tqm dec 2010 answers

15
B.E/B.TECH DEGREE EXAMINATION - Nov/Dec 2010 Seventh Semester Electrical and Electronics Engineering MG1401-TOTAL QUALITY MANAGEMENT Time: 3 hours Maximum: 100 marks Answer ALL the questions. PART A-(10X2=20 marks) 1. What are the seven faces of Quality? Seven Tools: 1. Pareto Diagram 2. Process Flow Diagram 3. Cause and Effect diagram 4. Check sheets 5. Histogram 6. Scatter diagram v Control charts 2. Define Strategic planning. It sets the long term direction of the organization in which it wants to proceed in future.Can be defined "As the process of deciding on objectives of the organization, on changes onthis objective, on the resource used to obtain these objectives and on the policies that are to govern the acquisition use and disposition of these resources" 3. Why do the business people measure customer satisfaction? The Customer is the King - Emphasized by Today's Buyers Market. TQM's Purpose ismeeting or exceeding customer expectations, so that the customers are delighted. The customersatisfactions must be the primary goal of any organization. 4. What are the strategic goals of performance measure? PERFORMANCE APPRAISAL It is a systematic and objective assessment or evaluation of performance and contribution of individual Needs Identifying employees for salary revision, promotion, transfer, demotion, lay off To determine training needs of employee To take organizational inventory of people To know personal strength and weakness of individuals To validate the selection procedure 5. Mention the ways to reduce variability. 6. Mention the uses of Control chart. A statistical tool to determine if a process is in control. Reasons for using Control Charts: • Improve productivity

Upload: belwin-edward

Post on 11-Sep-2015

217 views

Category:

Documents


2 download

TRANSCRIPT

  • B.E/B.TECH DEGREE EXAMINATION - Nov/Dec 2010

    Seventh Semester

    Electrical and Electronics Engineering

    MG1401-TOTAL QUALITY MANAGEMENT

    Time: 3 hours Maximum: 100 marks

    Answer ALL the questions.

    PART A-(10X2=20 marks)

    1. What are the seven faces of Quality?

    Seven Tools:

    1. Pareto Diagram 2. Process Flow Diagram 3. Cause and Effect diagram 4. Check sheets 5. Histogram 6. Scatter diagram v Control charts

    2. Define Strategic planning.

    It sets the long term direction of the organization in which it wants to proceed in future.Can be

    defined "As the process of deciding on objectives of the organization, on changes onthis

    objective, on the resource used to obtain these objectives and on the policies that are to

    govern the acquisition use and disposition of these resources"

    3. Why do the business people measure customer satisfaction?

    The Customer is the King - Emphasized by Today's Buyers Market. TQM's Purpose ismeeting

    or exceeding customer expectations, so that the customers are delighted. The

    customersatisfactions must be the primary goal of any organization.

    4. What are the strategic goals of performance measure?

    PERFORMANCE APPRAISAL

    It is a systematic and objective assessment or evaluation of performance and contribution of

    individual

    Needs

    Identifying employees for salary revision, promotion, transfer, demotion, lay off

    To determine training needs of employee

    To take organizational inventory of people

    To know personal strength and weakness of individuals

    To validate the selection procedure

    5. Mention the ways to reduce variability.

    6. Mention the uses of Control chart.

    A statistical tool to determine if a process is in control. Reasons for using Control Charts:

    Improve productivity

  • Make defects visible Determine what process adjustments need to be made Determine if process is in orout of control

    7. What are the goals of TPM?

    To develop a conceptual understanding of the basic principles and

    methods associated with TQM;

    To develop an understanding of how these principles and methods have been put into effect in a variety of organizations;

    To develop an understanding of the relationship between TQM principles and the theories and models studied in traditional management;

    To do the right things, right the first time, every time.

    8. List out various techniques adopted for JIT.

    JIT is a Japanese technique, which means Just-intime technique. The primary goal of JIT is to achieve Zero inventory in an organization as well as throughout the entire supply chain.

    Just-in-time is not a jargon term for a new concept. It represents a goal. That goal is the ultimate total elimination of inventory.

