tr5 d.j dbp...1.7 proiect billboaid 1.8 hadling of existins furnlture, vault door from old slte to...

24
tr5 d.J DBP Development Bank of the Philippines BID BUTLETIN NO. 1 27 November 2019 Attention: All prospective bidders for the project: Bid REf, No' I.2019.01: PROCUREMENI OF SERVICES oF A coIITRAcIoR FoR THE RENoVATIoN/FIToUT oF ROCES AVENUE SRANCH Ot tHE DEVETOPMENT BAN|( OF THE pHtUpptNES {ABC: php5,821,821.50 inclusive of all applicable taxes) Please be informed of the following: 1. The schedule for the submission and opening of bids is as follows: ScHEDUtE OF SUBM|SSION AND OpENtNG Ot EuGtElLtTy, TECHNtCAt AND FtNANCtAL DOCUMENTS/PROPOSAT Opening of Eligibility, Technlcal and Financial Documents/Proposals * Late Bids shatt not be dccepted 2. Amendments/Clarification on the Bidding Oocuments: On the Scope of Works: A. MAJOR WORKS INCLUDED BUT NOT LIMITED TO THE FOLLOWING: DIV 1 GENERAL REQUIREMENTS 1.1 Building & Occupancy Permits 1.2 As-built plan 1.3 Provision of temporary water, power & facllltles 1.4 Mobilization and Demobilization 1.5 General cleaning and hauling of debrls 1.5 Health & safetv 1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office, Makati City 05 December 2019 (Thu rsday) 01:00 PM 12lF Executlve Lounge-Suite 5 DBP Head Office, Makati City From to A. MAJOR WORXS INCTUDED BUT NOT TIMITED TO THE FOTLOWING: Dtv 1 GENERAT REQUIREMENTS 1.1 Bujlding & 9ccupFncy Permits, signed plans/workrng drawings 1.2 Bonds & lnsurance 1.3 Comprehensive All Rlsk lnsurance (CARI) 1.4 As-birllt olan 1,5 Provlsloi of temporary water, power & facllltles 1 1. 1 L I ,6 ,7 .8 .9 ,1 bris Moblllzatlon and Demobllizatlon door *Submission of Eligibility, Technical and Financial Documents/Proposals 05 December 2019 (Thursday) *"On or before" 11:30 AM From

Upload: others

Post on 27-Feb-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

tr5d.J

DBPDevelopment Bank of the Philippines

BID BUTLETIN NO. 1

27 November 2019

Attention: All prospective bidders for the project:

Bid REf, No' I.2019.01: PROCUREMENI OF SERVICES oF A coIITRAcIoR FoR THE RENoVATIoN/FIToUT oFROCES AVENUE SRANCH Ot tHE DEVETOPMENT BAN|( OF THE pHtUpptNES {ABC: php5,821,821.50 inclusive ofall applicable taxes)

Please be informed of the following:

1. The schedule for the submission and opening of bids is as follows:

ScHEDUtE OF SUBM|SSION AND OpENtNG Ot EuGtElLtTy, TECHNtCAt AND FtNANCtAL

DOCUMENTS/PROPOSAT

Opening of Eligibility, Technlcal andFinancial Documents/Proposals

* Late Bids shatt not be dccepted

2. Amendments/Clarification on the Bidding Oocuments:

On the Scope of Works:

A. MAJOR WORKS INCLUDED BUT NOTLIMITED TO THE FOLLOWING:

DIV 1

GENERAL REQUIREMENTS

1.1 Building & Occupancy Permits1.2 As-built plan1.3 Provision of temporary water, power

& facllltles1.4 Mobilization and Demobilization1.5 General cleaning and hauling of

debrls1.5 Health & safetv1.7 Proiect Billboaid1.8 Hadling of existinS furnlture, vault

door from old slte to the proposed slte

Actlvlty Tlme Venus

6/F BAC Secretariat Unit-PlMD,DBP Head Office, Makati City

05 December 2019(Thu rsday)

01:00 PM

12lF Executlve Lounge-Suite 5DBP Head Office, Makati City

From toA. MAJOR WORXS INCTUDED BUT NOT

TIMITED TO THE FOTLOWING:

Dtv 1

GENERAT REQUIREMENTS

1.1 Bujlding & 9ccupFncy Permits, signedplans/workrng drawings

1.2 Bonds & lnsurance1.3 Comprehensive All Rlsk lnsurance (CARI)1.4 As-birllt olan1,5 Provlsloi of temporary water, power &

facllltles11.

1LI

,6,7.8.9,1

brisMoblllzatlon and Demobllizatlon

door

*Submission of Eligibility, Technical

and Financial Documents/Proposals

05 December 2019(Thursday)

*"On or before" 11:30 AM

From

Page 2: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

From

C, PAYMENT TERMS

Further, neither the final certificate nor thefinal payment, nor any provision of thecontract document shall relieve the Contractorof the responsibility for faulty materials andworkmanship. lt shall, moreover, remedy anydefects thereof, and for any damages causedto other works resulting therefrom, within aperiod of one (1) year after the acceptance ofworks. The DBP shall give notice of anydefect/s found with reasonable promptness. lfthe CONTRACrOR refuses or falls to completethe Project wlthln the speclfied time plus anytime extension duly granted, the CONTRACIORshall pay DBP, by way of liquidated damages,the amount equivalent to one tenth of onepercent (1/10 of 1%) of the total contract pricefor each lapsed calendar day of delay until theProject is completed and accepted or takenover by the DBP as stated ln the Revlsed IRR

Annex E of R.A. 9184.

On the Bid Forms:

Scope of Services (pet FORM 8) duly signed fotconformance by the bidde/s authorizedrepresentative,

Detailed Financial Bid/ Bill of Quantities (hardcopy and soft copy in CD) in accordance withinstruction to Bidder Clauses 15.1. and 15.3

BIO BULLEtll,l I'lO. I

Please refer to Revised Scope of Works perREVISED FORM 8, attoched in thisSupplementEl Bid Bulletin No. 07 dated 27

e):Novemher 207

Further, neither the final certlflcate nor theflnal payment, nor any provision ofthe contractdocument shall relleve the Contractor of theresponsibility for faulty materials andworkmanship. lt shall, mo.eover, remedy anydefects thereof, and for any damages caused toother works resultint therefrom, within aperiod of one (1) year after the acceptance ofworks. The DBP shall give notice ofany defuct/sfound wlth reasonable promptness. lf theCONTRACTOR refuses or falls to complete th€

I ProJect wlthln the speclfled tlme plus any tlmeextenslon duly 8ranted, the coNTRAcToR shallpay DBP, by way of llquidated damages, theamount equivalent to one tenth of one percent(1/10 of 1%) of the cost ofunperformed portionof work for each lapsed calendar day of delayuntil the Project is completed and accepted ortaken over by the DBP as stated in the RevisedIRR Annex E of R.A. 9184.

Please refer to Revised Scope of Works perREVISED FORM 8, dttdched in thisSupplementol Bid Butletin No. 07 doted 27

C. PAYMENTTERMS

INovembet 2019

From

Revised Scope of Wotks {pet REVISED FORM 8lduly signed for conformance by the biddey'sauthorired rcpresentetive,

Please refer to Revised Scope of Works perREVISED FORM 8, attoched in thisSupplemental Bld Bulletin No. 07 doted 2ZNovember 2079).

Detalled Financial sld / 89iEl_g!A_d_@s!!EE(hard copy and soft copy in CD) in accordancewith instruction to Bldder Clauses 15.1. and 15.3

pr!.

To

To

Page 3: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

11.TAB

Faom

On th€ Ch.ckliit of R.quircmcnti:

lssue/Conrern

FIRST ENVELOPE. TECHNICAT COMPONENT:

Scope of Services fp er FORM 8) duly signed fotconformance by the bidde/s authorized16pr€sentEtive,

Oetailed Financial Bid/ Bill of quantitie3 (hard

copy and soft copy ln CD) ln accordance withlnstruction to Bidder clauses 15.1, and 15.3

Hard copy must be submitted and must be dulysigned by the bidder's authorized representative,

Detailed Financial Bid/ Bill of Quantities per

format provided in CD and hard copy

Tally/have the same total per TAB I (totalfinancial bid) which shall not exceed the ABC ofPhp 6,821,821.50

Notes:clouse 75.1. The contract sholl be for the wholeWorks, os described in ITB Clouse, bosed on thepriced Bi of Qudntities submmed by the Bidder.

