TOTAL QUALITY MANAGEMENT TOOLS AND TECHNIQUES:
THE QUEST FOR AN IMPLEMENTATION ROADMAP1
Seyed Mohammadbagher Jafari*
Graduate School of Management
Universiti Putra Malaysia, 43400 UPM, Selangor, Malaysia
E-mail: [email protected]
Mostafa Setak
Industrial Engineering Department, K.N.Toosi University of Technology,
No. 7, 4th
floor, Pardis st., Molla Sadra Ave., Vanak sq., Tehran, Iran.
E-mail: [email protected]
*Corresponding Author
ABSTRACT
Total Quality Management (TQM) has been recognized and used during the last decades byorganizations all over the world to develop a quality focus and improve organizational
performance. TQM is necessary to reach competitiveness; however, the way to achieve this is
not easy. TQM consists of a wide range of concepts regarding to quality. Most of the studiesin TQM implementation focus on the concept of TQM. There are few studies in the literature
that directly suggest an implementation roadmap of TQM tools and techniques and TQMimplementation is still problematic for many organizations. In order to respond to the quest
for a clear implementation methodology, this study tries to suggest an implementation
roadmap for TQM tools and techniques based on DMAIC methodology. The proposed
roadmap includes 6 steps and its developmental sequences start with steps that begin from
process documentation and lead to accomplishment of more complex and modern quality
tools and techniques that guide organization to a high level of institutionalized quality.
Keywords:Total Quality Management,TQM, Implementation Roadmap, TQM Tools, TQMTechniques, DMAIC methodology
INTRODUCTION
Quality management has long been recognized as a source of competitive advantage and oneof the most important drivers of global competition (Prajogo & Sohal, 2003). A few
researchers tried to identify the impact of TQM implementation on firms performances inboth industrialized (Ahire, Waller, & Golhar, 1996; Prabhu, Appleby, & Yarrow, 2000;
Prajogo & Sohal, 2003) and developing countries (Arumugam, Ooi, & Fong, 2008; Das, Paul,
Swierczek, & Laosirihongthong, 2006). Punnakitikashem et al. (2010) stated that the majorityof these studies concluded that TQM positively impacts firm performances depending on thedegree of its implementation. In spite of this, TQM implementation is still problematic for
many organizations (Hansson & Klefsj, 2003) and yet firms report less than optimal results
(Jayaram, Ahire, & Dreyfus, 2010)
1This article financially supported by the Islamic Union of Iranian Students Association (in Malaysia).
Proceedings of the AGBA 7th World Congress, Malaysia 13 Dec 2010
mailto:[email protected]:[email protected]:[email protected]:[email protected] -
8/13/2019 Tqm Tools & Tech
2/12
2
Total Quality Management (TQM) is a management strategy aimed at embedding awareness
of quality in all organizational processes (Siddiqui, Haleem, & Wadhwa, 2009). TQM definedby the Deming Prize Committee of the Union of Japanese Scientists and Engineers (JUSE,
2010) as: a set of systematic activities carried out by the entire organization to effectivelyand efficiently achieve the organizations objectives so as to provide products and services
with a level of quality that satisfies customers, at the appropriate time and price.
There are many proposed tools and techniques to achieve the TQM promises. Generally, atechnique can be considered as a number of activities performed in a certain order to reach the
values (Hellsten & Klefsj, 2000). On the other hand, tools sometimes have statistical basis to
support decision making or facilitate analysis of data.
Bunney and Dale (1997) reported that on the subject of quality management, there are many
studies that agree on the vital role of the use and selection of quality management tools and
techniques to support and develop the quality improvement process. However, they
emphasized that organizations do encounter a range of difficulties in their use and application
of quality management tools and techniques.
It is hardly surprising that research and theory in TQM implementation are still at a very earlystage in the West (Dale, Y.-Wu, Zairi, Williams, & Van Der Wiele, 2001; Sitkin, Sutcliffe, &
Schroeder, 1994) and the gap in the TQM implementation literature is obvious. Most of the
studies in TQM implementation focus on the concept of TQM. There are very few studies inthe literature that directly suggest an implementation roadmap of TQM tools and techniques
and usually they are not a complete roadmap. Therefore, in this research, firstly, the literatureon the current proposed tools and techniques for TQM implementation reviewed and then
based on the result of this review, a comprehensive roadmap for TQM implementationproposed that covers all the cited tools and techniques.
