TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr Institute Work since September 2002 Micro-mirror status Mirror support rings status Assembly of laser rods Optics and mechanics on end-plates

Upload: brad-hoggard

Post on 02-Apr-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 1

Status of laser systemStatus of laser system

TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen

Niels Bohr Institute

Work since September 2002 Micro-mirror status Mirror support rings status Assembly of laser rods Optics and mechanics on end-plates

Page 2: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 2

Laser system principleLaser system principle

Page 3: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 3

Micromirror productionMicromirror production

All 60 bundles produced and delivered in September 2002, but problems with mirror surface quality and mechanical precision preliminary: 46 accepted based on surface quality most of these will be accepted after being

mechanically improved at NBI

additional 20 bundles in production in Moscow

reflecting surfaces

brass cup

mechanical reference surface

Micromirror bundle

Page 4: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 4

Mirror surfaces (1)Mirror surfaces (1)

Looked at allmirrors inmicroscope.

Example:bundle 18+19

Page 5: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 5

Mirror surfaces (2)Mirror surfaces (2)Looked at allmirror reflectionsafter 2.5 m.

Example:bundle 18+19

Page 6: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 6

Mirror surfaces (3)Mirror surfaces (3)Analysed allmirror reflectionprofilesafter 2.5 m.

Example:bundle 18+19

Rejectedbadreflections

Page 7: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 7

Mirror reflectancesMirror reflectances

Acceptance level: 150 (arbitrary units)

Preliminary accepted bundles (based on reflectance and image quality): 46 bundles out of 61 received

Amplitudes of profiles on previous slide:

Page 8: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 8

Angles measurement (1)Angles measurement (1)

and angles of all micromirror faces measured by goniometer in Moscow

0.0014 (5 arc sec)

Page 9: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 9

Angles measurement (2)Angles measurement (2)

However: reference surface not good bundle not fixed to support in reproducible way

only relative angles any good from this measurement

Reference surface has beenturned off in NBI workshop toprovide good surface

Page 10: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 10

Angle re-calculationAngle re-calculation

Moreover: re-calculation of angles to take into account offset centres of 7 mirrors fail to use actual geometry of each bundle individual angles not correct

Page 11: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 11

Angles measurement @ NBI

Angles measurement @ NBI

All mirror angles have been re-measuredat NBI, using laser beam setup-up.

Check measurement in progress

Estimated precision: 0.5 mrad (2 arc min) 0.5 mrad (2 arc min)

Page 12: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 12

Angles measurementsAngles measurements

Mean = -0.08Sigma = 0.51

Mean = -0.29Sigma = 0.94

Page 13: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 13

Linear measurementsLinear measurements

L

Mean = -0.23 mmSigma = 0.57 mm

Page 14: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 14

Mirror support ringsMirror support rings

NBI workshop: 50 mirror support rings ready

All rings produced at NBI

Page 15: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 15

Micromirror positionsMicromirror positions

Micromirror positions as seen by laser beam:

Near end-plates Near central electrode

Page 16: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 16

Micromirror z positionsMicromirror z positions

Page 17: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 17

Rod gluingRod gluing

1. Drill holes in short rods2. Mount mirror bundles in support rings.

3. Glue mirror support rings onto short rods. Theta alignment guaranteed by jig + machined surface

4. Glue short rods into full length rods. Phi alignment adjusted during gluing

5. Measurements on final rod possible before installation.

Foreseen in February-March.Details to be discussed next week.

Page 18: TPC meeting, CERN, 17-18 January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen Niels Bohr

TPC meeting, CERN, 17-18 January 2003 Børge Svane Nielsen, NBI 18

Optics and mechanics on end-plates and laser hutOptics and mechanics on end-plates and laser hut

Design in progress on opto-mechanical supports on end-plates:

Prism holder:

Prototypes to be constructed in NBI workshop

Laserbeam

Market survey on optical components for end-plates ongoing

Piezo-electric adjustment system from New Focus on order