Clouse 15,3 All duties, toxes, and other levies

poyoble by the Contrdctor under the Controct, or

for ony other couse, prior to the deddline fotsubmission of bids, shdll be included in the rotes,

prices, and total bid price submitted by the

Bidder.

EID SULLETIiI I'lO. 1

TAB 2

E

To

Please refer to REV,SED eLL OF QUANIiTIESottoched ln thls Supplemental Bld Eulletln No,01 dated 27 November 2019).

cl.rlllcatlon

Revised Scope of Wotks (per REVISED FORM 8)duly signad for conformence by thc bidder'sauthofltad ruprorrnt,tlva.

Please refur to Revlsed Scope of Works perREvlsED FoRM 8.nd Annex "A" fo. the Revlsed

Checkllst of Requlrements, attoched ln thlssupplementol Bid Bulletin No. 01 doted 27November 2079)

TAB 11.

Hard copy of the 8gyEgllgillclLl3utElllE! murtbe submitted and each and every page must beduly signed by the bldder's authorlzedfepresentatlve.

must be ln the same templatefomat provided inCD. Both hard copy and CD must be submittedduring the Opening of Bids.

The Billof Quantities must have the same total perTAB I (total financial bid) which shall not exceedthe ABC of Php 6821,821.50.

A signature box shall be added at the bottom ofeach page of the Bill of Quantities where theauthorized representatlve ofthe Bidder shall affixhis signature. Failure of the authorizedrepresentative to sign each and every page oftheBill of Quantities shall be a cause for .ejection of

TAB 2-

Detailed Financial Bid/ Revised Bill of quantities

pag. 3 of 24

Detailed Financiel gidlRevlted Btll oI Quontltles(hard copy and sott copy ln cD) in accordance withinstruction to Bidder Cleu6es 15.1. and 15.3

Notes:

SECOND ENVELOPE- FINANCIAT COMPONENT:

Page 4: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

lssue/Concem Clarificatlon

hls bld, (per Phlilpplne Elddtng Documents lpBD)ht lnfrustructute proJects, sil Edltton)

Clouse 75,7, The contract sholl be lor the wholeWorks, as described in llB Clduse, bosed on thepriced Bill ol Quontities submifted by the Bidder.

Clouse 15.i All duties, toxes, and other leviespayable by the Controctor under the Controct, orfor ony other muse, prior to the deddline forsubmission of bids, sholl be included in the rotes,p ces, dnd totol bid price submitted by the Bidder.

Please refer to Revised Bill of euantities andAnnex "A" for the Revised Checklist ofRequirements, attoched in this SupplementdtBid Bulletin No.01 doted 27 Novembet 2Ol9

On the Revised Checklist of Requlrements:

From ToChecklist of Requirements for bidders Please see Annex "A" for the Revised Checklist of

Requirements, attoched in this SupplementolBid Bulletln No.07 doted 27 November ZOT,

Eidders are reminded to submit the following documents attached in this Supplemental Bid Bulletin andsubmit together wth AtL other.equired documents for the submission and opening of Eligibility,Technical and Financial Documentdproposal:

.. REVISED FORM 8. REVISED 5COPE OF WONK5b, REVISED BltL OF qUAilTtTtES (h.rd copy .nd CD lorm.tlr

rBlddctt who wlll purchcse thc Btddtng Documcnts afier the ttrucncc o! thlt supplementat BtdBulletln shall get o @py ol the CD contolnlng the Revts'ld Bt ol euantttt , and a copy ol tht, BtdEdle n ,rom the BAc secr.torrat-ptM4 & Ftoor, DBp Heod ofrce, Makatt clty, Btdden who havcalrcady bought the glddlng Documen'' bifotc the lssuance ol thts ,,ld Butlcttn shclt ltkwtse prcce.dto the 4C Secrcta at cnd get the (plptes ol the aboE-mentloned documcn8,,

6. Please be advised that bids submitted after the deadline shall only be marked for recording purposes, shallnot be included in the opening of bids, and shall be returned to the bidder unopened.

For the guidance and information of all concerned.

CAROTYN I, FINDOSenior Vice President andChairperson, Bids and Awards Committee

T

p.oo

4. Bidders are likewise reminded use the attached Annex "A" for the Revis€d Checklist of Requirementsattached in this Bid Bulletin.

5. The BAc shall no longer entertain any question/request fo, clarification after the issuance of this BidBulletin.

BIO EULLETIN NO. 1

Page 5: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

DBP Development Bank of the Phillppines

PROJECTLOCATto}{

tuarecrABC

PROPOSEO REHOVATIOII FIT-OUT OF DSP ROCES AVEUUE ARANCHGF t. A J BUILDIIIG,

'{O. IZ3 DOI{ ALEJANORO ROC€S AVENUE BARA}{GAY LAGITTG

HANDA, OUEZO}I CIIYTERIT' OF REFEREXCE/aCOPE OF WORXPa.tar,c2t.60

The Codlaclor shrll hold all the oblbatiorE. dutre3. ard ..sponsbd b6 necesrary lo th€ sucoo65lllcompbtiitn ol tha corlaac-t araEnad to oa ba und,analan by lia Conrector- including all ltbor. mrEnall,€quPmanl and aarvrors. other lncrcbrtl.E afil fumlshln!,8 tho.eof m accoclance wrih lha drarringr,rp.df@Bon! and all a(Bandt poparad by OBP

TEFI'IS OF REFEREIICE,/sCOPE OF WORX:

A, $AJOR WORKS II{CLUDEO BUT NOT LII'ITED TO THE FOLLOWI Gi

orv 1

t1

'l.3111515171.819l1

GEHERAL REOUIREMENTSBuldm! E Ocqprncy P.rm{a. algn€d pLani.\,orkrng drr$ngsgohda & lniuaancaComp.th.nrryr Al Ri.k ln !r.nc. ICARI)A6-bui[ pLnProvl36n ot !firporary wttaf. p<r\,lra. & laoliEaMobllrzrtaon rnd D,arnobdl! ionG€n ral cbaning .rd h.uling of dabristl€alth & SafatyF,rq.d &lbo.rdHeulrng ot exrsm! fumitur€ vault door fro.n old sitc to the proposed gite

orv 2 STTEWORKS2 1 Oltfianihnq and Oamolt6n works2.2 T€nafiir{ ot $nll.ry pip66I rsstoraton works2 3 T.hpo..ry Encr6.r,..

OIV 3 CONCRETING WORKS3 1 Formwo*! lnd Scsflolding33.2 RrbaG .nd Ti€ wr€6

3 2.1 Ceh Vauh6 columnsb Boamr- Top Beam" Fbor Baafic ToP Sl.t)

3.2.2 RC Colntar. Kitdin Sintb Liavabry

3 2 3 Sl6b6a. Stakwell enclosura

3 2 4 L,p.t!r6/Lhtcl Bonds B6rm!32SStil5enorCotumns326T,ewrca

3.3 Con€rat.33lC..nV.ult

e c6kfih!b Ba.mt- To0 B6am- Floo, Bcamd Top Slab

3.3.2 RC Counr.r. Kftrran Smkb Lavatory Fomab Raatrootn

3 3 3 Siib!a G€na{rl bund\rtllb. Strr /!ll ancltauE

3 3.1 Llp4raad,'l-inlcl 80nd 8..m33.3.5 Stffraner co&mna

conformr.

Name & Slgnatuae of Authodled Reprcs€ntative

Designation

Date

BID BULLETIN M), 1

EIid Ref. No. I.2OI9,O,I: PR@UREMEI{T OF SERVICES OF A CONTRACTOR FOR THE RENOVATIONFITOUT OFROCES AVENUE BRANCH OF IHE OEVELOPMENT BANK OF THE PHlLlPPll,lES IABC: Php6.82'1.321.50 inclu6ivc o, all aoolicable taxas)

page 5 ol 24

trilLI

REVISED FORM 8 (page 1 of 8)

8idd./s Company Nam.

Page 6: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

REVISED FORM 8 (paee 2 of 8)OIV 4 MASONRY WORK6

a 1 lnlltllttion ol CHEr'CMU rnilr 4OO p.l inclusiv. of 'lornm dis r.ba.e and plaataringon balh rialc! ulinq porfl,rnd conclt'laB. 1@ mm. thk.b '15O .tlm thk

4 2 lnatalLtign of CHB/CMU mrn 75o gar rncluarvc ot 1Omfl Ol. .sbe/a encl ptasLringon boih sld6s using portlend concrete.. 15O mm. thk

4 3 lnelalLtion of Lightv/Bighf CHB/CMU incluaiw of lomm alir rebars end dasterlngoa both 3roaa u3|ne portland apnc'.taa 1m mm th*

DIV 6 METAL I^,ORXS5 'l Structur.l St .l Work.

