torque-hub planetary final drive w3b/w3c series service manual€¦ · 5 planetary final drive...

54
1 Torque-Hub ® Planetary Final Drive W3B/W3C Series Service Manual Rev 03/07/13

Upload: others

Post on 25-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

1

Torque-Hub® Planetary Final Drive W3B/W3C Series Service Manual

Rev 03/07/13

Page 2: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

2

While every precaution has been taken in the preparation of this document, Fairfield Manufacturing Co. Inc. assumes no liability with respect to the use of the documentation described herein, or for any act or omission of Fairfield Manufacturing Co. Inc. concerning this documentation. Torque-Hub

® is a registered trademark of Fairfield Manufacturing Co. Inc.

Features and specifications are subject to change without notice.

Page 3: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

3

Planetary Final Drive Service Manual Content

Introduction 04 Roll and Leak Test 05 Tightening and Torquing Bolts 07 Lubrication Information 08 Disassembly Instructions Main Disassembly 12 Carrier Disassembly 15 Coupling Disassembly 16 Input Shaft Disassembly 17 Cover Disassembly 18 Housing-Spindle Disassembly 19 Assembly Instructions Cover Subassembly 24 Carrier Subassembly 26 Housing Spindle Subassembly 28 Coupling Subassembly 30 Input Shaft Subassembly 31 Main Assembly 32 Assembly Drawing 36 Parts List 37 Assembly Tools 40 General Information Contact Information 52

Page 4: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

4

Planetary Final Drive Service Manual Introduction

This manual is a step-by-step guide to the disassembly and assembly of the W3C/W3B Series Torque-Hub

® units. It is designed

for the customer or mechanic who is repairing this particular Torque-Hub

® model.

Users of this manual should note that each part mentioned is followed by an identification number enclosed in parentheses. These part numbers may be referred to in the Parts List and Assembly Drawing sections of this manual.

Specialized tools used to assemble this unit are noted in the assembly procedures and diagrammed in the Assembly Tools section.

Users should familiarize themselves with the procedures for roll and leak testing, as well as bolt tightening and torquing found on the following three pages before starting any repairs.

Standard safety practices should be followed during the disassembly and assembly procedures described. Safety glasses and safety shoes should be worn, and heavy, heat resistant gloves should be used when handling heated components. Be especially alert when you see the word CAUTION. This indicates that a particular operation could cause personal injury if not performed properly or if certain safety procedures are not followed. The word NOTE is used to bring attention to certain procedures or helpful hints that will aid in the disassembly and assembly process.

Page 5: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

5

Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub

® units should always be roll and leak tested before

disassembly (if possible) and after assembly to make sure the unit’s gears, bearings, and seals are working properly. The following information briefly outlines what to look for when performing these tests.

The Roll Test The purpose of the roll test is to determine if the unit’s gears are

rotating consistently, easily and properly. Release the brake by applying 400 Psi to the brake port. To perform a roll test, use the recommended tool from table below (or something equivalent) to apply constant rotational force to the input of the gearbox. If more drag is felt in the gears only at certain points, then the gears are not rolling consistently and easily and should be examined for improper installation or defects. Some gear packages roll with more difficulty than others. Do not be concerned if the gears in the unit seem to roll hard as long as they roll with consistency. Rotate the gearbox both clockwise and counterclockwise the same number of turns as the ratio of the unit. The gearbox ratio is the same number as the last three numbers on the ID tag.

Model code Roll Test Tool

W3xxxx3xxxx T223988

W3xxxx4xxxx T223989

W3xxxx7xxxx T223990

W3Bxxx8xxxx T223997

Continued on Next Page

Page 6: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

6

The Leak Test The purpose of a leak test is to make sure the unit is airtight. To perform a leak test use the leak test fixture from the table below. If the tool is not available, the gearbox must be sealed to perform the test. This can be accomplished by assembling the sealed input device onto the gearbox at the input end and replace one of the oil plugs with an air chuck. DO NOT EXCEED 10 PSI PRESSURE DURING THE LEAK TEST. Higher pressure will create a false sealing effect in assemblies with lip-seals. The unit has a leak if the pressure gauge reading on your leak check fitting starts to fall after the gearbox has been pressurized and allowed to equalize. Leaks will most likely occur at the pipe plugs, the main seal or wherever

o-rings or gaskets are located. The exact location of a leak can usually be detected by brushing a soap and water solution around the main seal and where the o-rings or gaskets meet on the exterior of the unit and then checking for air bubbles. If a leak is detected in a seal, o-ring, or gasket, the part must be replaced and the unit rechecked. Leak test at 10 psi for 20 minutes.

