SOUTHBURY ROAD PROGRAM Town of Southbury Department of Public Works 2014

Upload: carina-end

Post on 15-Dec-2015

219 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Town of Southbury Department of Public Works 2014

SOUTHBURY ROAD PROGRAM

Town of SouthburyDepartment of Public Works

2014

Page 2: Town of Southbury Department of Public Works 2014

Southbury Road Program Annual Funding HistoryFiscal Year Appropriation Amount

2001-2002 $800,000

2002-2003 $800,000

2003-2004 $465,000

2004-2005 $465,000

2005-2006 $465,000

2006-2007 $1,500,000

2007-2008 $2,148,000

2008-2009 $2,485,620

2009-2010 $2,243,096

2010-2011 $1,700,000

2011-2012 $2,000,000

2012-2013 $2,000,000

2013-2014 $2,000,000

2014-2015 $2,069,000

Page 3: Town of Southbury Department of Public Works 2014

Road Maintenance Cost Analysis

Page 4: Town of Southbury Department of Public Works 2014

PAVEMENT MAINTENANCE METHODOLOGIES

1. Reconstruction: Most intrusive, most expensive, most time-

consuming Improves alignment issues, width, curves, humps,

cross section, etc. Usually requires total storm drainage system Replaces entire road structure, base and pavement

2. Reclamation: Grinds existing pavement into existing base Improves minor alignment issues Often involves minor drainage improvements Replaces entire pavement structure

Page 5: Town of Southbury Department of Public Works 2014

PAVEMENT MAINTENANCE METHODOLOGIES

3. Mill & Pave: Grinds off top pavement surface Maintains existing alignment Replaces tops on existing catch basins Replaces top course of pavement

4. Chip Seal Maintains entire pavement structure Adds asphalt seal coat embedded with stone

chips5. Crack Seal:

Maintains entire pavement structure Seals individual cracks with asphalt material

Page 6: Town of Southbury Department of Public Works 2014

GRAVEL ROAD MAINTENANCE METHODOLOGIES

1. Re-grade Gravel: Most time-consuming, highest maintenance Highly susceptible to wash outs Dust issues Difficult to maintain in winter

2. Bituminous Base Course & Chip Seal Provides many benefits of paving while

retaining feel and appearance of gravel Support of Planning Commission & Land Use

Office

Page 7: Town of Southbury Department of Public Works 2014

IWORQ SAMPLE

Page 8: Town of Southbury Department of Public Works 2014
Page 9: Town of Southbury Department of Public Works 2014
Page 10: Town of Southbury Department of Public Works 2014

ROAD WORK CARRIED INTO 2014 CONSTRUCTION SEASON

Page 11: Town of Southbury Department of Public Works 2014

• Bucks Hill Rd. Route 6 to I 84 Bridge

• Skyview Drive*• Beecher Rd.*• Sunburst Drive*• Settlers Hill Rd.*• Glen Lane*• Hidden Brook*• Greenwood Drive*• Hemlock Ridge• Pleasant Drive*

• Grasslands Rd.*• Low Bridge Rd.*• Stiles Rd.*• Heritage Rd.• New Wheeler Rd.• Sunset Ridge Rd.*• Stoney Corners Lane• Country Woods Rd.• Sachem Rd.

* Completed

Crack Sealing Schedule for 2014

Page 12: Town of Southbury Department of Public Works 2014

Chip Sealing Schedule for 2014

Bucks Hill Rd. Route 6 to I-84 Bridge Reservoir Rd. Old Woodbury Rd. Tuttle Rd. Judd Rd. High Point Rd. Flood Bridge Rd. East Flat Hill Rd. Spruce Brook Rd.

Page 13: Town of Southbury Department of Public Works 2014

Peter Road

Cobbler Lane

Forest Road

Wolf Pit Road

Ivy Hill Rd.

Flag Swamp Road

Hollow Swamp Road

Paving Schedule for 2014

Page 14: Town of Southbury Department of Public Works 2014

Southbury Road Program Annual Funding HistoryFiscal Year Appropriation Amount

2001-2002 $800,000

2002-2003 $800,000

2003-2004 $465,000

2004-2005 $465,000

2005-2006 $465,000

2006-2007 $1,500,000

2007-2008 $2,148,000

2008-2009 $2,485,620

2009-2010 $2,243,096

2010-2011 $1,700,000

2011-2012 $2,000,000

2012-2013 $2,000,000

2013-2014 $2,000,000

2014-2015 $2,069,000