trailing suction hopper dredger “ostsee sheet... · trailing suction hopper dredger...
TRANSCRIPT
ONE COURSE FOR EVERY DIRECTION
Trailing Suction Hopper Dredger “Ostsee"
DUTCH MARINE CONTRACTORS
GENERAL INFORMATION
Length o.a.: 99,83 m Breadth o.a.: 17,75 mLength between perpendiculars: 90,25 mBreadth moulded: 17,70 mDepth moulded: 6,20 mDraught - Light ship weight: 3,63 m aft / 0,79 m foreDraught - Int. freeboard: 4,96 mDraught - Dredging mark: 5,59 mDraught - Inland mark: 6,03 mHeight vessel from keel to top of mast: 32,50 mLight ship weight: 2,607 tDeadweight - Int. freeboard: 3,838 tDeadweight - Dredging mark: 4,791 tDeadweight - Inland mark: 5,428 tDisplacement - Int. freeboard: 6,445 tDisplacement - Dredging mark: 7,398 tDisplacement - Inland mark: 8,035 tGross Tonnage: 3,785 tNett Tonnage: 1,135 tAccomodation: 13 menMinimum safe manning - 200 miles: 7 men
MAIN DIMENSIONS Main engines: 2 x MAN B&W - 6L 32/40- power: 2,640 kW eachAuxiliary generator engines: 2 x Deutz MWM - TBD 616 V8- power: 345 kW eachEmergency generator engine: 1 x Deutz MWM - BF 6L 513 RC- power: 120 kWTotal installed diesel power: 6,090 kW
ENGINES/PROPULSION
Marine gas oil: 702,5 m³Fresh water: 47,9 m³Fuel type engine: MGO (DMA)Luboil: 45,000 ltr
BUNKER CAPACITY
CONTACT
Phone: +31 20 3080 899Mail: [email protected]
Web: www.dutchmarinecontractors.com
Vessel: OstseeType of vessel: Trailing Suction Hopper DredgerCall sign: 5BAK4IMO number: 9105152Year of Build: 1995Refit / Conversion: 2014Building Yards: Detlef Hegemann Rolandwerft GmbH & Co., Berne and Peene-Werft GmbH, Wolgast Yard number: 175 (Penee-Werft Building # 429)Flag: CyprusClass: Bureau Veritas 1 HULL MACH, AUT UMS, Hopper Dredger, unrestricted navigationPort of Registry: Rotterdam
Bowthruster: 1 x 400 kWSternthruster: – Propulsion power - Free sailing: 5,280 kWPropulsion power - Dredging: 2,550 kW
INSTALLED PROPULSION POWER
Details of the equipment offered by DMC is done in good faith and believed to be correct but cannot be guaranteed.
Inboard dredgepumps: 2 x 480 kWShore delivery pumps: 2 x 1,800 kW (inboard dredgepumps)Shore delivery pumps in series: 3,600 kWUnderwater dredgepumps: –Jetpumps: 2 x 486 kW
INSTALLED DREDGEPUMP POWER
Trailing Suction Hopper Dredger “Ostsee"
DUTCH MARINE CONTRACTORS
CONTACT
Phone: +31 20 3080 899Mail: [email protected]
Web: www.dutchmarinecontractors.com
Hopper volume: 3400 m³Dredging depth - Normal: 25 mDredging depth - Maximum: –Trailing suction pipes - Diameter: 2 x Ø 0,7 mShore delivery pipe - Diameter: Ø 0,75 mShore delivery pipe - Bow coupling: Ø 0,75 m (Ø 0,8 m optional)Sailing speed - unloaded in ballast: 14,3 knotsSailing speed - loaded: 14 knotsUnloaded System: Bottom doors & bow dischargeAnchoring System: 3 anchors - 2 x bow / 1 x sternDynamic Positioning (DP): noDynamic Tracking (DT): no
CAPACITIES
ONE COURSE FOR EVERY DIRECTION
Discharge cargo: Bottom doors/Rainbow/via port dredging pipeLoading/discharge time: 45 min./1.10 hrs (sand)Fuel consumption: Saling 75% = 14 mt per day /100% 24 mt per day / during dredging opera-tions 12 mt per dayDeck crane: Kobelco 127 kW, 150 tm, boom 27 mtr
DREDGING FUNCTIONS
Details of the equipment offered by DMC is done in good faith and believed to be correct but cannot be guaranteed.