to minimize downtime and improve safety quick-action · 2015. 5. 4. · engineered for critical...

16
Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology PED 97/23/CE TÜV 1637 N°71 100 J 124 One person, Zero Tools, and blinded in minutes. Reduce Down-Time Improve Safety Sizes: 1/2” to 50” / DN12 to DN 1250 Temperatures: -155°F to 1400°F / -104°C to 760°C Pressure: Vacuum to 6100 psig (420 barg) www.onislineblind.com ONIS France : 1, Avenue Fernand Julien - ZA de Berthoire - 13410 Lambesc, France Ph. +33 4 42 92 93 20 - E-mail : [email protected] - Website : www.onislineblind.com ONIS Inc.: One Riverway - Suite 1700 - Houston, Tx 77056 - USA Ph. : +1 713 840 63 77 - E-mail : [email protected] - Website : www.onislineblind.com ONIS Middle East.: P.O. box 4058 Abu Dhabi Mall - East Tower, 6th Floor - Abu Dhabi Ph. : +971 566 220 325 - E-mail : [email protected] - Website : www.onislineblind.com Positive Isolation for Gases, Powders, Liquids, and Viscous Solutions ONIS Line Blinds replace spectacle blinds, slip blinds, and figure-8 blinds

Upload: others

Post on 03-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

Engineered for critical applications

to minimize downtime

and improve safety

Quick-ActionLine Blind Technology

PED 97/23/CETÜV 1637

N°71 100 J 124

One person, Zero Tools, and blinded in minutes.

Reduce Down-TimeImprove SafetySizes: 1/2” to 50” / DN12 to DN 1250Temperatures: -155°F to 1400°F / -104°C to 760°CPressure: Vacuum to 6100 psig (420 barg)

www.onislineblind.com

ONIS France : 1, Avenue Fernand Julien - ZA de Berthoire - 13410 Lambesc, FrancePh. +33 4 42 92 93 20 - E-mail : [email protected] - Website : www.onislineblind.com

ONIS Inc.: One Riverway - Suite 1700 - Houston, Tx 77056 - USAPh. : +1 713 840 63 77 - E-mail : [email protected] - Website : www.onislineblind.com

ONIS Middle East.: P.O. box 4058 Abu Dhabi Mall - East Tower, 6th Floor - Abu DhabiPh. : +971 566 220 325 - E-mail : [email protected] - Website : www.onislineblind.com

Positive Isolation for Gases, Powders, Liquids, and Viscous Solutions

ONIS Line Blinds replace spectacle blinds, slip blinds, and figure-8 blinds

Page 2: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

HOW THE ON I S B L I ND EVOLVED

In the mid 70's Edmond ONISinvented the first generationONIS Line Blind. Together withhis stepson Jean-FrançoisFAVREAU-ONIS, he went on todevelop the highly successfulONIS Quick-Action Line Blindwhich is now regularly specifiedby most of the major companiesworldwide.

The ONIS Line Blind is designedand manufactured to suit custo-mer applications. The speciali-sed demands of the petrochemical and oil industries overthe years have brought about a line blinding device that issimple yet highly effective in providing ultra safe line iso-lation.

To evaluate an ONIS system properly, one must firstunderstand the alternative methods of blinding. The mostbasic method utilizes a metal plate (or "spectacle" blind)that is inserted manually between two flanges. Thisapproach is obviously labor intensive, giving rise to potential dangers around heavy piping and exposure toresidual hazardous chemicals. The traditional "figure-8" or"spectacle" blind can only be swung when the flangeshave been forced open, with brass wedges or jackingbolts.

The traditional blinding methods have significant disadvantages :

• Uneven seal compression• External-bolt corrosion• Cumbersome gasket maintenance

ONIS technology overcomesthese traditional blinding pro-blems. ONIS respects the envi-ronment, increases productivityand improves safety.

2

Traditional blinding methods are slow,

prolonging downtime and often hazar-

dous

ONIS Quick-Action Line blinds reduce

downtime dramatically in many routine

maintenance procedures

ONIS offers a significantly higher degree

of safety and performance than traditional

blinding

1

2

3

2 ONIS 10" 150# - on refinery pump station

- TOTAL FEYZIN - France

Page 3: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

3

ONIS CONCEPT AND OPERATIONAL SEQUENCE

Evacuate the pipe

Open toatmosphere

1

2

3

4

5

6

7

8

Full-bore

Blinded

Open toatmosphere

Rotate lever / Clamp the pipe

Rotate lever / Separate pipe

Slide the gate

Slide the gate

Evacuate the pipe

Rotate lever / Separate pipe

ONIS Line Blind operating cycle :

Step by stepsequence of theONIS Line Blind

• Positions 1 to 5 is the change-over from

full-bore (open) to

positive-isolation

(blinded).