LITERATURE REVIEW
Researchers and practitioners have acknowledged the need to understand causal relationships
among various elements of total quality management (Ahire & Ravichandran, 2002). Bunney
and Dale (1997) stated that the introduction of the quality management tools and techniques
depend, to a certain extent, on the phase of the improvement process. The introduction of
TQM can take place in three phases (I) diagnosis and preparation, (II) management focus
and commitment, and (III) intensive improvement. The diagnostic and preparation phase of
TQM requires the introduction of a number of fact finding tools, some of which are cost of
quality and Departmental Purpose Analysis (DPA). The management focus and
commitment phase requires the use of data analysis tools (e.g. cause & effect analysis, flow
charts and Pareto analysis) to identify problem areas, quantify their effects and prioritize the
need for solution. During the intensive improvement phase the introduction of more complex
tools (e.g. statistical process control (SPC) and failure mode and effects analysis (FMEA))
help to facilitate company-wide improvement.
Bunney and Dale (1997)also categorized TQM tools and techniques in two different ways,first in five categories regarding to their application and second in seven categories regarding
to the function that they can be used. Table 1 shows the TQM tools regarding to theirapplication.
Proceedings of the AGBA 7th World Congress, Malaysia 13 Dec 2010
-
8/13/2019 Tqm Tools & Tech
3/12
The following table shows TQM tools and techniques within each function of a company
operation.
In another study, Hellsten and Klefsj (2000) suggested a new definition for TQM. Theirstudy indicates that TQM can be defined as a management system, which consists of three
interdependent units, namely core values, techniques and tools. The idea is that the core
values must be supported by techniques, such as process management, benchmarking, and
customer focused planning, or improvement teams, and tools, such as control charts, the
quality house or Ishikawa diagrams, in order to be part of a culture. They emphasized that this
systematic definition will facilitate for organizations the understanding and implementation of
TQM. Therefore, the implementation work should begin with the acceptance of the core
values that characterizing the culture of organization. The next step is to continuously choose
Table 1: Analysis of Application of Tools and Techniques (Bunney & Dale, 1997)
Table 2: Analysis of Tools and Techniques Used within each Function (Bunney & Dale, 1997)
Proceedings of the AGBA 7th World Congress, Malaysia 13 Dec 2010
-
8/13/2019 Tqm Tools & Tech
4/12
techniques that are suitable for supporting the selected values. Ultimately, suitable tools have
to be identified and used in an efficient way in order to support the chosen techniques. Figure
1 illustrates this definition (The techniques and tools in the figure are just examples and not a
complete list).
According to Hellsten and Klefsj (2000) the basis for the culture of the organization are the
core values. Another component is techniques, i.e. ways to work within the organization to
reach the values. A technique consists of a number of activities performed in a certain order.The important concept here is that TQM really should be looked on as a system. The values
are supported by techniques and tools to form a whole. We have to start with the core valuesand ask: Which core values should characterize our organization? When this is decided, we
have to identify techniques that are suitable for our organization to use and support ourvalues. Finally, from that decision the suitable tools have to be identified and used in an
efficient way to support the techniques (see Figure 2).
Hellsten & Klefsj (2000) indicated, as an example, Benchmarking should not be used
without seeing the reason for using that technique and an organization should not use just
control charts without seeing the core value behind the choice and a systematic
implementation roadmap of the techniques and tools. It is, of course, important to note that a
particular technique can support different core values and the same tool can be useful within
many techniques.
Figure 1: TQM as a Management System Consists of Values, Techniques and Tools
(Hellsten & Klefsj, 2000)
Figure 2: TQM Implementation Steps (Hellsten & Klefsj, 2000)
Proceedings of the AGBA 7th World Congress, Malaysia 13 Dec 2010
-
8/13/2019 Tqm Tools & Tech
5/12
-
8/13/2019 Tqm Tools & Tech
6/12
In another study in this area, Fazel & Salegna (1996) tried to group major TQM tools and
techniques into six major categories as determined by their primary area of implementation
focus:
1) customer-based;2) management-based;3) employee-based;4) supplier-based;5)process-based; and6)product-based.
Table 3 shows this classification.
The above mentioned categories are described below (Salegna & Fazel, 1996):
1)Customer-based strategies should be the focal point of every TQM programme, aroundwhich all other strategies are formulated. Customer satisfaction is only likely to be
achieved and maintained when the customer plays an active role in the
organizations process of quality improvement. Major techniques used to
accomplish this are customer needs analysis, customer surveys and quality function
deployment.