Model code Leak Test Tool

W3Cxxxxxxxx T220225

W3Bxxxxxxxx T201476

Page 7: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

7

Planetary Final Drive Service Manual Tightening and Torquing Bolts

If an air impact wrench is used to tighten bolts, extreme care should be taken to ensure the bolts are not tightened beyond their specified torque. The following steps describe how to tighten and torque bolts or socket head cap screws in a bolt circle.

1. Tighten (but do not torque) bolt “A” until snug.

2. Go to the opposite side of the bolt circle and tighten bolt “B” until equally snug.

3. Crisscross around the bolt circle and tighten the remaining bolts.

4. Use a torque wrench to apply the specified torque to bolt “A”.

5. Using the same sequence, crisscross around the bolt circle and

apply an equal torque to the remaining bolts.

Page 8: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

8

Planetary Final Drive Service Manual Lubrication Information

General Properties: The lubricant used in most Torque-Hub

® drives should be petroleum

based gear fluid containing anti-oxidation, anti-foaming and extreme pressure additives. The lubricant should have a minimum viscosity index of 95 cst and maintain a minimum viscosity of 40 cst under normal operating conditions. Some applications require special considerations; consult the machine manufacturer and Oerlikon Fairfield for more additional information.

The table below lists the recommended viscosities for various ambient operating temperatures. These recommendations are based on temperature rise of 50° to 100°F at normal operating conditions.

Continued on Next Page

Differential Planetary Simple Planetary

Ambient Temperature

ISO Index AGMA

Lubricate Number

ISO Index AGMA

Lubricate Number

-40° to -5° F(1)

VG100 3EP VG100 3EP

-5° to 40° F VG150 4EP VG100 3EP

40° to105° F VG220/VG320 5EP/6EP VG150/VG220 4EP/5EP

105° to 150° F(2)

VG460 7EP VG320 6EP

Footnotes 1. For operation in this ambient temperature range, synthetic oil is recommended with a pour point of

10°F lower than the minimum ambient temperature.

2. For operation in this ambient temperature range, synthetic oil is recommended for proper lubricant life at elevated temperatures.

Page 9: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

9

Maintenance Oil amounts for each series of Torque-Hub® drives are indicated in

the appropriate series literature. An initial oil change should be made after the first 50 hours of operation. Subsequent oil changes should be made at 1,000 hour intervals or annually, whichever comes first.

Oil temperatures should be not higher than 160° to 180°F for continuous operation, and no higher than 200°F for intermittent operation. For special applications, high horsepower, high speeds or wide temperature changes, please consult Oerlikon Fairfield.

Oil Fill Level When the Torque-Hub

® unit is mounted horizontally, unless

otherwise specified, the gearbox should be filled half-full of oil. Consult the appropriate series literature for approximate fill volumes. Vertically mounted Torque-Hub

® units may require special

lubrication procedures. Please contact Oerlikon Fairfield for vertically mounted applications.

Page 10: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

10

THIS PAGE

INTENTIONALLY

LEFT BLANK

Page 11: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

11

DISASSEMBLY

Page 12: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

12

Planetary Final Drive Service Manual Main Disassembly

1. Perform roll check and leak check prior to disassembling the unit. 2. Remove the magnetic Pipe Plug (6H) from Cover Plate (6A) and drain the oil out of the

gearbox.