    9.Define environmental policy.

    10.What are the elements of a Quality Systems? The key processes of Software Quality

    Management fall into the following three

    categories: 1) Quality Planning 2) Quality Assurance 3) Quality Control The Software

    PART B-(5X16=80 marks)

    11.(a)What are the different definitions given for quality?Explain how it got evolved and

    what are its pirme concerns.(16)

    QUALITY DEFINITION

    1. Predictable degree of uniformity and dependability at low cost and suited to the market

    -Deming

    2. Fitness for use-Juran

    3. Conformance to requirements - Crosby

    4. Minimum loss imparted by a product to society from the time the product is shipped -

    Taguchi

    5. A way of managing tile organization -Feigenbaum

    6. Correcting and preventing loss, not living with loss - Hosffin .

    7. The totality of characteristics of an entity that bear on its ability to satisfy stated and implied

    needs ISO

    Quality can be quantified as

    Q = P/E Where Q=Quality P=Performance E=Expectations

  • If Q is greater than 1.0, then the customer has a good feeling about the product or service.

    Or

    (b)(i)Discuss the management techniques for establishing quality costs.(8)

    COST OF QUALITY

    Quality costs are defined are those costs associated with the non-achievement of product or

    service quality as defined by the requirements established by the organization and its contracts

    Simply stated, quality cost is the cost of poor products or services.

    CATEGORIES & ELEMENTS OF QUALITY COST

    Costs are incurred in the accumulation and continued evaluation of customer and use quality

    needs and perceptions affecting user satisfaction with the organizations product or

    Costs are incurred to translate customer and user needs in to reliable quality standards and

    requirements and to manage the quality of new product or service.

    Costs are incurred to assure conformance requirements of supplier parts, materials or processes

    and to minimize the impact of supplier non conformance on the quality of delivered products

    or

    Costs are incurred in assuring the capability and readiness of operations to meet quality

    standards and requirements and to impart quality education to operating personnel.

    Costs are incurred in the overall administration of the quality management function.

    Purchasing appraisal costs can generally be considered the costs incurred for the inspection and

    test of purchased supplies or service to determine acceptability to use.

    2. Operations (Manufacturing or service) Appraisal Costs:

    Operations appraisal costs can generally be considered the costs incurred for the test or audit

    required to determine and assure the acceptability of product or service.

    External appraisal costs are incurred for field set up or installation and check out for the

    Costs are incurred for regular reviewing inspection and test data, prior to release of the product

    Costs involved in quality audits to assure continued ability to provide acceptable support to

    1. Product or Service Design Failure Costs (Internal):

    Design failure costs are the unplanned costs that are incurred because of inherent design

    Costs which are incurred due to the rejects of purchased items.

    3. Operations (Product or Service) Failure Costs:

    The costs associated with nonconforming product or service discovered during the operations

    process. It is categorized in to three distinct areas: material review and corrective action, rework

    1. Complaint Investigations of Customer or User Service:

    It includes the total cost of investigating, resolving and responding to individual customer and

    Costs incurred in evaluating, repairing and replacing goods.

  • Retrofit and recall costs are those costs required to modify or update products or field

    servicefacilities to a new design change level, based on major redesign due to design

    deficiencies.

    Warranty costs include the total costs of claims paid to the customer or user after acceptance

    tocover expenses, including repair costs, such as removing defective hardware from a system,

    orcleaning costs, due to food or chemical service accident.

    Liability costs are organization-paid costs due to liability claims, including the cost of product

    or Penalty costs are those costs incurred because less than full product or service performance

    is achieved as required by contracts with customers or by government rules and regulations.

    This category involves costs incurred that customers are not satisfied with quality of delivered

    product or service because the customers quality expectations were greater than the quality they Lost sales comprise the value of the contribution to profit that is lost due to sales reduction

    because of quality problems.

    (ii)Describe the various Quality Statements.Give examples.(8)

    QUALITY STATEMENTS

    VISION STATEMENT: It is a short declaration of what an organization aspires to be

    tomorrow. It is an ideal state which may never be achieved.