5.1 1 Struetural BL6l cornpon€ntB ol th6lf:a Vault (MGO, 3L€l platform, l-beem suppon)

5.1.2 CHB alael angla baso connoctor5 2 (frrlwo.ka rnd Miic.llan.ous Slaal Worka

5 2.1 Grill hou6ing including Yal€ padlod(E,.. ACCU mcluding pl.tlorm

522 Cash veultgralla snd doora, Gntt penotb G.ill door

" MGD-I. Sliding typ.

\^/OOD A PLASTIC

6.t.1 lostallation ol 12 5 mm thk. Gypsum board pa tion oo mctalst d6. Singte vv.tt- Floor to c€iling gartltionb. Doubl. wall

- Floor to c.iling partition- Lol, partdioh with 9l6sB panel at otficer6 cub.clc

6 1 2 l.ardlation of 12mm thk ph.nolic pan.ls cornpl€la with acc6ssor€3Archile€tural Woodwork66.21 Flbric.rion o, ovr.ha.d clblnets uBing z&rm lhk. marine plywood tor bactroom

pentry & vaull foomA.2.2 lnslallatl(,fl ot wooden louvGr at ATM v.etibul,aSrrppty of prrfab.icstcd mo<luLs uirnE zomm thk plvwood cracatt trmlog,aynthctlc gfantto fiailh end atalnLa! etaal pan€ls6.3,'l TalLra counior inclualva of rubbtr mat I all acryil. moduLts to.m!, ptc.ot tray6 A ? N6w Accounls low counLr inchrBiva ot k6ybottd rry, grommat6.3.3 Cornmgnlc tron bo.rd inclurivc of:cryllc634 Typine tlbL6 3.5 Sand box

DIV 651

9.2

6.3

a2

a3

84

DIV 7 THERMAL & MOISTURE PROTECTION7 I Walcrproolhg Works {Rast.ooms)

DIV A8.1

DOORS A WINDOWShstsll€tlon of 44.5mm thk flush hollow core (FHC) wood doors L,grng 6mm thkmsrm€ plywood skin on KO langrb traming on solid KO tsogilia i.mbGlaas Door (rnctusia ol door locts. door clos.r & hlngesla 2 1 lnatallation of 12.5mm thk. clear lemp€rcd gl.aa maa'r door wilh 3M brand

.1 mits or.Br s€curity frh wilh palch fittingE hbrdwar€sA 2 2 lnstalletbn of l2.5tnm lhk. cloa. tamplr.d gla3B siogle ganeldoor with 3M b.and

f.o6ied ,ilm with patoh littin9E h.rdwsrot

4.3,1 lnErellaton ot sto.l cloors urng Gs 18 staal ch€al6ncliamb wfpenic hardwlr€ end peep hol6 ror F E6 3 2 lnrt llatlon ol3.Nic. .l€al door and iamb lor alaclaE.l tacaw.y6 3 3 tnat.lt.tron of 12mm dl!. va.ticat iolid bare wlth horizontal punchod ,let b.rs rn ansr'lal paml f'nrahlnalallaton ol ttarnLrr alaol qllrldaal veulr door irmb rncluomQ rcoaltoflot

confoIme:

Name & Signatu.e ofAuthorired Representative

Designation

Date

BIO BULLETIN IiO. 1

Bid Ref. No- I'2019{,I: FROCUREMENT OF SERVICES OF A CONTRACTOR FOR THE REiIOVATIONFITOUT OFROCES AVENUE BRANCH OF THE DEVELOPMENT BANK OF THE PHILIPPINES {ABC: PhD6.O2I.82'.60 inclusive o'aII aDdicable tax6|

gaoe 6 ol 24

Bidderr's Company Name

Page 7: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

REVISED FORM 8 (paee 3 of 8lYtull room

8.5 lnEtallEtion or 12mm thk. phoholic door co.tlplqb with sccor6orios (a.o. hook. lock, hingas)8.6 Door Herdwersl

8.6.1 lnrt llation ol lovor tyrre ior lockleB. Keyrd typc lordl doora €xcopt tor torbt doorE whEh shlll bc non.keyed typc

E.6.2 ln8tall!tuon ot d.adbolt to. rrlatal.nd orill doort8.6.3 lnltalla oo ot door clo!€.. Surtaca mounbd ior wood doort8.8 .f ln8trlLbon ot door ltoppcr fo. v/ood .nd ri.t l door8.6.5 lnti,rlLtlon of hang68 Provid€ 3 pca. For FHC door and 4 p€s

lor louv.a dools8 7 Wlrdora. Framar 6nd Gla$ Peh6l3

4.7.1 ln3talation ot l2.5mm lhk cl6.r tempoGd 9lr!! intano, pansl on con@Eledlop rnd bottom aluminum C.houa. witl 3M 6 milr .acurity film full ha(tht

I7 2 ln3trlbtion ol 36" tik. cblr Erpolld gbtr plrrl wrth polbhrd rdgctr8.7.3 hltalladon of 12.5mm lhk. cbar tlmpafld glta! axLrio. panal on coocaabd

top rnd botiom alumrnum C.holdor wttl 3M 6 m r Ecunty frlmE 7.1 lnrlalhtion ot tlyning windory wltr arm thk chr ghlt on pov/dar coatGd whlb tubuttr hmr!

wrth 3M 6 m'15 8ecurity film end 6.conty stlcl gnll

DIV 10

10 1

SPECIALTIESSupply of lhr follo nng ltsmEFumBhing,l0.'l.l Woodon poL w(h ltrnd incluliva ol i.9l0!2 Bulbtrn boerd,l0.1.3 Sunscrosn10 'l 4 St66lah6tvc!'10 L5 St6€llockerg10.1.6 St.lnLls .tGal Tclbr Nulrtbor.l0.1.7 gxbrior Fllg Pob'10.1.8 Frdrl vtnity mrr.or rt toil€l - ltrmoLrs10.1.9 Synlhctic aruniL ladg. .t toilet101.10 L.b,.l tib - 3lay6rSign.gor/Polta. Holdan10 2.1 Flsg type SignEgo (for spproval ot DBP)10.2.2 Horizont.l si!)nago {tor lpprovtlot DBP)10.2.3 Brnk dacrll / lnterior 8ign goE

10.2

confoine:

Bidde/r Company tlame

Nlme & Sltnature ofAulhorh€d Represcntadr,.

Derltnatioi

lO 2.4 TelLrc bsckwrll logo w/ g.nk with OBP lign & wording8 (ror apprpval of DBP)10.2.5 ATM ela!3 plnal 3tEkrr (tor approvel of DBP)10.2 6 Mood bo!.d on 6rnrn lhk lintrr bolrd backino (for ippmvll of DBP)

10 3 Strinlc.s at6€l

BIO BULLETIN NO. 1

EId ReI. No. I.,O1O{I: PROCUREMENT OF AERVICEE OF A CONTRACTOR FOR IXE RENOVATIOI,IFITOUT OFROCES AVENUE BRANCH OF ?HE DEVELOPMENT BAN( OF THE PHILIPPINEs IABC: Php8.82'1.12'1.10 Incluilv€ ot.ll .oollc3bl. tere.|

prye 7 ol 24

OIV 9 FINISHESI 1 P.inl|ng of th! fo0owhg fanllha!

0.1 I Sgmr{lo6s Whitg paint frnich .tr.ight lrorn ttro can for w.lh, rhb6. FCU prpcphr.nbim plp€g cL.ddlng cxcapt with t e8 end fhl6ho$

912 FlEt psint linish wh . fo. gyp3um c.ilingI 1 3 Automotivc (duco) psint finigh for wood door3 and jemb69.1.4 Glo3! anrmrlorinl finiah for crbn tr9.1.5 EnlfrEl paint llnith lor vrult gdll dgor. g,ill panol, !b.l vaull compon.nt. JGcl trlmrng,

grils. rnssh, Etgll door, doo. jamb. and drrl hmad wlndor69 1.6 Epoxy paint finhh fo. ACCU e rillE, wEtsr rnrbr grill, aLdric lf|.t.. gdll 8nd fir! sxit doo.