NOTE: Record the condition and volume of the oil. 3. Remove eight of Bolts (17) followed by four of Bolts (18) from Cover Subassembly. 4. Lift the Cover Subassembly off of the unit. 5. Lift Ring Gear (4) off the unit. Continued on Next Page

Page 13: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

13

NOTE: Figure 1 refers to 30, 35, 50, 64 & 73 : 1 Ratios

NOTE: Figure 2 refers to 18, 24, 31 & 43 : 1 Ratios

Continued on Next Page

Page 14: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

14

6. If applicable remove Spacer (14) from the Input Shaft (11) 7. Remove the Sun Gear (13). 8. Lift out the Carrier Subassembly from the unit. 9. Remove the Input Spacer (12) from the unit. 10. Remove two Thrust Spacers (15) and Thrust Bearing (16) from the Internal Gear (2). 11. Remove Internal Gear (2).from the unit. 12. Remove Input Shaft Subassembly from the Hub Spindle Subassembly. 13. Take out Input Coupling Subassembly of the Hub Spindle Subassembly. This concludes the Main Disassembly.

Page 15: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

15

Planetary Final Drive Service Manual Carrier Disassembly

1. Drive Planet Shaft (3E) out of the carrier pin holes; forcing the Roll Pin (3G) to sheer off. 2. Hold on to the Planet Gear (3F) and push the Planet Shaft (3E) out of the Carrier (3A). The

Thrust Washers (3B and 3H) will slide off the shaft as it is removed. 3. Using a hammer and punch, drive the Roll Pin (3G) out of the Planet Shaft (3E) and Carrier

(3A). 4. Remove first set of Needle Bearings (3C) from the inside of the Planet Gear (3F). 5. Remove Thrust Washer (3D) from Planet Gear (3F). 6. Remove second set of Needle Bearings (3C) from the inside of the Planet Gear (3F). 7. Repeat steps 1-6 for the remaining two Planet Gears (3F). This concludes the Carrier Disassembly.

Page 16: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

16

Planetary Final Drive Service Manual Coupling Disassembly

CAUTION: Safety glasses must be worn during this next steps.

1. If necessary, remove Internal Retaining Ring (20).from the groove of Coupling (19). 2. If necessary, remove External Retaining Ring (21) from the groove of Coupling (19). This concludes the Coupling Disassembly.

Page 17: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

17

Planetary Final Drive Service Manual Input Shaft Disassembly

CAUTION: Safety glasses must be worn during this next steps.

1. If necessary, remove External Retaining Ring (10) from the groove of the Input Shaft (11). This concludes the Input Shaft Disassembly.

Page 18: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

18

Planetary Final Drive Service Manual Cover Disassembly

1. Remove the O-Ring (5) from groove in Cover (6A) and Discard O-Ring. 2. Remove two Thrust Washers (15) and Thrust Bearing (16) from Cover (6A). 3. Remove two Hex Bolts (6C) from Disengage Cap (6D), if required. 4. Remove the Disengage Cap (6D) from the Cover Cap (6B). 5. Pull the Disengage Rod (6E) out of the Cover Cap (6B). 6. Remove O-Ring (6F) from the Cover Cap (6B) and discard it. 7. Remove two Hex Bolts (6C) from Cover Cap (6B), if required. 8. Remove Cover Cap (6B) from Cover Plate (6A). 9. Remove O-Ring (6G) and discard it. 10. Remove Pipe Plug (6H) from the Cover (6A). This concludes the Cover Disassembly.

Page 19: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

19

Planetary Final Drive Service Manual Housing-Spindle Disassembly

CAUTION: Safety glasses must be worn during these next steps.

1 Remove Internal Retaining Ring (9) from the groove of the Spindle (1A). 2 Remove Thrust Washer (7) from the spindle (1A). 3 Remove Spring (8) from the Spindle (1A). 4 Remove Thrust Washer (7) from the Spindle (1A). 5. Set the unit on a bench so that the Spindle (1A) flange is down. Continued on Next Page

Page 20: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

20

6. Remove the O-Ring (5) from the Housing (1G) and discard it.

CAUTION: Safety glasses must be worn during these next steps. 7. Remove Retaining Ring (1I) from the groove of Spindle (1A). 8. Remove Thrust Washer (1H) from the Spindle (1A). 9. Remove two Pipe Plugs (1J) from the Housing (1G). 10. Turn the unit over and carefully place the unit on a support base until the Spindle (1A) post

rests on it. Ensure there is enough gap to lower the Housing (1G) down.

