System Safety Rules Summary
for Contractors
Revision 4 June 2012 HSEQ Department, TRANSCO
TRANSCO SSR - GUIDANCE BOOKLET Revision - 4, 2012
2 This Document is for General Guidance only | By HSEQ Department, Transco
A - INTRODUCTION This guidance booklet provides all the information required to become a Transco Competent Person (CP) or approved HSE Officer. It gives the process and requirements for competency, a summary of the System Safety Rules (SSR) required for passing the test and interview, and can also be used as a reference when working as a Competent Person. Transco want candidates to pass on their first attempt, but they must come prepared. Please read it carefully. B - PROCESS FOR TRANSCO COMPETENT PERSON OR APPROVED HSE OFFICER For 3rd Party Contractors (Competent Persons) 1. Documentation Requirement: o Reply to the Notice of Intent (with drawing) issued by Transco. o Competency Request letter from your company, as per the template given in Section-D. This must
clearly identify the project number, location & nature of work, (e.g. Near HV UGC/Crossing Water Pipeline/Under OHTL).
o Curriculum Vitae of the nominated candidate. o Specific Work Method Statement and Risk Assessment for the work you wish to undertake near
Transco facilities. Items to be covered in a Work method Statement are; Scope, Terminology, References, Roles & Responsibilities, Emergency Procedures, Significant Risks & Control measures, Safe Method of work, Resources and key interfaces.
o First Aid and Fire Fighting training Certificates.
2. Qualification requirements for the nominated candidate(s) o Relevant professional qualifications for the work required (e.g. a civil person for civil works) o Relevant work experience (not less than three years). o Basic HSE awareness of the work to be supervised, the associated hazards, control measures and
emergency procedures. o First Aid and Fire Fighting training. o Good communication skills in English. Must be able to demonstrate conducting a Toolbox Talk. o Safety Officer/HSE Engineers/All Managers will not be accepted for nomination as Competent
Persons.
3. Application Process Submit all of the above documentation to Transco HSEQ Office. The application will be assessed. If there is any requirement of additional documentation, this will be communicated. Once all the documentation is submitted, the next action on the application will be decided based on the request type (refer to Section F). Appointment date and time will be given based on the request type. This appointment will be arranged within approximately 3 weeks after receipt of the request letter and all required documents. An incorrectly completed request letter or inadequate documents will delay the appointment. Competency process involves HSE and/or Technical assessments. HSE assessment assesses a candidate’s understanding of Transco SSR as applicable to competent persons and his/her ability to execute the intended works in a safe way. Technical assessment assesses a candidate’s knowledge, training & experience required to execute the intended works in an appropriate manner.
4. HSE Assessment (Written Test and Interview) The nominated candidate for competency shall read and understand Transco SSR Summary for Contractors (for HSE Officers, they should go through their Project HSE Plan) before attending the written test & interview. If they are unsure on any items, they must seek help and assistance from their
TRANSCO SSR - GUIDANCE BOOKLET Revision - 4, 2012
3 This Document is for General Guidance only | By HSEQ Department, Transco
company’s senior HSE persons. They should also fully understand their company Risk Assessments and Method Statements for the relevant works. Most of the questions in the HSE written test are multiple choice questions, although some questions would require descriptive answers. Answers to most of the questions are contained within this booklet and the Risk Assessments/Method Statements for the relevant work. For HSE Officers, the questions are of basic nature that all HSE Officers are expected to know. They shall read and understand the relevant Project HSE plan and Risk Assessments.
5. Technical Assessment On successful completion of the HSE assessment, the candidate will be sent for Technical assessment. Subject to successful completion of the technical assessment and fulfillment of all documentation requirements, the candidate will be provided with the competency as agreed between HSE and concerned Technical Assessor.
6. Restrictions o A candidate needs to score at least 90% in the HSE written test in order to proceed to the HSE
interview stage. o A candidate will only have two opportunities/attempts to clear the testing process. o The candidate must turn up on the given date and time. Failure to turn up at the required time will
result in the test & interview being cancelled and counted as one unsuccessful attempt. For 2nd Party Contractors (Competent Persons or HSE Officers) 7. Clearly identify in your request letter the project number, location & nature of work (within Transco
Premises). Include detailed CV of the nominated candidate & any other approved competency certificates.