I 2 lnstallabor of tha follot.vmg ioor finlshe€9.2.1 600600mm Cct'rnica dr Milano Nortrpob while non .lam

poli3had polBhcd ho.nogenou3 trlo39.2 2 600x6(x)mm C€ram*x da Milano Super Brown matte homogenous lib6 (restmo.fl tloonng)9.2 3 3oox3rcmm Colt 9. T.n vinyt tib!

9. 3 lnE||lLtion of thc tollo\^,ing w.ll finirh.tS.31 6OOx60Omm Studlo vfiib mrn homo€onou.lih.

9.1 lmtlll.lion of th. follo ring cailrng finBhca9,1 'l 10.nm thk gyp6um borrd csilrhg on m€trlfurnng9.1.2 600)60ox10rnm thk.coustlc bo.d on

baked *triE l-runnorE with 10mm di! hsng.r rod9.,1.3 CowIghB

I 5 lnstallaton ot Nahr.sl / Crnrnt Plarbr Fina3hgrS5.1 Pbin camrnuplaBlor frnEh br allnrw CH8/concrat wall! & rhb!9 5 2 2&nrn thk Agglorn6rst whit gr.n[B rrflirh for Kdctran unk ard Lav.tory counl..

Oate

Page 8: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

10.4

10.5

10 6

10.3.1 Grab bar for tha dissbbdModulat Funitute Sealiog (not hrclufft104., LobDy S9ai,4g 4 s''l.r gcng chrir wilh blac* cugria!, (not includ)d)1 0 4 2 Visito/E chan hd l rct rtA10.1.3 lltgh brck chtr (nol lncr,l(H)10.4 4 Midiac*.hat ('l'ol rt ctud)10 3 A Sbfr chatr (dol lncrudcd)1 0.3 7 Penlry chai (no, lnclud)Mddor Fumiluro fabl€10.5.1 Ollioe/s l ,lod<slahon wth side labre (not l Etudd)10.5.2 Saafr WbrksLlion (rlol lrrchr<rad)lO 5.3 P.nW otN t blr (nol l tchrd.qM&ul€r cablrrols10d 1 Mobrrap6ddEtr/ (no,lnclu<bd)

16 1.816t9 Bidds/s company Name

N.ma & Si3natura ofAuthgri..d Rrpraa.ntativ.

D.slanrtlon

Oate

DIV,I5 PLUMAING'15.1 lnstellation of rolghing-ins fo. wsgl€, water and venl Byslom

'15.1.1 lnltrllatton ot wa3ic & vlant aysLms ulrng Sarias 1O0O PVC16.1 2 lnstallaton ol water syGtem us,ng PPR-C type 315.1.3 lnstallaton of FCU d.arn

'15.2 lnstallabon of the tolloung torlet fixtu.ss152 1 Starnle66 Sl6el Krtchon 6ink inclu6iva ot l6dge typ6 fauc6t a.d allolher r€qurod eccoaBori€a15.2.2 W.C. Urinel,Lav.,Faucol & Acr€66ori€615.2.3 Hand Erdet15.2 4 H€nd dryer

olv 15-a MECHANICAL WORKS (lncruding rnetallatlo,l costB)15.8.1 lnJtallllion of Wall mounbd Ar'C lnvarter split type units

.. 1.5 HPb 3.0 HP

'15-r 3 l^strlleton ol fie ll Exhrult e Vcntllrtion Syitrrn!. Criling lnd wall ftouniBd .)iheust inclu8iw ot pipgr rnd exhoual ai orillc. O6cillating t5n bclg. color

15.a 4 Othsr item of work neoBssary to complots lhs rnl€nl of the plan and specification

DIV 18 ELECTRICAf WORKS16 1 lnlbllrtion ot Lighting rnd Pow". Syltam

16 I 1 T.pfring ko{n ELclric Mrtc. to Mrrn Pr.El16.1.2 lnrtall€tion ol Unitjzcd Pancl bgrrd Pgr/dlr Coatad 8!rge

A. MCBb PP Pen6lc, ELPP Pano|d. PPup! Panelo. Tolephon€ Terminal Cabii6t with BEct Bo..dL BACP Csbrn€t wath BacI Bo6rdg. 'fimc. Switch Cabinet witi Backboordh. Backboard lof Prtvat6 Auomatlc Branch Excharg€ (PABX)

16.1.3 UPS (On-hn6 DoubL Conv.r3lon) (rot i[cludcd]A 6 KVAb l KVA

16.1.4 lnstBllaton ol NEMA onclo8urs16.1.5 lnstoll9lon of wiros and cable THWN16. t.6 lnstellatioo ot the Iollowing conduit.

., PVC16.1.7 lnstallation of tho follolxrn0 box€s, pullbox & wlre gutler

s. Junction box6s wllh covar Ga 16b. Ulility boxes Ga 16c. Square boxes wilh cover Ga 16d. Pullbor€s Ge 16e. Wira gutlerlnsialletion of Swilches Bfld outl€lInstBllation ot the following lighting fi)(turosProvrdc 1 ycal Warranty8. T5 fL Lrmp (lellet CgvelrahvMoodbog.d)

AIO BULLETIN I{O. 1

Eid Ref. No.l.201g4l: PROCUREMENI OF SERVICES OF A CONTRACTOR FOR THE RENOVATOiJFITOUT OFROCES AVENUE BRA cH oF THE DEVELoPMEI,IT BAN( OF IHE PHlLlPPllEs lABc: Pho6.821.821.60 lnclusive ol all epplicrble teres|

9a0. s ol u

REVISED FORM 8 (paee 4 of 8)

conforre:

Page 9: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

REVISED FORM 8 (paee 5 of 8)

1 6 2 hstallstio16.21

16 2.216?3

b. T5 FL Lamp/Rop€ l-ED Lightc. Troffer Typo Luhtlngd. Prnlrghte. Pinlilht with glasgf. EmeEgncy Light UFO typeg. &it Signo ot Security $ystamhstallaton ol the tollowrng Wires snd Cabtgsa. CAT5e Cablo 4prs UTPb. TF w'rerln.t.ll.tlon PVC conduitlnstrlhtron of th. followlng box'r, pullbox & wira gutt6.a. Junction boxes wim @vor Ga. 16b Utility boxes Ga 16c. Square boxes w[h covEr Ga. 16d. Pullboxes ce. 16lnstrllstron ol FACP End BACP w(h Accs$oncs1A 21

DIV 15A DATACOM SYSTEM1elA.1 lhslrllallo.l gf Orta Sysicm

164 11

16A13

DIV 168 CCTV SYSTEM168.1 lnst.lLuor of CCTV Syrtsm

168 t.1 lnstsllation ol RG-5 CO-Arialcablo

lnstallaton ol tho lo[owng Warl6 and Cabloco- CAT5G cablo 4pr. UTPb Alphet csbblnstallalion PVC cotduitElnstall.lion of tho follo$dng boxe$, pullbox & wi.6 guttorr. Juncton borcE wth cov€r Ga 16b. Ulility boxe3 Ge 16c. Squarq boxqa with covsr G€. 16d Ftullboxe6 Ga t 6lnstallation of Csbinob Bnd aocas6orb6Oqla T6.minal CabrnstSttinLlr Tcbphona Terminsl Cabinet rv/ GrilE & P6dloc,k1 I0 Torminal block24Po.t Patch PanelHorironlal Cebl€ Menaq€rRack ghllvasPo\.varttrip 6€0nv outlct llor data cabin€tC8t5. Cabl6 4pr8 UTP Pelch cord 2mtrsCatse Cabb 4prs UTP Palcfi cord 3mtrsDuplar Data poft oulbtDuplrx Voicc porl outl€tTripbx Voic6 pon oull€iMi!c.ll...oG M.fh (t.p., t ggang I rccc!!oiG!)

2 lnstallation PVC conduits3 lortrlletion o{ tha lollowlng boxes, pullbox & wre gutter

a Juftcton bores with caveaca 16b. Squaa€ boxaa wlth cover Ge. 16c Prrllboxe8 Ga. 16

4 lnctalhtion of CCTV camcr.!'rG Chsnn€t DVR/NVR wath 22" MenitorDo.rE Type CameraEullet Typs Cam€r.