• The procedure is repeated to return

to full-bore.Rotate lever / Clamp the pipe (will hold full working pressure)

ONIS Line Blind is composed of two half bodies connected bya mechanical system and a slide gate. The Line Blind has agreat stiffness and permits to one person to isolate a 10" linein seconds.

Depressurize and drain the pipe before useRelease the locking device DO NOT OPERATE UNDER PRESSURE

Operate the lever to spread the two half bodies, and then free theslide, centered by the lifting system. The expansion of the line is 3 to 5mm depending on the size of the blind (value less important than thenormal thermal expansion).

Move the slide gateSlide can be operated from the blinded position to full bore positionthanks to the roller lift system which permits to guide and center theslide during the movement.

Operate the lever to clamp the two half bodies and lock the Line Blindin position. Line Blind is now online in the chosen position.

2 Half bodies

Slide gateONLY 4 Gaskets

Page 4: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

PL S ER I E S L I N E B L I NDS

Model PLB : 1/2" - 10" / DN 12 - 250

Lever operation

Manual slide

4-point clamping

Slide guiding system, with additional rollers above 3"

Model PLR : 10" - 30" / DN 250 - 750

Gear operation

Manual Slide

4-point clamping

Slide guiding system with rollers

For graphite gasket, model PLR for dimension above 3"

Model MPL : 32" - 50" / DN 800 - 1250

Gear operation

Manual wheel operation slide

6 - 8 - 12-point clamping with lateral clamp system

Slide guiding system with rollers

4

• The simple and reliable ONIS Blind can be operated easily by one person Less than 30 seconds 1" thru 10"

Less than 3 minutes 12" thru 30"

Less than 5 minutes 30" thru 50"

• Adaptable for liquids, gases, powders, and viscous fluids• Available in special steels (carbon steel, stainless steel, Ni-Alloys...) for a wide range of temperatures, pressures and mediums• Available in API607 fire-safe with graphite gaskets.

Page 5: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

5

ON IS VANNOBTURATOR

DOUBLE -B LOCK-B LEED WITH A B L I ND

• Principle:This ONIS Vannobturator is a combination of an ONIS Line Blindand one or two ball valves.

• Two models of ONIS Vannobturator :Model 1V1 : Single block and bleed Line Blind system,

with one ball valveModel 2V1 : Double block and bleed Line Blind system,

with two ball valves

• Available in special steels (carbon steel, stainless steel, Ni-Alloys...) for a wide range of temperatures, pressures and

mediums

• In API 607 fire-safe, with graphite gaskets

Advantages

ONIS Vannobturator offers reduced flange to flange dimen-sion, as ball valve is part of the ONIS

The dead chamber decreases, the product loss during opera-tion is lower

Vannobturator uses less spiralwound gaskets when installed

Mechanical Safety Interlock between the Line Blind andvalves, prevents an operation of the Line Blind if the valvesare open.

Drain plug is included

Drain

ONIS Vannobturator 2V1 2" 150#

Mechanical Interlock System

ONIS Vannobturator 1V1 8" 150#

ARCELOR - France

ONIS Vannobturator 2V1

Page 6: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

ON IS F I LTER L I N E B L I ND MODEL P L F

UseThis ONIS Filter Line Blind was designed first tooptimize filter changing on crude oil line.

In traditional filter operation and replacement,the filters are in spool pieces between twoflanges. Maintenance workers must unboltflanges, separate the pipe and remove thespool piece with the filter usually using a craneor hoist. Next they replace the dirty filter with anew filter, replace the spool piece and bolt theflanges. This traditional replacement requires along process shut-down of several hours andresults in costly production loss.

The ONIS Filter Line Blind is a solution to minimize down-time, exposure time and to reduce the risk of pollution.

Spread and clamp operation are the same as a classic LineBlind, but the slide is replaced by a special filter holder.When one filter is in line, the second can be cleaned.

The ONIS Filter Line Blind can be adapted to any size,pressure, to many media, liquid or gas.