8. Follow the process and requirements as mentioned above in step-3 to 5.
C - CONTRACTORS/CONSULTANTS VISITING HOURS
Activity Timings
HSE Assessment (Test/Interviews) Every Sunday, 07:30 to 14:00
Technical Assessment As agreed with Technical Assessor
Meeting with HSEQ Manager / HSE Engineer By formal appointment only
Submission of Requests for Competency/HSE Officer and/or any other related issues
Sunday 07:30 to 14:00
Tuesday/Thursday 07:30 to 10:00
TRANSCO SSR - GUIDANCE BOOKLET Revision - 4, 2012
4 This Document is for General Guidance only | By HSEQ Department, Transco
D - REQUEST LETTER TEMPLATE FOR COMPETENT PERSON (To be produced on Company Letter Head)
Date: Reference No: Contact e-mail:
To: HSEQ Manager Abu Dhabi Transmission & Despatch Company (TRANSCO) Subject: Request for COMPETENT PERSON (NEW/RENEWAL/UPGRADING) Please arrange for below mentioned to be assessed by Transco for qualifying as a Competent Person for works near/on Transco premises for the following contract/project.
Contract/Project No & Detail: ___________________________________________________________
Name: Job Title:
Education: Overall Experience (years):
UAE Visa type: Experience in the UAE (years):
Company/Sponsor Name:
Category of Work: ______ HV _____LV _____Civil ______Mechanical
First Aid Training: Fire Fighting Training:
Previous Competency Certificate (Transco / Others):
Brief Work Description (works to be carried out under Safety Document):
We confirm that the Competent Person will not leave the work site while works are in progress under Transco System Safety Rules.
Regards,
Name & Signature (company Managing Director or Equivalent)
Attachments: - Candidate CV - Reply to the Notice of Intent issued from Transco (first issue & latest renewal) - Work Method Statement and Risk Assessment - First Aid Training & Fire Fighting Training Certificates copy - Other Company Competency Certificates copy - Passport copy with valid visa page or Labour card copy.
TRANSCO SSR - GUIDANCE BOOKLET Revision - 4, 2012
5 This Document is for General Guidance only | By HSEQ Department, Transco
E - REQUEST LETTER TEMPLATE FOR HSE OFFICER - TRANSCO PROJECTS (To be produced on Company Letter Head)
Date: Reference No: Contact e-mail:
To: HSEQ Manager Abu Dhabi Transmission & Despatch Company (TRANSCO) Subject: Request for HSE OFFICER (NEW/RENEWAL) Please arrange for below mentioned to be assessed by Transco for qualifying as a HSE Officer for the following contract/project.
Contract/Project No & Detail: ________________________________________________________
Name: Job Title:
Education: Overall Experience (years):
UAE Visa type: Experience in the UAE (years):
Company/Sponsor Name: Experience as HSE Officer (years):
NEBOSH:
First Aid Training: Fire Fighting Training:
Previous HSE Officer Approvals (Transco / Others):
We confirm that in case of an absence of the approved HSE Officer, a replacement HSE Officer approved by Transco shall be provided for the subject contract/project.
Regards,
Name & Signature (company Managing Director or Equivalent)
Attachments: - Candidate CV - NEBOSH Certificate copy - First Aid Training & Fire Fighting Training Certificates copy - Transco or other Company HSE Officer approval certificates copy, if any - Passport copy with valid visa page or Labour card copy.
TRANSCO SSR - GUIDANCE BOOKLET Revision - 4, 2012
6 This Document is for General Guidance only | By HSEQ Department, Transco
F - REQUIREMENTS FOR DIFFERENT REQUEST TYPES
Ne
w R
eq
ue
st
Re
ne
wal
R
eje
cte
d c
and
idat
e
Ad
din
g n
ew
/ch
angi
ng
pro
ject
(s)
on
ly
Ad
din
g
ne
w/c
han
gin
g
cate
gory
of
wo
rk
Re
ne
wal
Dis
cip
line
Bas
ed
Co
mp
ete
ncy
req
ue
st
Elig
ibili
ty :
Ple
ase
see
th
e
Tran
sco
SSR
Gu
idan
ce s
hee
t fo
r
Co
ntr
acto
rs
For
exp
ired
cer
tifi
cate
s
(mo
re t
han
3 y
rs)
-A c
and
idat
e is
reje
cted
wh
en h
e/sh
e
is u
nab
le t
o c
lea
r th
e
com
pet
ency
pro
cess
in t
wo
att
emp
ts.
