total productive maintenance tpm - iise.org · questions ? luis armendariz [email protected]...

30
Total Productive Maintenance TPM Luis Armendariz, P.E. MBA, 6Lean Systems and Operations Modeling Copyright 2010 1

Upload: vulien

Post on 09-Jan-2019

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Total Productive Maintenance TPM

Luis Armendariz, P.E. MBA, 6∂Lean Systems and Operations Modeling

Copyright 2010 1

Page 2: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Agenda

• TPM History, Definition, Benefits and Roles

• Applying TPM, DMAIC & Metrics

• TPM Success (Benchmark Study in BioTech vs Food & Beverage

Processing Industry)

• RCA Techniques

Copyright 2010 2

• RCA Techniques

• Current Challenges

• TMP to Infinity and Beyond

• Q & A

Page 3: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

TPM History

Copyright 2010 3

Dr. Deming1900-1993

Nippon DensoPM in 1960

1951PM

Nippon Denso TPM Award

Page 4: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Total Productive Maintenance

• Promote the collaboration between all departments to focus on the durability of equipment

Copyright 2010 4

Page 5: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Definition

• Total: Total employee involvement

• Productive: Eliminate or minimize breakdown during

production

Copyright 2010 5

production

• Maintenance: Complete a preventive maintenance

program

Page 6: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Benefits of TPM

• Improves Teamwork

• Improves Equipment availability

• Reduces cost• Reduces cost

Copyright 2010 6

Page 7: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Roles of TPM

• To target the major causes of poor performance (OEE )

• Involve operators in the routine maintenance of their equipment

• Improve maintenance efficiency • Improve maintenance efficiency

• Improving skills and knowledge

• To collaborate in partnership while having a common goal

Copyright 2010 7

Page 8: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Applying TPM

• Create a cross functional team

– D-Define– M-Measure– M-Measure– A- Analyze– I- Improve– C- Control

Copyright 2010 Luis Armendariz 8

Page 9: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Define DMAIC

D: Define the equipment, objectives, success indicators, customers, cost

Copyright 2010 Luis Armendariz 9

Page 10: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

A

Measure 7 Losses DMAICTPM identifies the 7 losses

1. Total time available – shutdowns/startup – scheduled maint. - calibration

2. Set-Up

3. Initial adjustment time

OEE= Availability x Performance x Quality

Q

P

Copyright 2010 Luis Armendariz 10

4. Equipment Breakdown Time (TBF, TTR)- unscheduled maint.

5. Idling

6. Speed (cycle time) losses,

7. Quality losses: start-up and in process quality

Page 11: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

OEE DMAIC

Availability (Downtime Loss) = Operating Time / Planned Production Time

Performance (Speed Loss) = Ideal Cycle Time / (Operating Time / Total Pieces)

Quality (Quality Loss) = Good Pieces / Total Pieces

OEE = Availability x Performance x Quality

Copyright 2010 11

Quality (Quality Loss) = Good Pieces / Total Pieces

OEE Factor Shift 1 Shift 2

Availability 90% 95%

Performance 95% 95%

Quality 99.5% 96%

OEE 85.1% 86.6%

Note: Availability (TBF and TTR)

Page 12: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

OEE “Pharmaceutical vs. Food & Beverage” DMAIC

OEE

Copyright 2010 12

Copyright © 2007 Pharmaceutical Benchmark Study. Informance International. All Rights Reserved

Page 13: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Equipment Availability : TBF & TTR (Breakdown Time) DMAIC

SETUP PRODUCE

During production time, machine is producing

U D U D U D U D U

time

Copyright 2010 13

During production time, machine is producing (Uptime - green) or not producing (Downtime - red)

We define:MTBF= Mean time between failuresMTTR= Mean time to repair

Page 14: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

TBF-Unscheduled Down Time DMAIC

Mean TBF Line 1 = 34 hr

Copyright 2010 Luis Armendariz 14

Page 15: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

TTR -Unscheduled Down Time DMAIC

15

Mean TTR Line 1 = 18 min

Copyright 2010 Luis Armendariz

Page 16: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Other Measurements DMAIC

• Time to Maintain TTM (Schedule Downtime)

• Cost to repair CTR

• Cost to maintain CTM

16

• Cost to maintain CTM

• Cost of Loss

• Cost of Yield Loss

Copyright 2010

Page 17: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Applying TPM: Analyze DMAIC

A :Define the resources, C&EBrainstorming and Fish Bone

Copyright 2010 17

Page 18: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Applying TPM: Improve DMAIC

• I: Establish current and future flow map, describe all responsibilities of operators and technicians.