6

Conic screen

ONIS Filter 16" 150# - PDVSA - Venezuela

UseModel RRF : for "Y" or "T" cartridgefilters.Model RRA-RRB : for quick couplingon processeshorizontal lever RRA or verticallever RRB

AdvantagesSelf centeredOperated easily, by one person, insecondsZero tools are neededBlind flanges are provided

CharacteristicsAll part in contact with product :PTFE, Stainless Steel, or otherFKM o'ring gasket, food grade orother special gaskets as requestedDimensions from 1"1/2 to 8" Ratings150# - 300#Other specific adaptation and cou-pling under request

QU ICK COUPL ING ONIS RRF 3" 150#

with SARCO Filter

housing

ONIS QuickCoupling RRB

4" 150#

ONIS Filter - NESTLÉ France

AdvantagesScreen replaced with zero toolsDowntime is reduced to a minimumThe second screen can be cleaned or replaced while the process runsScreen is set in position without damage during the operation

Characteristics3" 150# to 24" 600#Bodies : Carbon Steel, Stainless SteelSlide : Stainless SteelFKM O'ring gaskets, special gaskets on demand

Filter in Stainless SteelManual gear operator or actuatorManual slide or manual gear operator slideSpecial dimensions, ratings, or filter adaptation uponrequest

Page 7: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

7

ON IS CUSTOMISED BL IND ING SYSTEMS

Slide Gate Lifting System

When the Line Blind can be assembled onthe installation only with a vertical move-ment of the slide gate, it may be equipedwitha mechanical or hydraulic lifting system.

The hydraulic lifting system uses a manualhydraulic "hand" pump to raise and lowerthe slide. Safety is assured by non-returnvalves. This is frequently used on ONIS LineBlind for Off-Shore applications.

The lifting system is equipped with safetydevices on the hydraulic command.

The mechanical lifting system uses anhardwheel and a threaded rod. ONIS Line Blind 16” PN 10 with hydraulic

lifting system - ARCELOR MITTAL - FranceONIS PLB 8” 150# with vertical slideand safety locks

Line Blind with 3 positions slide gateThis Line Blind is equipped with a particular slidegate with three positions. In addition to the traditio-nal positions, full bore and blanked, the Line Blindhas a reduced passage, to create a drop pressure orto control the flow for a given application, such as anorifice plate.

The diameter of the reduced bore is machined accor-ding to customer’s specifications.

ONIS Line Blinds can be manufactured with specialmetallurgy and overlays, depending on the process.

ONIS manufactures Line blinds with Monel 400,Nickel overlay, or with PTFE inserts.

Miscellaneous : Custom made productThe ONIS Line Blind concept can be built to customer specific requirements.

ONIS Line Blind 4” 600#

with 3 positions slide gate

ONIS Line Blind with PTFE inserts

ONIS PL2V 18” 300# Fully Hydraulicremote-controlled operation - FFCUtransferline

Page 8: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

ON IS CUSTOM B L I ND ING SYSTEMS

8

ONIS Twin Line blinds 6" 150# with safety rupture disks - SANOFI SYNTHELABO France

ONIS Line Blind Full-Automated in coffee beans boiler

For special cases, an ONIS Line Blind canbe equipped with special threadedflange design (Model PLC), to reducethe flange to flange dimension Wafertype.

ONIS Line Blind can beadapted to be a customloading blind. Such appli-cation has been made forcoffee loading, with fullautomated line blinds.

ONIS Line Blind can be used as asafety rupture disc changer. Inthis case, one disc is in line, andwhen pressure blows out thedisc, the change is operated toput in the second disc. Then thebroken disc can be replacedduring operation.

ONIS Line Blind wafer style 4" 150#

Page 9: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

9

OIL EXPLORATION & PRODUCTION APPLICATIONS

ONIS Benefits :

AVAILABLE 24/24, 7/7, 365/365

No crane, No hoist, No scaffolding,

Reduce downtime, exposure to process and minimize loss of production

Quick isolation of independent unitsof the offshore platform in case ofincident or hurricane emergency

ONIS Line blinds meet the most extreme operating conditions and pressurewhich are consistently higher: 3"2500, 16"1500, 24"900, 36"600…

OFFSHORE - ONSHOREPAYBACK BY PRODUCTION, SAFETY AND ENVIRONMENTAL ASPECTS

ONIS Line blinds aregenerally installed on Filtration skidOffsite limitTurbine isolation• Suction line• Discharge line• Vent line• Drain line

ONIS 24" #900 Fire safe: Media : SOUR GASPressure : 140 Kg/cm²Leak test : 210 Kg/cm²

ONIS 36" #600 Fire safe: Media : CRUDE OIL

Pressure : 97 Kg/cm²Leak test : 146 Kg/cm²

ONIS 3" #2500 Fire safe: Media : NITROGENPressure : 378 Kg/cm²Leak test : 417 Kg/cm²

Page 10: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

10

ONIS LINE BLIND ON A FLARE STACK NETWORK

The diagram represents ONIS Line Blind 4” to 36” within aflare stack network, protecting the units that produce plas-tic.

