traffic microsimulation & 3-d visualization presenters: fadi emil nassar, p.e. veronica a. boza,...

38
TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

Upload: shawn-mckenzie

Post on 12-Jan-2016

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

TRAFFIC MICROSIMULATION & 3-D VISUALIZATION

Presenters: Fadi Emil Nassar, P.E.Veronica A. Boza, E.I.

FDOT – MAY 4, 2007

Page 2: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

MACRO / MICRO TRAFFIC MODELS

MACRO MODEL: TRAFFIC FORECASTMICRO MODEL: OPERATIONAL ANALYSIS NO LONGER SEPARATE FILEDS:

– DISTRIBUTION IMPACTED BY OPERATIONS– CAPACITY CONSTRAINT AT INTERSECTIONS– TRANSIT/MODAL SPLIT IMPACTED BY CONGESTION

GAP CLOSING BTW MACRO & MICRO ANALYSESCONVERGENCE OF SOFTWARE INTEGRATED MODELS:

– CUBE / DYNAMISM– VISUM / VISSIM

Page 3: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

TRAFFIC MICROSIMULATION MODELS

ANALYZE THE PERFORMANCE OF TRANSPORTATION SYSTEMS BY SIMULATING THE MOVEMENTS OF INDIVIDUAL VEHICLES ON A SPLIT-SECOND BASIS

ACCOUNT FOR ROADWAY, DRIVER AND VEHICLE CHARACTERISTICS

OPERATIONAL RESULTS (SPEED, QUEUES, DELAYS, ETC) ARE BASED ON TRAFFIC INTERACTION INSTEAD OF EQUATIONS

Page 4: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

3D-VISUALIZATION

COMPLEX ROADWAY SYSTEMSBRIDGESOVERPASSES INTERCHANGESAIRPORT TERMINAL RAMPSVIEW FROM CAR

Page 5: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

SR 112 - MIAMI

Page 6: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007
Page 7: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

WHEN TO USE MICROSIMULATION

LIMITATION OF HCM / HCSSYSTEM ANALYSIS (COORDINATION)CONGESTION / SPILLBACK / BOTTLENECKQUEUING / STORAGECLOSELY SPACED RAMPSBUS / MULTIMODAL / ITS / RAMP METERINGSIGNAL PRE-EMPTIONCOMPLEX OR UNIQUE GEOMETRY

Page 8: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

SIMULATION PROCESS

STUDY OBJECTIVESMODEL SELECTIONDATA COLLECTIONBASE MODEL DEVELOPMENT CALIBRATION / VALIDATIONALTERNATIVE ANALYSISMOE SUMMARY / PREFERRED ALTERNATIVEPRESENTATION OF RESULTS

Page 9: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

STUDY OBJECTIVES

GOALS OF MODELING PROCESSESTABLISH NEED FOR MICROSIMULATIONPROJECT SCOPING

– LIMITS OF ANALYSIS / INFLUENCE AREA– BOUNDARY CONDITIONS – TIME PERIOD– PEAK HOUR FACTOR

LEVEL OF DETAIL / EFFORT / BUDGETUNDERSTAND MODEL STRUCTURE

– DELAY, QUEUE, DRIVER BEHAVIOR

MOE DIFFERENT FROM HCM EQUATIONS

Page 10: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

MODEL SELECTION

BASIC MODELSCORSIMSYNCHRO/SIMTRAFFIC

ADVANCED MODELSVISSIM / AISUM / CUBE DYNAMISMPARAMICS & OTHERSCOMBINATION OF MODELS

Page 11: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

CORSIM

LINK-NODE NETWORK (DEVELOPED BY FHWA)ADVANTAGES:

– WIDELY USED & ACCEPTED– EXTENSIVE VALIDATION IN USA– FREEWAY/RAMP OPERATION– BUS ROUTES – ITS ANALYSIS – RAMP METERING– TIME PERIOD ANALYSIS– LINK AGGREGATION– SHORT/LONG INCIDENT SIMULATION– HEADWAY DISTRIBUTION TYPES

