WELCOME TO Thanhphuoc Port Corporation
The first river port of Binh Duong Province. The ideal destination for commodities and means of transportation from International partner to comee
April 7, 2023
Prepared by
Thanh Phuoc Port Corporation
General Introduction
Project’s feasibility study started in 2004
Operation license issued by Binhduong’s Planning & Investment Dept on 14 November, 2007.
Construction started in May 2010
First phase come into operation on quarter I/2012.
April 7, 2023
TPP Shareholders
TPP( THANHPHUOC PORT CORPORATION)
April 7, 2023
BICONSI(35%)
U&I Logistics(32,5%)
NTC (NamTanUyen IP)
(32,5%)
COMMODTIES FIGURE OF BINH DUONG, BINH PHUOC PROVINCE & HIGHLANDS.
No Name of terminal port UnitThe quantity of comodities go throught terminal port
2005 2006 2007 2008 2009
I
Total volume of commodities go throught port in HCM
City area.Ton 46,657,605 51,685,982 61,020,798 67,733,086 74,506,375
Container Teu 2,171,179 2,541,446 3,172,853 3,521,867 3,874,054
A/ Total commodities for export
Ton 14,298,850 15,898,05 17,546,154 19,476,231 21,423,854
Container Teu 1,008,984 1,162,74 1,382,668 1,534,761 1,688,237
B/Total commodities for import
Ton 28,795,939 32,112,393 38,976,669 43,264,103 47,590,513
Container Teu 917,030 1,093,363 1,369,442 1,520,081 1,672,089
C/ Total commodities for internal.
Ton 3,562,816 3,674,884 4,497,975 4,992,752 5,492,027
Container Teu 214,553 285,409 420,723 467,003 513,703.3
II
Total for commodities go throught Dongnai, Vungtau port erea.
Ton 2,028,057 2,271,422 2,612,144 2,899,480 3,189,428
Container Teu 205,894 230,602 265,192 294,363 323,799
IIITotal I+II Ton 48,685,662 53,957,404 63,632,942 70,632,548 77,695,803
Container Teu 2,377,03 2,772,048 3,438,045 3,816,230 4,197,853
April 7, 2023
ESTIMATED COMMODITIES GO THROUGHT TPP
No Commodities Unit 2010 2013 2018 2023 2028
1Commodities that need for
loading, unloading & transportation.
Ton 5,117,596 9,090,924 22,359,355 41,571,553 67,343,642
2
Commodities that loading, unloading &
transportation follow investment planning.
Ton 890,603 1,545,922 3,646,097 4,502,199 5,394,226
3Estimated ratio of
commodities go throught TPP
% 17.41 17.01 16.31 10.83 8,01
April 7, 2023
Master plan of Thanh Phuoc Port Corporation
April 7, 2023
April 7, 2023
Thanh Phuoc Port
LOCATION MAP NEIGHBOUR TPP
April 7, 2023
Thanh Phuoc Port
Becamex BP Industrial Pack
Chon Thanh Industrial Pack
South Dong Phu Industrial Pack
Tan Khai Industrial Pack
Minh Hung III Industrial Pack
Dong Xoai Industrial Pack
North Dong Phu Industrial Pack
Minh Hung-Korea Industrial Pack
Sai Gon BP Industrial Pack
Xanh BD Industrial PackNam Tan Uyen Industrial Pack
Dat Cuoc Industrial Pack
VSIP II Industrial Pack
Dai Dang Industrial Pack
Kim Huy Industrial Pack
Phu Gia Industrial Pack
