toll roads & transportation mobility · 2018. 4. 2. · 77 toll roads or no roads...
TRANSCRIPT
![Page 1: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/1.jpg)
Toll Roads & Transportation Mobility
Orange County, CA Model / TCA Experience
Western Region County Engineers Symposium
November 3-5, 2010
Sam Elters, Chief Engineer
![Page 2: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/2.jpg)
22
Presentation Outline
History of Agency + Existing System Planning, Financing & Construction Environmental Program System Operation
System Completion Planning, Financing & Construction Status Update:
– Engineering– Environmental Regulations– Financing– Leglislation SB 375 Greenhouse Gas Emissions Reduction Sustainable Communities Strategy
![Page 3: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/3.jpg)
33
Why the TCA’s were created
![Page 4: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/4.jpg)
44
Orange County’s Growing Need
Planned
Pacific
Coast
Freeway
• County population doubled between 1967
and 2000 from 1.4 to 2.8 million
• Regional growth was also expanding rapidly
• 4 miles of new freeway was to be added to
the 132 mile county freeway system.
• A planned route along the coast was dropped
by State planners.
• County planners then developed plans for
three new “transportation corridors”
• San Diego & Orange County are the 2nd and
3rd most populous counties in the State.
• Weekday traffic is projected to increase at
the San Diego/Orange County line by 60% in
next 25 years.
• The regional economy is dependent on the
free flow of traffic and goods.
![Page 5: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/5.jpg)
55
Major employment destinations in central OC (orange) are matched with origins (green) in south county and the Inland Empire
Major ports (L.A., Long
Beach and San Diego)
International border
Regional Job Centers and Residential Communities
![Page 6: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/6.jpg)
66
Transportation Corridor System Map
County developed two
Developer Impact Fee (DIF)
Programs designed to pay for
½ of transportation corridors.
Fee programs based on “Area
of Benefit”
In 1986, the County and Cities
within the AOB created the
Foothill/Eastern Transportation
Corridor Agency and San
Joaquin Hills Transportation
Corridor Agency
Created as Joint Powers
Authorities pursuant to CA
Govt. Code Section 6500
![Page 7: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/7.jpg)
77
Toll Roads or No Roads
Transportation Corridors were not originally
planned to be tolled
State Gas Tax Dollars Dwindle
– More Fuel Efficient Vehicles – Less Gas
Tax Revenue
– Aging Highway System – Higher
Maintenance Costs
– Tax dollars being shifted to other uses
Besides the DIF Program, the Agencies
needed another way to secure the balance of
Corridor financing
In 1987 Agency sought and obtained
legislation (SB 1413) allowing it to collect
tolls.
![Page 8: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/8.jpg)
88
Benefit of Tolling The System
Private investment in public
Infrastructure
TCA issues bonds backed by
future toll revenues and
development impact fees
Taxpayers are not responsible
for repaying the debt if
revenues fall short
The roads are built with
virtually no taxpayer dollars but
are owned and maintained by
Caltrans.
![Page 9: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/9.jpg)
99
Project History – A Unique,
Collaborative Effort
Local Government
Local Developers
State
Federal
First design/build
public toll roads built
in the United States
![Page 10: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/10.jpg)
1010
Agency Membership
San Joaquin Hills
County of Orange (Districts 3 & 5)
Costa Mesa
Dana Point
Irvine
Laguna Hills
Laguna Niguel
Mission Viejo
Newport Beach
San Clemente
San Juan Capistrano
Santa Ana
Foothill/Eastern
County of Orange (Districts 3, 4 & 5)
Anaheim
Dana Point
Lake Forest
Mission Viejo
Orange
Rancho Santa Margarita
San Clemente
San Juan Capistrano
Santa Ana
Tustin
Yorba Linda
Aliso Viejo
Laguna Woods
Irvine
Caltrans, Ex Officio Caltrans, Ex Officio
![Page 11: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/11.jpg)
1111
The System
51 miles -- part of the 140 mile state highway system in Orange County
Toll Roads are 20% of Orange County’s highway miles
Owned and maintained by Caltrans
250,000 Transactions per weekday (nearly 200,000 trips a day)
Patrolled by the CHP
Become freeways when bonds are paid off
2,000 Acres of native habitat set aside and restored in association with road planning
![Page 12: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/12.jpg)
1212
Foothill Corridor
Foothill (12 miles): opened in 1993/1999
– One mainline toll plaza and seven
ramp toll plazas
– Convenient alternative to clogged
surface streets and I-5/I-405
congestion
– Connects planned communities in
south-east Orange County to central
Orange County employment centers
– Planned 16 mile extension (Foothill-
South) will provide a much needed
alternative route to South Orange
County and north San Diego County
beach cities
![Page 13: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/13.jpg)
1313
San Joaquin Hills Corridor
San Joaquin Hills (15 miles):
opened in 1996
– One mainline toll plaza and
five ramp toll plazas
– I-5/I-405 reliever road for
north/south travel
– Commuter road serving
South Orange County
residents working in
Irvine/Costa Mesa/Newport
Beach
![Page 14: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/14.jpg)
1414
Eastern Corridor
Eastern (24 miles): opened in 1998
– Three mainline toll plazas and three
ramp toll plazas
– Principally a commuter road linking
residential Riverside and San
Bernardino Counties (“Inland Empire”)
with job centers in Orange County
– Land use and demographic patterns
suggest significant future traffic growth
– While Inland Empire commuters reflect
lower socioeconomic demographics,
they also face some of the worst traffic
in Southern California on SR91
![Page 15: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/15.jpg)