Page 12: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

CORSIM (CONTINUE)

DISADVANTAGES:– 2-D ONLY (NO ELEVATIONS)– SIMPLIFIED SIGNAL OPERATION– PROBLEMS WITH SHORT LINKS– RESULTS GROUPED PER LINKS– NO SIGNAL OPTIMIZATION– NO INTERSECTION LOS– IMPROVED BUT LIMITED GRAPHICAL INTERFACE

Page 13: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

CORSIM-CYPRESS

Page 14: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

Alternative 1

Alternative 2

Partial Cloverleaf Interchange:

•Limited Spacing of Interchange

•Stacks queue in one or more quadrants

•Requires Extensive ROW

•Complex Design

Diamond Interchange•Sufficient Spacing•Simple Design•Narrow ROW•Stopped Condition

CORSIM – INTERCHANGE ALTERNATIVES

Page 15: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

SYNCHRO/SIMTRAFFIC

LINK-NODE NETWORK (TRAFFICWARE)ADVANTAGES:

– WIDELY USED– EASY DATA ENTRY / BEST GRAPHIC INTERFACE – EXPORT TO CORSIM / T7F / HCS / VISSIM – DATABASE INTERFACE (VOLUME/SIGNAL/LAYOUT)– INTEGRATED SIGNAL OPTIMIZATION– ROUNDABOUT MODELING (NOT YET VALIDATED)– INTERSECTION LOS (HCM / ICU)– DIAMOND INTERCHANGE / RING & BARRIER– QUEUE LENGTH (PERCENTILE)– EASY TO CREATE SUB NETWORKS

Page 16: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

SYNCHRO/SIMTRAFFIC (CONTINUE)

DISADVANTAGES:– NO TRANSIT MODELING– LIMITED FREEWAY CAPABILITY– SIMTRAFFIC RESULTS DIFFER FROM SYNCHRO & NOT

WIDELY ACCEPTED – LINK-BASED MOEs– LIMITED FLEXIBILITY OUTSIDE BASIC INTERSECTIONS

(TOLL PLAZA, AIRPORT, SIGNAL PREEMPTION, ITS, ETC)

Page 17: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007
Page 18: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

SYNCHRO - UNIVERSITY OF MIAMI

Page 19: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

SAMPLE SYNCHRO/SIMTRAFFIC NETWORK

Page 20: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

Becker Road

I-95

CORSIM Network

PORT ST. LUCIE

Page 21: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

ADVANCED - VISSIMLINK-CONNECTORDEVELOPED BY PTV IN GERMANYADVANTAGES:

– INCREASING ACCEPTABILITY IN US– EXTENSIVE TRANSIT MODELING CAPABILITY

• LIGHT RAIL• BUS TRANSIT WITH BUS STATIONS• ROUTE ASSIGNMENT BASED ON SCHEDULE

– EXPLICIT PEDESTRIAN & CYCLIST MODELING– 3D GRAPHIC OUTPUT / IMPACT OF GRADES– ADVANCED SIGNAL CONTROL LOGIC

• IMPORTANT FOR DEMAND RESPONSIVE OPERATION• IMPORTANT FOR SIGNAL PREEMPTION

Page 22: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

VISSIM (CONTINUE)

ADVANTAGES:– ADVANCED ORIGIN-DESTINATION– ROUTING FOR ALL VEHICLE TYPES– DYNAMIC ASSIGNMENT (VISUM)– ROUNDABOUT SIMULATION– UNLIMITED VEHICLE TYPE

• IMPORTANT FOR TOLL PLAZA• AIRPORT CURB SIDE OPERATION

– FLEXIBLE DATA COLLECTION– INTERFACE WITH 3-D MODELER– DYNAMIC VISUALIZATION OF RESULTS

Page 23: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

VISSIM (CONTINUE)

