tps - petrogas systems€¦ · tps team continues to demonstrate its satisfaction even after the...
TRANSCRIPT
![Page 1: TPS - Petrogas Systems€¦ · TPS team continues to demonstrate its satisfaction even after the completion of the project. The Field Service team also has the merit of all after](https://reader034.vdocuments.us/reader034/viewer/2022042115/5e926f4039453a04112f3121/html5/thumbnails/1.jpg)
Loading and offloading stations& metering skidsSuccess Story
Key achievements• Engineering and Design.• Project management.• Manufacturing of complete skids.• FAT (Factory Acceptance Test).• Packing and Shipping.• Commissioning and Start-up.• On-Site Calibration.• Government Certification according to regulation.• Training and support.
Customer satisfactionThe whole project took place in optimal conditions.TPS team continues to demonstrate its satisfaction even after the completion of the project.The Field Service team also has the merit of all after sales support, with all the required professionalism and reactivity.
TPSThyna Petroleum Services
[email protected]@petrogas-systems.com www.petrogas-systems.com
@
C
M
J
CM
MJ
CJ
CMJ
N
Success Story_PGS_TPS2016.pdf 1 05/04/2017 10:25
![Page 2: TPS - Petrogas Systems€¦ · TPS team continues to demonstrate its satisfaction even after the completion of the project. The Field Service team also has the merit of all after](https://reader034.vdocuments.us/reader034/viewer/2022042115/5e926f4039453a04112f3121/html5/thumbnails/2.jpg)
Executive summaryTPS is a company created in 1992 following an equal partnership agreement between the Tunisian Company of Petroleum Activity (ETAP) and British Gas Tunisia and was bought by the Austrian company OMV in 2003.PGS has been selected to ensure conformity of the TPS project with the national safety standards for the loading / unloading of tank trucks and to optimize the time of loading / unloading operations.
ApplicationBottom loading/offloading for crude oil products
Scope of supply GUEBIBA Station:- 2 Bottom Heavy Crude Oil Loading skids TANK BATTERY Station:- 1 Bottom Heavy Crude Oil loading skid - 1 Bottom Light Crude Oil loading Skid - 1 Bottom Produced water Offloading skid TRAPSA Station:- 1 Bottom Crude Oil Offloading Skid
Skids specifications - One positive displacement flow meter with mechanical indicator.- Temperature Transmitter.- Pneumatic Flow control valves. - One Preset Computer. - Thermal Safety Valve. - Check Valve. - Double block and bleed Valves.- Prover Connection. - Liquid phase/ vapor phase arms with emergency release couplings. - Overfill control system.- Shutdown valves. - ATEX Junction boxes.
SAFETY PLC CABINET - Compact SIL3 safety-related controller.- Controller suitable for mounting in ATEX zone 2. - Controlled safety devices: shutdown valves, overfill sensor, emergency shutdown button, manual alarms components.- Interface with existing SCS.
Services- Commissioning, start-up, training & maintenance. - Meters calibration.
Design, supply, installation assistance and commissioning of 5 loading stations on 3 sites, guebiba, tank battery and Trapsa.This project covers the Civil, Structural, Mechanical, Electrical and process activities to upgrade the loading/offloading terminals.
Project Overview
Thyna Petroleum Services
Customer: Thyna Petroleum Services
Industry: Oil & Gas
Order date: 2012
Completion: 2013
TPSThyna Petroleum Services
C
M
J
CM
MJ
CJ
CMJ
N
Success Story_PGS_TPS2016.pdf 2 05/04/2017 10:25
![Page 3: TPS - Petrogas Systems€¦ · TPS team continues to demonstrate its satisfaction even after the completion of the project. The Field Service team also has the merit of all after](https://reader034.vdocuments.us/reader034/viewer/2022042115/5e926f4039453a04112f3121/html5/thumbnails/3.jpg)
Loading and offloading stations& metering skidsSuccess Story
Key achievements• Engineering and Design.• Project management.• Manufacturing of complete skids.• FAT (Factory Acceptance Test).• Packing and Shipping.• Commissioning and Start-up.• On-Site Calibration.• Government Certification according to regulation.• Training and support.
Customer satisfactionThe whole project took place in optimal conditions.TPS team continues to demonstrate its satisfaction even after the completion of the project.The Field Service team also has the merit of all after sales support, with all the required professionalism and reactivity.
TPSThyna Petroleum Services
[email protected]@petrogas-systems.com www.petrogas-systems.com
@
C
M
J
CM
MJ
CJ
CMJ
N
Success Story_PGS_TPS2016.pdf 1 05/04/2017 10:25