    Example: To continuously enrich knowledge base of practioners in mobility industry and institutions in the service of humanity SAE

    MISSION STATEMENT: Describes the function of the organization. It provides the clear

    statement of purpose for the employees, customers and suppliers.

    Example: Facilitating world class technical education through high quality institutions, academic excellence and innovative research and development programmes, technology

    forecasting and global manpower planning, promoting industry institute interaction,

    inculcating entrepreneurship AICTE

    QUALITY POLICY STATEMENT: It is a guide for everyone in the organization as to how

    they provide products and services to the customer. Written by the CEO feedback from

    workforce and approved by quality council.

    Example: Xerox is a quality company. Quality is the basic business principle for Xerox.

    Quality means providing our external and internal customers with innovative products and

    service that fully satisfy their requirements. Quality is the job of every employee Xerox

    12.(a)(i)Explain the key elements of partnering.(8)

    (ii)Explain the conditions for selection and evaluation of suppliers.(8)

    SUPPLIER PARTNERSHIP

    A commitment to continuous quality improvement cannot be translated into reality without

    treating supplier as partner

    PRINCIPLES OF CUSTOMER / SUPPLIER RELATION

  • Both the customer and the supplier are fully responsible for the control quality

    Both the customer and the supplier should be independent of each other and respect each

    others independence The customer is responsible for providing the supplier with clear and sufficient requirements so that the supplier can know precisely what to produce

    Both the customer and the supplier should enter into an non adversarial contract with respect

    to quality, quality, price, delivery method and terms of payments

    The supplier is responsible for providing the quality that will satisfy the customer and

    submitting necessary data upon the customers request

    Both the customer and the supplier should decide the methods to evaluate the qualityof the

    product or service to the satisfaction of both parties

    Both the customer and the supplier should establish in the contract the method by which they

    can reach an amicable settlement of any disputes that may arise.

    Both the customer and the supplier should continually exchange information, sometimes using

    multifunctional teams, in order to improve the product or service quality

    Both the customer and the supplier should perform business activities such as

    procurement, production and inventory planning, clerical work and system so that anamicable

    and satisfactory relationship is maintained

    When dealing with business transactions both the customer and the supplier should always

    have the best interest of the end user in mind

    SUPPLIER PARTNERING

    It is defined as a continuing relationship, between a buying firm and supplying firm,involving

    a commitment over an extended time period, an exchange of information,

    andacknowledgement of the risks end rewards of the relationship.

    BENEFITS OF SUPPLIER PARTNERING

    Improved Quality

    Reduced cost

    Increased Productivity

    Increased efficiency

    Increased market share

    Increased opportunity for innovation

    Continuous improvement of products/services. .

    JAPANES REVIEW OF PARTNERING

    The Japanese partnering concept is KELRESTU developing long term relationshipswith a few key suppliers rather than having short term relationship with many suppliers.

    Key elements to Partnering

    Long term Commitment

  • Trust

    Shared vision - To satisfy the end users is the common goal of both supplier andcustomer.

    SUPPLIER SOURCING

    Sole sourcing - only one supplier for the entire organization. This may be forced. tohappen

    because of patent, technical specification, raw material location, monopolisticsupplier

    Multiple sourcing - For a single item having two or more supplier, resulting in bette r quality,

    better service at lower cost

    Single sourcing- use of one supplier to one item when several sources are available leading to

    long-term partnering relationship.

    BASIS OF SUPPLIER SELECTION

    Cost, Quality, Delivery, Reliability, Management compatibility, Goal congruence and Strategic

    direction of supplier firm.

    STAGE IN SUPPLIER SELECTION & EVALUATION

    Survey stage, enquiry stage, negotiation and selection stage, experience stage.