11. Use a dead blow hammer on the Housing (1G) flange to drive the inboard Bearing Cone

(1F) off of the Spindle (1A). Continued on Next Page

Page 21: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

21

12. Lift the Spindle (1A) out of the Housing (1G). 13. If required, remove Boot Seal (1Q) from the Housing (1G) 14. Remove Lip Seal (1B) from the Housing (1G) 15. Remove the Bearing Cone (1D) from the Bearing Cup (1C). 16. Using a hammer and punch drive the inboard Bearing Cup (1E) out of the Housing (1G). Be

careful not to damage the counter bore in the housing. 17. Turn the Housing (1G) over and drive the outboard Bearing Cup (1C) out of the Housing

(1G). Be careful not to damage the counter-bore in the housing. This concludes the Housing-Spindle Disassembly.

Page 22: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

22

THIS PAGE

INTENTIONALLY

LEFT BLANK

Page 23: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

23

ASSEMBLY

Page 24: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

24

Planetary Final Drive Service Manual Cover Subassembly

1. Screw Pipe Plug (6H) into Cover Plate (6A) using thread sealant and hand hexagonal

wrench. 2. Apply grease and position O-Ring (6G) over Cover Cap (6B) until it rests against the flange. 3. Blow out internal groove of Cover Cap (6B) with air hose. Place greased O-Ring (6F) into

internal groove of Cover Cap (6B).

NOTE: The Disconnect Rod (6E) may be used to push the greased O-Ring (6F) into position in the O-Ring groove of the Cover Cap (6B)

4. Place Cover Cap (6B) into Cover Plate (6A).with larger flange hole on Cover Cap (6B)

located over Pipe Plug (6H). Fasten Cover Cap (6B) with two Bolts (6C) located 180 degrees apart. Torque Bolts to 70-80 in-lbs.

5. Place Disengage Cap (6D) on Cover Cap (6B) with nipple facing out. Secure with two Bolts

(6C) located 180 degrees apart. Torque Bolts (6C) to 70-80 in-lbs. 6. Turn Cover Plate (6A) over and push Disconnect Rod (6E) into Cover Cap (6B), until

Disconnect Rod (6E) bottoms out on the Disengage Cap (6D). Continued on Next Page

Page 25: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

25

7. Grease and install O-Ring (5) into groove on the Cover Plate (6A). 8. Grease and install Thrust washers (15) and Thrust Bearing (16) into Cover Plate (6A)

NOTE: Thrust Washers (15) has to be assembled onto either sides of Thrust Bearing (16) and then, this has to be greased and installed as a single unit into Cover Plate (6A)

This concludes the Cover Subassembly.

Page 26: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

26

Planetary Final Drive Service Manual Carrier Subassembly

1. Apply a liberal coat of grease to the bore of Cluster Gear (3F). This will enable the Needle

Rollers (3C) to be held in place during assembly. 2. Install first row of 14 Needle Rollers (3C) into the bore of Cluster Gear (3F).

NOTE: The last roller installed must be installed end wise. That is, the end of the last roller must be placed in between the ends of the two rollers that form the space, and then slid parallel to the other rollers into place.

3. Place one Spacer (3D) on top of the Needle Rollers (3C) inside the Planet Gear (3F). 4. Install second row of 14 Needle Rollers (3C) into the bore of Cluster Gear (3F) against

Spacer (3D).Grease and install Ball Indent Washers (3H) onto the counter bores of either sides of Cluster Gear (3F) with indents away from the cluster gears.

5. Place Carrier (3A) into tool fixture so that one of the roll pin holes is straight up. 6. Start Planet Shaft (3E), with end opposite roll pin hole first, through the planet shaft hole in

carrier (3A), making sure that the roll pin hole with the large chamfer in the planet shaft is straight up.

Continued on Next Page

Page 27: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

27

7. Using ample grease to hold it in position, slide one Thrust Washer (3B) over Planet Shaft (3E) with tang resting in the cast slot of Carrier (3A).