TECHTICAL SPECIFICANON ADDRESSABLE FIRE ALAR SYSTEl. Add.r$rble Fi.e ALrm Contol P.ntlSirBle Loop Address€bb Pan€lC€o coonoct up to 128 a&lGB6able devrcasI zon€ lin6 and f6ult indicatqrSelt confEuratg vir p6ncl klyboardPo$,!r lupply 230 VAC , 6OHz2, Frdl rnlr.l SwitchRe-s€tLble (non'br6akabla glaas) via sp€cial k6y

confollna:

Bldde/i Comp.ny N.me

Name & Slgnature ofAuthodzed Representatilr

Deslgnatlon

0ata

168.1168 1

6B

Prqa 5

BID BU[J.ET { ito. 1

pa0e g o, 24

Page 10: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

Esy lct !!rrt|in6t6 and 2nd tir nqigllruonSami-ou.h o. rudr6 mqunt inltBllslranProtaction riting lP43Oporatirlg volt.Or 2iaVDC3. A.ld't.aall. Sount ar lnolaAddraaaaDb co.iblna fiaahinC h€h |nbnaity LEO traacon arrd GoundlrTrc 9an phrg-in conatructron with baaa morrotad tarlnination .flowrngttty brnl'ratlolrEbclronEalt .d<t.aaaabLa. l.l..t Orl.clorFixad tarnBrafur! |nd rrb nla haat dataqtorAaathatically p.oqrtao. with A,/O crnvcrta.I bit inlafl€ant p.oaaaaor with A/O ConvlltatEhchoa :.lly lddrlar.bbwith ramot krdic.io, ouputTwio LEO tor 360 visbnOpeGtiog voltrgo 24VDC6. PhoroaLcltlc Clliota OatactotAarth.tlcdt pbaalrlC lou protiL da.EoI blt inbligal1l p.gcartor unth A'|O convanarBullt-in alCorfltrrt mtga lor taba at.,m ,aloctkrnEbctorrixlly addr!r..bbWith .!mob indrc|to, ouEutTwln LEO fo. 3@ vlslonOp...t.rg voltsgo zillDcA. Alrto.rEttc TaLdlona IxaLrJablotron o. app.ova aqurv.bntOpaflting volt gr 12VDCTECI{,.]CAL SPECIFlcANOil CCIV sYSTETl. lC Ch.nn.l OvR,tfirnH.26,4 Vk oo Comp..rlion/Thrd prrt c.ma.a supporHUp to 6 mrelpir.h r.lolutron racordiogtiDlull rnd VGA outsut up to 1020 r ,loOOP .orotuton&IC ch 3ynchronouE pllybad.HOD quota ard g.oup manalcmentH.rd d|rk c.p.oty 3TB2, Iroltt C.ltlrtHO 720P r.€l rne vd.g rlcordingL€or lRl S€.Ea . 3 6mrrAngb Yaw. 76' (3.&rrn)Houamg uraathar proof lF66 aafadlndoo.louEoorOirtanc. 10m. 15mt. 6ulLt GamaarHD 720P .!d trn. vxfo ilco.dlngL.n.: lRl S.ra. - 3.grnmAr€h vaw: 76' (3.6mm)Houaing. $,rrt r!. proof lF66 raLdlrdoor/ouk oorlR Doranca 10.n - 15rn

B

Confotme:

Bidd€r/s Company Narne

N.rne ! Sltn.tur. olAuthorlred Repreiemstlv!

DedSnatlon

Date

oTHER TVORXt AirO RIOUTRETENT&COiaD|TIOI.t:'l Tha Contractor 3hall aecJre and pey sll .tqgrrad Itrmrtt ia!r. l&antaa rn<| Lxaa analconply urlh all taws !n(, local 0adngncc6 end raLtad gowmfirnt aa9ulltpna rn

connacton with tha proiad hcludcd hararn aG stlnrng of plsns tor proc.Bsing olh€oc33ary grrnita.

2 Ths Contrrctor ahall subrnit GANTT Cha,l, const ucton schedlb rdbctlng .ll activitiosneed€d lo comp+alc thc 9roltcl, thair aaqurnc. and du.etioh

3 Th. Contraclgr lhgukl hrve s gtfttv Otficor .t th. prqi6ct sib et all timr.4 The Contractor ah6ll subrnit 3ampl6/a ol m&ttnrls.{rxturas for epproval by DBP taiora

f .bric.ttorVrn6tallatron.5 Defocriv€ works aoc, malo.ials rnay be r€tectcd by OgP st 6oy tmc balora llrc frnal

rcccptanca of Ara worl( and rcbirftU..pLc. m lcccr'rllnca wllh the plen end lpacricatonswtlr tha ra3ultinc exponses ctlafgeabb to hts account

6 Th€ Contractor 6ha[ amploy e compatont suparviDor accapt bl€ to lh. OBP who wrllaupervba lhc work oo a fullt,rn baa6

7 The Conlrac,tor 3h.ll not €.npby mrnor woakgG and wtll hrre qurlificd and comooLnt

BIO BULLE?IN NO. 1

Paoe 10 ol 24

REVISED FORM 8 (paee 6 of 8l

Page 11: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

REVISED FORM 8 (paee 7 of 8)

asquipm€nl op€.stor€Thc Contraclor 6hall compl€ts att work6 within Naoetv (9O) calen<ta. ctsv5. reckoned trom ttl€ deteot lh€ winnino bidder acceptanca of th€ Nolic€ to Procoed tor the PROPrOSED RENOVATTON F|T-OUTOF OBP ROCES AVE?,IUE BRANCH proi.ctEmployr6r .16 prohibrLct to u.. mobil. phon.s durinE sorlstruction hou.! ss it may caulc elistract|on6nd irnpinro 5fnployao. !p.tl.l .w!r.n ar, r.cornitlon ot h...rdi.hd opar.lbn ot don€orou. .qarprylontIt b ibo pmhibtod lo !.6 dsnoerces d.uo6 aod lny lorm of Fon-E.scnorton m.{rrcltlons. .rcohot dnnks,a. w.ll as r€portnE io work under th6k nfl@nETho!. involv€d

'n alislribuling or sc@otin9 any torm of ilt€gst d.rrgs or atcohot on the iob sitswill b€ Elmlnat€dAh emplovce on .ny typG ot pr..cr'pt'on h.dk.iion 6u.r hoiify his/h?. rop.tuBor b.forr .t.rt,ng workro.lho d.y All..hDloy.!a on th. tob.it !r..utri6ct ro drue ro.t,ng ao. €€sonabh 6u.prcton.a. Cel,.rrninrd by 6!. Cona.do. or tlt. B!nk. Th6 Contr.ctor i! r66po.cibl! ro. adminiai6rinl d.uo r.rl.Errploy..3 t .tino po.nrw ln a d(rg t st wlt b€ te.mtn€ted.Smak.n! on conrtrucnon Orcnr'..s,. prohibitrd !l.ttrima! No hoG.pllyeil b. tobr.r6d rncr No tghtinoAll rnvolv€d w{l b9 aubl€ct to b6mo r€mov6.t fmm the eib.Slmilllrly. No lre€rms or w€ar'ons ars sllowEd on th€ iob eitEEmploysrr ahrll worh tully<iothod or Contr.dor mry provtda thorn lrnrforms snd wrth prop€r dentllicEticn(1.D.). Sl..vra.hirt l.nk top3. hatEhkte.r. not pcmjtr€dH.rd h3l6 rn€eling ANSI Btand6rct 6pedtk6nons are requlred for s[ p€Bonnet Equnng accc!,!t to th€ job sil6'Bump capa" arc prohibfiad ANS| ltand6rds 9re slso adopted to. Eye end Fsc€ proEcton, Hrnd rndhlmProt cton cquhmcnrEmPloyr.r mud w..r..r plu$ .ndor.ennuff. whlb \/\,orktng ir ..er3 po€r.d wlh noi3. we.nhg sigEs, orwhlL working with or n€ar toolB or €qulpment whlch Oenerut sufllcEnr nota€ to m.ke norfiat convEfna0ondifficulr.Conftaotor rhrll €nrurc that ths.r l! !d.qu.t lupply of dnnkng wlt r fo. ihalr anrployacs Cofitrrclo.! lirltProvitia sinol. u3a crrpaAll lrlih. .lebrir, including h.zar.tous r\ra6te (spilts) muEl b0 removed from the rmm€dbtr worh a.ea aB thewo.k prograssca .nd ahourd bt phc.d in tr..h b.gr, rlcka o. .ppropriab! contsinrr bciora dirposat. DBP i!.n l8O 14001 ca(fr.d bank rnct thc contrilclor 13 rcqurrsd to obrorvc.nd .bida by d. ruLr an<, rcautrtlon6,

r anrch offici.l bolrdino p.mil i6luad bv th. locrl oll{clrl8ii Th€ wi.nina bidclor mu6l op6n an account with OBP ilter th€ .scaipt or Norc. or Aw.rd (NOA)

19 UPon completlon ol work6. lhe contracror sh.ll remov€ all t€mporsry dructurs€ .nd surprus ms|rrirls befor.tl€aving thE pr€ml3ea All old m.t3riEl. rerrlov€d f.om $a !n€ sh6ll be carerutty p{€{, up (rn th€ manne. srEtedm rtcin 8.14, hcludlng lno.e thlllllttron conn.crors vchrcl€3) !n., dicposci iy tha contraaor.

