Page 1:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

Planning with Precision

A Passion for Perfection

Driven by Professionalism

PO. Box : 4536 Jeddah 21412 KSA

Tel. : +966 12 672 8216

Fax. : +966 12 672 7965

Email. : [email protected]

www.abuljadayel.com

Page 2:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

“Allah Loves When One of You does a deed to do it well (Perfect)”

Narrated Hadith (Say) of Prophet Mohammed (PBUH)

Page 3:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

Table ofContents:

1 Owners Message............................................................................ 1

2 Introduction...................................................................................... 2

3 Mission, Vision, and Core Values............................................... 3

4 Quality and Safety Policies......................................................... 5

5 Financial Growth Chart................................................................ 6

6 Wastewater Projects.................................................................... 7

7 Potable Water Projects................................................................ 13

8 Operation & Maintenance Projects.......................................... 15

9 Abuljadayel Ready-Mix................................................................ 16

10 Abuljadayel Factory for Concrete Pipes................................ 17

11 Abuljadayel Factory for GRP...................................................... 18

12 Abuljadayel Factory for HDPE................................................... 19

13 Abuljadayel Crushers.................................................................... 20

14 Certifications and Awards........................................................... 22

It is with great pleasure that I take this opportunity as the owner of Abuljadayel Co. for Contracting and Maintenance to share with you our company history, projects, core values, and plans as we move forward in our vision contributing to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed our clients’ expectations, we continue to build strong and technically capable high-level engineering division, and use the latest technologies and techniques, along with cooperation with top world designers and manufacturers to serve as the backbone of our company allowing us to undertake mega multi-discipline projects.

We are committed to not only earn a profit and expand our business, but also to earn the respect, trust and professional recognition of our clients.

Owner & CEO

Engineer. Nizar Abuljadayel

Owners Message

1

Page 4:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

Abuljadayel Co. for Contracting and Maintenance is a Saudi National Company established in 1974 with Head Office in Jeddah and branches in Jeddah, Makkah AIMukaramah, Taif and Madinah AIMunawarah. The company is specialized in the field of Water and Wastewater Infrastructure projects such as Construction of Water & Sewage Pipeline Networks, Water Storage, Treatment Plants, and Pump Stations as well as Operation and Maintenance Projects of related fields. The company also executes tunneling projects for water and sewage lines using tunnel boring machines and pipe jacking

techniques utilizing its alliances and cooperation with top specialized international companies such as Herrenknecht, Bauer, and other reputable world suppliers and designers. Due to the distinct quality of its work, Abuljadayel Co. is classified as class A by the ministry of public works & housing (Contractor’s Classification Agency) in the following categories:

l Construction of Water & Wastewater Utility.

l Operation and Maintenance of Water & Sewage Works.

l Electro-Mechanical works, Buildings and Road Construction.

Introduction

Mission

Vision

&

Core Values

Our MissionTo become the number one construction and infrastructure development company in Saudi Arabia who safely, profitably and sustain ably, delivers best in class projects and solutions that exceeds our clients expectations.

Our Vision• To continue being top national contracting company for infrastructure projects.

Our Core Values• Trust and Professionalism: We conduct ourselves professionally, with respect and integrity, building partnership with our clients.• Passion for Perfection: Always Innovative striving to find better ways utilizing the latest technologies, expertise, and skills to deliver the highest quality and the best in class services.

2 3

Page 5:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

• Planning with Precision: Planning the resources, processes, work breakdown structure identifying the tasks and activities within the process, and defining up-front what success will look like.

• Safety First: Ensuring a safe and Healthy work environment and a zero

injury culture including risk management.

• A People Focused Culture: Developing our most valuable assets and realizing the full potential of our people.

• Value Engineering: We follow systematic and function-based approach to continue improving the value of projects and processes.

MissionVision

& Core

Values

Quality and Safety Polices

4 5

Quality PolicyThe Policy of Abuljadayel Co. for Contracting & Maint. is to complete Construction, Electromechanical Works, Water and Waste Water Projects that comply with, and satisfy all customers› expectations and needs, considering that the internal implemented procedures and techniques insure the achievement of the following goals:

• Pursue the highest level of Quality regardless of provided products. Consistently satisfy and support the Clients requirements.

• Promote the qualities and achievement of the Company with the objective of attracting and expanding a Client/Project base, an encouraging a sense of pride and satisfaction with the workforce itself.

In order to achieve the above, the Company will:

• Develop and implement a Quality Management System which is appropriate to its own operation and take account of the service it provides. The Quality Management System shall be developed in accordance with the requirements of ISO 900 I - 2008.