    The supplier should understand and appreciate the management philosophy of the organization

    The supplier should have a stable management system

    The supplier should maintain high technical standards and have the capability of dealing with

    future technological innovation

    The supplier should provide those raw materials and parts required by the purchaser andthose

    supplied meet the quality specifications

    The supplier should have the capability to produce the amount of production needed

    The supplier should not breach the corporate secrets

    The supplier should be easily accessible in terms of transportation and communication

    The supplier should be sincere in implementing the contract provisions

    The supplier should have an effective quality system and improvement program such as ISO /

    QS 9000

    The supplier should have a track record of customer satisfaction and organization credibility

    SUPPLIER RATING

    Also referred as score card system, is used to obtain and overall rating of supplier performance

    based on quality, price, performance and production capability

    OBJECTIVES OF SUPPLIER RATING

    Obtain an overall rating of supplier performance ensure completer communication with

    suppliers - provide each supplier about the details of problems for corrective action and -

  • maintain and improve the partnering relationship between the customer and the supplier.

    Or

    (b)(i)Compare Deming and Juran approaches.(8)

    DEMINGS 14 POINTS

    1. Create constancy of purpose for improvement of products and service.

    2. Adopt a new philosophy: we are in a new economic age.

    3. Cease dependence upon inspection as a way to achieve quality.

    4. End the practice of awarding business based on price tag.

    5. Constantly improve the process of planning, production, and service- this system includes

    people.

    6. Institute training on the job.

    7. Institute improved supervision (leadership)

    8. Drive out fear.

    9. Break down barriers between departments.

    10. Eliminate slogans/targets asking for increased productivity without providing methods

    11. Eliminate numerical quotas.

    12. Remve barriers that stand between workers and their pride of workmanship.

    13. Institute programs for education and retraining.

    14. Put all emphasis in the company to work to accomplish the transformation.

    JURAN TRILOGY

    Dr. Joseph Moses Jurans major contribution to the world has been in the field of quality management.

    Dr.Joseph Juran was also called as father of Quality. He was a professor and Quality consultant

    and conceptualized the Pareto principle where many Industries depends on it. The American

    society for quality have proposed to rename the Paretos principle as JuransPrinciple. Its universal application makes it one of the most useful concepts and tools of modern day

    management.

    Dr. Joseph Moses Juran has written many books on Quality. One of his book

    namelyStandard reference work on Quality control is one of the reference handbook used by quality departments in most of the organizations.

    This handbook on quality gives more useful information to improve the performance of the

    organization by improving the quality of goods and services. One of his classic book namely

    Managerial Breakthrough presents more general theory of quality management

    The book Managerial Breakthrough is the first book to describe a step by step sequence for

    breakthrough improvement. Today this process has evolved in to six sigma and it act as a basis

    for quality initiatives world wide.

  • In 1979 Juran founded Juran Institute, an organization aimed at providing Research and

    pragmatic solutions to enable organizations from any Industry to learn the tools and techniques

    for managing Quality.

    Juran describes Quality from the customer perspective as having two aspects.

    Higher quality means greater number of features that meet customer needs.

    The second aspect is that the product should be free from troubles.

    The Juran Trilogy, published in 1986, was accepted world wide as the basis for quality

    management.

    The Juran Trilogy describes three basic components or processes required to manage quality

    in the organization. They are

    Quality Planning

    Quality improvement

    Quality Control

    Quality Trilogy model was developed by Juran at Juran Institute. Quality Trilogy provides a

    model of how an organization can improve from the bottom line by better understanding the

    relationship between the processes that plan , control and improve quality.

    (ii)Explain the importance of customer satisfaction.(8)

    Customer satisfaction

    The Customer is the King - Emphasized by Today's Buyers Market. TQM's Purpose is meeting

    or exceeding customer expectations, so that the customers are delighted. The

    customersatisfactions must be the primary goal of any organization.

    CUSTOMER SATISFACTION MODEL

    Tebouls Model of customer satisfaction as shown in figure

    From the above diagram it is understood that the company should strive for increasing th e

    intersection portion i.e. Customer Satisfaction.

    THE CUSTOMERS ARE

    The most important people in the business

    Not dependent on the organization, but the organization depends on them.

    Not an interruption to work but are the purpose of it.