20 lha Conlractor shall b€ tully r€eponeibre lor the Eatety of hi6 m€n and clearly uade.itand5 .nd ag.Ee that nol'mploytr-.mplol/G(} nllation3hap lhell 6xa!t batlman tho Contructoa! mcn Entt tha OBP Any dlrnago c.u.cdby th. contr.ctor or h|s m.n to rhy prop.rty ol the OBP o. inJury or .t.ein b c ihird pi.t, rhrlr bG !h. roterraPo.tibility ol lh. contr.cto..ncl the l.llc. .hrll ply th. cost o. .houkl.r rha bu.da6 th.6of

2t rhe DBP shall bo lr€. .nd m.dc h.,mrcas from any.^d .11 kind of clarms. d.mEg6s, liabllities allsing rromth€ conractor's non-complrance wth tho reqeir€mgnt of th. Wo.kmcn s compans6lon. Socr.l S.cunty .ndothe.labor lawE,

PAYTENT TERSS :

OBF s rnann€r of pryment lor !h. Conlractor shall b. on foLr. prog6r. bllll'lgri d.p.ndlno on lh6 drt.rmincdp6rcantaglc comPbtion sch6dul6 ol prymlrnbs 6ra illu6t..i!d b6low

9

to

1J

12

't5

l

17

1a

Fu(h.r, noilh!'r ihc tlnrl c€rlllicata noa tha lrnal paymGnl nfi rny provi.lon ot tha contrret dgcumanl rhall rall.va th.Co.rtaelor of lh6 .lsponribrllty lor l.utty matar'Grs a6cl $orlmlrlrhrF h rhltt, moraover, romedy ony cl€t.cl5 th.r.ofand tor any damlie. clucod to othar worta raruliang tha.aiiom, wfim s ponod oI on. (1) yaar rltcr lha rcccpt.nca 6tworhs. Tho DgP ch.il grv€ not cc ol .ny dcf.cur found with reaion.bre p.omptn.s! lf rh. CONTRACTOR rstuses orfaib Lo complot€ rh€ Proiecl within th€ sperif€d tm€ plus any nm€ e)donslon duly grrnlecl, th. CoNTRACTOR Ehallgry OBP, by lyuy o, liqu.d.!.d damerae, th. a.iount.qulvalont to onc lifiur ol olrc parc.nt (l/10 ol l*) of thicoll ot unp.rfo.mrd po?tlon o, work lor.!ch Lplrd calcndar day otdeLy undl,l. P.oJsct |t complatad encl.cc.pird o. Lt.n ov.r by thr OBP .c steed h th. R6vr3cd rRR Ann x E of R.A 918,t

conformai

Bidde/5 companyNeme

Name & Signature of Authorired R6presantrtive

D.iilnatlon

Date

BIO BULLETIN iIO. .I

p.g+ 11 ol 2{

Page 12: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

,nn^.roo'r(o. *^,St.fl , Workrrgin..dng Unrt

Propered by.

--l-:. J

encx/.lev x. p#lereArchi6.i lV, Projaq E Conlr.ct M.nr!.m.nt Unrl

R.vl6w€d bv'

=44./-sr6axe(/rruouenaHoBd, Pdlect E ConlrsclE Msnogem€nt Unrt

REVISED FORM 8 (paee 8 of 8)

Recommended byl

EF,Heed.

VP ROMEO A, AGUH€a6, Conslructon E

EVP LAGUAHead,

Mgr D€pl.,-/'/,/

EVP FE Z, PRADOrng Sector

slo EULLET|N ito. 1

prla' tAltx o, ?r{ FHrLtFt

Page 13: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

REVISED BIt[ OF QUANTITIES (PAGE 1 of 7}

I

!rii,iiriiI

,

6

ig

II

IE

I

rl t /.. ,. t: ( i a,

5I

IE'!t

Ena

,I!:

I ! l J

,-

tII

a

IiIt

IIII

IIIttII

i

?

I

a

""

llrill

illill

lllT

I

lillIlltill

lil

llr

lIillllt

lltrllil

llil

lrllll

ill

lilllt

ilI

ililll

ill

lllfllffillillflilillt

illililllll

lIlI

II

lllillilt

lll

ll

ilil

lll

llllil

lllII

ff

ilt

illlilill

lIlIill

illllrlll

III

BID BULLETII{ t.IO. 1

Bid Rel. No. l-2019{1: PROCUREMENT oF sER\flcEs oF A cotlTRAcToR FoR THE REl,lOVATloiUFlTouT oFRoCES AvEr,lUE BRANCH OF THE OEVELOFTMENT BANK OF TIG PHILIPI,INES {ABc: Ptp6.821.821.50 inclusive ot all applic.bl. tax.s}

page 13 of 24

Page 14: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

REVISED Blt[ OF QUANTITIES (PAGE 2 of 7)

Il.

ir,!iriiI

IIE

BB

iE

I

rl

I

LII

itI

a

tI

3 a

l

c

In

IIItII

ItItIIII

I

iIIItI,

I,III

II

a

ilt

lIililllliltilllillflt

lfiilll

il

llIlt

illtIIIlI

llll

il

il

ll

II

llII

ilII

il

IIilII

ll

I

II

llIIII

ll

lt

llII

II

lt

llIllII

IIil

III

llll

lt

II

IIIlt

lI!lI

ll

IIll

il

ll

ll

ilIltll

llil

ill

lIIltII!l

tI

l]

llltltlt

II

IIIIll

llilII

il[lilll

IltllII

III

Blo BULLEIfl t{O. .t

Hd Ref. No. 1.20'19{1: PROCUREME I OF SERVICES OF A COI{TR|CTOR FOR THE RE Or,rAllOtUFlT4UT OFROCES AVE UE BRANCH OF THE DEVEOPT ElIr BAflK OF TtC PHlLlPPlt{ES IABC: PM.821.82150 imlusivG ot all.polh..bLE tares}

p*o 14 ol24

Page 15: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

E

!

IE

t

ii I

I

tI

It

II

Itt

tE

:

I

!

I

iIItiI6

tI

tIII

Ig

IIiII,IitI!

tIItI

II5

,III

i

IE

tlll

ill

11ililffi

filillltllllIIl[

II

iltil

!lI

ilr

I

tilllillill

lllltilflltiltililll

REVISED BltL OF QUANTITIES (PAGE 3 of 7)

I

iIItrlilIli!iIiiI

SIO BULLETN f,{O. I

page 15 ol 24

.

I

II

!

Page 16: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

E

bI

!

,

!7

ii t:

I

!I

Ix

It

tD

t

i I I I

Et

I6I

iIIIItII

I,I

II

I

llt

lI

lt

il

IIill

illt

ililrtililillI

illlllIlllllIII

ll

lll

ll

II

ffilll

lill

llllllll

REVISED BItt OF QUANTITIES (PAGE 4 of 7)

I

I

!i,!iriiI

BIO BULLETIN T€. 1

tlid R.r. tlo. l-2019.O1: PRoCUREMENT OF SERVIC€S OF A CONTRACToR FoR IHE RENOVATPN/FIToUT orROCES A\rENt E BRANCH OF nlE DEVELOPMENT BANK OF TIE PHILIPPINES IABC: Php5.821321.60 inclusive ot all aoolicibl. taxe.)

page 16 of 24

:

II

I

,

IIII

Page 17: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

REVISED BItt OF UANTITIES PAGE 5 of 7

BID BUILEIIN TIO. ,i

Bid Rel. No. l-20'19{t: PROCUREMENT OF SERVICES oF A coNTRAcToR FoR THE RENOVATIo},,F|ToUT oF

i

It.I!

ii,!iliii

II!:

a ::

I,!

aBEt2

IE

J

II

t.

T

!I

ax

IIrt

a

ttI

:I ! ! ! ;

I

ttIE

It

I

ii

iIiItttIiii!

ItIt

II

:

I

i :I

it:IIla

I

ItIIIt,I

I

I

pale 1

Page 18: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

1,.

!IE

IC

I7!

I

I1

t. I t. t.

