![Page 1: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/1.jpg)
Total Operational Excellence 21/04/23
1
Case Study:Improvement Projects
Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust.
![Page 2: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/2.jpg)
Total Operational Excellence 21/04/23 2
Learnings from the Case Study
• Gaining active involvement of C-level – sponsorship and ownership
• How to influence executive decisions and sponsorship with winning business case for continuous funding
• Selling and marketing your improvement projects/ programmes with maximum visibility of outcomes and financial gains
• Establishing and driving executive ownership – knowing how to keep management on board for sustainable change
![Page 3: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/3.jpg)
Total Operational Excellence 21/04/23 3
• In 2009 up to present, Improvement projects initiative was rolled out, the metric is for each department to generate cost reduction projects that will impact the annual operating budget expense.
• It is a “cost” reduction initiative intended to reduce the plan operating expense.
• The cost savings will be achieved and recognized as a result of team’s efforts.
Case Study: Improvement Projects
![Page 4: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/4.jpg)
Total Operational Excellence 21/04/23
Project Charter
4
• Project charter contains the business case showing the benefits of the project.
• To be approved by the sponsor.
![Page 5: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/5.jpg)
Total Operational Excellence 21/04/23 5
• Consolidated tracking and verification through project review.
• Periodic reporting on a monthly basis by each Manager to provide information on the progress.
• Each senior leaders are accountable to achieve the target. Each Manager to measure and report the achievement by the end of the year.
Case Study: Improvement Projects
![Page 6: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/6.jpg)
Total Operational Excellence 21/04/23 6
Improvement Projects
Process Flow
![Page 7: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/7.jpg)
Total Operational Excellence 21/04/23 7
• Review of each project charter to make sure that the target savings can be verified.
• To assess the quality of project to assure that the results can be measured and are aligned with the intent to reduce plan costs.
• All initial reviews will be completed by the end of Quarter1.
1. Initial Review
![Page 8: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/8.jpg)
Total Operational Excellence 21/04/23 8
2. Periodic Reporting
• A periodic reporting on a monthly basis by each Manager to provide information on the progress.
• A project tracker will be maintain at a department level and consolidated at the business level.
• Tracker will be updated by each department every end of the month.
![Page 9: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/9.jpg)
Total Operational Excellence 21/04/23 9
Tracking ToolsProject
No.Project Title Accountability
Planned Savings $000
Forecast Savings
$000
Actual Savings $000
LOC-001 Neutralisation Lime Usage Reduction 1000 4400 2670LOC-002 R&D Projects Tax Return to the Business 1530 1530 1530LOC-003 Leach Tank Repairs 350 350 0LOC-004 High Cr Grinding Media Trial on BM1 300 150 40LOC-005 Pond water usage reduction - using Brine 500 150 148LOC-006 Rod Mill Liner Wear Monitoring and Reline Strategy 130 130 110LOC-007 Calciner Fuel Reductions 100 30 10LOC-008 L.E.D lighting changes 30 30 8LOC-009 Leach Chemistry Optimisation TBD TBD TBDLOC-010 Fine pH control in Leach Tanks TBD TBD TBDLOC-011 Primary Screen Bottom Deck TBD TBD TBDLOC-012 Alternative to Water Truck Hire 47 70 70LOC-013 Mineralogy Assay Reprogramming 60 30 28LOC-014 Rationalisation of Plant Ops Roles 200 200 200LOC-015 Solar Array 3 3 2LOC-016 Cooling Tower Treatment 15 25 0
Planned Forecast ActualTOTAL $4,265 $7,098 $4,816
(millions) $4.27 $7.10 $4.82
![Page 10: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/10.jpg)
Total Operational Excellence 21/04/23
Planned Forecast Actual
TOTAL (millions)
$5.23 $8.28 $5.25
2012 Cost Savings Metric• Updated and reported monthly
![Page 11: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/11.jpg)
Total Operational Excellence 21/04/23 11
3. Closeout Review
• A final review will take place to determine whether your targeted savings were realized based upon the agreed measurement established in the initial meeting.
• All reviews will be scheduled by the end of November of every year.
• All closure reviews will be completed by the end of January of the following year.
![Page 12: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/12.jpg)
Total Operational Excellence 21/04/23 12
Cost Savings (2009-2012)
$5M
$3.5M
$13M
$8.3M
0
2
4
6
8
10
12
14
2009 Actual 2010 Actual 2011 Actual 2012 Forecast
(mil
lio
ns
)
2009 2010 2011 2012
$5M $3.5M $13M
$8.3M
![Page 13: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/13.jpg)
Total Operational Excellence 21/04/23 13
![Page 14: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/14.jpg)
Total Operational Excellence 21/04/23 14
![Page 15: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/15.jpg)
Total Operational Excellence 21/04/23 15
![Page 16: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/16.jpg)
Total Operational Excellence 21/04/23 16
![Page 17: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/17.jpg)
Total Operational Excellence 21/04/23
![Page 18: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/18.jpg)
Total Operational Excellence 21/04/23 18
![Page 19: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/19.jpg)
Total Operational Excellence 21/04/23 19
![Page 20: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/20.jpg)
Total Operational Excellence 21/04/23 20
![Page 21: Total Operational Excellence 18/09/2015 1 Case Study: Improvement Projects Leila Sarcia- BI Specialist Rio Tinto Group- Energy Resources Aust](https://reader035.vdocuments.us/reader035/viewer/2022062423/56649e5c5503460f94b5491d/html5/thumbnails/21.jpg)
Total Operational Excellence 21/04/23 21
Thank You!
The success of Improvement projects?................................................. Striving for Operational excellence.