town of lyons - lyonsparksmp.com · town of lyons limits lyons valley river park mcconnell ponds...

8
TOWN OF LYONS LIMITS LYONS VALLEY RIVER PARK McCONNELL PONDS POCKET PARK BOHN PARK LYONS TO BOULDER TRAIL ST. VRAIN GREENWAY TRAIL SANDSTONE PARK 3rd AVE POCKET PARK 2nd AVE POCKET PARK BLACK BEAR HOLE POCKET PARK CLARIFIER POCKET PARK LYONS MIDDLE / SENIOR HIGH SCHOOL LYONS ELEMENTARY SCHOOL MEADOW PARK HIGHWAY 66 US-36 US-36 TRAIL PLANNING, PARK CONNECTIVITY & RECREATION OPPORTUNITIES TOWN OF LYONS - FLOOD RECOVERY PLANNING PROCESS AUGUST 19TH, 2015 - PUBLIC MEETING HALL RANCH OPEN SPACE POTENTIAL BUYOUT PROPERTIES CONFLUENCE POCKET PARK POTENTIAL TRAILHEAD CONNECTIONS HEIL VALLEY RANCH OPEN SPACE TRAILHEAD* HEIL VALLEY RANCH OPEN SPACE RABBIT MOUNTAIN OPEN SPACE DRIVE VRAIN ST. HWY 7 / LEGEND TOWN OF LYONS LIMITS MULTI-USE TRAILS LYONS PARKS AREA POTENTIAL BUYOUT PROPERTIES LYONS SCHOOLS OPEN SPACE REGIONAL TRAIL CONNECTION POTENTIAL TRAILHEAD CONNECTIONS POTENTIAL POCKET PARKS STEAMBOAT MOUNTAIN

Upload: others

Post on 29-Aug-2019

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TOWN OF LYONS - lyonsparksmp.com · town of lyons limits lyons valley river park mcconnell ponds pocket park bohn park lyons to boulder trail st. vrain greenway trail sandstone park

TOWN OF LYONS LIMITS

LYONS VALLEY RIVER PARKMcCONNELL PONDS POCKET PARK

BOHN PARK

LYONS TO BOULDER TRAIL

ST. VRAIN GREENWAY TRAIL

SANDSTONE PARK

3rd AVE POCKET PARK

2nd AVE POCKET PARK

BLACK BEAR HOLE POCKET PARKCLARIFIER POCKET PARK

LYONS MIDDLE / SENIORHIGH SCHOOL

LYONS ELEMENTARY SCHOOL

MEADOW PARK

HIGHWAY 66

US-

36U

S-36

TRAIL PLANNING, PARK CONNECTIVITY & RECREATION OPPORTUNITIES

TOWN OF LYONS - FLOOD RECOVERY PLANNING PROCESSAUGUST 19TH, 2015 - PUBLIC MEETING

HALL RANCH OPEN SPACE POTENTIAL BUYOUT

PROPERTIES

CONFLUENCE POCKET PARK

POTENTIAL TRAILHEAD CONNECTIONS

HEIL VALLEY RANCH OPEN SPACE TRAILHEAD*

HEIL VALLEY RANCH OPEN SPACE

RABBIT MOUNTAIN OPEN SPACE

DRIV

E

VRAIN

ST. HWY 7 /

LEGEND

TOWN OF LYONS LIMITS

MULTI-USE TRAILS

LYONS PARKS AREA

POTENTIAL BUYOUT PROPERTIES

LYONS SCHOOLS

OPEN SPACE

REGIONAL TRAIL CONNECTION

POTENTIAL TRAILHEAD CONNECTIONS

POTENTIAL POCKET PARKS

STEAMBOAT MOUNTAIN

Page 2: TOWN OF LYONS - lyonsparksmp.com · town of lyons limits lyons valley river park mcconnell ponds pocket park bohn park lyons to boulder trail st. vrain greenway trail sandstone park