Two flares stacks are connected with a principal vessel, diameter 1200 (48") and isolated by two ONIS Line BlindsMPL 900 (36"). This configuration provides a proven meansof quick and safe maintenance isolation for one flare stack,while the other remains online.

A mechanical interlock system insures that the two Lineblinds are never in the blind position at the same time.

The ONIS Line Blind PLR 700 (28") can be used during main-tenance or within the security circuits of the flare stacks.

All the units are connected to the vessel by ONIS Line Blindat the inlets (PLR 400 –16", PLR 600 –24", PLR 650-26"),which enables isolation of each unit whenever needed.

ONIS blinds, at the inlets of the main vessel, are fitted onthe basis of operating at ten-year intervals, for plannedshutdown to allow for metallic-corrosion inspection.

This is an insurance-type application in case of accident orcorrosion damage, giving the refinery the means to reactquickly to isolate a unit or process. The off-site ONIS blinds,as well as the vessel blinds, can be operated at any time formaintenance or process needs.

2 ONIS MPL 48" 150# - TOTAL Gonfreville - France

SHELL - Flare Stack Network - France

ONIS PLR 28" 150# High Temperature on hydrocracker

flare stack network - DEA - Germany

PVC3-PLANTPVC2-PLANTPVC1-PLANT

EXPENDERSTEAM CRACKER

OIL-PLANTCHLORINE-PLANT

VCM-PLANT

POLYETHYLENE-PLANT

VESSEL

BUTADIENE-PLANT

ETHYLENE-PLANT

FLARE STACK 2

FLARE STACK 1

Page 11: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

11

ON IS L I N E B L I NDS ON ETHYLENE STEAM

CRACKER OR BO I L ER

The diagram above represents the use of ONIS Line Blind:ONIS Twin blinds and ONIS combi Series, fom 2" to 8" in anolefin plant or steam plant.

Water Inlet : By using a valve and an ONIS Line Blind,water inflow into the furnace can be controlled.

Steam Inlet : Same principle and material as for the waterinlet.

Gas Inlet and Decoke Air Inlet : the traditional practice ofmanual "elbow" switching to ensure gas or air only-andnever the two together, is labor intensive. This results inunnecessary plant downtime, and thus affecting the end-product profitability.

By replacing this traditional practice with the ONIS twinblinds system, it is possible to switch from one line to theother with total confidence in seconds. Also ONIS has a safety blanking position on both lines to process ormaintenance needs. Cost savings are considerable andpersonnel safety increased.

Furnace 1 in serviceSupply of water line Full bore positionSteam line Full bore positionSupply of gas line Full bore positionAir line Blind position

Furnace 2 in maintenanceSupply of water line Blind positionSteam line Blind positionSupply of gas line Blind positionAir line Blind position

Furnace 3 in decokingSupply of water line Blind positionSteam line Blind positionSupply of gas line Blind positionAir line Full bore position

ONIS Twin Line Blind 2" 150# with three positions slide

PLR DN 10’’ 150# - Steam Cracker - France

ONIS Combi Series DN 3’’ 150#

Page 12: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

12

ONIS L INE BL IND IN A LOADING TERMINAL

OR PUMP STATION

The diagram below represents the possibility of using ONISLine Blind within a loading terminal.

ONIS PLR 400 (16") and PLR 450 (18") on Stocking Station - TIGF - LUSSAGNET

ONIS PLR 400 (16") on Naphta loading arms

ONIS Line Blind PLB 8’’ 600# and 2” 600# - Gas plant TIGF Barbeira

In this case, only diesel can be loaded from manifold 3, crudeoil line and unballast line are in blinded position.

Brut crude oil can be unloaded from manifold 2, unballast anddiesel lines are in blinded position.

In this case, the use of ONIS Line Blind avoids the possiblecontamination and allows isolation of lines for maintenance.

