transboundary water management in the congo basin · 2017-09-25 · ci o s transboundary water...

2
C C I O S Transboundary Water Management Project Partner: International Commission of the Congo-Oubangui-Sangha Basin (CICOS) Project Region: Republic of the Congo, Democratic Republic of the Congo, Central African Republic, Republic of Cameroon, Gabon Project Term: Overall: 2006 - 2016 Current phase: January 2013 – July 2016 Project Budget: Total: EUR 11 million Current phase: EUR 6 million Context Located in the heart of Africa, the Congo basin extends across ten countries, in an area seven times larger than Germany. It is the second largest river basin worldwide just after the Amazon basin. With an average flow of 41,000 m 3 /s, the Congo River accounts for over a third of Africa’s freshwater resources and offers considerable poten- tial, particularly for the development of irrigation and hy-dropower production. e Congo is one of the main means of transportation in Central Africa, used for both transportation of passengers and transportation of goods. e network of waterways upstream of Kinshasa-Brazza- ville is estimated at more than 25,000 km. Aware of the development issues in the Congo basin, four riparian countries (Cameroon, Central African Republic, Republic of the Congo and Democratic Republic of Congo) signed in 1999 an agreement to establish a uniform river regime and creating the International Commission of the Congo-Ubangi-Sangha basin (CICOS). CICOS is man- dated with the promotion of inland navigation and water resources development in the basin. e Government of the Federal Republic of Germany is supporting CICOS since 2006 with the implementation of the project on transboundary water management in the Congo basin. Project e project aims to strengthen the capacities of CICOS in the sectors of inland navigation and water resources management. e project works in four intervention areas: 1. Inland Navigation e project facilitates the application of the Code on Inland Navigation CEMAC-DRC to improve the effi- ciency of inland navigation and increase security along the river. 2. Regional Vocational Training Centre e project supports the establishment and strengthen- ing of the Regional Training Centre on Inland Naviga- tion (CRFNI) through the design and implementation of training programs and the rehabilitation of its build- ings and facilities. 3. Water Management In collaboration with the European Union, the French Development Agency and the African Development Bank, the project supports CICOS in the development of deci- sion making tools for the development and sustainable management of water resources in the Congo basin. 4. Organizational Development e project supports the implementation of a participa- tory approach in the field of water management, through the establishment of dialogue platforms to inform, consult and involve stakeholders in the process of developing a Master plan for water resources develop-ment and man- agement in the Congo basin (SDAGE). Impact Since 2009, the CRFNI has trained more than 1500 crew members and administrative officers. In 2013, the Minister of Transport in DRC made it mandatory for all captains Transboundary Water Management in the Congo Basin (Gestion Transfrontralière de l’Eau dans le Bassin du Congo)

Upload: others

Post on 02-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Transboundary Water Management in the Congo Basin · 2017-09-25 · CI O S Transboundary Water Management Project Partner: International Commission of the Congo-Oubangui-Sangha Basin

C CI OS

Tr ansbounda r y Wate r Management

Project Partner: International Commission of the

Congo-Oubangui-Sangha Basin (CICOS)

Project Region: Republic of the Congo, Democratic Republic

of the Congo, Central African Republic,

Republic of Cameroon, Gabon

Project Term: Overall: 2006 - 2016

Current phase: January 2013 – July 2016

Project Budget: Total: EUR 11 million

Current phase: EUR 6 million

ContextLocated in the heart of Africa, the Congo basin extends across ten countries, in an area seven times larger than Germany. It is the second largest river basin worldwide just after the Amazon basin. With an average flow of 41,000 m3/s, the Congo River accounts for over a third of Africa’s freshwater resources and offers considerable poten-tial, particularly for the development of irrigation and hy-dropower production. The Congo is one of the main means of transportation in Central Africa, used for both transportation of passengers and transportation of goods. The network of waterways upstream of Kinshasa-Brazza-ville is estimated at more than 25,000 km.

Aware of the development issues in the Congo basin, four riparian countries (Cameroon, Central African Republic, Republic of the Congo and Democratic Republic of Congo) signed in 1999 an agreement to establish a uniform river regime and creating the International Commission of the Congo-Ubangi-Sangha basin (CICOS). CICOS is man-dated with the promotion of inland navigation and water resources development in the basin. The Government of the Federal Republic of Germany is supporting CICOS since 2006 with the implementation of the project on transboundary water management in the Congo basin.