TRAIL PLANNING, PARK CONNECTIVITY & RECREATION OPPORTUNITIES

TOWN OF LYONS - FLOOD RECOVERY PLANNING PROCESSAUGUST 19TH, 2015 - PUBLIC MEETING

Hard Surface Trail Types

Landscape/ hardscape buffer

Hard Surface Trail Types

On-street Trail Types AccessibleTrail Types

Page 3: TOWN OF LYONS - lyonsparksmp.com · town of lyons limits lyons valley river park mcconnell ponds pocket park bohn park lyons to boulder trail st. vrain greenway trail sandstone park

TRAIL PLANNING, PARK CONNECTIVITY & RECREATION OPPORTUNITIES

TOWN OF LYONS - FLOOD RECOVERY PLANNING PROCESSAUGUST 19TH, 2015 - PUBLIC MEETING

Trailheads

Wayfinding/ Interpretation

Rest Areas/ Overlooks

Soft Surface Trail Types

Primitive Trail Soft Surface Trail Multi-use Soft Surface Trail

Page 4: TOWN OF LYONS - lyonsparksmp.com · town of lyons limits lyons valley river park mcconnell ponds pocket park bohn park lyons to boulder trail st. vrain greenway trail sandstone park

TRAIL PLANNING, PARK CONNECTIVITY & RECREATION OPPORTUNITIES

TOWN OF LYONS - FLOOD RECOVERY PLANNING PROCESSAUGUST 19TH, 2015 - PUBLIC MEETING

PICNICKING / SOCIAL GATHERING

EDUCATIONAL / INTERPRETIVE FEATURES

OUTDOOR CLASSROOM

TRAILHEADNATURAL PLAY AREA

PRESERVED OPEN SPACE COMMUNITY GARDEN WILDLIFE / HABITAT VIEWING

FITNESS LOOP TRAIL / STATIONS

Page 5: TOWN OF LYONS - lyonsparksmp.com · town of lyons limits lyons valley river park mcconnell ponds pocket park bohn park lyons to boulder trail st. vrain greenway trail sandstone park

TRAIL PLANNING, PARK CONNECTIVITY & RECREATION OPPORTUNITIES

TOWN OF LYONS - FLOOD RECOVERY PLANNING PROCESSAUGUST 19TH, 2015 - PUBLIC MEETING

PUBLIC ART

STAGE / PERFORMANCE AREA CAMPING RIVER ACCESS / RIVER ACTIVITIES

DOG WALKING / ACCESS EVENT SPACE

FISHING

MOUNTAIN BIKING

Page 6: TOWN OF LYONS - lyonsparksmp.com · town of lyons limits lyons valley river park mcconnell ponds pocket park bohn park lyons to boulder trail st. vrain greenway trail sandstone park

Pre-2012 2012 2013 2014-

2017 2017+

1 Callahan Trail - Louisville ******2 Coal Creek Regional Trail - Flagg Park trailhead and bridge. ******3 Coal Creek Regional Trail - Public Road Trailhead ******4 Coal Creek Regional Trail - Upgrade section R11 through Lafayette ******5 Coal Creek Regional Trail - US36 to McCaslin ******6 Feeder Canal Trail - City of Boulder CEAP process. ******7 LoBo Regional Trail - SH52 Underpass ******8 Rock Creek Regional Trail - Imel trail connection ******9 LoBo Regional Trail - Cottontail connection to SH 52 underpass ******

10 LoBo Regional Trail - Cottontail Loop Trail, North Gunbarrel Estates ******11 Rock Creek Regional Trail - US287 to Dillon Road ******12 St. Vrain Greenway - East County Line Road Underpass ******13 LoBo Regional Trail - SH 119 at Four Mile Creek ******14 LoBo Regional Trail - 95th Street Bridge ******15 Coal Creek Regional Trail - Mayhoffer / Singletree Trail ******16 Rock Creek Regional Trail - Meadowlark Trail ******17 LoBo Regional Trail - 83rd to 95th (Niwot to Longmont) ******

18 Rock Creek Regional Trail - 120th to Flagg Park (Eastern Link) ****** ******19 Coal Creek Regional Trail - Flagg Park to Erie (Eastern Link) ****** ******20 LoBo Regional Trail - IBM Connection underneath SH119 ****** ******21 Union Pacific Rail Regional Trail Master Plan ****** ******22 St. Vrain Greenway - Golden Ponds to Pella Crossing - Phase 1 ******23 LoBo Regional Trail - Railroad Underpass at Four Mile Creek ****** ******24 US36 Bikeway - City of Boulder to Rock Creek Regional Trail ******25 Nederland Trails (County 130 and others) ******