Song Than III Industrial Pack
Dong An II Industrial Pack
Thoi Hoa Industrial Pack
My Phuoc II Industrial PackMy Phuoc Industrial Pack
Bau Bang Industrial Pack
My Phuoc III Industrial Pack
My Phuoc IV Industrial Pack
Rach Bap Industrial Pack
An Tay Industrial Pack
Viet Huong II Industrial Pack
Mai Trung Industrial Pack
April 7, 2023
Thanh Phuoc Port
Vung Tau Port
Cai Mep Port
Sai Gon Port Area
Hiep Phuoc Port Area
Cat Lai PortD
ong N
ai River
Viet Nam Singapore Industrial Park
My Phuoc Industrial Parkc
Linh Trung 3 Industrial Park
north-west Cu Chi Industrial Park
Duc Hoa 3 Industrial Park
Thai Hoa Industrial Park
Duc Hoa Dong Industrial Park
Xuyen A Industrial Park
Tan Duc Industrial Park
Vinh Loc 2 Industrial Park
Thuan Dao Industrial Park
Tan Son Nhat AirPort
Bien Hoa AirPort
Amata Industrial Park
Bien Hoa I Industrial Park
Song Than 1 Industrial Park
Song Than 2 Industrial Park
Binh Chieu Industrial Park
Viet Huong Industrial Park
Nam Tan Uyen Industrial Park
VSIP II Industrial Park
Tam Phuoc Industrial Park
Loteco Industrial Park
DISTANCE BETWEEN THANHPHUOC PORT CORPORATION TO SOMES DEEP WATER PORT, INDUSTRIAL PARK AND
IMPORTANCE AREA IN THE SOUTH OF VIETNAM. THANH PHUOC PORT CORPORATION TO DISTANCE ( Km)
TRUCK ON
ROAD BARGE ON RIVER
1 KCN Xanh Bình Dương ( IP) 5
2 KCN Nam Tân Uyên (IP) 5
3 KCN VSIP I (IP) 10
4 KCN Tân Đông Hiệp A (IP) 10
5 KCN Tân Đông Hiệp B (IP) 10
6 KCN Kim Huy (IP) 10
7 KCN Phú Gia (IP) 10
8 KCN Đất Cuốc (IP) 10
9 KCN Đại Đăng (IP) 10
10 KCN VSIP II (IP) 10
11 KCN Việt Hương I (IP) 15
12 KCN Sóng Thần I (IP) 15
13 KCN Sóng Thần II (IP) 15 April 7, 2023
14 KCN Đồng An I (IP) 15
15 KCN Bình Chiểu (IP) 16
16 KCN Linh Trung II (IP) 16
17 KCN Sóng Thần III (IP) 17
18 KCN Đồng An II (IP) 17
19 KCN Linh Trung II (IP) 20
20 KCN Tân Định (IP) 20
21 KCN Bình An (IP) 20
22 KCN Bình Đường (IP) 20
23 KCN VSIP III (IP) 25
24 KCN Mỹ Phước 1,2 (IP) 25
25 KCN Mỹ Phước 3,4 (IP) 25
26 KCN Thới Hòa (IP) 30
27 KCN Việt Hương II (IP) 40
28 KCN Bầu Bàng (IP) 40
29 KCN Rạch Bắp (IP) 40
April 7, 2023
30 KCN An Tây (IP) 40
31 KCN Mai Trung (IP) 40
32 Tỉnh Bình Phước (PROVINCE) 50
33 Tỉnh Đắk Nông (PROVINCE) 150
34 Tỉnh Đắk Lắk (PROVINCE) 250
35 Tỉnh Gia Lai (PROVINCE) 300
36 Cảng Đồng Nai ( DONGNAI PORT) 18
37 Cảng khu vực Sài Gòn ( SAIGON PORT AREA) 60
38Cảng khu vực KCN Hiệp Phước ( DEEP WATER
PORT) 69
39 Cảng khu vực Cái Mép (DEEP WATER PORT) 110
April 7, 2023
ADVANTAGES & POTENTIALS OF TPP : 1. Geographical location : Located along right side of Dong Nai River, TPP ‘s being planned to
connect all deep water ports in HCMC & Ba Ria-Vung Tau. In the central of Binh Duong industrial areas (Nam Tan Uyen, Song
Than I,II,III; VSIP I,II; My Phuoc I,II,III…), it ‘s easy for TPP to collect & transit cargo.