    Doing a favor when they seek business and not vice-versa.

    A part of business, not outsiders and they are life blood of the business

    People who come with their needs and jobs

    Deserve the most courteous and attentive treatment.

    TYPES OF CUSTOMERS

    Internal Customer: The customer inside the company are called internal customers

  • External Customers: An external customer is the one who used the product or service or

    whopurchase the products or service or who influences the sale of the product orservice.

    CUSTOMER SUPPLY CHAIN

    CUSTOMER COMPLAINTS (FEEDBACK)

    Customer feedback must be continuously solicited and monitored to reduce the

    dissatisfied customers as much as possible.

    CUSTOMER FEEDBACK OR CUSTOMER COMPLAINT IS REQUIRED

    To discover customer dissatisfaction

    To identify customers needs

    To discover relative priorities of quality

    To compare performance with the competition

    To determine opportunities, for improvement

    TOOLS USED FOR COLLECTING CUSTOMER COMPLAINTS

    Comment card - Low cost method, usually attached to warranty card

    Questionnaire - Popular tool, costly and time consuming - by mail or telephone

    preferably multiple choice questions or a point rating system (1 to 5) or (1 to 10)

    Customer Focus groups - Meeting by a representative of the company with the group

    of customers. Imprint analysis is an emerging technique to obtain intrinsic feelings using

    customer meetings, word associations, discussion, relaxation techniques etc.

    Phone - Toll free Telephone numbers

    Customer visits - Visit customer's place of business.

    Report cards - Usually, send to customer on a quarterly basis.

    The internet and computer - It includes newsgroups, electronic bulletin board mailing

    lists,Employee feedback.

    Mass Customization - Capturing the voice of customers using data of what customer want

    instead of what customer is thinking about buying and manufacturing exact what they want.

    STEPS TO SOLVE CUSTOMER COMPLAINTS

    Complaints can be collected from all sources (letters, phone -calls, meetings and verbinputs)

    Develop procedures for complaint resolution, that include empowering front-linepersonnel.

    Analyze complaints, but understand that complaints do not always fit into new

    categories

    Work to identify process and material variations and then eliminate the root cause.and strive to

    resolve the concern.

  • Establish customer satisfaction measures and constantly monitor them.

    solution, to all people in the organization. .

    Provide a monthly complaint report to the quality council for their evaluation andneeded, the

    assignment of process improvement teams.

    Identify customer's expectations beforehand rather than afterward through complaint analysis.

    CUSTOMER RETENTION

    More powerful and effective than customer satisfaction

    It is the process of retaining the existing customer

    Customer care can be defined as every activity which occurs within the organization that

    ensures that the customer is not only satisfied but also retained.

    SIGNIFICANCE OF CUSTOMER RETENTION

    60% of organizations future revenue will come from exiting customers

    2% increase in customer retention has 10% decrease in operating cost.

    96% of unhappy customers do not complain but 3 times likely to convey to other customers

    about their bad experience.

    91% of unhappy customers never purchase goods and services from you.

    It costs 5 times more to attract the customer than retaining the existing customer.

    Customer retention creates customer loyalty and moves customer satisfaction to a nextlevel

    called customer delight.

    EMPLOYEE INVOLVEMENT

    It is the total involvement from every person at all levels in the organization

    ASPECTS OF EMPLOYEE INVOLVEMENT

    1. Employee motivation

    When a survey response is received, a senior manager should contact the customer

    Communicate complaint information, as well as the result of all investigation

    2. Employee Empowerment

    3. Teams and Team work

    4. Recognition and Reward Schemes

    5. Performance Appraisal

    13.(a)Explain the different types of control charts available for problem

    solving.Enumerate on the different patterns commonly noticed in control charts.(16)

  • CONTROL CHART: A statistical tool to determine if a process is in control.