26 Coal Creek Regional Trail - McCaslin Link (Superior) ******27 Union Pacific Rail Regional Trail - Design and Construction ****** ******28 St. Vrain Greenway - Pella Crossing to 61st - Phase 1 ****** ******29 St. Vrain Greenway - 61st to US36. ******30 Lyons to Boulder Regional Trail - Trail Master Plan ******31 Lyons to Boulder Regional Trail - Design and Construction ******

32 LoBo Regional Trail - Spine Connection ******33 LoBo Regional Trail - Lookout Road to Twin Lakes ******24 Lyons to Boulder Trail - Rabbit Mountain Connection ******

THIRD SET OF TRAIL PROJECTS (FUTURE PROJECTS)

ESTIMATED TIMELINE

* Based on current priorities and funding available. Actual funding set annually as part of the countywide budgeting process.

TRAIL PROJECT

Regional Trails Implementation Schedule*

COMPLETED TRAIL PROJECTS

PLANNED TRAIL PROJECTS

RECOMMENDED NEXT SET OF TRAIL PROJECTS (FUNDED)

BOULDER COUNTY TRANSPORTATION MAY 2012

N 63

RD ST

JAY RD

N 1

15TH

ST

C A N YO N D R

N 39

TH ST

NEVA RD

L E E H I L L D

R

EAST

C OU

NTY

L IN

E RD

N 11

9TH

ST

MC

CA

S

LIN

BLV

D

N 95

TH ST

ISABELLE RD

FL

AG

ST A

F F R D

OXFORD RD

N 95

TH ST

KENOSHA RD

JASPER RD

N 11

5TH

ST

HYGIENE RD

N 5

1S

T S

T

OXFORD RD

NIWOT RD

NELSON RD

WASATCH RD

DILLON RD

BASELINE RD

SOUTH BOULDER RD

N 75

TH ST

N 87

T H ST

N 83

RD ST

N 73

RD S T

DR

VALMONT R D

N 5

3R

D ST

OLD

E ST

AGE

RD

ST VRAIN RD

SUNSHINE CANYON DR

ARAPAHOE RD

128 287

287

PARKWAY

42

7

7

170

170

157

52

287

119

119

287

7

66

36

36

36

93

42

36

Boulder County Regional Trails Program

Callahan Trail

Regional Trail Bikeway Local Connector Open Space*Existing

Planned

Conceptual

Instructions: Click on trail name for more information

*Includes all public open space within Boulder CountyMap is for planning use only. Alignments for future and planned trail alignments are conceptual.

Actual alignments may differ from those shown or may not be constructed at all.

Lyons-to-Boulder Trail

St. Vrain Greenway

Longmont-to-Boulder Trail 

Boulder-to-Erie Trail

East Boulder TrailCoal Creek Trail

Rock Creek Trail

US 36 Bikeway

TOWN OF LYONS-BOULDER COUNTY PARKS AND OPEN SPACE TRAILS REQUESTS-2015

Lyons:1. Lyons St. Vrain Corridor Trail Extension to Route 36 underpass (repair needed?) with eventual

connection to Lyons to Boulder Trail and St. Vrain Greenway Trail-underpass connections on east side of Hwy 36

2. Lyons to Boulder Trail 3. St. Vrain Greenway Trail 4. Lyons to Rabbit Mountain connector trail 5. Lyons to Hall Ranch connection along Old South Road or State Highway 7 6. Steamboat Mountain public access 7. Underpass/Trail for Apple Valley Road at Bridge/Crossing

 

Page 7: TOWN OF LYONS - lyonsparksmp.com · town of lyons limits lyons valley river park mcconnell ponds pocket park bohn park lyons to boulder trail st. vrain greenway trail sandstone park

PUBLIC COMMENTS

Page 8: TOWN OF LYONS - lyonsparksmp.com · town of lyons limits lyons valley river park mcconnell ponds pocket park bohn park lyons to boulder trail st. vrain greenway trail sandstone park