the

18 status is of an agreement with the U.S. Fish and Wildlife

19 in terms nf the north sector of the Proving Grounds?

20

21 MR. PAUL CLOUD:

22 That - that agreement is currently

23 with the Fish and Wildlife Agency. We, the Army, signed

24 a letter and provided it to them for review just before

25 Christmas. December !6th if I'm correct. We t~lked with

., '

~------~---------

Page 72: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

-- ---------- ---------

Fish and Wildlife yesterday. They are contjnuing thejr

review. We expect some comments back shortly. They have

stated to us that they see no show stoppers in that

agreement. What that agreement essentially does is to

provide a funding mechanism from the Army to the Fish and

Wildlife to provide s~me additional man power from the

Fish and Wildlife for the Fish and Wildlife to perform

natural resource functions north of the firing line.

There are some specific comments that they are going to

make and it's basically a detailed type of thing that

will probably result in two (2) things happening -

actually three (3) things happening. One (1) a meeting

between the Fish and Wildlife Service and the Army to

work out details. Two (2) to get those details

incorporated into a revised memorandum of understanding

and then three (3) to have the actual und~rstanding

signed by Commanding General at my headquarters and the

regional administrator who I think has delegated that

authority now to one (l) of the field officers. We

expect that probabl~ in light - was that Mar~h. ~pril

t1me frame? We don't know. We are hoping to have

comments by the end of the week. So we are proceeding nn

along those lines. Again the Fish and Wildlife Servic•

did t~ll us yesterday they s~w no show stoppers in the

o;:-igina] proposal we harl pc•."lVlded to them J'-l<<t befcr.e

- 72 -

------------------------------~-------

Page 73: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Christmas.

MR. CLYDE CAMPBELL:

How much acres does that involve that

the Fish and Wildlife is talking about?

MR. PAUL CLOUD:

That area is north of the firing

line. For basic purposes it's fifty-one thousand

(51,000) ac:re.s.

MR. CLYDE CAMPBELL:

That's above K Road?

MR. PAUL CLOUD:

No that's above the firing line.

That's from the firing line north to the north perimeter

from the east and the west.

MR • CLYDE CJI...MPBELL :

Okay above K Road how much

contaminant is in that area up through there?

MR.. PAUL Ct.OUD:

T~at is al! potential DXO.

- f ~"' -

---~------

Page 74: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

MR. CLYDE CruMPBELL:

~bove the R Road?

MR. PAUL CLOUD:

Yes sir. The~e was what's called an

archive search work done by the Corps of Engineers that

came out in June of 1995. We have copies of it at the

8 Proving Ground. There is a copy of it at Hanover College

9

10

11

12

13

14

15

16

in the Administration - Administrative Record that we

have established there, that the company established for

us. You are more than welcome to take a look at that.

It will go into some level of detail. It's broken up

into three (3) volumes. One (1) is south of the firing

line. One (1) north of the firing line to K Road and

then one (1) volume north of K Road. It will go into

some lengthy discussion. They went through archi••~

17 searches. They went through overhead aerial shots. They

18 went through personnel interviews. They went through the

19 firing records at the Proving Ground. It was a very

20

21

22

23

24

25

intensive effort that lasted about six (6! months.

MR. CLYDE CAMPBELL:

Thank you.

Page 75: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

MR. PAUL Ci.OUD:

Yes sir.

MR. JOHN HOLMES:.

On this memo ot 1mderstanding l•lent to

the State Wildlife in December --

MR. PAUL CLOUD:

F1sh and Wildlife. Federal. Federal

agency.

MR. JOHN HOLMES:

Federal agency?

MR. PAUL CLOUD:

Yes fli!'.

MR. JOHN HOLMES:

Ts that document available for our

review?

MR. PAUL CLOUD:

We can provide a copy but it's not

final yet. This is a forwal agreement between two (21

f~deral agencies. Once the document has been signed we

;;-., -

Page 76: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

will be glad to provide you w1th thP record but it's

between two (2) federal agencies right now. It is not

final.

MR . JOHN HOLMES:

Well I - I would like --

MR. PAUL CLOUD:

Again let me - let me emphasize the

intent of this document is not - Fish and Wildli~e will

not take title to the property. All the Army is doing is

utilizing the Fish and Wildlife Service to basically do

what they are normally tasked to do. But they don't have

the work that we would like to see them do north of the

firing line into their budget cycle right now. Normally

it takes about three (3) years to get a new item in the

federal budget, federal agency's budget cycle. So part

of that agreement is that we, the Army, will fund the

Fish and Wildlife and I believe it's for approximately

three (3) to four (4) people per year for the n~Kt three

(3) years until they can get it in their funding cycle.

And then it will be their funds instead of the Army's

fund that will dn this. And it will basically provide

three (3) to four 14) Fish and Wildlife people to perfor~

nat~ral resource proteotion ~unctions north of the f1rin~

- ~~ -

Page 77: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

line. They w::.11 not nsEume any other tunct1ons or

responsibilities. They will not mow the property. They

will not have any liability for the property.

MR. JOHN HOLMES:

The thing that I find disturbing and

I will admit that I'm new kid on the block in relation to

this program, but the thing that I find disturbing

representing a county immediately to the north that has a

significant stake in this property and probably has under

its boundaries the largest portion of the land area

covered by this site where there is a lot of historical

frustration as to how the government took this land over

to begin with many years ago down to the present time.

That th1.s whole effort seems to be centered in a

community to the south with little consideration of the

governmental officials in that county that is north.