1515
Ongoing Improvements and
System Enhancements
![Page 16: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/16.jpg)
1616
16
Ongoing Improvements and System Enhancements
![Page 17: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/17.jpg)
1717
SR 73 Environmental Mitigation Program
15 Mile Toll Road in Coastal OC
Environmental Mitigation - $21.9M
– CSS, Wetlands, Oak Woodlands
Coastal NCCP Funding - $3.7M
Wildlife Crossings
– Construction of 6 bridge crossings
Cowbird Trapping
– Monitoring in perpetuity
300 Mitigation Measures – project specific mitigation measures to minimize/reduce significant effects on the environment
Project Design Features (PDFs) – specific design elements incorporated into the project
Standard Conditions and Requirements – compliance with local, State or federal regulations and laws
17
![Page 18: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/18.jpg)
1818
SR 73 - Upper Bonita Creek – 1996 vs 2000
18
![Page 19: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/19.jpg)
1919
SR 241 Environmental Mitigation Program
36 Mile Toll Road in Central OC
Environmental Mitigation – $58.8M
– CSS, Wetlands, Oak Woodlands
Central NCCP Funding - $2.9M
Wildlife Crossings
– Construction of 7 bridge crossings
Cowbird Trapping
– Monitoring in perpetuity
182 Mitigation Measures – project specific mitigation measures to minimize/reduce significant effects on the environment
Project Design Features (PDFs) – specific design elements incorporated into the project
Standard Conditions and Requirements – compliance with local, State or federal regulations and laws
19
![Page 20: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/20.jpg)
2020
The Toll Roads Record of Success
Environmental program - $224.6M
Over 2,000 acres of habitat restored and preserved as open space
Compatible with Orange County NCCP/HCP Habitat Reserves
Reduces region’s GHG
Carbon sequestration
Redundancy in transportation system
20
![Page 21: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/21.jpg)
2121
Operation Basics
Upon opening to traffic, Caltrans accepted highways into their system
Caltrans maintains roadways, bridges, landscaping, etc.
TCA retains permits to collect tolls
TCA maintains and staff toll facilities
21
![Page 22: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/22.jpg)
2222
Closed Barrier System
![Page 23: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/23.jpg)
2323
San Joaquin Hills Tolling Concept
“conventional closed barrier tolling system”
![Page 24: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/24.jpg)
2424
Ability to accept cash or FasTrak
Ability to handle high volumes of traffic
FasTrak patrons continue at high speeds
Minimize toll collection costs
Minimize toll plaza and ramp infrastructure
First in California to introduce FasTrak®
– Statewide standard
– FasTrak is a TCA registered
trademark
Closed Barrier System
![Page 25: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/25.jpg)
2525
Use of New Technologies
In 1993, F/E was the first toll road in the nation to
install a high speed electronic toll collection system
– Automated Vehicle Identification (“AVI”) use
on the TCA roads currently accounts for 66-
87% of all transactions depending on the
road, direction of travel and time of day
FasTrak transponders are part of an interoperable
system with all other California tolling
authorities/agencies (e.g. Orange County
Transportation Authority, Bay Area Toll Authority,
South Bay Expressway, etc.)
FasTrak enables the TCA to continue to develop
and expand its congestion pricing program and
video tolling
– Cash vs. FasTrak
– Peak vs. Non-Peak
TCA is committed to remaining a leader in
implementing technology advancements
![Page 26: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/26.jpg)
2626
Trends in Tolling
Business Models
– Manual Toll Collection
– Electronic Toll Collection
– All Electronic Tolling
Manual and Electronic Toll Collection
Models
Manual: Toll plaza, booths, lane
equipment, booth attendants, cash
processing, back office
Electronic: ETC Lane and
transponder equipment, free-flow
lanes, call center, back office
![Page 27: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/27.jpg)
2727
Transponders
1990’s Radio frequency based transponders
2000’s “Sticker Tags”
![Page 28: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/28.jpg)
2828
28
Distribution of Transponder Technologies
![Page 29: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/29.jpg)
2929
29
All Electronic Toll Collection
Examples
– North Texas Tollway Authority (Dallas)
– 407 ETR (Toronto)
– E-470 Public Highway Authority (Denver)
– Florida Turnpike Enterprise (Florida)
– Miami-Dade Expressway Authority (Florida)
– Tampa-Hillsborough County Expressway Authority (Florida)
– Illinois Tollway (Chicago Metro Area)
![Page 30: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/30.jpg)
3030
Emerging Technologies
Transponders
Novel payment methods
License plate tolling (optical character recognition & cameras)
Multiple gantry technologies
Switchable transponders
– RFID Technology
– Application for HOT lanes
– Multi-capability for patrons
5.9GHz DSRC transponders
– Dedicated Short Range Communications band
– Future federal on-road communications network
– Driver safety alerts and conditions, congestion improvement, screening, and tolling
![Page 31: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/31.jpg)
3131
Recent Toll Collection Improvements
Novel Payment Methods
– Pre-Paid Cards
– Cell Phone
Improvements to Cameras
– Faster, higher resolution
– Sensitive to low light conditions
– Higher performance and better image quality
– Expect continued improvement in the future
Improvements to Optical Character Recognition
– Higher accuracy under different conditions
– Learning algorithms and neural networks
– Expect continued improvement in the future
![Page 32: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/32.jpg)
3232
All Electronic Tolling
Why is All Electronic Tolling the future?