Mean TBF Line 1 = 34 hr

Copyright 2010 18

Page 19: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Applying TPM: Control DMAIC

C: TPM Improvement Projects

Projects Effect Due Date Comp. Date Note

CIP cycle removed None

Sight glass change Leakage

Copyright 2010 19

Sight glass change Leakage

Training: Clamp

Installation

Human

Error

Add cooling step Leakage

Visual Aid Posted Std

Work

Page 20: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Applying TPM “Where to Start ?”

• Start with an equipment pilot

1. Choose the right machine

2. Choose the right person

3. Choose the good time

Copyright 2010 20

Page 21: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

TPM and other Lean Tools

• Overall Equipment Effectiveness

• Mistake Proof

• 5S

• Standard work

• Set up reduction

• Self maintenance

Copyright 2010 21

Page 22: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Justice to Root Cause Analysis “RCA”

A systematic method that:Investigates as incident, attempts to understand the underlying causes and generates corrective actions to prevent and mitigate incidents

Common Recommendations:

Copyright 2010 22

• Training

• Procedure Revision

• Repair or Replacement of broken equipment

• Restart the system

• Fix and go !

Page 23: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Justice to Root Cause Analysis “RCA”

Brain Storming Fishbone 5 Why’s

Method of Elimination Clue Generation Diagnostic Tree

Analysis Techniques

Copyright 2010 Luis Armendariz 23

Method of Elimination Clue Generation

FMEALeveraging Stratification

Diagnostic Tree

FTA

Page 24: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

So what was the root cause of the failure?

FAILURE

Maintenance

Design &

Installation

Copyright 2010 Luis Armendariz 24

Operations

Human Error

Mgt. Control

System

Page 25: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Management Control System “PDCA”

Proactive

Analysis

PLAN

Management

Control

System

DO

Operations

Copyright 2010 25

What could go wrong?

CHECK

OEE

Reactive

Analysis

RCA

ACT

What went wrong? How much can you afford to lose?

Page 26: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

COST of Non TPM

• “$30 Million Refinery Glitch Stalls Fuel Users – No Petrol for 2 Weeks”

• “Liquefied Natural Gas Project Back On Track after Production Train Repairs -

$300 Million Lost”

• “Refuelling Problems Delay $250 Million Terminal Operation – Jet Fuel Pipes

Contaminated”

Copyright 2010 26

Contaminated”

• “330 Hospital Patients Suffer Cold Winter Showers for Two Days – Risk of

Spreading Infection”• More than 4 million barrels of crude oil spewed into the seas off the U.S. Gulf

coast & 1.2 billion dollars in claims

Page 27: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

TPM Implementation Challenges

• OEE measures

• RCA

• Leadership (Who Should Lead TPM ?)

• Employee training, development & compensation

• Employee Turn Over

• Collaboration

Copyright 2010 27

• Collaboration

• Accountability

• Defined Responsibilities

• Spare parts and tools inventory mgt.

• 5S

• Visualize Standard Work and Maintenance Instructions

• Share best practices

Page 28: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

TPM to infinity and beyond

• Asset Management and Spare Parts Inventory Management

• Predictive Maintenance

• Reliability Centered Maintenance, Ultra-Reliability and DFR

• Human Performance

Copyright 2010 28

• Human Performance

• Information and Employee Communication

• Learning organization

• Management Control System

Page 29: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Conclusion & Recommendation

• Decrease the firefighting !

• Increase Collaboration between departments

• Avoids stress in a breakdown

• Visual Maintenance

• Standard Work Maintenance

• Increase productivity

Copyright 2010 29

Page 30: Total Productive Maintenance TPM - iise.org · Questions ? Luis Armendariz luisarmen@prodigy.net Copyright 2010 30 Resources: Title: TPM_LuisArmendariz Author: Luis Armendariz Created

Questions ?

Luis [email protected]

Copyright 2010 30

Resources:TPM - Japan Institute of Plant MaintenanceIIE –Process Industries webminars : http://www.iienet2.org/Landing.aspx?id=887Lean Management Database Tools: http://www.ProtimeSystems.com