MR. PAUL CLOUD:

Let me give you a little history,

maybe repetitious to some people here, but as you've

already said you are new to the process. Let me give you

a little bit of history on how we arrived at the property

rP-use stage that we currently are at at JPG. When a

facil1ty, a milit~ry f~cil1ty, ~as identifiPd for closure

- .,,! -

Page 78: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

1 under the BRAC p~ocess JPG was in the first round in

2 1988. There was a round in '91, '93 and '95 as the most

3 recent. When JPG was identified in '88 part of that

4 process that is required tor re-use of property goes

5 through a - what they call pro~erty screening sequenc~ or

6 process for making that prop~rty available. This is

7 required by law. But what it basically says is that the

8 first entity or group that the property is made available

9 to - and in this case it's a military facility - is

10 another military organization whether it's Navy, the Ai~

11 Force, the Marine Corps. They are given first cut to see

12 if they want to take the property over and then it would

13 be a federal to federal transfer basis. The Army had it

14 and the Air Force has got it. Now they've got to assume

15 the liability. No one in the Department of Defense

16 raised their hand for that. The next group that it comes

17 available for potential is any other federal agency.

18 There was a federal agency that did in fact write a

19 letter. I have a copy of it if you would like to 5ee i•

20 It's signed by Secretary Babbitt, Department of the

21 Interior. It's signed back in April of '94. They raised

22 their hand and said we are interested in approximately

23 fifty-three thousand (53,000) acres. Not only everything

24 north of the firing line but segments down south of the

25 f1ring !ine. As tha~ process went ~nd developed o•rer th~

..... --- I .-, -~

--------------

Page 79: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13 - 14

15

16

17

18

19

20

21

22

23

24

25

----·····-- ·-··-------·-

next six (6) months to a year, it became clear to the

Fish and Wildlife Service that yes they were interested

in the property but because there are significant

concerns in their· agencies .few were liability for UXO.

The depleted uranium that they determined - this was

totally in their house - that they did not want to tak~

title. Based upon that fact the government then w•nt -

the federal government then went and said okay we - the

federal government declared everything south of the

firing line as ''excess''. Now it can be offered t0

states, local communities and even private individu~ls

should we get to that step. The next step was to make

the property available to the state. They are given a

certain amount of time to make their desires known. No

one from the state raised their hand. The next

opportunity is for the local community, the counties as

it were. For the count).es to makP. t.heir request they had

to create what's called a Local Redevelopment Agency or

LRA. That LRA was in fact cr~ated here. Becau~..- the

federal government made onlv the area south of the firing

line as excess and all of that property is in Jeffer~on

County, while the LRA was - Jefferson County was granted

primacy by the other counties. The other counties had

representation and participated in that LRA and in their

request for the property. They did in fact submit a

- 7S -

-------------

Page 80: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

request to the Army. That request was in fact denied

based upon financial considerations, based on the fact

that they were asking for the property and they were also

seeking unsecured and unguaranteed loans or grants from

the federal and state governments when they had no

assurance that that money was going to be provided and

that they were - they had no other mechanism to assure

that their plan h~d any economic liability to get those

funds that weren't provided. So that app1ication was

denied. The next process was that property was put up

for bid. The initial bid process went through the Corps

of Engineers who did an appraisal of the property. They

established what they considered was a fair market value

minimum of six million ($6,000,000) dollars. That went

out. We got no offers as a minimum of s1x million

($6,000,000). After that we decided we would try it

17 again with no minimum bid. We went through that Pt'Ocess.

18 We received a half a dozen bids accepting the high bid

1g from Mr. Ford of Ford Building and Lumber of f1ve p0int

20 one lS5.1J million dollars. And that's how w~ ha~e

21 gotten to the process. But to say that any of the other

22

23

24

25

counties did not have a role, did not participate and

were not knowledgeable about the LRA and the

participat1on and re-use is not really oorrect. Rut J

think if ycu go back ~nd H~P th~ Pr•)c~ss and ha~ 1t

- qr, -

Page 81: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

d~veloped and what )t be.d to go through- and this r.ot

only applies to JPG but to all closing facilities, then

that is the sequence. Then there is a definite hierarchy

on who has priorities. The homeless are also factored

into that. In fact they take priority over just about

anyone. But if a homeless organization would have com&

in and said we want to go take the housing units of the

JPG and they had a financial sponsor to make that viable,

it would take precedence over just about anyone. You

have to go through that process. No homeless provider

came forward. But we would have to go through that

process to get to this.

MR. JOHN HOLMES:

Just for point of clarification. hre

you saying that the County of Ripley did not in •:.he

appropriate time table make a statement as to their

wishes and wants and desires?

MR. PP.UL CLOUD:

No I'm not. The County of Ripley did

in fact make their wishes known. They made it known

through the LRP.. And they also made it through the

Jefferson Proving G~ound Redevelopment Board when it was

in ex1stence before the LRA because they participated ~r

- Sl -

Page 82: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

that even before I became associated with JPG in 1994.

So Ripley County has been involved with the redevelopment

and re-use of the Proving Ground since the Proving Ground

basically was put on the closure list and a redevelopment

organization was in existence, whether it was the LRA or

before that.

MR. JOHN HOLMES:

But they weren't privileged to create

their own redevelopment board?

MR. PAUL CLOUD:

They did in fact. The Army had no

directions that said you, you and you will be on the

board. They asked for members. T~is was a total

comm\rnity board. There WPre - the ccmmandin~ officer was

ex-officio member, i.e. he was granted status to come on

the board but he was not a voting member.

community run, community controlled. Yes ma'am?

meeting.

questions.

MS. JAE BREITWEISER:

I missed the first part of your

1 had a previous me~ting. And I have some

- ~ ') --

Page 83: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

MR. PAUL CLOUD:

Sure.

MS. JAE BREITWEISER:

Concerning the Fords' purchasing of

the land that they have and own, I understand that you

made that announce~ent that they are asking for forty

t40) acres to be released? Is thRt correct?

MR. PAUL CLOUD:

Let me make the clarification.

MS. JAE BREITWEISER:

After you do that I have some

questions.

MR. PAUL CL.OUD:

Sure. Well let me make the

clarification first. Currently Mr. Ford and l:is company

OW!1 no prope-rty.

MS. JAE BREITWEISER:

I know that.

-----------·-------

Page 84: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

. -. ---..- ·---

MR. PAUL CI.OUD:

It's a lease and furtherance of

conveyance.

MS. JAE BREITWEISER:

I know that.