– Safety
– Environment
– Speed
– Service
– Savings
Multiple gantry implementations for AET
E-470 Tollway
![Page 33: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/33.jpg)
3333
Successes
TCA financing model allowed Orange County
to create significant infrastructure without
reliance on traditional funding sources
SJHTC was the first design/build
transportation project in California.
Several obstacles overcome including
financial, litigation and Coastal Commission
Concept of highway tolling has been
accepted into the OC’s everyday lifestyle.
TCA highways built in an environmentally
sensitive manner
250,000+ trips per day now use the TCA toll
road system.
![Page 34: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/34.jpg)
3434
Challenges
Traffic forecasting
Weathering recessions
Increasing environmental regulations
Competing with toll-free State Highway
system
![Page 35: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/35.jpg)
3535
Foothill-South
8 Alternatives
![Page 36: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/36.jpg)
3636
Foothill-South
Green Alignment
Relieves traffic on I-5 and arterial
intersections
Avoids sensitive wetlands
Allows for wildlife connectivity
Does not displace homes or businesses
Water treatment system
![Page 37: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/37.jpg)
3737
Foothill-South
Traffic Improvement 2025
No Action Alignment
![Page 38: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/38.jpg)
3838
Foothill-South
EIS & ROD Approval Process
1999 - 2005 – Federal and State Transportation and
Resource Agency Collaborative Process – Evaluated 24
alternatives
2005 -- U.S. Environmental Protection Agency and U.S.
Army Corps of Engineers conclude that “Green Alignment”
is the Preliminary Least Environmentally Damaging
Alternative
2006 – After 25 years of planning, study and public input,
Foothill/Eastern Board of Directors approves the EIR and
selects Green Alignment
February 2008 – California Coastal Commission objects to
the TCA’s federal Coastal Zone Management Act
consistency certification
February 2008 – TCA appeals Coastal Commission objection to Secretary of Commerce.
April 2008 – U.S. Fish and Wildlife Service issues Endangered Species Act approval
May 2008 – California Department of Fish and Game approves permit for Project
December 2008 – Secretary of Commerce upholds Coastal Commission objection
![Page 39: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/39.jpg)
3939
USMC
CAMP PENDLETON
![Page 40: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/40.jpg)
40
![Page 41: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/41.jpg)
4141
241 Completion Project
January 2009 – TCA public outreach
Avoids/Minimizes Environmental Impacts:
– Maximum 6 lanes
– Avoids wetlands – alignment shifted east
– Avoids crossing ecological reserve area
– Bridges over San Juan and San Mateo Creeks allowing unobstructed water flow, continued wildlife movement
Reduced number of column structures to minimize impacts to high-value habitat areas in the creek
– Avoids Pacific pocket mouse occupied habitat
Environmental Cost to Date - $143.8M
Wildlife Crossings
– Construction of 15 crossings
Arroyo Toad Barrier
– Construction & monitoring in perpetuity
Pacific Pocket Mouse
– Construction & implementation of management plan
Habitat Restoration
– CSS, Wetlands, Oak Woodlands
41
![Page 42: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/42.jpg)
4242
Next Steps for 241 Completion
24 million people live in Southern California today
Population will grow to more than 30 million
Resulting in a 60 percent increase in traffic on Interstate 5 in southern Orange County
Continue coordination & working with Department of Navy, State Parks, public and elected officials to reach an acceptable solution.
42
![Page 43: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/43.jpg)
4343
Legislation
SB 375 – Greenhouse Gas Emissions Reduction
– Free Flowing Traffic Cuts Emissions
– Part of the Congestion Pricing Solution
– Successful Model
– Capacity to Enhance Transit Service
– Increased Fire Safety
Sustainable Communities Strategy
43
![Page 44: Toll Roads & Transportation Mobility · 2018. 4. 2. · 77 Toll Roads or No Roads Transportation Corridors were not originally planned to be tolled State Gas Tax Dollars Dwindle –More](https://reader035.vdocuments.us/reader035/viewer/2022062605/5fd319a8b8c3dd5dd425bce5/html5/thumbnails/44.jpg)
Toll Roads & Transportation Mobility
Orange County, CA Model/TCA Experience
Sam Elters
Chief Engineer
(949) 754-3428