2) Management-based strategies are also extremely important for the successfulimplementation of TQM. TQM initiatives are not likely to succeed without strong
leadership and support from top management. The goals and the benefits of
Figure 3: Steps in Application of Deming's PDCA Technique and Associated Tools(Ahmed & Hassan, 2003)
Proceedings of the AGBA 7th World Congress, Malaysia 13 Dec 2010
-
8/13/2019 Tqm Tools & Tech
7/12
7
implementing TQM must clearly be communicated by top management to the
workforce. The alignment of the reward structure with the goals of the organizationis also vital to the organizations success in achieving these goals.
3) Employee-based strategies provide a means of increasing the participatory role ofworkers. Strategies such as empowerment, teamwork and cross-training may result
in employees having increased decision making authority, greater jobresponsibilities, and increased motivation and sense of pride in their work. Quality
programmes may also benefit from employee suggestions resulting from othergroup activities including quality teams, quality circles, the nominal group
technique and brainstorming.
4) Supplier-based strategies provide a means of increasing an organizations likelihood ofhaving suppliers who are reliable and willing to work towards the organizations
goals of providing a quality product. Given the trend towards companies reducing
the number of suppliers and cultivating long-term relationships with the remaining
ones, these strategies are particularly important today.
Implementation Strategy Tools and Techniques
1) Customer-based Customer survey
Customer need analysis
Quality function deployment
2) Management-based reward structure Communication
Leadership
3) Employee-based teamwork EmpowermentCross-training
Quality circlesQuality teams
BrainstormingNominal group technique
4) Supplier-based supplier research Supplier trainingSupplier documentation
Supplier certification
5) Process-based statistical process
control
Quality improvement process
Just-in-time
Lead time reduction
Benchmarking
Quality cost analysis
Quality audits
Quality assessment
Process documentationISO 9000
Work flow analysis
6) Product-based standardization Benchmarking
Design of experimentsConcurrent engineering
Product flow analysis
Table 3: TQM Tools and Techniques Categories (Salegna & Fazel, 1996)
Proceedings of the AGBA 7th World Congress, Malaysia 13 Dec 2010
-
8/13/2019 Tqm Tools & Tech
8/12
5) Process-based strategies focus on improving processes by reducing waste, defect rates,cycle time, and providing feedback on the performance of the process.
Benchmarking, SPC and JIT are some of the most popular techniques employed by
companies to achieve these goals.
6) Product-based strategies are directly focused on the quality of the product, its physicalcharacteristics and its manufacturability.
THE PROPOSED ROADMAP FOR TQM IMPLEMENTATIONAccording to Hammer & Goding (2001) DMAIC methodology provides a structured
framework for solving business problems by assuring correct and effective process execution.This methodology has 6 phases in which, in the case of Six Sigma, teams take total employee
involvement approaches to complete the cycle of process management and use self-diagnosisskills to fulfill the goals of each phase. The business will naturally reach the Six Sigma
quality, when all key processes within a business are completed for each of these five eachphases (Byrne, 2003). Figure 4 shows the DMAIC methodology.
However, in the case of TQM, the factors that affecting TQM tools selection are many and it
should be considered before any implementation plan. These factors are:
the availability of resources within the company to facilitate tools successfulintroduction;
the objective of using quality management tools such as solving a simple problem orreaching to a high level in quality;
the product characteristics; and current product and process improvement or new product introduction.
Some tools or techniques appear simple over others in their development and interpretation.
The purpose of each of them is distinct and problem specific. Certainly, not all tools or
techniques are required in one firm. SPC tools are very basic and can be applied for both short
and long term goals. Some of the tools and techniques are commonly (even frequently) used,
for example Pareto chart, cause & effect diagram, histogram or quality control charts for
quality performance monitoring and improvement, and some others can be used less
frequently (such as Benchmarking, QFD). Some of the techniques are used, for example,
QFD, FMEA, and design for manufacturability (DfM), in the design and development
Figure 4: DMAIC Methodology (Hammer & Goding, 2001)
Proceedings of the AGBA 7th World Congress, Malaysia 13 Dec 2010
-
8/13/2019 Tqm Tools & Tech
9/12
-
8/13/2019 Tqm Tools & Tech
10/12
10
The next step is to collect the required data and measuring the process. Collecting and
analyzing data are key steps in process improvement. Collecting process performance datahelp answering questions such as (Ehresman, 1995):
What is happening? How is the process performing? Is the process improving? Is the process satisfying customer requirements?