I

II

E

c

!

rt{

i I I I I t I t I I

E

tt

Ia

I

IIlltilllllil

llll lI

ill lll II I

llll lilllII

lt

ll

IllffiililI[illllt

llil

I

i

IIr

it,Iitlii

AO AULLETIN I'iO. IEd R.f. T{o.I,OI9{I: PR@UREMEMT OF SERVICES OF A CONIRACTOR FOR THE RENOVATIO},UFITOUT OF

ROCES AVENUE BRAiICH OF IHE DEVELOPIi,IENI gAr{X OF nG PHlLlPPltlES IABC: PtE6.821.421,60 lnclurlv. of.ll epolicabl. t r.5lpo!€ 18 ol 24

REVISED Bltt OF QUANTITIES (PAGE 6 of 7)

:

Page 19: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

REVISED BILL OF quANrlrlEs (PAGE 7 of 7)

t

Il.iilt!iriiril!T

E

EI!

7F

a

o

IE

!II

I

I!II

Bnt

tII

i

tIx

I

: ,

Ii

lllilffillllffilil

lllilff

rilllfl

II

Illlt

Ilt

ill

lll

tI

L

I

a

::

ll

II

IIII

II

ll

llIIIIllilll

AID BULLETIIi IIO, 1

Bid Rel. No. l-2019{l: PRoCUREMENT OF SERVICES OF A CONTRACTOR FOR THE REuovATloiUFlToUT oFROCES AVENUE BRANCH OF THE OEVELoPiIENT aANx oF THE PHILIPPINES rABc: Php6.82t,82'1.60 inclusiv€ otallaoolicable tares)

pW 19 al24

II!t

:

.l

Page 20: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

TRANSMITTAL FORM

REVISED CHECKLIST OF REQUIREMENTS FOR CONTRACTORS

PROCUREMENT OF SERVICES OF A CONTRACTOR FOR THE RENOVATION/FIT-OUT

OF ROCES AVENUE BRANCH OF THE DEVETOPMENT BANK OF THE PHTLIPPINES

Bid Reference No. l-2019-01

FOR IIACI IE STAIP {OFF|CIAL nl.B BY THE D6P 8AC SECTRETARTAT

Receivedl

Name of Bidderi

Complete Addrers:_

Emaiil

Bidders who will buy the bidding documents shall be provided with the following:

FTRST ENVELOPE: EtlGlBltlTY DOCUMENTS AND TECHNICAL REQUIREMENTS (DUtY SEALID ANDMARKED}

Submitted by:

Landline:

a,

b,

c.

Item

LEGAL ELIGIBILITY DOCUMENTS

TAB 1

Proof of appointment/authority of bidde/s representative:a. Duly notarized Special Power ofAttorney (ifthe bidder is a sole proprietorship) 9Bb, Duly notarized Secretany's Certificate (if the bidder is a corporation, partnership, cooperative or

joint venture)

IN CASE, THERE ARE MORE THAN ONE APPOINTED/DESIGNATED REPRESENTATIVE, U5E OF "AND"shall mean boti/all representatives must siEn the bid forms (i.e. Statements. TOR, financial bid)to be submitted for the bid openinq.

GPPB hos lssued Arcutor No. 07-2017 doted 37 luly 2077 ln rclotion to the delerment ol the implementotionol mondotory submlssion ol PhllcEPs cefttlcote ol Registtotlan undet "Pldtinum' Cdtegory in CompetlthEEtddtng undet Sedion 8.5,2 ol the 2016 Revi*d IRR ol RA 918,4- ond os rcquired per 6PPB Circuldr No, 03-2016 doted 27 October 2076, to ptovide prospedive bidders with additiondl time to registet with PhilGEPsunder the Platlnum Membe6hlp categw,

TAB 2

Valid and current PhiIGEPS Certificate of Registration in PLATINUM CATEGORY with Annex"A" or the List of class "A' Eligibility Documents required to be uploaded and maintainedcurrentand updated inthe PhilGEPS. "Uploaded" documents under Annex "A" shall meanall of the following required Legal EliSibility Documens are updated or maifltained valid and

currenl (TAB' 2A-2E):

TAB 2ARegistration Certificate issued by Securities and Exchange Commission (5EC) or Department ofTrade and hdustry (DTl) or Cooperative Dev€lopment Authority (CDA);

EID BULLETIN iIO. Itlid Ref. No. l-2019{1: PROGUREMEMT OF SERVICES OF A CONTRACTOR FOR T}E REi€vATloiUFlTouT OF

R€CES A\TENUE BRANCH oF rHE DEVELoPMENT BANK OF THE PHlLlPPltlEs {ABC: Phn6.821.821.60 ihdus,ve ol all aDolicabletares}page 20 d 24

ANNEX "A"

t{ote: Please fill-out this form and submit directly to the BAC Se.retariat outlide of the sealed envelopes.

Blueprint/Plans and DrawingsTechnical Specifi cations -ManualRevised Bill of Quantities

Use of "OR" or "ANY OF THE FOLLOWING" is recommended.

Page 21: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

Item

TAB 28

2019 BusinesslMayo/s permit issued to bidder by the city or municipality where the principalplace of business of the bidder is located or the equivalent document for Exclusive Economic Zones

or Areas

TA8 2C

TAB 2D

. lndependent Audito/s Report;

. Balance Sheet (Stetement of Financial Position); and

. lncom€ Statem€nt (Statem€nt of Comprehensive lncome)

Eech ofthe above statements must have stamped "recelved" by the Bureau oflnternal Revenue (BlRl or its duly accredited and authorized institutions.

Audited Financial Statements for 201E or lts latest

TAB 2E Valid and current PCAB License Category C & D, at least Size Range Small B

(1) Bldders with E!!!!g4g9$ PhllGEPs ReSistration (Platinum membeEhip/ cateprylwhere all Eligibility Documents under Annex "A" {of the PhiIGEPS Certificate of Registrationlare all uploaded/updated, need not to submit documents under TABS 3A, 38, 3C, and 3D inlieu of the PhIIGEPS Certlflcate of Reglstratlon and Memb€rshlp,

(2) For blddcrc who ere I{OT YEI REGISTERED WITH PHILGEPS gB CURRENILY UNDER "RED"OITEGORY, MUST SUBMIT COPY/IES OF THE DOCUMEI.ITS PER TAB! 3A, 38, :}C .nd 3DPtovldcd: lh.lcc',;lflcate of PhllGEPS Rrglst.rtlon (Ph num Mlmbe6hlpl rh.ll rcmrln rs rportduallfl€tion requlrement to be submltted ln accordanc. with Slctlon 34,2 of the 2015

Ravlrod IRR of RA 9184 whlch rh.ll b. iubmltt.d wlthln flv! (5) rabndar deys upon rac.lptof the Notlce of the Slngb or LowGlt Celculeted Bld (SCB/tCBl.

(3) For bldders who are already reglstered under "Platlnum" category, however, the uploadedflle of Class "A" Ellgiblllty Documents under Annex "A" are not cuffent or updated or ln theevent tftat some Class "A" Documents earller 3ubmltted wlth PhllGEPS already exghed, a

combination of their Ph|IGEPS Certificate of Registration under "Platinum" Category AltlD

valld/current/updated Class "A" Ellglblllty oocuments under TABS 3A, 38, 3c and 3D sh.ll be

submitted.

the Certificate of PhiIGEPS Retistration under Platinum Membership withvalid/current/updated Annex "A" of Eligibility Documents shall remain as a post-

qualification requirement to be submitted in accordance with Section 34.2 of the 2016

Revised IRR of RA 91&4 which shall be submitted within five {51 t3lendar days upon receipt

of the Notice of the sintle or Lowest calculated Bid (scB/LcB).

TECHNICAT ETIGIBILITY DOCUMENTS

TAB 3

FiRST ENVELOPE: ELiGiBiLiTV DOeUMENTS AND TECHNICAL REQUIREMENTS (DULY SEALED ANttMARKED)

Note: For bidd€rs who have no ongoing government and/or private contracts, kindly indicate intheir statement "NONE" to comply with the requirement. Bidders will be rated "feiled" if no

document is submitted or if the document submitted is incomplete or patently insufficient (per

6PPB NPM 094-201i dtd 201i-12-19)

BIO BULLETIN NO. ,I

gid Ref, No. I.2O,I9.OI: PROCUREMENT OF SERVICES OF A CONTRACTOR FOR TTIE REI,IoVATIOT,I/FIT.oUT OF

W.2l d'24

Current (not expired on the date of opening of bids) Tax Clearance (y4llfl9qful$lgflglpgggg) per

Executive order 398, series of 2005, as finally reviewed and approved by the Bureau of lnternalRevenue (BlR)

Statement by the bidder of AIL its oneoins government and/or private contracts (includine thoseawarded but not vet started, if any), whether similar or not similar in nature dnd complexity to th€contract to be bid (include all contracts with the DBP for the said period, if any (lemplote petFoRM 1],, duly signed by the bidde/s authorized representative.