8. With large end of Cluster Gear (3F) facing the roll pin hole in the Carrier (3A), place Cluster

Gear (3F) into position in Carrier (3A) and push Planet Shaft (3E) through the Cluster Gear (3F) without going all the way through.

9. Slide the second Thrust Washer (3B) between the Cluster Gear (3F) and the Carrier (3A)

with the tang of Washer located in the cast slot of Carrier (3A) .Finish sliding Planet Shaft (3E) through the Thrust Washers (3H and 3B) and into Carrier (3A).

10. Position the chamfered side on the Planet Shaft (3E) roll pin hole so that it is in line with the

hole in the Carrier (3A), using a 1/8 inch diameter punch. 11. After using a 3/16 inch punch to align the two roll pin holes. Drive the Roll Pin (3G) through

Carrier (3A) and into Planet Shaft (3E) until the Roll Pin (3G) is flush with the bottom of the cast tang slot in the Carrier (3A). Use a ¼ inch pin punch to make sure the Roll Pin (3G) is flush in the slot.

12. Repeat the steps 1 through 11 for the remaining two Cluster Gears (3F) This concludes the Carrier Subassembly.

Page 28: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

28

Planetary Final Drive Service Manual Housing Spindle Subassembly

1. If required, using Stud pressing fixture press Studs (1N) into the flange holes of the Hub

(1G), be sure stud heads are tight to the hub flange face. 2. Place Hub (1G) on table such that long hub end is up. 3. Press Bearing Cup (1E) using T148905 with the large diameter side up into cover end of

Hub (1G). 4. Turn Hub (1G) over and press Bearing Cup (1C) into Hub (1G) using T148905 with small

diameter side up

NOTE: Apply generous amount of lubricating oil on all bearings at the time of installation. 5. Place Bearing Cone (1D) on Bearing Cup (1C). 6. Press Bearing Seal (1B) with the open face down into the Hub (1G), be sure seal is flush

with the hub face.

NOTE: Generally Seals should not be reused. 7. If the unit requires Seal Boot (1Q) place on Hub (1G) with flange end facing up. Coat the

inside surface of the seal – boot – flange with liberal amount of grease. 8. Place Spindle (1A) with large diameter end down on the bench and coat the seal shoulder

with oil. Continued on Next Page

Page 29: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

29

9. Place Hub (1G) onto Spindle (1A) making sure the Seal (1B) is in position on the seal shoulder of Spindle (1A).

NOTE: The Bearing Cone (1F) is a press fit onto Spindle (1A) and is installed using Snap Ring Assembly Tool T205660

10. Place Snap Ring Assembly Tool T205660 onto Spindle (1A). 11. Place Bearing Cone (1F) onto the tapered portion of Snap Ring Assembly Tool T205660. 12. Place Spacer (1H) and Retaining Ring (1I) onto the top of the Bearing Cone (1F). 13. Slowly press Bearing Cone (1F) Spacer (1H) and Retaining Ring (1I) all at once using a

Bearing Pressing Tool, T137970, until the Retaining Ring (1I) falls into the retaining ring groove on the Spindle (1A.)

14. Install Pipe Plug (1J) into Hub (1G). 15. Grease and install O-Ring (5) into Hub (1G). 16. Grease and install Thrust Washer (7) into Spindle (1A). 17. Install Spring (8) into Spindle (1A) until it Bottoms on Thrust Washer (7). 18. Grease and place second Thrust Washer (7) on Spring (8). 19. Using retaining ring pliers, push Retaining Ring (9) against Thrust Washer (7) until retaining

ring snaps into place in the Spindle (1A) groove. This concludes the Housing-Spindle Subassembly.

Page 30: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

30

Planetary Final Drive Service Manual Coupling Subassembly

CAUTION: Safety glasses must be worn during these next steps.

1. If necessary, install External Retaining Ring (21) into groove on OD of Coupling (19). 2. If necessary, install Internal Retaining Ring (20) into retaining ring groove of the Coupling

(19). This concludes the Coupling Subassembly.

Page 31: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

31

Planetary Final Drive Service Manual Input Shaft Subassembly

CAUTION: Safety glasses must be worn during these next steps.

1. If necessary, install Retaining Ring (10) onto the groove of Input Shaft (11). This concludes the Input Shaft Subassembly.