Project The project aims to strengthen the capacities of CICOS in the sectors of inland navigation and water resources management. The project works in four intervention areas:

1. Inland NavigationThe project facilitates the application of the Code on Inland Navigation CEMAC-DRC to improve the effi-ciency of inland navigation and increase security along the river.

2. Regional Vocational Training CentreThe project supports the establishment and strengthen-ing of the Regional Training Centre on Inland Naviga-tion (CRFNI) through the design and implementation of training programs and the rehabilitation of its build-ings and facilities.

3. Water ManagementIn collaboration with the European Union, the French Development Agency and the African Development Bank, the project supports CICOS in the development of deci-sion making tools for the development and sustainable management of water resources in the Congo basin.

4. Organizational DevelopmentThe project supports the implementation of a participa-tory approach in the field of water management, through the establishment of dialogue platforms to inform, consult and involve stakeholders in the process of developing a Master plan for water resources develop-ment and man-agement in the Congo basin (SDAGE).

ImpactSince 2009, the CRFNI has trained more than 1500 crew members and administrative officers. In 2013, the Minister of Transport in DRC made it mandatory for all captains

Transboundary Water Management in the Congo Basin (Gestion Transfrontralière de l’Eau dans le Bassin du Congo)

Page 2: Transboundary Water Management in the Congo Basin · 2017-09-25 · CI O S Transboundary Water Management Project Partner: International Commission of the Congo-Oubangui-Sangha Basin

Imprint

Published by:Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

Dag-Hammarskjöld-Weg 1-5 65760 Eschborn/GermanyT +49 6196 79 -0F +49 6196 79 -80 11 15E [email protected] www.giz.de

Contact:Dr. Bertrand MeinierCroisement des avenues Wagenia et Poids LourdsBuilding Kilou 3rd floorKinshasa – Gombe, DR KongoT +234 (0) 998012074E [email protected] I www.giz.de

Photos and map:© GIZ, Damien Brunel, Heike Grebe,

Jorn Schumann

Design by:creative republic / Thomas Maxeiner Kommunikationsdesign, Frankfurt a. M.

Printed on 100 % recycled paper

Status: October 2014

gers traveling between Kinshasa and Brazzaville. It is now cheaper and faster to travel between these two African cities.In the water sector the project facilitates the process of sustainable infrastructure development, which is an engine for economic growth. Access to electricity and water supply is still very low throughout the basin, less than 10 % in average. Despite the urgency, water infrastructures must be designed to reduce the impact on the environment and account for their potential effects in other Member States. The project is currently supporting the formulation of a guideline on prior notification to be tested in the process of developing Inga III.

navigating on the river to obtain a certificate from the CR-FNI. The Minister made this decision after reading the results of a CICOS study providing evidence that the main cause of accidents along the Congo River is due to the lack of training of the various crew members. With proper training, more than 200 lives could be saved annually.

In addition to promoting security on the river, the project supports CICOS and Member States with the reduction of non-physical barriers along the river. For instance, the Governments of DRC and the Republic of Congo agreed to eliminate a tax of 5.00 USD collected from all passen-

C o n go

Ou

ba

ng

uiSangha

K a s a ï

Kwa

O u é l é

Lualab

a

L u ku g a

L u v u a

Lu

ala

pa

C o n go

LacMoero

LacBangwelo

LacMai -Ndombe

LacTankanyika

Cameroun

RDCCongo

Gabon

RCA

Angola

Rwanda

Burundi

Tanzanie

OugandaKenya

Sud-SoudanNigeriaTchad Ethiopie

Zambie Malawi

GuinéeEquatoriale

0 200 400 600Km

Bassin du Congo(3.689.000 km2)

Cours d’eau principaux

Changement de nom de rivière

30°E

30°E

20°E

20°E

10°E

10°E

5°N5°N

0° 0°

5°S5°S

10°S

10°S

Sour

ces:

ESR

I (fro

ntiè

res)

; Hyd

roSH

EDS

(WW

F).

Rive

rs o

f Afri

ca (F

AO).

S i t u a t i o n d u B a ss i n d u C o n go e n A f r i q u e C e n t ra le

C CI OS

coopérationallemande

C CI OS

© C

ICO

S 20

14