FILL MATERIAL AND COMPACTION
PROPOSED KIOSK SUBSTATION PRECAST PADSCHNEIDER ELECTRIC 415kVA TRANSFORMER
Mobile: 0427 411 633 Email: [email protected]
Engineers
Consulting
Northern Territory, Australia
P.O. Box 900
COOLALINGA 0839
ABN 73 102 631 186
N.T. Consulting Engineers
TOP VIEW
SL92 MESH 50 mm
BTM COVER
2600
KIO
SK
S
UB
ST
AT
IO
N 4
45
0
46
50
300
1940
360
37
25
50
25
74
69
04
64
SCHNEIDER
A
173
1820607
DEFENCE KIOSK
SECTIONSCALE: 1:50
TYPICAL
A
_
CONCRETE
CURE CONCRETE AT AMBIENT ENVIRONMENT FOR A
PERIOD OF 21 DAYS OR UNTIL CONCRETE PEACHES 70%
OF STRENGTH SPECIFIED. SOME CRACKING OF
CONCRETE SLABS IS ANTICIPATED. THIS CRACKING WILL
BE NON STRUCTURAL & ASTHETIC IN NATURE.
372 550 2574 690 464
16
5
90
0 m
in
PRECAST PAD
APRON SLAB
100 thk: 25 MPa
GAL SL72 MESH:
40 TOP COVER.
GENERAL NOTES
PLAN, SECTION & NOTES
NORTHERN TERRITORY OF AUSTRALIA BUILDING ACT
SECTION 40 – CERTIFICATE OF COMPLIANCE STRUCTURAL CONSTRUCTION
Revised 31/7/2014 No changes to the declaration are permitted Page 1 of 2
All sections must be completed – mark N/A to any question that does not apply
PROPERTY / PROJECT DETAILS
Owner (if known): Lot/Portion Number:
n/a
Address:
RAAF Location:
Tindall
Town / Hundred :
Katherine Description of works :
Proposed Substation PAD Building Permit Number (if known)
DOCUMENTS ATTACHED (as built drawings or latest amendments)
Drawing Nos:
NTCE Dwg No.’s U822688-S1 Inspection Records :
VARIANCES FROM DESIGN CERTIFICATE CRITERIA
COMMENTS / EXCLUSIONS (Exclusions to this Certificate must be clearly identified).
CERTIFICATION BY STRUCTURAL ENGINEER
Company Name if certification is on behalf of a company
Company NT Registration Number
I certify that reasonable care has been taken to ensure that structural engineering aspects of the works described above have been constructed in accordance with the approved plans and permit.
*Name (print clearly)
Michael Cooper
* Nominee/Individual NT Registration Number
21133ES
Signature Date
30 April 2017
Page 2 of 2
SCHEDULE OF STRUCTURAL INSPECTIONS COMPLETED
[ X ] 1. Completion of site preparation/site filling/excavations for footings prior to placement of any reinforcement
or concrete.
[ ] 2. Completion of preparations for placing of concrete strip footings including placement of reinforcement.
[ X ] 3. Completion of preparations for placing concrete slabs including compaction of fill and sand blinding,
placement of formwork, reinforcement, starter bars and cast in items.
[ ] 4. Completion of preparations for placing of concrete pier footings including reinforcement (if any).
[ ] 5. Starter bars and cast in items after placing of concrete and prior to any covering up work.
[ ] 6 Reinforcement to walls completed prior to core filling (inspection holes and cleanout cores to be completed).
[ ] 7. Structural steelwork and cold formed steelwork completed and prior to any covering up work. Floor framing
system completed before floors are laid or underside is lined.
[ X ] 8. Suspended concrete floor slabs with formwork, reinforcement and cast in items completed, prior to placing
of concrete.
[ ] 9. Wall framing or blockwork wall core filling completed (with windows fixed in place) and roof framing with
connections completed and prior to sheeting or lining.
Note: [ ] Prior lodgement of truss manufacturer’s drawings, details and certification required.
[ ] Prior lodgement of windows manufacturer’s drawings including fixings and certification required.
[ ] 10. Structural wall linings completed and prior to any covering up work.
[ ] 11. Final inspection upon completion of all structural work including fixings of external roof and wall claddings,
flashings, barges & vents.
[ X ] 12. Other Inspections