Page 32: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

32

Planetary Final Drive Service Manual Main Assembly

Figure 1: 30, 35, 50, 54 & 73:1 Ratios

Figure 2: 18, 24, 31 & 43:1 Ratios Continued on Next Page

Page 33: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

33

1. Place Hub-Spindle Sub assembly on the table with Spindle flange side down. 2. Set the Internal Gear (2) with the spline down, so that the spline of the spindle (1A) is in

mesh with the internal spline of the Internal Gear (2). 3. Install Input Shaft Subassembly with the retaining ring end down into the spindle counter

bore. 4. Slide Thrust Spacer (12) over the Input Shaft (11) Make sure the large end is against the

Spindle (1A).

NOTE: Refer to Figure 2 with 18, 24, 31 & 43 : 1 Ratios.

5. Place Carrier Subassembly with the large end of Cluster Gears facing up. Position all three

punch marks on the face of large gears at 12 o’clock and secure the gear teeth using timing fixture.

6. With longer shoulder side of Ring Gear (4) facing down, place the ring gear into mesh with

the Cluster Gear (3F)and remove this assembly from timing fixture Continued on Next Page

Page 34: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

34

NOTE: Be sure that the punch marks remain in their correct location during Ring Gear (4). installation.

7. Place Thrust Washer (15), Thrust Bearing (16) and Thrust Washer (15), in order, on the pilot

diameter on Internal Gear (2).

NOTE: For 30, 35, 50, 54 & 73:1 ratios Skip step 8. 8. Install Input gear (13) with counter bore down in mesh with the Input Shaft (11) splines

counter bore down. 9. With small end of Cluster Gear (3F) down and while holding Ring Gear (4) in mesh with

Carrier Sub Assembly, place assembly into Internal Gear (2). 10. Once in place Rotate the Ring Gear (4) until hole marked “X” is aligned with one of shoulder

bolt holes in Hub (1G)

NOTE: If the gears do not mesh easily or carrier sub assembly does not rotate freely, then remove the Carrier and Ring Gear and check timing (Step 5).

NOTE: Check each Cluster Gear (3F) to make sure that the timing punch-marks is in line with a tooth on the large end & a tooth on the small end of the cluster gear. THESE TWO TEETH MUST BE IN LINE WITH THE PUNCH-MARKS ON EVERY CLUSTER GEAR (3F).

NOTE: For 30, 35, 50, 54 & 73:1 ratios Skip step 11.

11. Install Spacer (14) onto the Input Shaft (11) against the Input Gear (13).

NOTE: Refer to Figure 2 with 18, 24, 31 & 43 : 1 Ratios

NOTE: For 18,24, 37 & 43:1 ratios Skip step 12. 12. Install Input Gear (13) with counter bore down to mesh with the teeth of Cluster Gear (3F)

Continued on Next Page

Page 35: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

35

13. Install Cover Sub-Assembly onto the Ring Gear (4) being sure that the pipe plugs in the Hub

(1G) and Cover (6A) are in time with each other. Be sure the Thrust Washers (15 & 16) remain on the Cover (6).

14. Install four Shoulder Bolts (18) into the four marked counter bore holes in the Hub (1G). Start

Shoulder Bolts (18) by hand for the length of at least two threads or two full turns before running down and torque to 45-47 ft-lbs

15. Place the remaining eight Bolts (17) into the remaining holes and torque to 45-47 ft-Lbs. 16. Turn the assembly over and insert Input Coupling Subassembly into the Spindle (1A)

counter bore. 17. The unit should now be leak and roll checked as per instructions on page 5, and 6. The

motor can be reinstalled into the gearbox for the leak check to seal it off, and the unit pressurized through a pipe plug hole on the cover.

This concludes the Main assembly.