-Th
e co
mp
any
can
re-
req
ues
t af
ter
six
mo
nth
fro
m t
he
dat
e
of
reje
ctio
n, w
ith
pro
vid
ing
just
ific
atio
n
on
his
/her
imp
rove
men
ts.
Elig
ibili
ty:
1-T
ran
sco
issu
ed
com
pet
ency
cer
tifc
ate
ho
lder
on
ly.
2-A
tlea
st s
pen
ds
thre
e
mo
nth
s o
n h
is/h
er
exis
tin
g co
mp
eten
cy
cert
ific
ate.
Elig
ibili
ty:
1-T
ran
sco
issu
ed
com
pet
ency
cert
ifca
te h
old
er o
nly
.
2-A
tlea
st s
pen
ds
thre
e m
on
ths
on
his
/her
exi
stin
g
com
pet
ency
cert
ific
ate.
1-F
or
exp
ired
cer
tifi
cate
(les
s th
an 3
yrs
)
2-F
or
valid
ity
exte
nsi
on
on
ly.
Elig
ibiil
ty:
1)
Seco
nd
Par
ty/M
ain
con
trac
tors
on
ly
2)
Exp
osu
re t
o T
ran
sco
SSR
for
mo
re t
han
a y
ear.
3)
Rel
avan
t w
ork
exp
erie
nce
of
5 y
rs.
4)
At
lea
st 1
0 s
afte
ty
do
cum
ents
rec
eive
d/c
lea
red
.
5)
No
SSR
vio
lati
on
(s).
6)
No
t m
ore
th
an o
ne
cate
gory
of
wo
rk (
e.g
pro
tect
ion
co
ntr
ol
syst
em r
elat
ed w
ork
s o
nly
)
Req
ues
t Le
tter
(Tr
ansc
o T
emp
late
)Ye
sYe
sYe
sYe
sYe
sYe
sYe
s
Pro
ject
Lim
itat
ion
(s)
Thre
eTh
ree
On
eTh
ree
Thre
eA
s p
er t
he
exis
tin
g
cert
ific
ate
All
Pro
ject
s (d
irec
t P
roje
ct w
ith
Tran
sco
)
Safe
ty D
ocu
men
t co
pie
s
(LA
P/P
TW/S
FT)
NA
Yes
NA
Yes
Yes
Yes
Yes
FA &
FF
(val
id c
erti
fica
te)
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Vis
a P
age*
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Oth
er d
ocu
men
ts**
1-T
ran
sco
issu
ed
NO
I (N
oti
ce o
f
Inte
nt)
2-W
MS/
RA
(W
ork
Met
ho
d
Stat
emen
t/R
isk
Ass
essm
ent)
1-T
ran
sco
issu
ed N
OI
2-W
MS/
RA
1-T
ran
sco
issu
ed N
OI
2-W
MS/
RA
1-T
ran
sco
issu
ed N
OI
2-W
MS/
RA
1-T
ran
sco
issu
ed N
OI
2-W
MS/
RA
Tran
sco
issu
ed N
OI
NA
HSE
Ass
esm
ent
(wri
tten
exa
m)
Yes
Yes
Yes
NA
***
Yes
NA
***
Yes
HSE
Ass
esm
ent
(In
terv
iew
)Ye
sYe
sYe
sN
AYe
sN
AYe
s
Tech
nic
al A
sses
smen
t
(Tes
t/In
terv
iew
)Ye
sYe
sYe
sYe
sYe
sN
AYe
s
Req
ues
t Le
tter
pro
cess
ing
tim
e
Co
mp
eten
cy C
erti
fica
te V
alid
ity*
**
1 y
ear
1 y
ear
6 m
on
ths
1 y
ear
1 y
ear
1 y
ear
1 y
ear
Wit
hin
3 w
eeks
Wit
hin
2 w
eeks
*Pro
fess
ion
men
tio
ned
in t
he
visa
pag
e sh
ou
ld b
e re
lava
nt
to t
he
inte
nd
ed w
ork
s (F
or
exam
ple
a p
erso
n w
ith
'Cle
rk' p
rofe
ssio
n o
n t
he
visa
pag
e is
no
t ac
cep
tab
le f
or
com
pet
ency
)
**Fo
r w
ork
s n
ear/
cro
ssin
g Tr
ansc
o e
xist
ing
seri
vces
(i.
e O
verh
ead
Lin
e/U
G C
able
/UG
Wat
er P
ipel
ine)
***S
ub
ject
to
HSE
Q D
epar
tmen
t ap
pro
val.