• Identify and provide relevant training and awareness to its staff.

• Give all the staff the opportunity to contribute to the continuous improvement of Quality and the Quality Management System.

• Require all staff to perform their duties in compliance with the Quality Management System.

• Give the appropriate staff the responsibility and authority for ensuring that the policy is understood, implemented, maintained and reviewed at all levels.

• Setting up the necessary quality objectives which can improve internal systems.

Safety PolicyAbuljadayel Co. Recognizes the importance of Planning safety, safety standards, and continuously taking the proactive approach in its projects at the earliest possible stage of which injuries and ill health arising from the construction activities is to be avoided,Abuljadayel Policy and Safety Plan describe how to manage, control and coordinate the work in order to secure health, safety and the welfare of all personnel engaged in the projects and others who may be affected.For the Safety policy to be effective, Abuljadayel management stresses the high importance on all Abuljadayel engineers, supervisors, workers, and subcontractors to be familiar with the relevant requirements of the plan and instruct them to abide by the safety policy and plan.It is the policy of ABULJADAYEL Co. at all times to:1 .Provide a safe work environment.2. Conduct all operations in a manner that eliminates risk.3. Maintain conditions in a way that eliminates all risk to visitors, the public and any representatives of the employer.4. Eliminate the risk of damage to the property on and adjacent to the site.All engineers, supervisors. and workers must routinely accept complete responsibility for prevention of accident” and for the safety of all work which is under their directionAny company or individual refusing to correct observed safety violations will be banned from the site, at least, and unit such violations are corrected. They will also be held entirely responsible for all the resulting after effects.There is no magic to safety. With proper attention, awareness, and co-operation of everyone, we will achieve an accident-free job and the pride that goes with it.

Page 6:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

Financial Growth Chart

Wastewater Pump Station Projects North Jeddah Pump Station (World’s deepest and third largest Pump Station)

Turnkey Design, Construction, Testing, Commissioning and Operation. This Pump station is designed to Pump a future maximum flow of up to 1 Million m³ per day catering for flows from approx. 3 million people.

Scope of Work:

Screening Shaft, 42 meters Dia. with depth of 76 meters comprising of fully automated screenings removal, washing, compaction and transportation system. Pumping Shafts (2Nos.) each of 42 meters Dia. with depth of 76 meters each designed with 5 pump sets of capacity 2.2 m³/sec each, with 2.4 MW Variable Speed MV Drives.

State of the art diaphragm wall construction used for shafts construction with depths up to 85 meters requiring more than 116,000 m³ of reinforced concrete and over 403,000 m³ of excavation.

Collection Chamber, Distribution Pipes (3 X 2000mm), Main Distribution Chamber, Service Buildings, Flow Collection measurement and distribution systems. Fully automated control & monitoring by SCADA Ancillary services including Odour Control, Ventilation, Air Conditioning & Utilities.

Benefit of Project:

The North Jeddah Pump Station will serve the northern Jeddah area, as the final solution for sewage networks problems pumping sewage and wastewater through 3.5m dia. and 65m deep tunnel at the station and from there to the North Jeddah Wastewater Treatment Plant.

6 7

Wastewater Pump Station Projects

700,000,000

600,000,000500,000,000

400,000,000300,000,000

200,000,000

100,000,000

Page 7:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

Wastewater Pump Station Projects South Jeddah Pump Station

Purpose of This Project is Construction of deep lift sewage station to be used to screen sewage from Central & South Jeddah sewage networks and lift it to the STP Phase 1, 2, 3 & 4 in Al Khumrah area.

Scope of Work:

Construction of 2 shafts, of diameter of 32 meters and 40 meters depth with interconnecting tunnels of 3 meters diameter complete with all mechanical equipment (24 Submersible Pumps each of 0.53 MW with VFDs, flow meters, gates, valves, and SCADA system, etc..) and auxiliary buildings.

Wastewater Treatment Projects Al Khumrah 4 Wastewater Treatment Plant :

Complete Design, Construction, Installation, Testing, Commissioning & Operation of Wastewater treatment plant comprising full biological treatment including combined nutrient removal, tertiary treatment, UV disinfection belt press dewatering for design flow rate of 250,000 m3/ day with final effluent in compliance with EPA standards for sea discharge. Full plant automation is provided by customized central SCADA system.

Diaphragm walls method was used to construct the shafts using the most advanced machines in the world (BAUER),Tower cranes, 350 tons Cranes, Piling machine. A specialized and approved laboratory was established on site to ensure the QA/QC procedures.