Page 36: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

36

Planetary Final Drive Service Manual Assembly Drawing

Page 37: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

37

Planetary Final Drive Repair Instructions Parts List

Number Qty Description

1A 1 SPINDLE

1B 1 LIP SEAL

1C 1 BEARING CUP

1D 1 BEARING CONE

1E 1 BEARING CUP

1F 1 BEARING CONE

1G 1 HOUSING

1H 1 THRUST WASHER

1I 1 EXTERNAL RETAINING RING

1J 1 PIPE PLUG

1N 10 STUD

1Q 1 BOOT SEAL

2 1 INTERNAL GEAR

3 1 CARRIER

3A 1 CARRIER

3B 6 WASHER

3C 84 NEEDLE BEARING

3D 3 THRUST WASHER

3E 3 PLANET SHAFT

3F 3 CLUSTER GEAR

3G 3 ROLL PIN

3H 6 BALL INDENT WASHER

4 1 RING GEAR

5 1 O-RING

6A 1 COVER PLATE

6B 1 COVER CAP

6C 4 HEX BOLT

6D 1 DISENGAGE CAP

6E 1 DISENGAGE ROD

6F 1 O-RING

6G 1 O-RING

6H 1 PIPE PLUG

6J 1 ID PLATE

7 2 THRUST WASHER

8 1 SPRING

9 1 INTERNAL RETAINING RING

10 1 EXTERNAL RETAINING RING

11 1 INPUT SHAFT

Page 38: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

38

Number Qty Description

12 1 INPUT SPACER

13 1 SUN GEAR

14 1 SPACER

15 4 THRUST WASHER

16 2 THRUST BEARING

17 8 HEX BOLT

18 4 SPECIAL BOLT

19 1 COUPLING

20 1 INTERNAL RETAINING RING

21 1 EXTERNAL RETAINING RING

Page 39: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

39

Planetary Final Drive Repair Instructions Assembly Tools

T114920 – CRADLE FOR STAKING PLANET PIN PLACE

Page 40: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

40

T122786 – PLUG FOR PRESSING IN OIL SEAL

Page 41: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

41

T134344 – SNAP RING SEATING TOOL

Page 42: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

42

T137970 – TOOL TO PRESS IN BEARING

Page 43: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

43

T148905 – ASSEMBLY PRESSING TOOL

Page 44: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

44

T155783 – ASSEMBLY PRESSING TOOL

Page 45: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

45

T220225 – LEAK TEST ADAPTER PLATE

Page 46: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

46

T201476 – LEAK TEST ADAPTER PLATE

Page 47: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

47

T205660 – SNAP RING ASSEMBLY TOOL

Page 48: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

48

T223988 – ROLL TEST TOOL

Page 49: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

49

T223989 – ROLL TEST TOOL

Page 50: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

50

T223990 – ROLL TEST TOOL

Page 51: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

51

T223997 – ROLL TEST TOOL

Page 52: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

52

Planetary Final Drive Repair Instructions Contact Information

With over 80 years of experience, Fairfield Manufacturing has become the largest U.S. non-captive producer of gears, custom gear assemblies, planetary final drives, and related gear products. Fairfield Manufacturing, headquartered in Lafayette, Indiana, is distinguished by our extensive design, manufacturing, and applications engineering capabilities. Our 500,000 square foot plant is a modern, fully equipped manufacturing facility that includes a full service heat treat department.

Our philosophy of synchronous engineering is a partnership that matches our best and brightest people with your people to evaluate your unique requirements, and develop products and assemblies that meet your needs.

For more information, contact Fairfield Manufacturing today

Mailing Address Fairfield Manufacturing Co., Inc., U.S. 52 South / P.O. Box 7940 Lafayette IN 47903-7940

Shipping Address 2309 Concord Road Lafayette, IN 47909

Fax Main (765) 772-4001 Applications Engineering (765) 772-4011 Sales and Service (765) 772-4010 E-mail Applications Engineering [email protected] Sales [email protected]

Website www.fairfieldmfg.com

Page 53: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

53

THIS PAGE

INTENTIONALLY

LEFT BLANK

Page 54: Torque-Hub Planetary Final Drive W3B/W3C Series Service Manual€¦ · 5 Planetary Final Drive Service Manual Roll and Leak Test Torque-Hub ® units should always be roll and leak

54

Oerlikon Fairfield U.S. 52 South / P.O. Box 7940 Lafayette, IN 47903 USA 765-772-4000 www.oerlikon.com/fairfield