    CONTROL CHARTS FOR VARIABLES AND ATTRIBUTES VARIABLE CONTROL

    CHARTS

    1. Deal with items that can be measured. Example

    1) Weight 2) Height 3) Speed 4) Volume

    Types:

    X chart: deals with a average value in a process R chart: takes into count the range of the

    MA chart: take into count the moving average of a process 2.ATTRIBUTE CONTROL CHART

    v Control charts that factor in the quality attributes of a process to determine if the process is

    performing in or out of control.

    Types:

    P chart C Chart U Chart

    P Chart: a chart of the percent defective in each sample set.

    chart: a chart of the average number of defects in each sample set.

    Reasons for using Control Charts: Improve productivity

    Make defects visible

    Determine what process adjustments need to be made Determine if process is in orout of control

    Or

    (b)With a specific application compare the affinity diagram and relationship diagram in

    terms of getting highly creative solutions for managerial problems.(16)

    Affinity diagram

    An affinity diagram is a tool to collect a large amount of verbal expressions (ideas, opinions,

    observations, etc) and organize them in group according to natural relationships between

    individual items.

    Affinity diagram is used:

    To provide a visual representation of large amount of

    ideas.

    To determine logical priorities.

    To extract the large amount of useful information from few or scattered

    data or from unrelated ideas.

    To understand and organize problems that are not clear.

    To clear new concepts.

  • Relationship diagram

    The relationship diagram is a tool for fining causes to a problem. The relationship diagram not

    only clarifies the relationship between cause and effect but also between the various causes.

    Use of relationship diagram

    The purpose of the relationship diagram is generate a visual representation of the relations

    between an effect and its causes as well as the inter-relationship between the different causes

    of the problem.

    Tree diagram

    A tree diagram systematically breaks down a topic into its components elements, and shows

    the logical and sequential links between these elements.

    The tree diagram systematically outlines the complete spectrum of paths and tasks that must

    be carried out to achieve a goal.

    Use tree diagram

    The purpose of the tree diagram is to explore the ways and means to achieve the

    objective, develop a list of alternative means and to present them in visual

    understandable from.

    Matrix diagram

    A matrix diagram is a tool that is used to systematically organize information that

    must be compared on variety of characteristics in order to make a comparison,

    selection or choice.

    Use matrix diagram

    The matrix diagram is used to show relations between individual items in two sets of factors.

    Decision tree or process decision programmer chart (PDCA)

    A decision tree or PDPC is a planning tool to outline every conceivable and likely occurrence

    in any planning.

    Use decision tree

    The PDPC or decision tree is useful when one wants to plan all possible chains of events that

    might occur during a project. This tool is particularly used in new

    product development, building and equipment, and data processing programs.

    This tool is widely used in decision making when the task is new, complex and

    unique.

  • arrow diagram

    An arrow diagram is a graphic description of the sequential steps that must be

    completed before a project can be completed. Example: PERT and CPM charts.

    use arrow diagram

    The main purpose of the arrow diagram are:

    i)to show the paths to complete for

    the project.

    ii)to find the shortest time possible for the project and

    iii)to display

    graphically simultaneous activities.

    The arrow diagram is indispensable for long-term projects, such as the

    construction of a plant or development of new products.

    Matrix data analysis diagram

    A matrix data analysis diagram is very much similar to a matrix diagram with a

    difference that numerical data is used instead of symbols indicating the existence and strength

    of relationship.

    Use matrix data analysis diagram

    The purpose of matrix data analysis diagram is to present numerical data about

    two sets of factors in a matrix form and analyse it to get numerical output. This

    tool is used in principle component analysis where only two characteristics can be studied at a

    time.

    14.(a)Describe the different benchmarking metrices that can be used in educational

    institutions.(16)

    Process benchmarking - the initiating firm focuses its observation and investigation of business

    processes with a goal of identifying and observing the best practices from one or more

    benchmark firms. Activity analysis will be required where the objective is to benchmark cost

    and efficiency; increasingly applied to back-office processes where outsourcing may be a

    consideration.

    Financial benchmarking - performing a financial analysis and comparing

    The results in an effort to assess your overall competitiveness.

    Performance benchmarking - allows the initiator firm to assess theircompetitive

    position by comparing products and services with those of target firms.

