![Page 1: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/1.jpg)
Tools and Case Studies forGreen-Gray Lifecycle Cost Analysis
ASCE Spring Seminar April 2018Justin Kerns
ms consultants
![Page 2: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/2.jpg)
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis 2
EPA National Stormwater Calculator
![Page 3: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/3.jpg)
Low Impact Development (LID) Controls
3
Included LID Controls• Disconnection (rooftop downspouts)• Rain Harvesting (rain barrel or cistern)• Rain Gardens• Green Roofs• Street Planters• Infiltration Basins• Permeable Pavement
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 4: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/4.jpg)
Low Impact Development (LID) Controls
4
Included LID Controls• Disconnection (rooftop downspouts)• Rain Harvesting (rain barrel or cistern)• Rain Gardens• Green Roofs• Street Planters• Infiltration Basins• Permeable Pavement
Modeling Capabilities• Hydrologic Analysis• Cost Analysis• Climate Scenarios
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 5: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/5.jpg)
Location and Project Information
5
• Site Name• Search for Site Location• Site Area
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 6: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/6.jpg)
Soil Type
6
• NRCS Web Soil Survey• Defined by Hydrologic
Soil Group• Group A – Sand• Group B – Sandy Loam• Group C – Clay Loam• Group D – Clay
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 7: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/7.jpg)
Soil Drainage
7
• NRCS Web Soil Survey• Saturated Hydraulic
Conductivity
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 8: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/8.jpg)
Topography
8
• NRCS Web Soil Survey• Surface Slope
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 9: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/9.jpg)
Precipitation
9
• Measured at nearbyNational WeatherService rain gage
• Average annual rainfallbased on long-termhistorical data
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 10: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/10.jpg)
Evaporation
10
• Measured at nearbyNational WeatherService weather station
• Monthly evaporationrates calculated fromlong-term historical data
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 11: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/11.jpg)
Climate Scenarios
11
• Climate projectionsproduced by the WorldClimate ResearchProgramme (WCRP)
• Scenarios model futurechanges in temperatureand precipitation
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 12: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/12.jpg)
Climate Scenarios
12
• Climate projections affect the average monthly rainfall• Three scenarios• Two time periods
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 13: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/13.jpg)
Climate Scenarios
13
• Climate projections affect the average monthly rainfall• Three scenarios• Two time periods
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 14: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/14.jpg)
Climate Scenarios
14
• Climate projections affect the average monthly rainfall• Three scenarios• Two time periods
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 15: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/15.jpg)
Land Cover
15
Select the percent of sitearea covered by:
• Forest• Meadow• Lawn• Desert• Impervious
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 16: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/16.jpg)
Low Impact Development (LID) Controls
16
Select percent ofimpervious area to betreated by each LID type
Enter design storm to beused for LID sizing
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 17: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/17.jpg)
LID Controls
17
Rain Gardens• Ponding Height• Soil Media Thickness• Soil Media Conductivity• % Capture Ratio
(ratio of LID area todesired captured area)
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 18: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/18.jpg)
LID Controls
18
Street Planter• Ponding Height• Soil Media Thickness• Soil Media Conductivity• Gravel Bed Thickness• % Capture Ratio
(ratio of LID area todesired captured area)
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 19: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/19.jpg)
LID Controls
19
Permeable Pavement• Pavement Thickness• Gravel Layer Thickness• % Capture Ratio
(ratio of LID area todesired captured area)
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 20: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/20.jpg)
LID Controls
20
Site Suitability• Physical Obstructions• Utility Conflicts• Ease of Access
Impacts• Construction Cost• Maintenance Cost
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 21: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/21.jpg)
LID Controls
21
Select cost region
Impacts• Construction Cost• Maintenance Cost
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 22: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/22.jpg)
LID Controls
22
Select cost region
Impacts• Construction Cost• Maintenance Cost
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 23: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/23.jpg)
LID Controls
23
Select cost region