Ple
ase
no
te: 1
) A
ny
chan
ge(s
) o
n t
he
abo
ve r
equ
irem
ents
is t
he
sole
des
cret
ion
of
HSE
Q D
epar
tmen
t.
2) A
ny
sub
con
tra
cto
r re
qu
esti
ng
for
com
pet
ency
sh
all s
ub
mit
a c
op
y o
f th
eir
agr
eem
ent
wit
h t
he
mai
n c
on
tra
cto
r.
Re
qu
est
Typ
e (
wit
h D
esc
rip
tio
n)
TRANSCO SSR - GUIDANCE BOOKLET Revision - 4, 2012
7 This Document is for General Guidance only | By HSEQ Department, Transco
G - SUMMARY OF SSR The following information is an extract from Transco SSR Revision 3.0. The contractors’ Competent Persons need to comprehend the following as a minimum requirement and to pass the written exam and interview. PRINCIPLES OF SSR
1. System Safety Rules are intended to protect persons from inherent system hazards
2. Only Competent Persons can undertake works in TRANSCO premises after receiving a Safety Document (SD)
3. Authorized Person (AP) assesses all risks & applies System Safety precautions before issuing the SD.
4. Equipment must be clearly identified in SD (matching equipment label on site)
5. Operation of equipment is by direct communication; operation by prearranged signals or timing is not allowed.
6. Competent Person (CP) must be present on site all time during work, controlling all activities & persons. (This is called Principle of Supervision)
7. Safety Document must be retained by the CP on site.
GENERAL DEFINITIONS
Hazards Source of dangers to persons (for example tool is a hazard). Safe Free from Hazards System Equipment interconnected in a network (Power & Water Transmission Networks) System Hazards Hazards present (inherent) in a system (Electrical, Mechanical, Chemical, Pressure) System Safety Precautions to control system hazards, applied by an Authorized Person
Example: Isolation, earthing, safety document, safe method of work, applying demarcation, danger / caution notices, labeling, venting, draining, purging & release of stored energy, PPE
General Hazards Non system Hazards like excavation, lifting, scaffolding, ladders, hot works, tools, etc.
General Safety Precautions to control non system hazards, maintained by a Competent Person Example: Shoring, barriers, training, supervision, approved procedures, safe method of work, inspection of certificates tools &equipment, on site risk assessment, toolbox talks, PPE etc.
Release of Energy Means Venting, draining, purging, or braking, or spring release. Key Safe Key A unique Key for locking the Key Safe at work location, given to CP by the AP High Voltage (HV) A voltage exceeding 1000 volts PPE Personal protective equipment (helmet, safety shoes, gloves, coveralls, high-vis etc.) Receipt Means that CP has agreed that he/she fully understands the work and is satisfied of
applied system safety precautions and accepts full responsibility to maintain the safety and supervise the work.
Clearance Means a declaration by the CP that all persons, materials & tools are removed from the work area and it is no longer safe to work within that area.
LDC Load Dispatch Center Isolation Point The point at which equipment has been isolated to provide physical separation. Primary Earth Conductor that protects from accidental operation while working on HV equipment
(min. 95 mm2) Additional Earth Conductor that protects from induced voltage while working on HV equipment.
(Min. 25 mm2) Toolbox Talks An onsite communication between the CP and his/her working party before the start
of work conducted each day early in the morning. Must include, work to be done,
TRANSCO SSR - GUIDANCE BOOKLET Revision - 4, 2012
8 This Document is for General Guidance only | By HSEQ Department, Transco
hazards, control measures, Emergency procedures, working environment, any changes from previous day, check PPE and tools.