The best tools for this purpose is check sheet, Pareto chart, histogram, scatter diagram, runchart and statistical process control (SPC). The data collected by these tools can be used to
measure the process. According to Ehresman (1995) process measurements serve as a meansto listen to a process. When appropriately analyzed and interpreted, the measurements provide
accurate, meaningful and timely process performance feedback. The measurements can tellyou a lot about the process. Process measurements are useful for many purposes including
those listed below:
understanding what is happening; provide objective performance feedback;
evaluate the need for improvement; evaluate the impact of changes; and set schedules and performance targets.
The third step in the proposed roadmap is to use problem finding and solving tools. Problem
solving requires a structured approach. Without such an approach, efforts often are random
and/or misguided. The five steps listed below can be applied to any type of problem,
regardless of its complexity (Ehresman, 1995):
1) define a problem;2) identify the root cause;3) select the best solution;4) develop an action plan; and5) verify plan results.
The proper techniques for this goal are cause & effect diagram, relationship diagram,
brainstorming, reversal and characteristic changing. These techniques can be applied todetermine and eliminate the root cause of a problem. Key element of any problem-solving
effort are identifying the root cause and generating a list of possible solution ideas.Continuous quality improvement is the next step. In this step all the above mentioned steps
will be repeated and more tools and techniques will be used to ensure continuousimprovement. The most common tools and techniques in this step are control charts, FMEA,
and fault tree analysis.
After the above steps quality stabilization within company and making quality everyones job
is necessary. Quality is not a part of everyones job. Everyone doesnt do quality for a whileand then get back to his/her real job. Quality is everyones job (Ehresman, 1995). The best
tool that can assist every organization in its effort to make quality everyones job is ISO9000
series. A key aim of TQM is customer satisfaction. The focus of customer satisfaction, in turn,
is to understand and meet or exceed customer requirements. A system is required to ensurethat the requirements are continually and consistently adhered to. This system contains
documentation so requires that anyone assigned to perform a job can be trained in the same
precise manner as the previous person on that job. There can be no decline in quality just
because the person performing the process has changed. The existence or need for quality
Proceedings of the AGBA 7th World Congress, Malaysia 13 Dec 2010
-
8/13/2019 Tqm Tools & Tech
11/12
11
systems certainly is not new; companies around the world have been developing their own
quality systems for years. ISO9000 is series of international quality standards that widelyaccepted and is the best tools for ensuring that quality is everyones job (Martnez-Costa,
Choi, Martnez, & Martnez-Lorente, 2009; Van der Wiele, Dale, & Williams, 1997).
However, in addition to the above mentioned tools and techniques, there are numerous
techniques which are technical and engineering related and have specific applications toproduct design and development. Usually these tools and techniques cover all functionswithin the organization and need more effort to implement and to lead organization to a high
level of quality. Six Sigma, 5Ss housekeeping, total productive maintenance (TPM), reward
system, suggestion system, electronic data exchange (EDI), computer aided (product/process)
design (CAD), computer aided manufacturing (CAM), design for manufacture and assembly
(DFMA), finite element analysis (FEA), computer numerical control (CNC), computer
integrated manufacturing (CIM) and just-in-time (JIT) are within this category.
CONCLUSIONThe correct selection and use of tools and techniques is a vital component of any successful
TQM implementation plan. The TQM tools and techniques can be divided into simple tools
for solving a special problem and complex one that cover all functions within the company.Before any implementation the availability of resources within the company, the usage and
scope of each tools and techniques and the product characteristics should be considered
carefully. In order to response to the quest for a comprehensive methodology for TQM toolsand techniques implementation, a roadmap with 6 steps proposed in this research. The
developmental sequences of this roadmap start with steps that begin from processdocumentation and lead to accomplishment of more complex and modern quality tools and
techniques that guide organization to a high level of quality. This roadmap can help allorganizations intending to reach to a high level of institutionalized quality.
ReferencesAhire, S., & Ravichandran, T. (2002). An innovation diffusion model of TQM
implementation.Engineering Management, IEEE Transactions on, 48(4), 445-464.
Ahire, S., Waller, M., & Golhar, D. (1996). Quality management in TQM versus non-TQM
firms: an empirical investigation. International Journal of Quality & Reliability
Management, 13(8), 8-27.
Ahmed, S., & Hassan, M. (2003). Survey and case investigations on application of quality
management tools and techniques in SMIs. International Journal of Quality &
Reliability Management, 20(7), 795-826.