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 24: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/24.jpg)
Model Options
24
• Select number of yearsto analyze
• Enter event threshold• Consecutive Days
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 25: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/25.jpg)
Results
25
• Compare multiplescenarios at once
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 26: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/26.jpg)
Results
26
Site Description
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 27: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/27.jpg)
Results
27
Summary
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 28: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/28.jpg)
Results
28
Rainfall / RunoffEvents
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 29: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/29.jpg)
Results
29
Rainfall / RunoffFrequency
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 30: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/30.jpg)
Results
30
Rainfall / RetentionFrequency
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 31: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/31.jpg)
Results
31
Runoff by RainfallPercentile
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 32: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/32.jpg)
Results
32
Extreme EventRainfall / Runoff
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 33: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/33.jpg)
Results
33
Capital Cost(tabular)
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 34: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/34.jpg)
Results
34
Capital Cost(graphical)
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 35: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/35.jpg)
Results
35
Maintenance Cost(tabular)
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 36: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/36.jpg)
Results
36
Maintenance Cost(graphical)
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 37: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/37.jpg)
37
Quantifying Costs
Traditional Costs• Capital Costs• Maintenance Costs
Indirect Costs• R/W Acquisition Costs• Treatment Plant Costs• Snow removal• Water Re-Use• Energy Savings• Tax Incentives / Utility Fees
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 38: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/38.jpg)
38
Quantifying Costs
Traditional Costs• Capital Costs• Maintenance Costs
Indirect Costs• R/W Acquisition Costs• Treatment Plant Costs• Snow removal• Water Re-Use• Energy Savings• Tax Incentives / Utility Fees
Non-Monetary Costs• Air Quality• Water Quality• Habitat Quality
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 39: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/39.jpg)
39
Franklin County Correctional Facility
23 Acre SiteBuildingParking LotLandscaping
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 40: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/40.jpg)
40
Lifecycle Cost AnalysisTraditional Stormwater Gray Infrastructure• Asphalt Parking Lot• Storm Sewer• Catch Basins• Detention Basin• Maintenance (30 Years)
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 41: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/41.jpg)
41
Lifecycle Cost AnalysisTraditional Stormwater Gray Infrastructure• Asphalt Parking Lot• Storm Sewer• Catch Basins• Detention Basin• Maintenance (30 Years)
Low Impact Development Green Infrastructure• Permeable Pavers• Storm Sewer• Catch Basins• Detention Basin• Maintenance (30 Years)
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 42: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/42.jpg)
42
Lifecycle Cost AnalysisTraditional Stormwater GrayInfrastructure• Capital Cost = $1,350,000• Maintenance Cost (30 years) = $430,000• Total = $1,780,000
Low Impact Development GreenInfrastructure• Capital Cost = $1,710,000• Maintenance Cost (30 years) = $380,000• Total = $2,090,000
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 43: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/43.jpg)
43
Lifecycle Cost AnalysisCity of Columbus StormwaterUtility Fee• Based on property’s contribution to
stormwater runoff• 2,000 SF Impervious Area = 1 ERU
(Equivalent Residential Unit)• 23 Acres Impervious = 500 ERU• Annual Stormwater Fee = $27,040• 30 Year Fee = $811,200• GI used to meet all water quality and
quantity requirements = 100% credit
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 44: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/44.jpg)
44
Lifecycle Cost AnalysisTraditional Stormwater GrayInfrastructure• Capital Cost = $1,350,000• Maintenance Cost (30 years) = $430,000• Stormwater Fee (30 years) = $811,000• Total = $2,590,000
Low Impact Development GreenInfrastructure• Capital Cost = $1,710,000• Maintenance Cost (30 years) = $380,000• Total = $2,090,000
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis
![Page 45: Tools and Case Studies for Green-Gray Lifecycle Cost Analysis · City of Columbus Stormwater Utility Fee • Based on property’s contribution to stormwater runoff • 2,000 SF Impervious](https://reader034.vdocuments.us/reader034/viewer/2022050219/5f64ef01854eee597f4432da/html5/thumbnails/45.jpg)
Questions?
45
Justin Kernsms consultants, inc.2221 Schrock Rd,
Columbus, OH 43229614-898-7100
April 2018 ASCE Spring Seminar | Green-Gray Cost Analysis