Earthing Schedule A schedule indicating the additional earth requirements for each stage of the work necessary to control induced voltages as circumstances change
Safety Clearance The distance from the nearest exposed HV conductor not earthed, or from an insulator supporting an exposed HV conductor, which must be maintained at all times to avoid danger to persons. 5.5m for 400kv, 4m for 220kv, 3m for 132kv, 1.5m for all HV conductors up to 33kv, (Note: HV insulators minimum safety clearance distance= 0.5m)
DEFINITION OF AUTHORITIES
Competent Person A competent person (CP) is a person, having suitable & sufficient technical Knowledge & experience to recognize and avoid danger, use safe method of works & use appropriate PPE, receives & clear SD.
Authorized Person An authorized person (AP) is a Transco competent person who has been additionally authorized to Issue & cancel Safety documents, assess all work risks and apply system safety precaution before start of any work.
Control Person A control person (CN) is a Transco employee who controls the transmission system (from LDC) & coordinates system safety activities.
SAFETY DOCUMENT PROCEDURE 1. Please note that the CP should be in possession of only one SD at any point of time. 2. CPs should not proceed with any works at any time if they are unsure or in doubt about any aspect of
the work. They must STOP AND CONTACT THE AP IMMEDIATELY.
No Person Actions
1 Contractor Apply to Transco concerned department 2 - 7 days before the start of intended works
using Application For Work (AFW) form (available with concerned department Transco)
2 Transco Concerned department review application for work & submit to LDC for approval
3 Transco LDC approves application for work & return to the concerned Transco department
4 Authorised AP from the concerned department shall asses all the risks on site, apply System
Safety precautions, and issue Safety Document to the contractor Competent Person after obtaining consent from a Control Person in LDC
5
Competent Read and understand the SD before receipt. Conduct toolbox talks, start the work & maintain general safety. CP must follow and only do the works as mentioned on the SD, follow method statement, supervise 100% of the time. NEVER PROCEED IF YOU ARE UNSURE OR IN DOUBT, always contact AP for help, advice and clarification.
6 Competent CP gives clearance after completion of work & removal of persons, tools from work
location. Transco site supervisor must be informed before giving clearance.
7 Authorised AP cancel the SD after inspecting the work area
TYPES OF SAFETY DOCUMENT (Only three in Transco)
Permit to Work (PTW): A safety document for works requiring secured isolation followed by Earthing or Release of stored energy.
Limited Access Permit (LAP): A safety document where safety from the system is achieved by applying limits to work and/or work area. See the LAP form in Section-J.
Sanction for Test (SFT): A safety document for works requiring injection of high voltage or current and which may require the removal of primary earths. All PTW must be cancelled first.
TRANSCO SSR - GUIDANCE BOOKLET Revision - 4, 2012
9 This Document is for General Guidance only | By HSEQ Department, Transco
SAFE WORK AREA (Prepared by the Authorized Person)
SOME PICTURES AND A SCHEMATIC
H - VIOLATION OF SYSTEM SAFETY RULES Common violations of Transco’s System Safety Rules (SSR) by Competent Persons (CPs) include the following. Please remember that this list is indicative only and not exhaustive. CP not present on site while work is under progress through an open safety document. This is a major
violation. The Competent Person must always be present on site supervising his/her working party for the period while the work is in progress through an open safety document.
CP receives more than one safety document. He may have finished his work; but as long the safety document is not cleared by him and cancelled by the relevant AP, he/she cannot receive another safety document.
CP receives safety document for work that is not covered by his existing competency. This includes both the project and nature of the work. It is responsibility of the CP not to apply and receive a safety document for works that are not covered by his competency.
CP takes on work that is not compatible with the work, equipment and location mentioned in the safety document. It has to be known that the CP is allowed to do only what is mentioned in the safety document. It is for this purpose that CP is expected to read and understand the safety document before signing (or receiving) it.
All equipment outside Safe Work Area are considered LIVE!
The limits of Safe Work Area must be physically identified by Red & White tape or chain with Danger notices displayed at the limits, facing
into the Safe Work Area (inside). Work is not allowed on an established isolation point
Red & white tape or chain
Lock Lock
Earth Earth
Isolation Point Isolation Point
400kv OHL safety clearance distance
measured from HV conductor Safety-Key is locked inside
key-safe by 1 Control-Key
and 4 key-safe-keys
Used to identify
Points-of-Isolation
Displayed facing
into the Safe Work
Area
CAUTION NOTICE DANGER NOTICE MINIMUM SAFETY CLEARANCE DISTANCE SAFETY KEY
5.5 meter
HV Insulator HV conductor
TRANSCO SSR - GUIDANCE BOOKLET Revision - 4, 2012
10 This Document is for General Guidance only | By HSEQ Department, Transco
CP receives a safety document that is inappropriately filled by the Authorized Person. The CP must read and understand safety document before receiving it, confirming all the details and fields of the safety document.