Page 22: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

ItemFIRST ENVEIOPE, ETIGIBIT]TY D(rcUMENTs AT{D TEC}INI€AT REQUIREMEI{TS (DUtY SEAIED ANDMARl(EDI

TAB 4

Statement of single compl eted contract of similar nature (government or private contract) withinlhEJfftIItjILISilf equivalent to at least fifty percent (500,6) of the ABC (Iemplote pet FORM 21,

duly slSned by the bidde/s authorized reprcsentative.

Similor controct sholl meon "renovotion/fit-out /construabn under PCAB License

Classification: General Building-GB 1- Building or lndust.ial Plant

Listed completed contract must be supported by the following:

i. Notice ofAward (NOA), OR Notice to Proceed (NTP), OR

AND

Cont act

l Proof of satisfactory completion and acceptance for the Single Largest Completed Contract(should reflect fu ll amount of total contract price of completed project) whichever is

a pplicable:

a. lf the completed contract is a qovernment oroiect: Constructo/s Performance EvaluationSystem (CPES) rating reflecting a qualitative description of at least satisfactorv

b. lf the completed contract is e dyelg-llgiCg!: Owne/s Certificat€ of Final Acceptancereflecting a qualltative description of at leest satisfactory

FINANCIAT ELIGIBILITY OOCUMENTS

TAB 5

Completely accomplished computation of Net Financial Contracting Capacity (NFCC) which mustbe at least equal to the ABC (femprote per FORM 3), duly signed by the bidde/s authorizedrepresentative.

2) The value of the NFCC must at least be equal to the ABC of this project.

TECHNICAT COMPONENT

a. Cashier's/manager's check issued by a Universal or Commercial gan.k (ot leost 2% oJ ABc)

b. Eank draft/guarantee or irrevocable letter of credit issued by a Universal bank: Provided,however, that it shall be confirmed or authenticated by a Universal or Commercial Bank, ifissued by a foreign bank (ot leost 2% of ABC)

c. Surety bond callable upon demand issued by a surety or insu.ance company duly certified bythe lnsurance Commission as authorized to issue such security fot /e ost 5% ol ABC).

d. Duly notari2ed Bid S€curing Declaration lTempldte pet FORM 4l duv signed by the bidde/s.uthorhed repre3entatlve.

Total ABC ln (Php) Bld SecurlngDeclaration

TAB 6

BIDAULLEN NO.1Bid RcL tlo. l-2018-01: PROCUREIIEiIT ()F SERVICES OF A COI{TRACTOR FOR T}E REIIOVATIoIUFIT-oUT oF

ROCES AVENUE BRANCH OF IHE DEVELOPMEIT BANK OF Tt€ PHlLlPPlilES IABC: Pto6.821.821.30 indudvc ofdl amlicluGt'rGil.€ge 22 d 24

1) The values of the bidde/s current assets and current liabilities shall be based on the 2018o. its latest

Original Bid Security issued in favor of the Development Bank of the Philippines (must be valid forat l€est 120 calendar days from th€ date of bid opening); ggyg4g of the following is acceptablel

Page 23: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

For blddcrs who oot to submlt a suretv bond must rlso submlt coov of Certlflcatlon lssued bvlniurance commhslon that tfie surew oa lnsuranc€ comprnv ls eutho zcd to lssue such securltv.

The Bid Securing Declaration mentioned above is an undertaking which states, among othets,that the bidder shall enter into contract with the P.ocuring Entity and furnish the performancesecurity required under ITB clause 31, within ten {10} calendar days from rcceipt of the Notice ofAwald, and commits to pay the corresponding amount as fine, and be suspended for a period oftime from being qualified to participate in any government prccurement activity in the event itviolatB any of the condations stated therein as provided in the guidelines issued by the GPPB.

Php 6,821,821.50 Php341,091.08Php136,435,43ercenta

ol ABC

lrrevottbleletE, of c.edlt

TAB 7 Organizational chart for the contract to be bid, signed by the bidder's authorized representative

List must be signed by the bidder's euthorized representative

TAB 9

TAB 10

List of contractor's major equipment (Templdte Wt FORM 6) which are owned, leased and/orunder purchase agreements supported by proof of ownership, certification of availability ofequipment from equipment lessor/vendor for the duration of the proiect, as the case may be,

which must meet the minimum requirements for the contract set in the Bid Data sheet (BDs)

List must be signed by the bidder's authorized representative.

Accomplished Omnibus Sworn Stalemenl (lemplate pet FORM n, duly sl$ed by the blddey's

authorized representative and notarized.

TAB 11

Revised Scope of Works (per REVISED FORM I dttoched in the Supplementdl Bid Bulletin No. A7

doted 27 November 20I9l duly signed for @nformance by tlie bldde/s authorizedrcpresentatlve,

TAB 13

Affidavit of site lnsp€ction (Bidder's own format) signed by the bidder's authoriz€d r€presentative,indicating therein the person who conducted the site inspedion

AM MARYXNELL R, PORCIONCUI.A

Br.nch BanllnB Group-Metro ManllaDBP Building, Commonwealth Avenuc, Diliman, Quezon City, 112:.

Tel. No. (02) 8818-9511 loc. 1500

Contact parson :

tabel SECOND ENVELOPE; Fll,lANClAL COMPONENT (DULY SEALED AND MARKED

TAB 1ouly accomplished Financial Proposal (lemplate pet FORM 9), duly sl8ned by the bldde.'s.uthorll.d r!pru!ntrtlv!

TAB 2Dctalled Flnanelal AE/Ravl'[d Bill of Quontlthr (hard eopy and soft copy ln eD) ln aeeordance wlthinstruetlon to Blddcr elauses 15.:., and 15,3

Eie Elr lig.,t.Otl{r: P

*9.20 ol 21

No required

TAB 8

List of contractor's personnel (Templote per FORM 5) (e.9. Project Manager, Proiect engineers,Materials Engineers and Foremen), to be assigned to the project if awarded the contract, with thecomplete qualification and experience data, These personnel must meet the required minimumyeers of experience set in the Bid Data Sheet (BDS);

TAB 12construction schedule (GANTT chart/PERT/CPM) (Bidde/s own format) siBned by th€ bidde/sauthorized representative which must be within the required completion period/milestones.

:tD autt5til tlo, t

Page 24: tr5 d.J DBP...1.7 Proiect Billboaid 1.8 Hadling of existinS furnlture, vault door from old slte to the proposed slte Actlvlty Tlme Venus 6/F BAC Secretariat Unit-PlMD, DBP Head Office,

Hard copy of the Revised Bill of Quantities must be submitted and each and every page must beduly signed by the bidde/s authorized representative.

Detailed Financial Bid/ Revised Bill of Quantities must be in the same templateformat providedin CD. Both hard copy and CD must be submi$ed during the Opening of Bids.

The Bill of Quantities must have the same total per TAB 1 (total financial bid) which shall not exceedthe ABC of Php 5,821,821.50.

Notes:

A signature box shall be added at the bottom of each pate of the Sill of quantities where theauthorized representative of the Bidder shall affix his signature. Failure of the authorizedrepresentative to sign each and every page of the Bill of quantities shall be a cause for rejectionof his bid.

Clouse 75.1. The controd shdll be for the whole Wotk, os described in ITB Clouse, bosed on thepriced Bill ol Quantities submitted by the Bidder.

Clouse 75.j All duties, toxes, ond other levies poyoble by the Controdor undet the Controct, or forony other couse, prior to the deodline for submission of bids, sholl be included in the rutes, prices,dnd totol bid price submitted by the Bidder.

BIO BULLETIN iP. ITId R'I. No. I.2019.O1: PROCUREMENT OF SERTIICES OF A GOITRICTOR FOR T}C REiOVANOiUFITOUT OF

ROCES AvEilUE BRANCH oF IHE D€VELOPITE;.IT BAta( OF rlc PHlUPpltlES (ABC: Irtp6.82'1.82'1.80 lndudv. of Jl .oolic.UG t.rcatN.24 d 24