MR. PAUL CLOUD:

Until such time as either the UXO is

removed or the environmental contamination is cleaned up

or we identify areas where that is not an issue, we have

not transferred anything. There is a forty (40) acre

parcel commonly referred to as a parcel that's bounded by

Woodfield and Paper Mill Road and Mr. Ford has expressed

to us a desire to obtain actual ownership of. We are in

the process of creating that document and it's my intent

as the Army's representative to provide to, not only the

State and the EPA. but all the RAB rnembers and anyone

else in the public who would desire to see a copy of it,

what's called a finding of suitability to tr~nsf~r, ?

FOST. Th1s is an environmental document that explains

what basically is being proposed to transfer and if there

is any environmental consequences of that transfer. Is

there lead based pa1nt in the hujldinqs? Is th@re

asbestos ~n the builrlinq2? Do ~e have contaminat•d sol>

•· B 4 -

-·· ----.------

Page 85: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

contamin<~tecl grmmd water? What's the adjac-ent properly

look like? Has there been a radon survey done? Does

there need to be a radon survey done of the buildings?

So on and so forth. And then that will go out we ar~

hoping either in January or mid February to have that out

for a thirty (30) day review. It comes back. We look at

the comments and ~ry to incorporate everything we can and

it goes out for a shortened review to identify those what

we call outstanding issues, things that we didn't

incorporate but if we identify that as an outstanding

issue then we would attach that to the back of the

document so that it's just not thrown away and ignored.

I mean it becomes part of a public record. It would then

go up and be signed by the individual that has that

authority and it depends upon what is present at the

property. In this case the person that's delegated th~t

authority is the command above my command which is the

Army Material Command in Alexandria, Virginia. They sign

that document. They signed the document for building 216

and the railroad trackage. That was signed at AMC, Army

Material Command. Once that document is sjgned it would

then go to the real estate division of the Louisville

Corps of Engineers as the Army's real estate agent

essentially. They will then cr~ate the deed transfer

documen~ ir,cotp~rating parts of the FOST &a ne~essarv if

- 85

Page 86: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

there have to be deed restrictions, historical prov1sion~

that may have to be complied with, things of that nature.

That would be rolled into the deed. The deed would then

be signed by the Secretary of the Army or his designate

and then it would go to the successful person, 1n thim

case the forty (40) acres, Mr. Ford. And in the cas~ of

the Madison Port Authority, the Madison Port Authority

signed and they paid their sum of money and now they are

the first in fact title holder of property that used to

belong to the Army.

MS. JAE BREITWEISER:

Do the Fords have to in any way

announce to the community what they are doing with that

property? Is there any agreement between them and the

gov~rnment that they do that?

MR. PAUL CLOUD:

No there's not.

MS. JAE BREITWEISER:

Does that go back --

MR. PAUL CLOUD:

And there's no requirement for th~~.

- ;.~ y. -

----------------

Page 87: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

~ 14

15

16

17

18

19

20

21

22

23

24

25

They are private - not only private individuals but th•v

are private corporation for that matter.

MS. JAE BREITWEISER:

So the community will never know what

they are developing unt1l it's done then unless it goes

back to local zoning?

MR. PAUL CLOUD:

If they want to do anything that

would require zoning then it would - it's my

understanding that they would have to come to the council

and get that ~oning for whatever they wanted to do.

MS. JAE BREITWEISER:

Well that presents a problem. Our

county doesn't own that so how can they have rules and

regulations for zoning on that land?

MR . PAUl. CLOUD:

No. But what Mr. Ford would have to

do is at the time that he becomes the owner if he wants

to do something other than what's currently there, i.e.,

light industrial, medium industrial, residential,

something that wo~lct require a zoning change it would be

- r'i -

-- --·------------

Page 88: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

a 14

15

16

17

18

19

20

21

22

23

24

25

his responsibility to seek that with the county and fnr

the county and Mr. Ford tc come to an agreement. 'l'hat 1.s

his responsibility.

MR. DAVID NOVAK:

Paul? Just a quick question. When

he takes possession of the land, when he finally ends up

buying it does it lose it's status as f~deral facility

property?

MR. PAUL CLOUD:

Well whatever portion that he takes

title to that is an accurate statement.

MR. DAVID NOVAK:

So that then it reverts to a county

status of sorts?

MR. PAUL CLOUD:

Let me make on~ (l) clarification on

- on that because you've rais@d an interesting point.

And I hope this doesn't confuse everyone. In 1997

Defense Appropriation fnr the D~partment of Defense had a

change in the Superfund law. In it it said before this

time, before ~his law was p~ssed 1n ~ate '?~. bMfor~ th~~

- ·~F. -

·- ·------- --------- ----------

Page 89: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

.. 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

law Wa5 pass~d yol• ~o\alci ~ot transfer property witli

environmental contamination on it. This 13w made a

change to that. It said yes you can transfer property

with environmental contamination on it but in the case of

a Superfund site it had to get Pegional Adn,1.nistr<ttor's:.

concurrence from the EPA. In the case of a non NVL ~ite,

which is JPG's case, you had to give the governor of the

appropriate state, in this case it would be the governor

of Indiana. Before the governor of Indiana is going to

re-allow the Army to transfer any property to Hr. Ford,

he's going to have to receive some assurances that the

Army is not going to walk away from the property. And

that is also written into the new revisions of the law.