CP clears a safety document that has been received by another Competent Person. Please remember that safety documents are not transferrable under normal situations. Only in case of certain emergencies, to be established by the Authorized Persons, a safety document can be transferred from one CP to another (Transfer of Safety Document). This must follow a proper procedure as established by the SSR.
CP receives a safety document while his competency has expired or is in possession of an open safety document while his competency expired.
CP has not cleared a safety documents within the validity of the Safety Document as identified by the AP. CP must contact the AP before expiry of the validity in case if there is any requirement of extending the validity of the safety document.
PENALTIES
The above mentioned violations are subject to penalty. Any competent person who is found to have conducted these violations WILL have his COMPETENCY WITHDRAWN immediately and will not be considered for competency again. There is zero tolerance to not complying; no matter how minor the violation may be. I - ACCESS TO SUBSTATIONS AND PUMPING STATIONS All Competent Persons accessing Transco substations and pumping stations for work purposes are required to follow certain code of personal and operational behavior. This code is explained in Transco SSR. Details of the code can be obtained from the Authorized Person who is issuing the safety document. The following, however, are some of the points that contractor CPs must be aware of and follow;
Inform Load Despatch Centre (LDC or Control Person) whenever you access Transco Substation or Pumping Station for work purposes. Contact details can be obtained from the Authorized Person.
Enter details of your work and safety document in the Substation or pumping station Log Book. In case of a manned pumping station, the shift operator/engineer may issue the safety document. CPs must ensure that the safety document details have been entered by the shift operator/engineer into the log book.
Ensure that you keep the main door of the substation or pumping station locked all the times. Never leave a Transco substation unsecured.
For access to rooms protected by automatic fire protection system, please ensure that the firefighting system has been switched to ‘Manual’ mode. On exit, switch it back to ‘Automatic’ mode ensuring that the door is left closed behind.
All CPs accessing SS and PS for work purposes must familiarize themselves with the local Emergency Procedures. This involves the evacuation plan detailing the assembly points and the emergency exit. These procedures must be communicated to the working party during the TBT.
Copy of the safety document must be posted appropriately at the work location and removed when work is done and safety document cleared.
Only access work areas or locations/rooms inside the substation or pumping stations that are required according to the safety document.
The minimum PPE requirement for access and work in a SS and PS (Safety Shoes, Safety Helmet, Coverall, and Hi-Vis Jacket) must always be fulfilled.
Where two CPs are working at the same location, there must be a full coordination between them so as not to expose each other to the risks involved in their activities.
TRANSCO SSR - GUIDANCE BOOKLET Revision - 4, 2012
11 This Document is for General Guidance only | By HSEQ Department, Transco
J - LIMITED ACCESS PERMIT (LAP)
L - APPLICATION FOR WORK (POWER) - Typical
TRANSCO SSR - GUIDANCE BOOKLET Revision - 4, 2012
12 This Document is for General Guidance only | By HSEQ Department, Transco
This booklet is designed for TRANSCO Contractors & Contractors who work near or on TRANSCO facilities. It is the property of TRANSCO, and cannot be used nor given to outside party without prior authorisation.
First Appointment
Company Name: _________________________________________________________________
Name: _________________________________________________________________________
Date: _______________________________Time_______________________________________
I agree to turn up on the correct date and time allocated for me and will come prepared:-
Sign: __________________________________________________________________________
Second Appointment
Company Name: _________________________________________________________________
Name: _________________________________________________________________________
Date: _______________________________Time_______________________________________
I agree to turn up on the correct date and time allocated for me and will come prepared:-
Sign: __________________________________________________________________________
For comments and suggestions, please send us your feedback as per below contacts
Abu Dhabi Transmission and Despatch Company (TRANSCO), HSEQ Department
P.O. Box: 173, Abu Dhabi, UAE. Tel: (2) 4164000/ Fax: (2) 6946314/6313 Web: www.transco.ae, Email: [email protected]