Toshiba IR Test Apparatus Project
Ahmad Nazri Fadzal
Zamir Izam
Nurfazlina Kamaruddin
Wan Othman
![Page 2: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/2.jpg)
Project Goal Create a test program that can verify the
TV is outputting the correct IR signals to VCR and DVD that are connected through IR blaster cable
4 different VCR and DVD brands will be tested
![Page 3: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/3.jpg)
Requirements Two modes: Database mode and Test
mode Database mode
Receive signal from TV, analyze, and store its characteristic
Allow operator to designate a “name” Signal begins on the first signal
transition and ends after 1s of no transitions
![Page 4: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/4.jpg)
Requirements (continued) Test mode
Allow operator to select a sequence of signals from the database mode
START and STOP capabilities Handle no more than a 1s “silent”
transition between each new test signal Log pass/fail results to User Interface
and text file output
![Page 5: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/5.jpg)
Test model
![Page 6: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/6.jpg)
GLINK Use to connect cable
box and VCR
![Page 7: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/7.jpg)
Block diagram for capturing signal from VCR player
![Page 8: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/8.jpg)
TheaterNet Use to connect DVD
player
![Page 9: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/9.jpg)
Block diagram for capturing signal from DVD player
![Page 10: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/10.jpg)
Software
Programming
Database Mode Test Mode
![Page 11: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/11.jpg)
Database Mode
Database Mode
Sampling
• Start and stop trigger
• Edit signal feature
Storage Analyzing
Save
Name file
• Library
Graphical display
• Time length
• Bit length
![Page 12: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/12.jpg)
Test mode
Test Mode
Retrieve Signal
• Start and stop trigger
• Edit signal feature
Test output signal
Statistic GraphicalDisplay
• Compare
• Result-pass/fail
•Pulse width
•Bit length
Normal plot
Expected & Actual signal plot on same plot
Load signal
Select signal from library
![Page 13: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/13.jpg)
Operational concept Sample 4 different DVD and VCR brands:
Toshiba Panasonic JVC Sony
Theaternet Sample 8 functions for each DVD brand (Power, Play, Stop, FF, REW, Pause, Skip, Search) Each test function will be sampled 3 times (3 rep/test)
![Page 14: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/14.jpg)
GLINK Sample 3 functions for each VCR brand (Power, Stop, and Record) Each test function will be sampled 3 times (3
rep/test)
![Page 15: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/15.jpg)
Block Diagram for Database Mode
![Page 16: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/16.jpg)
Database Mode Front Panel
![Page 17: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/17.jpg)
![Page 18: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/18.jpg)
Library file of Toshiba DVD PLAY Signal
![Page 19: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/19.jpg)
Block Diagram for Test Mode
![Page 20: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/20.jpg)
Test Mode Front Panel
![Page 21: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/21.jpg)
![Page 22: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/22.jpg)
![Page 23: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/23.jpg)
![Page 24: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/24.jpg)
![Page 25: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman](https://reader033.vdocuments.us/reader033/viewer/2022061608/5697bfc11a28abf838ca43d1/html5/thumbnails/25.jpg)
Next week plan Start and Stop Trigger
Signal analysis