It would require the Army to provide schedules and

commi. tments based on availability of funding that we will

continue to do the clean up. What it does is allow

property to be transferred because what has been

experienced from lessons learned based on base closures

in other areas of the country is that for redeve-lopment

it's very difficult for a company to ~et a bank loan for

property that they don't own. So if Mr. Fnrd wants to

sell a piece of property to XYZ Manufacturing and XYZ

needs a bank loan to go build up a building or a new

building or buy equipment, he goes to the bank and the

- ·":· ::" -

- ~~~-------~--~----------------------------

Page 90: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

- W~ll gee I don't know. I got this ~roperty that doesn't

2 belong to me yet that I might get some day. The bank's

3 not going to look too favorably upon that. So that was

4 one (1) of the reasons why that change in the law was

5 made to allow companies to actually gain title and the~

6 they could use the title as collateral to obtain loans

7 and to facilitate a - a better redevelopment and re-use

8 of property that was formerly in a military installation.

9

10 MS. JAE BREITWEISER:

11 ! see this as a problem, very large

12 problem for our community with this being done, like

13 piece of forty (40) acres here and forty (40) acres over

14 here and our county doesn't actually own that.

15

16 MR. PAUL CLOUD:

17 Oh the county wi 11 nevet· "own" it.

18

19 MS. JAE BREITWEISER:

20 ! kn0w. B•1t they don't ev~n have

21 jurisdiction.

22

23 KR. PAUL CLOUD:

24 No ma'am that's not true.

25

.~ .· ~·

- -------··-------

Page 91: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

~ 14

15

16

17

18

19

20

21

22

23

24

25

MS. JAE BREITWEJSER:

For zoning.

MR. PAUL CLOUD:

That's not true. Back in 1995 the

gov~rnor signed wh&t's call~d a lett~r of recision.

MS. J1-.E BREI '!'WEISER.:

That's good.

MR. PJI.UL CLOUD:

And the state, including the

counties, now have legal jurisdiction on JPG. It.'s what

called concurrent jurisdiction. The county sheriffs can

patrol, come in, issue tickets. You know arrest people

where as before that time it was what they call exclusive

federal jurisdiction. And they could not come on th~

property and arrest someone or give them a ticket or

bas~cally do anythjng else. So there is a legal

authority now p~~sent for the coDnties and the state on

JPG. It's called concurrent jurisdiction.

MR. DON BARNES:

Paul does that include zoning? Since

they don't own the property. thP individt1al ~oesn't own

- ·J l -

---~----------------·-----

Page 92: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

the property, could he dr> scmethin.g that would vid=>t.­

the normal zoning laws p~ior to the transfer and the

county would not have any jurisdiction on it?

MS. JAE BREITWEISER:

There seems to be a big hole here.

MR . DON BARNES:

Do we have power to do that?

MR. PAUL CLOUD:

Mike?

MR. MIKE EARLY:

I think you would have to ~efer

comment on that to the Jefferson County Commissioners.

MR. PAUL CLOUD:

Yeah.

MR. MIKE EA..~LY:

But at the meeting that we had with

them at the court house and the EP~ was present at that

meeting. r forget when that was, but one (l) of the sid~

issues that WE:' :;~ddressed ·.atb cOllnty commlssj.on<H.s <'.nd "'t

Page 93: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

a 14

15

16

17

18

19

20

21

22

23

24

25

that time at th~t same meeting they ;ndjcated that tne

county is working on a revi~ion to the comprehensive

zoning plan and the commissioners indicated that they

were considering JPG property in that. So if you have a

question about that zoning I would - I would suryg~st to

you that you address that to the county commissioners so

that they can properly consider it in the county zon1ng

plan which is currently being updated.

MR. PAUL CLOUD:

Thank you Mike.

MS. CAROL WITT-SMITH:

Paul could we just make the

suggestion that the county be invited to RAE that maybe

you could see about maybe on the next agenda looking into

maybe somebody from th~ Louisville Corps office, real

estate office and the county officers.

MR. Pl\UL Cl,OUD:

The county. That's a very good idea.

MS. Cl\ROL WITT-SMITH:

And make a presentation of how this

works with ?on1ng wjth t};8 l~ase sgre~~entF and the

- .., .'; -

- -------------------------------

Page 94: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

subleases. How that prac@SS ~orks. Because it ~eems

like the public is getting the same sets of problems that

we had to deal with upon receiving the property, how it

goes through the real estate division.

HR. PAUL CLOUD:

I see Richard shaking his head yes.

Yes sir? As co-chair I think we will see that on the

next meeting's agenda. Yes sir?

MR. TIM MOORE:

Paul you said previously that the

Army is committed to four (4) feet deep.

MR. PAUL CLOUD:

That's for UXO in the cantonment area

yes s~r.

MR. TIM MOORE:

Okay. But you're talkinq about

residential uses and things that wouldn't nccur to that?

MR. PAUL CLOUD:

No that's not true. When I say

res.ideni:~al that w~uld be f.or th~ c,1-rr~nt housP.os tb;e.t a:r~

-.:, ~ -

Page 95: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

-2

3

4

5

6

7

8

9

10

11

12

13 - 14

15

16

17

18

19

20

21

22

23

24

25

in the housing loop. That WO\tld not be for new house~ in

an area that had been identified as having potential UXO.

If you want - if Mr. Ford at some later date wants tr.

build a house in one (1) of those areas and wants to dig

something that's going to go belo~ that, the Cllrrent

position of the Army is th?t he Wlll have to fund a UXO

clearance operat1on below the fout (4\ foot level. Jf he

wants to build a house 1n an area that does not have

potential UXO then there ar~ no restrictions. He cah dig

down as deep as he wants.

MR. TIM MOORE:

So essentially you are not going to

give anybody clear deed to it? The Army is still going

to have that four (4) foot deep

MR. PAUL CLOUD:

That's correct.

MR. TY.M MOORE~

The Army is still going to have --

MR. PAUL CLOUD:

That's correct. That is what the

Army committed to. That was many, many years ago.

~----~-----

---------------~~~

Page 96: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

MR. TIM MOORE:

2 The Army is going to have control?

3

4 MR. PAUL CLOUD:

5 They will have --

6

7 MR. TIM MOORE:

8 It will not be a clear deed?

9

10 MR. PAUL CLOUD:

11 It's not that they will have control.

12 There will be a deed restriction. You have a house.

13 There are certain restrictions on that house. You cannot

a ' 14 go on your property and do anything anywhere on that

15 property for~ver. I'm sure there are either mineral

16 rights reserved or something else such that you know you

