tower cranes crane activity hazard analysis designated qualified person list of weights for each...

43
1 TOWER CRANES

Upload: vunhu

Post on 22-May-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

1

TOWER CRANES

Page 2: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

2

TOWER CRANETYPES

Page 3: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

3

Could be remote control or cab operated.

Page 4: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

4

TOWER CRANEERECTION PROCEDURES

PREPARATORY1. Manufacturers inst.2. Erection procedure3. Foundation design4. Layout sketch

Power linesOther structuresOther cranes

5. AHA6. Qualified person

Page 5: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

5

TOWER CRANEACTIVITY HAZARD ANALYSIS

Designated qualified personList of weights for each pieceSketch of all adjacent areasNames and quals of operatorsNames and quals of riggersAll crane structural support informationSystem of communicationRadio frequency approval

Page 6: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

6

CRITICAL KNOWLEDGE OF PARTS, WEIGHTS, ERECTION PROCEDURES

Page 7: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

7

Tower Crane Post Erection Procedures

Test Components1. Crane Supports2. Brakes, clutches limit

switches, all overload switches, audible/digital warning, locking & safety devices.

3. Load hoisting & lowering.4. All swing motions5. Load testing IAW

manufacturers printed instructions.

Page 8: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

8

TOWER CRANESAFETY PROCEDURES

QUALIFIED OPERATORS

QUALIFIED RIGGERS

UNATTENDED CRANESMUST BE LEFT IN THEWEATHERVANEPOSITION (FREE SWING)

Page 9: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

9

EXAMPLE OF CONGESTED LOCATION

Page 10: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

10

TIGHT & UNIQUE LOCATIONS OF SOMETOWER CRANES

Page 11: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

11

TOWER CRANE DAILY OPERATIONCONSIDERATIONS

1. WIND 20 MPH - or asper manufacturer

2. Fall Protection-Access

3. Communications &Signals by one person only!

Page 12: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

12

Page 13: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

13

Page 14: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

14

Page 15: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

15

Page 16: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

16

Tower Crane Operator Available Certification

Resources

Page 17: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

17

Tower Crane Operator Training Resources:

Tower Crane Simulation Training

Page 18: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

18

Test your knowledge and understanding - review some basic components:

TrolleyCounterweight

Foundation

Rotating Structure

Operator Cab

Page 19: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

19

Some crane types or manufacturers require piling installation

A sampling of some common rules to be aware of established by one manufacturer based on crane design parameters include:

Page 20: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

20

Wind hazard

Page 21: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

21

Lightening hazard (ground structure)

Page 22: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

22

Tower Crane Installation Documentary:NAVFAC NORTHWEST

•A safe tower crane installation begins with advanced pre planning assured by a professional government and contractor team (a good idea to include a representative from the manufacturer as well – most require it):

Page 23: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

23

Tower crane foundations (key) -are carefully designed by a professional:

•Tower crane foundation work and quality assurance/control serves as the basis for your tower crane installation success:

Page 24: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

24

Installing the vertical tower sections:

•The tower sections similar to the one pictured below will arrive by truck:

•Remember two cranes if required = critical lift:

Page 25: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

25

Installing tower vertical sections:

•Tower cranes requires and erection plan: Don’t forget employees must be positioned in a manner such that no part of their body is directly under the load.

Page 26: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

26

100 % fall protection (no exceptions)

•100% fall protection considerations during erection is essentialand should be carefully planned out ahead of time:

Page 27: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

27

Rotating structure

•All steps are critical but probably the most critical is placing the rotating structure. It is very heavy and unbalanced so the lifting crane capacity should be validated (remember 80% or more requires a critical lift plan and never more than 90% in any configuration per guide specification).

Page 28: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

28

Horizontal members (one at a time):

• Installing the remaining horizontal counter weight and jib sections is a balance that must follow the manufacturers installation requirements closely.

Page 29: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

29

Electrical installation:

•Don’t forget to assure a safe grounded electrical installation and lock out tag out considerations:

Page 30: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

30

Days done:

•Once erected all operations and load tests can begin in accordance with the manufacturers instructions:

Special thanks to those of the NAVFAC Northwest team responsible for documenting the tower crane erection.

Page 31: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

31

Sample Mishaps

•Tower crane mishaps

Sample mishaps to review what can go wrong.

Page 32: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

32

Page 33: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

33

Page 34: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

34

Page 35: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

35

Page 36: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

36

Page 37: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

37

Page 38: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

38

Page 39: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

39

Page 40: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

40

Page 41: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

41

Page 42: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

42

Page 43: TOWER CRANES CRANE ACTIVITY HAZARD ANALYSIS Designated qualified person List of weights for each piece Sketch of all adjacent areas Names and quals of operators Names and quals of

43