towards the coating of 3 mbb dipoles status report
DESCRIPTION
Towards the coating of 3 MBB dipoles Status report. SPS-U. Coating t ests on MBB 096 with liner. Test #1 Liner 2 meters, 2 cathodes, 1 anode, sputtering power 400 W (limited by geometry and arcs at the extremities) Thickness non homogeneous SEY non homogeneous as a consequence. Test #1. - PowerPoint PPT PresentationTRANSCRIPT
Towards the coating of 3 MBB dipolesStatus report
SPS-U
Coating tests on MBB 096 with liner
• Test #1– Liner 2 meters, 2 cathodes, 1 anode, sputtering power 400 W (limited by
geometry and arcs at the extremities)– Thickness non homogeneous– SEY non homogeneous as a consequence
SPS-U Sergio Calatroni -17.02.2009 2
Test #1
SPS-U Sergio Calatroni -17.02.2009 3
Test #1
SPS-U Sergio Calatroni -17.02.2009 4
Coating tests on MBB 096 with liner• Test #2
– Liner 2 meters, 2 cathode, 2 anodes, sputtering power 700 W– Max temperature on liner during coating 120 °C (specified for the
vacuum chambers 150 °C at the sides, 300 °C on top)
– More uniform dark colour– SEY:
SPS-U Sergio Calatroni -17.02.2009 5
SEY for test #2
SPS-U Sergio Calatroni -17.02.2009 6
0.6
0.7
0.8
0.9
1.0
1.1
1.2
0 200 400 600 800 1000 1200 1400 1600 1800
energy [eV]
SEY
MBB_C80_20090216_1
MBB_C80_20090216_2
MBB_C80_20090216_3
MBB_L80_20090216_1
MBB_L80_20090216_2
MBB_L80_20080216_3
a-C on MBB 867 Liner #2 , 2 positions
Under way• Test #3
– Liner 2 meters, 2 cathodes, 2 anodes– Better insulation of and shielding of feedthroughs and of cathodes
extremities– Test for higher power sputtering and temperature limit.
• Cleaning of MBB 085 and MBB 040– Si-O-Si and HC were detected on all three dipoles before cleaning– Cleaning of MBB 096 was successful but not 100% conform to UHV
specs
• Modification of vacuum chambers– Piquages on MBB 096, 085, 040 done– Piquages to be done on MBB 51470 and QD 51510 in the tunnel (week
10, 2-6.3)– Studs for RF shields being welded on MBB 085, 040 (MBB 096 done)
SPS-U Sergio Calatroni -17.02.2009 7
Coating plans• MBB 096
– Start assembly 19.2– Coating– Dismount 24.2 (store under N2)
• MBB 085– Start assembly 24.2– Coating– Dismount 27.2 (store under N2)
• MBB 040– Start assembly 27.2– Coating– Dismount 4.3 (store under N2)
• Last delivery date– Monday 9.3
SPS-U Sergio Calatroni -17.02.2009 8
Sample for C magnet, coated with a-C on 1.10.2008
SPS-U Sergio Calatroni -17.02.2009 9
0.0
0.2
0.4
0.6
0.8
1.0
1.2
0 200 400 600 800 1000 1200 1400 1600 1800
energy [eV]
SEY
SPS_2_20081001_1
SPS_2_20081001_2
SPS_2_20090217_1
SPS_2_20090217_2
SPS-SEY insertion sample, after 4 months in static vacuum
Liners
• Liner #1: inox• Liner #2: a-C coated from last year• We are still testing the Zr coating parameters for the liner #3
– Problems in temperature control for obtaining the right “rough” zirconium
• Liner #4 to be defined
• Installation schedule to be defined both for C-magnet sample and for liners
SPS-U Sergio Calatroni -17.02.2009 10