17 can't do something that might negatively impact the value

18 of your neighbors property or someplace else. So no one

19 really has unlimited use of their property. This is -

20 you know it's a deed re~trict1on. Tha~'s a deed

21 restriction. This would similarly be a de~d restriction.

22

23 M~. TIM MOORE:

24 If he d1gs a basement on that

25 property that of ~curse is his opt1oo. It says he cal,not

- -----------

Page 97: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

a 14

15

16

17

18

19

20

21

22

23

24

25

;.:.:-....

build a house n: }Je cap'l

MR. PAUL CLOUD:

Well again if it's in an area where

there's no potential UXO there is no need to stop him

because there's no restriction. If he - if he wants to

go build it he's going to have to get a building perwjt.

A building permit --

.MR. TIM MOORE:

Does th~ Army clear this?

MR. PAUL CLOUD:

The examiner will look at th~

restrictions on the property and say it you want to hui.ld

something here it's going to require an excavation down

below tour (4) feet, there's a restrict1on in your dePd

that says you can't do that. You have to fix that before

you can dig your hole.

MR. TIM MOORE:

Is there any area of that cantonment

area other than the buildings that are currently there,

i~ there any area of that cantonment area that you people

Page 98: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

MR. PAUL CLOUD:

Not at this present time.

MR. JIM QUINT:

Paul?

MR. PAUL CLOUD:

Yes sir?

MR. JIM QUINT:

When you said that the U. S. Fish

and Wildlife was going to be in the management of the

natural habitat of the north area will they be merely

accepting the responsibilities of the cultural resources

up there too-:>

M.R • PAU.L CLOUD:

No .sir.

MR. JIM QO!NT:

Who w1ll maintain that property?

MR. PAUL CLOUD:

~hat's th• Army's responsibility.

- :-+b -··

Page 99: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

~ 14

15

16

17

18

19

20

21

22

23

24

25

MR. JIM QUIN'I':

They will.

MR. PAUL CLOUD:

Yes sir. They may enter into anoth~r

agreement with someone else whc addressed that, but

currently that's net the Army's responsibility,

MR. DAVID NOVAK:

Because thP.re are some national

register buildings up there.

MR. PAUL CLOUD:

Yes sir. That's the Army's - those

are the Army's responsibilities. Laura do you have a

question?

MS. t.AURA HODGES:

Yeah I do. You sajd earlier in the

meeting that D~an Fcrd 1~ ~lready subleasing part nf ~h~

property?

MR. PAUL CLOUD:

He has subleased some of the

buildings. Specific case ls building lOS to J&R Sta~ping

------------------

Page 100: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

Company. Another one is Ball Corporation who has woodeD

pallets in there. If you would like a detailed list Ken

can provide that to you. Mr. Ford periodically sends the

Army, through the Corps of Engineers, lists of potential

re-uses and then ~e evaluate them to make sure that

there's not a restriction either due to UXO or to

environmental or any other restriction and provide that

information back to Mr. Ford through the Corps of

Engineers and then he can act on that.

MS. LAURA HODGES:

I would like to have that yes. Thank

you.

MR. PAUL CLOUD:

Any other - Cathy?

MS. CATHY HALE:

Yeah. If this takes five (5) years,

seven (7) years, what~ver to transfer this property to

him and he's doing all this subleasing, is there any

property taxes that may go back on - if it's a~tually not

transferred to him?

- 10~) -

-------------------------

Page 101: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

,

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

MP , PAUL CI.OUD:

I don't think r can answer thar. I

would probably have to refer you to the Corps of

Engineers real estate. I really don't know. I know what

I think but what I think is 1rrelevant. ! don't know.

MS. CATHY HALE:

The forty (40) acres is that clean

now? Or is that --

MR. PAUL CLOUD:

Yes. We believe it's clean. There

are some asbestos issues. There are some lead based

paint. But governor to the same historical criteria that

your building is but other than that we don't believe

there's anything. That will be I think adequately

documented in the FOST when it comes out later this montb

or next month. And it will discuss the area.

MR. RICHARD HILL:

It's probably clear of UXO also?

MR. PAUL CLOUD:

Yes. We don't believe it's in a

potential UXO area. ~.ny other qnesti ons?

- 101 -

-------·------------····-···-·- ·-----------------------

Page 102: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

MR. DAVID NOVAK:

2 Paul could 1 Just clarify s~mething

3 real quick for the folks here? I'm Dave Novak. I'm with

4 public affairs ~ith !P~ out of Chicago. And part of the

5 process which Corrine was explaini~g on community

6 involvement, at a normal Superfund site that we've got a

7 lot of clean up going on it's a very aggressive program.

8 F.:ere, because you don't have that type of threat and

9 given the community, it's not as aggressive. However,

10 the same rules apply. Keep the community informed. And

11 over the last couple of months that we've been talking or

12 the State has been involved, communities around here and

13 several of the people here already brought up concerns • 14 .

saying we don't know what's happening, this whole

15 community involvement portion of it is to get out there

16 like Corrine s~ys talk to the community, talk to the

17 residents anrl everybody around. f'T1d this includes th.,.

18 entire fifty-five thousand (55,000) acres not just the

19 southern part, find out what your con~erns are so that

20 over the course of the next several years or whatever

21 amount it takes, your questions are going to be answer~d.

22 And that's the whole idea of re-assessing community

23 involvement. It's spearheaded of course by the Army with

24 other concerns. And again our concern as EPA of the

25 State is not as it 1s structured under the Superfund.

- ::.o 2 -

------·------------------------ ·---

Page 103: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

But we ar~ concerned and we want to get the information

cut and that's coming up tonjght that there is some stuff

out there you don't quite understand. Jl.nd that's the

idea of the emphasis on community involvement. So you

can have better lines of comreunication back and forth.

So you know what's happening out there.

HR. P~UL CLOUD:

Laura?

MS. LAURA HODGES:

I just want to make very sure I

understand. Have we been named a Superfund site?

MR. PAUL CLOUD:

No. No we have not.

MR. DAVID NOVAK:

No we're just here ~s an involvement.

Like I say Karen is a Superfund video project manager. I

am over all community involvement. When we get into a

Superfund site I really get heavily involved. Here I'm

not involved only as interested because the community is