DISADVANTAGES:– NOT AS WIDELY USED IN FLORIDA– EXPENSIVE (WITH TRANSIT OPTION)– CODING OF DESIRED OUTPUT PARAMETERS– FLEXIBILITY REQUIRES GREATER KNOWLEDGE AND

CODING EFFORTS – NO STANDARD SUMMARIES WHICH COMPLICATE

REVIEW PROCESS– NO SIGNAL OPTIMIZATION (INTERFACES WITH

SYNCHRO)

Page 24: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

MIAMI - PROPOSED ROUNDABOUT

Page 25: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

DATA COLLECTION

GEOMETRY & LAYOUTTRAFFIC CONTROL: SIGNAL & SIGNVOLUMES (RECONCILE COUNTS)DATA FOR CALIBRATION

– TRAVEL TIME– AVG & FREEFLOW SPEED– QUEUE LENGTH– OBSERVATIONS / WARNING SIGNS

Page 26: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

BASE MODEL DEVELOPMENT

DEVELOP LINK-NODE DIAGRAMNODE NUMBERING / PROPER CODINGBASE MAPPINGDATA COLLECTION / FIELD REVIEWCHECK INPUT DATABALANCE VOLUMESDEVELOP O-D MATRIX (RAMPS)SIGNAL TIMINGQA/QC – CHECK SIMULATION RUNSVERIFIABLE / REPRODUCIBLE / ACCURATE

Page 27: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

VOLUME CALIBRATIONCONGESTED CONDITIONS

(EX: SR112)

DATA COLLECTION INITIAL CALIBRATION RESULTSADDITIONAL INVESTIGATIONDEMAND PEAK HOUR VOLUMESTRAVEL TIMES

Page 28: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

DATA COLLECTION

Legend:Signalized IntersectionUnsignalized IntersectionRoadway Split AreasTurn Lane Storage Length

Posted Speed Limit

1

100'

Ockeechobee Rd/N. River Drive

From SR 112Ramp

1?

130'

110'110'

ToFlyover

250'

Flyover

75'

325'

ToAirport

FlyoverFrom NB

Le Jeune Road

23

4

5

7

EBL used to re-direct traff ic to NBLe Jeune fromOckeechobee &Le Jeune Int.

1

Bridge overMiami River From SR 112

Ramp

NW 36 Street

5

WB - NW 36 Street

2

6

3

FromSR 112 500'

4

7

EB -NW 36 Street

To EB SR 112Ramp

ToNW 42 Ave

6

100'

Driveway

65'

WB SR 112 Ramp toOckeechobee Road:

Fourth lane starts west ofNW 32nd Ave and ramp

separat ion starts atNW 35th Ct

30MPH

30MPH

1

11

6

5

4

2

1

9

108

3

Intersection Count Location

Machine Count Location

Ramp Count Location

1

1

5

4

6

9

1

3

7

8

2

7

6

5

4

3

2

1

8

7

12

Page 29: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007
Page 30: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

INITIAL CALIBRATION RESULTS

VISSIM not replicating observed queues with measured volumes:– Traffic backups on ramps and intersections

– Tri-Rail and Freight Train Impact on traffic

Significant difference is travel times

Need for additional investigation

Page 31: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

ADDITIONAL INVESTIGATION Intersections Peak Hour Factors (PHF) greater than 0.95

suggests constrained conditions.