Arumugam, V., Ooi, K., & Fong, T. (2008). TQM practices and quality management
performance: An investigation of their relationship using data from ISO 9001: 2000
firms in Malaysia. The TQM Journal, 20(6), 636-650.
Bunney, H., & Dale, B. (1997). The implementation of quality management tools andtechniques: a study. The TQM Magazine, 9(3), 183-189.
Byrne, G. (2003). Ensuring optimal success with Six Sigma implementations. Journal ofOrganizational Excellence, 22(2), 43-50.
Dale, B. G. (2003).Managing Quality(4th ed.). Oxford: Wiley-Blackwell.Dale, B. G., Y.-Wu, P., Zairi, M., Williams, A., & Van Der Wiele, T. (2001). Total quality
management and theory: An exploratory study of contribution. Total QualityManagement & Business Excellence, 12(4), 439-449.
Proceedings of the AGBA 7th World Congress, Malaysia 13 Dec 2010
-
8/13/2019 Tqm Tools & Tech
12/12
12
Das, A., Paul, H., Swierczek, F., & Laosirihongthong, T. (2006). A measurement instrument
for TQM implementation in the Thai manufacturing industry. International Journal ofInnovation and Technology Management, 3(4), 117.
Ehresman, T. (1995). Small Business Success Through TQM: ASQC Quality Press,Milwaukee, WI.
Hammer, M., & Goding, J. (2001). Putting six sigma in perspective. Quality, 40(10), 58-62.
Hansson, J., & Klefsj
, B. (2003). A core value model for implementing total qualitymanagement in small organisations. The TQM Magazine, 15(2), 71-81.
Hellsten, U., & Klefsj, B. (2000). TQM as a management system consisting of values,
techniques and tools. The TQM Magazine, 12(4), 238-244.
Jayaram, J., Ahire, S., & Dreyfus, P. (2010). Contingency relationships of firm size, TQM
duration, unionization, and industry context on TQM implementation--A focus on
total effects.Journal of Operations Management, 28(4), 345-356.
JUSE (2010). THE DEMING PRIZE GUIDE 2010: Union of Japanese Scientists and
Engineers
Martnez-Costa, M., Choi, T. Y., Martnez, J. A., & Martnez-Lorente, A. R. (2009). ISO
9000/1994, ISO 9001/2000 and TQM: the performance debate revisited. Journal of
Operations Management, 27(6), 495-511.
Prabhu, V., Appleby, A., & Yarrow, D. (2000). The impact of ISO 9000 and TQM on bestpractice/performance. The TQM Magazine, 12(2), 84-92.
Prajogo, D., & Sohal, A. (2003). The relationship between TQM practices, quality
performance, and innovation performance: An empirical examination. InternationalJournal of Quality & Reliability Management, 20(8), 901-918.
Punnakitikashem, P., Laosirihongthong, T., Adebanjo, D., & McLean, M. (2010). A study ofquality management practices in TQM and non-TQM firms: Findings from the
ASEAN automotive industry. International Journal of Quality & ReliabilityManagement, 27(9), 1021-1035.
Rao, A., Carr, L. P., Dambolena, I., Kopp, R. J., Martin, J., Rafii, F., et al. (1996). TotalQuality Management: Cross Functional Perspective. New York: Wiley.
Salegna, G., & Fazel, F. (1996). An integrative approach for selecting a TQM/BPR
implementation plan.International Journal of Quality Science, 1(3), 6-23.
Scheuermann, L., Zhu, Z., & Scheuermann, S. (1997). TQM success efforts: use more
quantitative or qualitative tools?Industrial Management & Data Systems, 97(7), 264-
270.
Siddiqui, F., Haleem, A., & Wadhwa, L. (2009). Role of Supply Chain Management in
Context of Total Quality Management in Flexible Systems: A State-of the-Art
Literature Review. Global Journal of Flexible Systems Management, 10(3), 1-10.
Sitkin, S., Sutcliffe, K., & Schroeder, R. (1994). Distinguishing control from learning in total
quality management: a contingency perspective. Academy of Management Review,
19(3), 537-564.
Spring, M., McQuater, R., Swift, K., Dale, B., & Booker, J. (1998). The use of quality tools
and techniques in product introduction: an assessment methodology. The TQMMagazine, 10(1), 45-50.
Van der Wiele, A., Dale, B., & Williams, A. (1997). ISO 9000 series registration to totalquality management: the transformation journey. International Journal of Quality
Science, 2(4), 236-252.
Proceedings of the AGBA 7th World Congress, Malaysia 13 Dec 2010