involved in this site also. But no, it's not a Superfund

site. Don't get scared over that.

- 10~ -

Page 104: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

M.R . PAUL Cf,OUD:

Let me try to explain it a different

way Laura. There are basically two (2) regulations you -

there are two (2) basic regulations you can apply to use

for clean up at a facility whether it's a military

facility, it's a gas station. it's a manufacturing plant

or anything else. One (1) is what Carol is an expert in

is RCRA hazardous waste. That's for things that you're

basically doing now. generating now, dispos1ng of and

retrieving now. The other one is what Karen is an expert

in and that's called CERCI.A. That's what .John is an

expert in. That's for basically things that you did in

the past maybe five (5), ten (10), fifteen (15), twenty

(20), fifty (SO) years ago that there weren't regulations

for at that time. Now if in fact an assessment is done

on a facility, and there was one (1) done of JPG, it's

basically called a hazardous range scoring - HRS. If you

reach a certain numerical number then you are recommend~d

or suggested for inclusion or you will be placed on the

NVL. As far as I know JPG has not been recommended to be

placed on that list. In that case because we are not OD

the Superfund list in theory there's no real mechanism

for the Army to go use for the clean up of the Proving

Ground. Therefore we're doing what's called a voluntary

CERCLA operation. It's basically CERCLA in all r~spects

- 104 -

Page 105: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

,

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

the Superfund list. Sn that is a difference. The ott.e~

difference is because ~e're not on the Superfund, inst~ad

of EPA being "lead regulator", then that lead regulatory

status falls to the state. But t~ey have a significant

contributor in EPA because the EPA has significant

technical resources that the state, just not Ind1ana, but

all states don't have so they are very intimately

involved in the process. So maybe that explains jt a

little bit better.

MR. DAVID NOVAK:

The resourc~s of all of ~hem are

being used towards this end.

MR. PAUL CLOUD:

And because we're a BRAe facility,

base closure facility, we have formed and it has been

formed for several years now, it's called BRAC clean up

team, BCT. And that comprises Karen from the EPA, .John

from the State and myself from the Army. And we

representing our agencies will after all the information.

the eco risk assessment, human health risk assessment,

the remedial investigation, the feasibility study that

analyzes the vario~s methods that we might use to go

- 10"> -

----------------------------------

Page 106: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

clean up the ?rovin~ Grottnd, we will rnake the decision on

which methods to go use and at ~hat levels ar~ ne~ess~ry

to go clean 11p part of what we factored into that would

be the level of re-11s~ th3t will be formed. So it's not_

a very simple you know yes bl~ck and white, no type of

issue. But it incorporates a whole numbe~ cf things.

But no we are not on the Superfund list. Yes sir?

MR. TIM MOORE:

How can we call JPG officially closed

when you still have an active range on the property?

MR. PAUL CLOUD:

The facility as an active Army

facility is in fact legally officially closed.

MR. TIM MOORE:

Then how can they legally officially

keep title --

MR. PAUL CLOUD:

That is the Air National Guard. They

have a license or permit to go continue that operation as

had been endorsed by the Secretary of the Army when he

was here in October. And it is his intent that the Army

- :.0£ -

-------------------- ---

Page 107: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

continue to allow that op~!~tion.

MR. TIM MOORE:

I don't see how we can cal\ it

closed.

MR. PAUL CLOUD:

From an Army prospective it was

mandated by law to be closed as an Army facility and it

is so closed. Yes sir?

MR. CLYDE CAMPBELL:

You said the Department of Interior

referred to it as a National Wildlife Refuge? That's

what they were interested in?

MR. PAUL CLOUD:

They were i~terest in that. They

made appllcation --

MR. CLYDE CAMPBELL:

How about the State of Indiana?

MR. PAUL CLOUD:

They did not make an application or

- 107 -

--------------------

Page 108: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

request for any of the n~op~rty when they had tha~

opportunity.

MR. CLYDE CAMPBELL:

All right. And then going back you

said something about the Wildlife was going to take their

flfty-six thousand (56,000) acres?

MR. PAllL CLOUD:

Fifty-one (51,000).

MR. CLYDE CAMPBELL:

Fifty-one (51,000). Okay.

MR. PAUL CLOUD:

North of the firing line.

MR. CLYDE CAMPBELL:

All right.

HR. PAUL CLOUD:

It's basically the Army for the next

three (3) years will provide funding for them so that

they can get the funding into their budget cycle.

- 108 -

Page 109: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

MR. CLYDF CAMPBELL:

Okay.

MR. PAUL Ci.OUD:

Then three (3) years from now - so

three (3) years from now the Army won't be paying the"'·

They will h3ve it in their budget and they will continue

to do the same function.

MR. CLYDE CAMPBELL:

To do what?

MR. PAUL CLOUD:

To manage the natural refuge, the

birds, the bunnies, the deer, the endangered species

which is the Indiana bat which is up north. Those types

of functions. None of the cultural natural resourc~s.

That is their charter.

MR. CLYDE CAMPBELL:

As far as public use?

MR. PAUL CLOUD:

No. We are not talking public use no

sir.

- i 0 9 -

------------·--------------,.----

Page 110: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

MR. CLYDE CAMPBELL:

Okay. So myself in com1ng to this

meeting and setting here and interested in public use of

~he fifty-one thousand (51,000) acres--

MR. PAUL CLOUD:

At this present time there are no

pians for public use north of the firing line. That is

not to say that at a future date that might change. But

currently that is an accurate statement.

MR. CLYDE CAMPBELL:

Great. I'll keep on coming.

MS. CAROL WITT-SMITH:

And could you just clarify one (l' of

the reas0ns why they backed out on the refuge deBl w~5

that the EPA sent some major comments about the portion

of the refuge that had to be open to the general public

and the question of will they do clean up or not and what

level on that portion of that can go back to open to the

public? Once it was discussed that all the permitting

and requirements that would have to be added into the

requirement for Fish and Wildlife they kind of backed out

of the deal because of a lot of these issues of our

- ll 1) -

---------

Page 111: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