  • Product benchmarking - the process of designing new products or upgrades

    To current ones. This process can sometimes involve reverse engineering which is taking apart

    competitors products to find strengths and weaknesses.

    Strategic benchmarking - involves observing how others compete. This type

    isusually not industry specific meaning it is best to look at other industries.

    Functional benchmarking - a company will focus its benchmarking on a

    singlefunction in order to improve the operation of that particular function. Complex functions

    such as Human Resources, Finance and Accounting and Information and Communication

    Technology are unlikely to be directly comparable in cost and efficiency terms and mayneed

    to be disaggregated into processes to make valid comparison.

    Or

    (b)Explain the different steps involved in Failure Mode Effect Analysis with an

    example.(16)

    Design FMEA is used in the design process by identifying known and

    foreseeable failure modes and then ranking failures according to relative impact on the product.

    Design FMEA reduces development time and cost of manufacturing process by eliminating

    many potential failure modes prior to operation of the process.needed for reference.

    FMEA number space is given on the top right corner of the document which is

    ITEM space is used for component (or) process to be analysed.

    Design Responsibility space is used for the team in-charge of the design or

    process , (or) the name and the department of the person responsible for preparing the

    document.provided to avoid confusion between similar components.

    Model Number / Year of the component should be included in the space

    Key date space is used for initial Due date of FMEA.

    FMEA date original and FEMA date latest revision should be filled.

    In the Core team space, the names of the responsible individuals and

    departments having authority to perform tasks should be filled up.

    Item / Function:

    In this column, the name and code number of the item being analysed is recorded.

    This function of the item should be entered.

    If the item has more than one function, they should be listed and analysed separately.

    The environment (temperature. pressure, humidity etc) in which the system operates should be completely given.

    15.(a)List the different types of quality audits available in practice and explain when each

    has to be carried out?

  • This chapter describes the types of audits that government and nongovernmental

    auditorganizations conduct and those organizations arrange to have conducted, of government

    organizations, programs, activities, functions, and funds. This description is not intended

    tolimit or require the types of audits that may be conducted or arranged. In conducting these

    types of audits, auditors should follow the applicable standards included and incorporated in

    the chapters, which follow.

    All audits begin with objectives, and those objectives determine the type of audit to be

    conducted and the audit standards to be followed. The types of audits, as defined by their

    objectives, are classified in these standards as financial audits or performance audits.

    Audits may have a combination of financial and performance audit objectives or may have

    objectives limited to only some aspects of one audit type. For example, auditors conduct audits

    of government contracts and grants with private sector organizations, as well as government

    and nonprofit organizations, that often include both financial and performance objectives.

    These are commonly referred to as "contract audits" or "grant audits." Other examples of such

    audits include audits of specific internal controls, compliance issues, and computer-based

    systems. Auditors should follow the standards that are applicable to the individual objectives

    of the audit.The internal audits were carried out by the Managing Director and the quality

    system representative, who drew up the audit plan, the audit check-list and the formats for the

    audit report and for the reports by the regional office experts on their particular fields. The

    Managing Director and the quality system representative audited the local offices in respect of

    the quality system and the departments of the regional office in every respect. The experts

    audited the local offices in respect of their particular business areas. The objective of the

    auditwas to verify that quality activities and related results comply with the definitions given

    in operating procedures and work instructions, and to determine the effectiveness of the quality

    system. The internal audit was announced several days before it took place, and all the required

    records (see the check-list below) were delivered. The first audits focused on documents

    control as a basis for the first stage in implementing the ISO norm. We then had to look closely

    into the question of whether the operating procedures were in conformity with actual processes

    and were appropriate. Nonconformities were noted and recorded, but it was astonishing that

    the quality system worked so well despite the short duration of implementation. We made two

    audits before the assessment to ensure that corrective action could be taken, and that approach

    was effective in ensuring that AMS Salzburg was in good shape to face the assessment.

    Or

    (b)(i)Explain the requirements of Environmental Management Systems.(8)

    (ii)Discuss the benefits of environmental management systems.(8)