Intersection AM Peak Hour PM Peak Hour

Le Jeune Rd/SE 8 St 0.98 0.97

Le Jeune Rd/Okeechobee Rd: 0.98 0.99

Le Jeune Rd/NW 36 St 0.97 1.00

Le Jeune Rd/NW 31 St 0.95 0.95

NW 36 Street/Lee Dr 0.98 0.98

NW 36 St/S. River Dr 0.97 0.95

NW 36 St/N. River Dr 0.97 0.97

Page 32: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

ADDITIONAL INVESTIGATION

Location TO/FROMQuality Counts

FDOT Stations

AM PM AM PM

WB SR-112 Off Ramps

To Okeechobee RdTo NW 36 StreetTo AirportTo SB Le Jeune Rd

5.2%8.0%6.7%6.7%

3.5%6.3%7.5%8.9%

4.2%8.7%n/a6.3%

11.1%5.8%n/a7.2%

EB SR-112 On Ramps

From Okeechobee RdFrom NW 36 StreetFrom AirportFrom NB Le Jeune Rd

12.3%9.7%4.2%5.7%

4.7%8.1%9.5%7.6%

10.9%n/an/a4.2%

5.3%n/an/a8.4%

Peak to daily factors (K-factor) less than 8.5% on freeways and 9.0% for arterials suggest constrained conditions.

Ramps:

Page 33: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

ADDITIONAL INVESTIGATION

Location AM PM

Le Jeune Rd, South of NE 8 St 5.8% 7.1%

Le Jeune Rd, South of NW 31 St 5.8% 4.4%

N. River Dr, West of Flyover merge

8.6% 6.6%

N. River Dr, North of NW 36 St 6.6% 5.8%

N. River Dr, South of NW 36 St 6.9% 7.5%

S. River Dr, East of Le Jeune Rd 6.5% 6.2%

S. River Dr, West of NW 36 St 6.5% 9.4%

NW 36 St, West of N. River Dr 6.5% 6.4%

NW 36 St, East of N. River Dr 5.1% 6.1%

Arterials

Page 34: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

VOLUME ADJUSTMENT

Adjustment to achieve demand volumes based on FDOT Quality/Level of Service Handbook:– Ramps:

•Minimum K100 is 8.5%; and

•Average Peak to daily ratio percent difference is 28% and 26% for the AM and PM Peak Hours respectively.

– Arterial Road:•Minimum K100 is 9.0%; and

•Average Peak to daily ratio percent difference is 27% for both the AM and PM Peak Hours.

Page 35: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

VOLUME BALANCING (SEASONAL FACTOR / TRUCKS / ETC)

Page 36: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

CALIBRATION / VALIDATIONDRIVER BEHAVIOR

– STARTUP DELAY & REACTION TIME– MINIMUM HEADWAY/GAP ACCEPTANCE– LANE CHANGE PARAMETERS– CAR FOLLOWING SENSITIVITY

VEHICLE CHARACTERISTIC– TRAFFIC COMPOSITION– MAXIMUM ACCELERATION / DECELERATION

ROADWAY CHARACTERISTICS– FREE FLOW SPEED– CHANNELIZATION– PARKING ACTIVITY

Page 37: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

TRAVEL TIMES AM Peak Hour

SegmentCollected Travel

Time Range (Sec)

VISSIM Travel Time

(Sec)

SR-112 Off ramp

232 - 291 235

EB NW 36 St 178 - 295 195

WB NW 36 St 273 242 PM Peak Hour

SegmentCollected Travel

Time Range (Sec)

VISSIM Travel Time (Sec)

SR-112 Off ramp

430 - 580 394

EB NW 36 St 180 - 655 204

WB NW 36 St 229 - 380 368

NB Le Jeune Rd

248 - 303 266

SB Le Jeune Rd 281 - 445 285

Page 38: TRAFFIC MICROSIMULATION & 3-D VISUALIZATION Presenters: Fadi Emil Nassar, P.E. Veronica A. Boza, E.I. FDOT – MAY 4, 2007

ALTERNATIVE ANALYSIS / MOE

SIMULATION GREAT FOR ALT ANALYSIS SIMPLIFIED REALITY / LIMITATIONS ESTABLISH MOE & MATRIX EVALUATION

– SPEED– DENSITY– TRAVEL TIME– QUEUE– DELAY

PERFORM MULTIPLE RUNS (SEED #) SENSITIVITY ANALYSIS PRESENTATION OF RESULTS

– GRAPHIC SIMULATION– OPERATIONAL RESULTS