agency not wanting tn seA north of the firing line opAn

to general public type of action here. It's because of

the unresolved issues of how to deal with UXO. So that

was kind of what was leading that so in this respect it

was MOO. It's a good thing this Fish and Wildlife

primarily wanted the concern of saving a habitat species

north of the firing lin~ and they could b~ a land manager

without the impact by the regulatory agencies to say

you're an owner or an operator.

MR. PAUL CLOUD:

Theylre basically going to be like a

contractor.

MS. CAROL WITT-SMITH:

It's much 1nore beneficial in that

respect.

MR. PAUL CLOUD:

Any other questions?

MR. TIM MOORE:

What's EPA's plans and involvement

from now on? I know we went through these assessments

and everything. Is EPA going to basically take over all

- 111 -

Page 112: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

the ecological - is the ~rmy going to ba~k completely out

of the EPA and Just make sure that all regulations of t~e

EPA be followed north of the firing line?

MR. PAUL CLOUD:

I will let EP~ respond to that. I

don't want to intrude on EPA. I don't want to speak for

the EPA.

KS. CAROL WIT'!'- SMITH:

I mean in the sense that we will

guarantee compliance of regulations. I think in the

contents north of the firing line right now the biggest

regulatory aspect is the open detonation range is going

for closure. So we're working with the Army on getting a

formal closure of the open detonation range which is

basically centralized north of the firing line. As part

of that we also look at security because the perimeter

fence is the security for that detonation range. So

we're working with the Army on making sure that security

is maintained for north of the firing line. And as far

as the - the other concerns would be we've already done

what's called RCRA facility assessment for north of the

firing line and identified sp~cific units where we might

have concerns abcut waste management in the past. Those

- 112 -

Page 113: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

,

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

3ll the ranges th~t once thPy became closeri, all except

for the Air National Guard range, wh1ch is still active,

is that then they became solvent waste management units.

So there is RCRA authority in the sense of future

investigations of the area to see if they is really

anything that's hazardous or not. So it's like the next

phase of things and it's a matter of scheduling. I mean

currently the funding on the budgets are - are pushing

more south of the firing but we'r~ going to be working on

the closure activities, the security issues north of the

firing line right now. And then leaning towards, as soon

as there's settlement of this range rule, munitions rule

issue between our two (2) headquarters, once those things

settle out which should be fairly soon, then we will kind

of have a frame work of how we're going to start looking

at landfills. And there's a priorization system that

they have to go through for ranking the ranges and then

figuring out which phases will get funding to look at

ranges. So that's all kind of coming down the line and

it gives us more authority to make sure that the phases

are done. So there is progression and we are starting to

look at north of the firing line issue.

- 113 -

--~------.----------~--

Page 114: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

MR. TIM MOORE:

Well I didn't see the E?A involved

o:!arli"!r.

MR.. PAUL CLOUD:

The EPA has been involved for several

years.

MS. CAROL WITT-SMITH:

We've been involved.

MR. PAUL CLOUD:

It may not have been evident as it is

now but they have been formally and officially involved

for several years.

MR. TIM MOORE:

Could you explain to me what - you

made the statement solvent waste management units?

MS. CAROL WITT-SMITH:

Yeah. Solvent management units are

basically any unit whether it's a container, a tank, a

landfill, anything that contains by storing, treating,

say you were burning something in a ground, or had any

- :_ 1 4 -

--·-----------·-•··-- ---·------

Page 115: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

0

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

kind of management practice behind it of solid w?~te.

that that becomes listed in ~orrective action as a

solvent waste management units. And so every solvent

waste management unit that gets identified on the entire

base we go through the system of documenting what it i~.

what kind of waste 1o1ere handled by that. whether it was

paper "aste in a trash C.Rll or you know red J.ead in <'

container. So tl1ose get all documented and they go

through an evaluation system where you figure out has

anything been mis-managed, somebody release something,

spilled something on the ground? And then we look

through the same sort of thing of Superfund process and

evaluate the need to clean up activity. And that's done

on the RCRA side. So it's kind of like south of the

firing line what's being done through Karen and John. On

the Superfund side it's a parallel to what RCRA 1o1ould

require. So it's kind of like you do a duplicate review

and RCRA helps Superfund to make sure that there's

compliance with both laws at the same time instead of

coming back five (S) or ten {10) years down the line.

But we also work on both north and south of the firing

line.

MR. TIM MOORE:

You are just looking at existing

- 115 -

- -~-----------------··--- ----.. ---------~

Page 116: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

dumps? You're not looking at new dumps that h~vB he~~

put in?

MS. CAROL WITT-SMITH:

We don't look at new sitings unless

it's an actual - say somebody wanted to re-use part of

the base as a brand new landfill. Well that would have

to go through the whole sit1ng processes that the state

has in place for the solvent waste program seeing if it's

a prop~r site. It has to go through all that. You can't

just create something new.

MR. PAUL CLOUD:

Yes ma'am?

MS. JAE BREITWEISER:

I just have one (1) more question.

You probably answered this and I haven't caught it.

Because there are several of us here for that reason.

One {1) who is going to be responsible for the up keep

and repair and maintenance of Old Timbers and the school

house that is out there and are historical?

MR. PAUL CLOUD:

That's an easy answer. That's the

- 116 -

Page 117: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

0

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

ArTny.

MS. JAE BREITWEISER:

The Army w1ll maintain that?

MR. PAUL CLOUD:

The Army is responsible. We own the

property until such time as we do not own th~ property.

We are responsible for the up keep and the maintenance of

the entire facility in compliance with all laws whether

