total costs
TRANSCRIPT
CREWRole Rate/day Number of days Total PayCinematographer 500 20 10000Camera Operator (x2) 300 20 12000Camera Assistant (x2) 250 20 10000Director 1000 20 20000Assistant producer 300 150 45000Producer 1000 150 150000Production Manager 400 150 60000Makeup artist 250 20 5000Costume Designer 350 20 7000Runner 200 20 4000Editor 300 30 9000Digital Image technician 250 30 7500Lighting Technician 240 20 4800Location Manager 200 80 16000
Total cost: 360300
EQUIPMENTItem Rate/day number of days total costSony PXW-‐FS7 Ultra Kit(Camera)(x2) 230 20 9200SmallHD DP7 (Monitor) (x2) 20 20 800Lighting (mixture of lights) (x5) 40 20 4000Sony XLR-‐K2M Adapter Kit and Microphone (x3) 23 20 1380Vinten Pro-‐10DC System (Tripod) (x2) 16 20 640
Total cost: 16020All Equipment prices obtained from http://www.hireacamera.com/ActorsRole rate/day number of days total payMain Leads (x4) £300 27 32400Background Artistes (x10) 100 27 27000Stunt performers(x3) 500 27 27000
Total Cost: 86400
Locations rate/day number of days total costDetective Offices £2,500 20 £50,000Houses (x5) £1,000 20 £100,000Public shooting (estimated cost) £5,000 20 £100,000
Total Cost: £250,000
Cost for crew, equipment and actors: £712,720