Project Benefits:

Providing sanitary drainage for complete central & southern areas of Jeddah City, as a final solution for sewage disposal problems in conjunction with the existing and planned Treatment plant facilities and therefore avoiding the use of tankers for collection and disposal of sewage.

Al Khumrah 3 Wastewater Treatment Plant:

Complete Design, Refurbishment, Installation, Testing, Commissioning & Operation of WWTP comprising of Full Biological Treatment, Nutrient, Removal, Tertiary, UV Disinfection, Centrifuge Dewatering, Automated Central SCADA control for average daily flow of 140,000 m³/day.

Al Khumrah 2 Wastewater Treatment Plant:

Complete Design, Refurbishment, Installation, Testing, Commissioning & Operation of WWTP comprising of Full Biological Treatment, Nutrient, Removal, Tertiary, UV Disinfection, Centrifuge Dewatering, Automated Central SCADA control for average daily flow of 60,000 m³/day.

8 9

Wastewater Pump Station Projects - Continued Wastewater Treatment Plant Projects

Page 8:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

Wastewater Tunneling Projects Wastewater Projects

Central (Middle) Area Contract:

Execution of main lines, branch lines and house connections for sewage water networks in the central area of Jeddah. Excavation, supply & laying of clay pipes gravity sewer with length of 260,045 meters and 8.4 km replacement. Excavation, Supply & laying of G.R.P. Pipes of different diameters with length of 7.5 km including the construction of 6,450 manholes. Micro Tunnels with dia of 300 to 1200 mm with length of 7.8 km including construction of 44 shafts. Large tunnels with dia of 1500mm with length of 3,5 km including construction of shafts (22 Nos.). House connections including all the necessary works for 50 & 200mm dia V.C. Pipes with length of 2,350,000 meters including construction of 235,000 inspection chambers 600 - 900mm.

The Sewatge Networks for the Historical Jeddah Area:

Construction of the sewage water networks for the Historical Jeddah area including Shafts construction, Tunneling, Piping and finishing works.

Contract No. 2A-1 of TAIF:

Construction of the main sewage gravity line T-13 to the lift station. The main sewage gravity line T-13-9 to the pipeline T-13. Open trench works for wastewater pipe lines in hard rock soil with diameters varying from 2200 to 2500mm in total length of 9 km.

Contract 4 of North Jeddah

Supply and Construction of Sewage Tunnel of dia 2500mm with length 7.6 km with inner coating of HDPE 3mm thickness. Const. of 16 Shafts with depth of 24 m. HK Tunneling machines dia 2500mm were used to finish tunneling works. Shafts were executed using Vertical Shaft Sinking Machine, Manual Sinking, Diaphragm Walls, and Internal structures methods.

Contract 4A of North Jeddah

Supply and Construction of Sewage Tunnel of 3500mm diameter with length of 8.6 km & 2500mm diameter with length of 475 meters and shafts construction of 3 km depth & 9 meters diameter (17 Nos) and 50 meters depth & 6 meters diameters (3 Nos.). Tunneling machines dia 3500mm and dia 2500mm were used to finish the tunneling works. Tunnel constructed using concrete pipes with GRP internal coating.

Contract 17 of North Jeddah

Const. of Main and Branch Sewage lines for AlMuhammadiyah area in Jeddah including Tunnels with dia of 1500mm and 1800mm with length of 4 km and the required shafts for Tunneling Lines, Gravity VCP line of dia 400 & 500mm and length of 4.6 km with 55 Manholes.

Alhawya Transmission Sewage Pipe Line

Open trench works for wastewater pipe lines in hard rock soil with diameters varying from 2200mm to 2500mm in a total length of 9 km. Tunneling Works using the world most advanced TBMs (by Herreneknecht, Germany) to execute a 6 km RC tunnel with inner diameter of 2500mm.

AI Khumrah Inlet Connection

Design, Const., T&C of the Inlet Connections for the South Lift Station at Al Khumrah, Jeddah with a maximum hydraulic capacity of 14.5m3/ sec Shaft construction along with 3000mm dia tunnel connecting the shafts.10 11

Page 9:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

Wastewater Projects - Continued Potable Water Projects

� Cont. No. 3 Makkah Supply, Install Sewage

Main+Branch Lines & House Connections

for Various Areas.

� Cont. No.1 Makkah, Constr. of Sewage Main+Branch

Lines & House Connections in Central Area.

� Cont. No 2 Makkah House Connections of Wady

ibrahim Area, Sewage Network and Mainline.

� Construction of Sewage Network for Amir Ahmed

& Amir Abdulrahman Areas in Taif.