it's cultural, historical, natural resources, it's an

environmental law or it's anything else. We are

responsible.

MS. JAE BREITWEISER:

We wanted that clarified.

MR. PAUL CLOUD:

Yes ma'am. Any other questions? I

would say we probably did our open discussion then. I

will kind of flip the closing remarks around since I'm

already on my feet and just make the announcement that

our next planned RAB meeting is for Tuesday, March 4th

here. I have no further closing remarks other than to

again to encourage you to sign our attendance sheet, take

- 1 ~.? -

---------------------

Page 118: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

one (11 oE my business cards.

number that you can call me on. And if you have someone

you would like to give a card to, Ken has additional

cards that he can give out and we will go from there.

Richard?

MR. RICHARD HILL:

I thought we had a lot of good

questions tonight and it's real obvious that we're going

to have a lot more good questions. Or a lot more

questions. I don't know how good they will be but we

will have a lot more. I like to see that kind of

participation because that has been a little bit lacking.

I mean if you don't come to every meeting you miss out on

things as far as to keep caught up because ther~ is so

much going on. So I encourage people unt1l such time

that we get this Community Involvement Program going just

perfectly, you just keep coming to the meetings. Okay~

Yes?

MS. DOTTIE REINDOLLAR:

Because all of us can't always come

to all of the meetings could the Army and the

environmental get more media releases out so that we can

keep up without having to go the Hanover College?

- l .. ;. ·~ -

Page 119: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

MR. RICHARD HILI,:

2 I th1nk that's one fl) of the goals

3 or should be yes. That's a good recommendation.

4

5 MS. LAURA HODGES:

6 I h~v~ a comment too Richard. You

7

8 say Ha.rch 4th?

9

10 MR. RICHARD HILL:

11 I think that's correct. That's what

12 we had on the papers. Is that not a good day?

13 • 14 MS. LAURA HODGES:

15 Let me explain why that's a really

16 terrible date. Okay? If what you want is community

17 involvement if you want your city representatives and

18 your county representatives here, you are continuing to

19 put these meetings on the same night as the City Council

20 meeting when every elected official in tbe City of

21 Madison plus all the people who work for the City of

22 Madison, like the Special Projects Administrator, have

23 to be at City Hall all evening. And then secondly

24

25

- Jl9 -

------------------------·-· ·-·· ··--· ··--------------------------------------

Page 120: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

MR. RICHARD HII.L:

No one ever told us that.

MS. LAURA HODGES:

No one ever told you that? Did you

ever ask what is a good day to have these meetings?

MR. PAUL CLOUD:

They were asked and we provided

information as to when the meetings were going to be and

asked if that presented a problem or not. But we have

never gotten any feedback saying we prefer another time.

MS. LAURA HODGES:

I gave you feedback at the time you

scheduled it on election night. That was a really,

really bad night. I gave you feedback about six (6)

weeks before the meeting.

MR. PAUJ, CLOUD:

I understand that. Unfortunately

there are certain other things we have to take into

consideration.

- 120 -

--------- ·-----------

Page 121: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

.MS. LAURF-. HOD~ES ·

Th~ second really bad reason 1s thHt

the county also has meetings that go on this night. The

County Plan Commission and the County Board of Zoning

Appeals meet and that involve~ Steve Lyons, who is the

president of the Co~nty Commission. He's in effect our

county administrator. He cannot be at these meetings

because he has to be in the court house on the first

Tuesday of the month.

MR. DAVID NOVAK:

What's your best time? What's your

free night during the week?

MR PAUL CLOUD:

What would you as a member of the

community recommend? Whether you're officially with th~

press or just a member of the community?

MS. LAURA NODGES:

Well another Tuesday besides this.

At least go to the second Tuesday. Or the fourth

Tuesday that would work. Or if it was a Wednesday. Or

the second Monday.

- J. 21 -

-------------------------------------

Page 122: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

MR. DAVID NOV.l\K:

What night is a good night? Is th1~

not a good night?

MS. LAURA HODGES:

No a lot of people couldn't b~ here

on Wednesday night because of church.

MR. DAVID NOVAK:

Yeah that's right. Wednesday's are

not a good night.

MS. LAURA HODGES:

Thursday nights are bad too.

MR. DAVID NOVAK:

Thursdays a~e bad too.

MR. PAUL CLOUD:

Second Tuesday. r appreciate your

comment and that is relevant. I may retract my pr~viou~

statement. The community co-chair, Richard and I, will.

discuss the issue, get input from not only the regulators

but the community and we will then announce when the next

RAE meet1ng will be. It may not be March the 4th. Tt

-------------

• I I ...

Page 123: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 • 14

15

16

17

18

19

20

21

22

23

24

25

may be a different date. Thank you.

That's all we hav~. I appreciate your coming. Again

sign our attendance sheet. Thank you.

* * * * '* CONCLUSION OF HEARING

- 12'3 -

-·-··-··--"----~----------------

Page 124: Transcript of Public Hearing of the Jefferson Proving Ground … · 2016-02-29 · which is an envi~onmental document has been signed and it was signed in February of last year. And

2

3

4

5

6

7

8

9

10

11

12

13 ,, 14

15

16

17

18

19

20

21

22

23

24

25

c E R T I F I c Pt T E

STATE OF INDI.l\NA ) ) SS:

COUNTY OF .JEFFERSON )

I I Sharon Shields, do hereby certify that I am

a Notary Public in and for the County of Jefferson, Slat•

of Indiana, duly authorized and qualified to administer

oaths; That the foregoing public hearing was taken by me

in shorthand and on a tape recorder on January 7, 1997 in

the offices of the Salvation Army Headquarters, 331 East

Main Streftt. Madison, IN; That this public hearing was

taken on behalf of the Jefferson Prov1ng Ground

Restoration Advisory Boarfi pursuant to agreement for

taking at this time and place; That the testimony of the

witnesses was reduced to typewriting by me and contains a

complete and accurate transcript of the said testimony.

I further certify that pursuant to stipulation

by and between the respective parties. this testimony ha~

been transcribed and submitted to the Jefferson Proving

Ground Restoration Advisory Board.

WITNESS my hand and notarial seal this 13th day

of January, 1997.

My Commission Exp1res: July 2, 1999

__ ____x[~ y£e£L) Sha~on Shields, Notary Public