2. Strong support from customers : TPP has contacted more than 80 customers in the area of Binh
Duong and Binh Phuoc province in which 25 enterprises have signed the agreement and agrees to deliver the goods pass through TPP. Container production is estimated 4000-5000 teus / month. The remaining companies are very interested and said they will support TPP when it puts into operation.
Key Accounts : VIETNAM RUBBER GROUP (VRG); PETEC Logistics Joint Stock Company; MAGNUSEN; Return Gold…
April 7, 2023
April 7, 2023
Construction of infrastructure & Materials handling equipment
Total areas 63ha with total investment cost VND1,450 Billion.
16 piers ( 62 meter per pier). The first phases 2011-2014 build 08 piers. The second phases 2012-2018 build more 08 piers.
04 (Four) Liebherrs’ fixed cranes handling bulk cargo up to 90tons.
12 ( Twelve) Quay side gantry crane handling container 20”, 40” 45”.
Rubber Tired Gantry handling for container 20”, 40” 45” at container yard.
Reachstakers of Hyster for handling container up to 45tons.
Install updated software system for container, yard and barge planning
April 7, 2023
HANDLING MATERIALS EQUIPMENTRail mounted quay cranes,17m rail span.Lifting capacity underSpreader (20’/40’/45’)Crane lifting capacityFixed crane
06 Sets ( First phase)
41m/t50 m/t30 cont/h/move02 sets ( First
phase)
Rubber Tired GantryCranes ( 41m/t)Lifting capacity
12 (one over four, six wide)
33 cont/h/move
Reach Stacker 04
Side Lifter 06
CFS forklifts 06
Yard tractors (company owned)Trailers (company owned)
28
20
Reefer connections 370
April 7, 2023
TPP option for the first two piers come into operation on QI/2012
April 7, 2023Illustrate picture
April 7, 2023
WAREHOUSING
Activities since Jan, 2012
April 7, 2023
Handling commodities from barge to truck
April 7, 2023
April 7, 2023
International standard piers
April 7, 2023
April 7, 2023
TPP’s barge operation
April 7, 2023Illustrate picture
Sea access to Thanhphuoc Port
April 7, 2023
THANH PHUOC PORT
Save cost, time and labor for clients
Save cost compare to truck on road to deep water port area of CATLAI, HIEPPHUOC & CAIMEP.
- TPP handle for barge transportation with cost cheaper 5% compared to truck on road transportation (Depend on distance).
- Barge transportation save cost for clients up to 5%.- Reduce traffic jam and road accidence.- Avoid and reduce pollution for environment.
Save time and labor for clients.- Save transportation time for clients.- TPP handle the commodities for clients from clients
factory to deep water port ( go in/out) in shortest time with suitable cost.
- Big volume in container or bulk cargo in barge transportation.April 7, 2023
Benefits to use TPPQuay side gantry crane and Liebherr fixes cranes with
productivity 30move/crane/hour.Brand new yard equipment – Reachstackers and RTG ( 1
over 4 high, six wide).Late cut time.High productivity.Pier availability. Close to high volume commodities market.On par or better cost saving to cargo owners
April 7, 2023
Easy access to Thanhphuoc port by truck on road for location near BinhDuong as BinhPhuoc, Highlands of south Vietnam to move by barge to deep water port at Hochiminh City and Caimep ( Vungtau province).
Barge transportation cost cheaper than by using truck on road by 5%.
Flexible customs.Congestion FREE, ability to grow.Attractive rates.
April 7, 2023
www.thanhphuocport.com.vnPort address: 207, DT 747A, Thanhphuoc Ward, Tan
Uyen District, Binh Duong Province.Email: [email protected] Mobil: +84.908 458590.Tel: +84.650.2475.859 Fax: +84.650.3629.434
April 7, 2023
Welcome to Thanh Phuoc Port
Presented by TPP
April 7, 2023