� Upgrading of Sewage Network for Maiman, Jazair,

Kudai & Hindawiya Areas in Makkah.

� Const. of Pump Station & Pipeline, Contract no.15,

Bani Malik, Jeddah.

� Repair of Sewage Pipeline of 1000 mm dia Carrying

Sewage at Aziziyah, Makkah.

� Upgrading of Sewage Network for Al Washa,

Outbiyah Wadi al Naml Aqeeq in Taif.

� Extension of Sewage Main Line for Bawadi area in

Jeddah (Cont# 6).

� Transfer of Sewerage from AlAujam to

AlJaroudiyah Treatment Plant.

� Const. of Sewage Pipeline at Khaldiyah in Madinah

(Part 1& Part 2).

� Const of Force Main Line & Pump Station 25-C

Jeddah.

� Const. of Sewage Network at Central Area in

Madinah (Part 1).

� Construction of Sewage Network for Qatif New

Developing Area.

� Execution of House Connections Sewage Lines

in Makkah.

� Construction of Auxiliary Gravity Sewage Line

from Okashiya STP to new proposed location at

Makkah.

� Construction of Qatif New Development Area

Munirah wastewater Network & Pumping Station.

Construction of New Water Storage Tanks & Pumping Station for the Extension of ZamZam Plant Project:

The purpose of the extension is to construct 6 numbers of new storage tanks and pumping station at the vicinity of the existing ZamZam plant project site to store the product water from the existing plant to overcome the required demand during Umrah, Ramadan & Hajj seasons, and to accommodate every year for millions of people, and to provide the pilgrims with sufficient supply of Zamzam water and meet the required future demands. The capacity of each tank is 6720 m3 with combined capacity of all 6 tanks are, 40320 m3.

Al Faysaliah Water Mixing Chamber

The design and construction of water mixing chamber and automatic dosing system in Al Faysaliah site in the city of Jeddah using the most advanced system for the city of Jeddah including the latest technology in this field that has been proven in the Kingdom of Saudi Arabia and world wide.

Measures to improve Madinah Al Munawarah water network performance (QW2).

Upgrade Madinah water network, upgrading existing valves and installing new control valves all with SCADA RTUs connected via GPRS/ 3G to the Water Directorate SCADA system, installing new D.I. pipes and house connections, supply of valves, pipes, and all required materials, excavation works, construction of valve rooms backfilling, asphalting works, and T&C.

12 13

Page 10:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

Potable Water Projects - Continued Operation and Maintenance Projects

� Installation of water pipeline, 55,500 meters with Ductile Cast Iron Pipes and house connections, construction of branch water pipeline in central area (Cont. No. 13) of Makkah Al Mukaramah.

� Construction of potable water pipeline with dia 600mm ductile T-length 8,660 meters for surrounding areas of Haram const. of Valves chamber with Air + Butterfly valves.

� Construction of main pipeline from Abyar Almashi to Madinah water reservoir.

� Upgrading of water network at Madinah (Part 1).

� Supply & Installation of VC pipes from size 150mm to -700mm.

� Execution of water line at Makkah Al Mukaramah.

� Operation & Maintenance of Water Network at Madinah Al Munawarah (Three Contracts).

� Operation & Maintenance of Water & Sewage Network for Qatif & Villages (Three Contracts).

� Operation & Maintenance of Potable & non Potable Water distribution network of North west WEJ valley at Taif, including upgrading of Water Network & Connections to New Areas.

� Operation & Maintenance of all utility works at Jeddah industrial city.

� Operation & Maintenance of Sewage Network, STP and Pump Stations, Khamis Mushayt City.

� Operation & Maintenance of Sewage Network for Buraydah city.

� Sewage Treatment Plant & Storm Water for Abha city

� Operation & Maintenance of Sewage Treatment Plant Network for Makkah (Four Contracts).

� Operation & Maintenance of Sewage Network for Jeddah City. Pipes, Manholes, Inspection Chambers, Maintenance of Sewage Pumping Stations and Electro-Mechanical Works.

14 15

Page 11:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

controlled with very high productivity Water Chillers,

Washing Plants for sand, Concrete mixer mobile

trucks with different capacities. Mobile Concrete

trucks with different heights,.

Quality Control : In order to guarantee the quality

of the concrete mix, AJ-Ready-Mix established

a new quality control and testing lab equipped

with the most advanced tools that are necessary

to perform the tests, before, during and after the

production process to ensure meeting the targeted

criteria. These tests include :

Cement : Fineness, Initial and Final setting times

Expansion. Compressive strength

Water : Soluble salts. Chlorides Sulfates. PH.

Slump : Compressive. Rebound Hammer. Core test.

Aggregate & Sand : Sand analysis Sieve content

(Chlorides & Sulfates). Salts Fresh and hardened

concrete, Absorption. Apparent specifd gravity.

Bulk density.

Abuljadayel Pipe and Concrete Products Factory

was established in 2007 in Jeddah to provide high

quality concrete and precast concrete products

for projects in Saudi Arabia. AJ Pipe and Concrete

Products Factory use BESSER technology (U.S.A)

supported with the technical back-up from

GOLLWITZER Germany and Concrete Mixing Plant +

Batching Machines from WIGGERT Germany.

Abuljadayel factory for concrete pipes products:

� Reinforced Concrete Jacking Pipes.

� Concrete pipes with any diameters as per the customer requirement and according to national and international standards.

� Reinforced Concrete Manholes and Inspection Chambers.

� Reinforced Concrete Storm Water Pipes.

� Reinforced Concrete Sewer Pipes.

Production : Abuljadayel Ready-Mix produces

all kinds of Ready Concrete Mixes according to

customers specific requirements and complying

with international standards.

Plant Machinery: Central concrete mixing unit is

made by the German company “WIGGERT” one of

the pioneer and leading manufacturers with the

latest computerized technology. It is automatically

Abuljadayel Ready-Mix Abuljadayel Factory for Concrete Pipes

16 17

Page 12:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

Abuljadayel Factory for GRP and PE Pipes Abuljadayel Factory for HDPE

Abuljadayel Factory for GRP & PE pipes is a modern

factory with state-of-the-art technology. It has the

most modern and sophisticated production and

testing equipment, capable of producing GRP pipes

and fittings of 400 - 4000mm in diameter and

suitable for the following fields and applications:

� Water transmission and distribution networks

for both municipal and industrial systems.

� Sewer systems, gravity and forced mains for

both urban and industrial applications.

� Cooling sea water intakes and outfall systems

for power and desalination plants.

� In-plant water circulation systems for both sea

water and desalinated water pipe lines.

� Irrigation systems and main transmission lines.

� Stormwater collection and disposal networks.

GRP Pipes are designed to meet the property

requirements of the following International and

National Standards (ASTM 03262,

ASTM03517, ASTM 03754, ASTM 02992,

ASTM 03681, ASTM 04161, SASO 1577, SASO

1578, WWA C950, AWWA M45).

18 19

Abuljadayel Factory for GRP and PE pipes is located in the

Industrial City Phase (5) Jeddah, KSA. AJ Pipe HDPE is made

of high density polyethylene using the most modern German

technology in polyethylene pipe industry, Evolving from the

German experience in this field, High Density Polyethylene

Pipes (HDPE) have perfect mechanical and chemical

properties, it is classified as PE80 and PE100 according to

its strength. HDPE pipes are used for many pressure and

non pressure applications for water sewers, surface water

drainage gas & chemicals transportation It is the most widely

used in pipeline systems because of its advantages:

� Environmentally safe, as it consists only of carbon and

hydrogen in formula (CH2-CH2) & can be recycled, Low

weight, Excellent flexibility.

� Low pipe friction losses, Toughness even at very low

temperature.

� Good chemical resistance, Corrosion resistance,

Competitive price.

� AJ-KST Liners:

� PE Liners products by Abuljadayel factory for GRP &

HDPE Pipes provides concrete surfaces protection from

chemical and physical attack. PE Liner has good resistance

acids, alkaline solution & all kind of gases encounters in

sewers environments AJ-KST PE liner has excellent abrasion

resistance and very high impermeability. It has permanent

anchorage into concrete due to the shape of T rib. AJ-KST

Liners are produced in different thicknesses ranging from 1.5

to 10 mm and in different shapes (T-Lock and V-Lock) and

different colors.

Page 13:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

Abuljadayel Crushers Abuljadayel Crushers

Abuljadayel Crushers established in 2009, located in Briman, and Shubrakan of Makkah province,

Abuljadayel Crushers are heavy-duty impact crushers,

crushing and screening plants

Jaw crushers, and conveyors providing variety of top-quality

aggregates

Products for construction, building, and development

projects

Producing over 4500 m3 of different aggregate sizes and 3000 m3 of backfilling subase

materials on daily basis.

20 21

Page 14:  · to the extensive development of the Kingdom of Saudi Arabia. In order to achieve this challenging goal and exceed ... Turnkey Design, Construction, Testing, Commissioning and

Certifications and Awards

22 23