Installing the ONIS Line Blind on the manifold's bottom outlets avoids contamination between the different productsand clogs the collector.

Hydrocarbon Pump Station

In a pump station, each pump canbe protected by ONIS blinds (ups-tream and downstream).

A pump can be isolated and takendown for maintenance, withoutstopping the pump station orlosing production.

Page 13: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

13

ONIS L INE BL IND IN PRODUCTION AND

MAINTENANCE OF REACTORS

ONIS Benefits• Downtime savings• Security improvement• Production and quality improvement

Typical use of ONIS technology on reactor

ONIS Quick-Action Line Blind• Loading lines of products• Off-loading line of product : ONIS on reactor valve• Vacuum line• Inert gas line• Degassing line• Cleaning head introduction• Cleaning flush : ONIS on reactor valve

ONIS Quick-Action Rupture Disc Changer• A safety rupture disc can be replaced inline in secondsand without tool.

ONIS Quick-Action Orifice Plate Changer or Strainer• Simple and quick inspection or replacement of processorifice plates for precise flow control.

The ONIS Quick-Action Line Blind can be applied in ABS,polypropylene, polyethylene, synthetic rubber, VCM, PVC,and PTA processes.

Rupture Disk Changer

Hydraulic Cleaning Head Input Liquid

Drain Pipe

Nitrogen Flushing

Natural Gas

De-Gas

Vacuum Stripping

De-Gas

Output Cleaning

Reactor ValvesOutput Cleaning

ONIS PL2V 6" 150# - Currently used on loading line on

CVM Reactor - ARKEMA - France

ONIS PLB 8" PN 25 - ARKEMA - FranceONIS PL2V 10" 150# - ARKEMA - France

Drain Pipe

Page 14: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

TECHN ICAL SPEC I F I CAT IONS

Standard Specifications • Body in Carbon steel A350 LF2• Raised Face Flanges• Slide in Stainless Steel (304L or 316L)• 4 FKM O'ring gaskets

• Self-lubricated bearings, grease fittings• Bodies Spread Movement:> Manual lever operation thru 10"> Manual gearbox operation from 12"

• Manual Slide Movement

ONIS Line Blind answers your specificationsMiscellaneousLine Blind• Drain plug• Operating extension• Safety lock• Mechanical Interlock• Stainless Slide cover• Rupture disc changer• Twin Line Blinds

FlangesBodies• Following standards :EN 1092-1, B16-5, B16-47

• RF, RTJ• Butt weld• Threaded NPT• Special fitting upon request

GasketsSlide gate gaskets• FKM O'Ring• Graphite gaskets• FKM overlay PFA or FEP O'ring Gaskets

• Special gasket material upon request

Material Bodies and Slide• High temperature Alloy Steel• Exotic Steel : Monel 400, Nickel 200, Duplex,

• Overlays : Inconel, Nickel,Monel 400, PTFE, …

TECHN IQUES AND CERT I F I CAT IONSONIS Line Blind are designed using the latest techniques,like the CAD, finite element analysis for stress and thermalcalculations, from the conception to the verification ofONIS products.

ONIS Line Blinds have the CE marking (TÜV Agreement1637) following the PED 97/23/CE module H, and can bedesigned, by specific request, Fire Safe following the API607 IV.

ONIS Line Blinds are manufactured under an ISO 9001:2008quality system, for each step of the manufacturing.

14

PED 97/23/CETÜV 1637

Slide Movement * Bodies spread/unspread movement

Manual

Manual or gear box

Electric actuator

* ONIS Line Blind with slide movement vertical to ground must be equipped with a special accessory. Consult your ONIS distributor.

Hydraulic actuator

Pneumaticactuator

Electric actuator

Lever

Manual gearbox operator

Electricactuator

Pneumaticactuator

Electric limit switch

Pneumatic or hydraulicunder request

Movement parallel to ground Options

Limit Switch

Options

Movement vertical to groundMagnetic limit switch

N°71 100 J 124

Optimizing structures using finite element analysis softwares

Page 15: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology

• Follow manual rules for mechanicalequipment

• Reduce pipe stress to a minimum• ONIS Line Blind must be closedduring installation

• Pipework must have allowance foraxial movement (3 mm to 5 mm)

Flexibility on 1 or 2 sides ONLY REQUESTED

Standard Fitting Rules

15

TECHN ICAL SPEC I F I CAT IONS

INSTAL LAT ION

RefPLB 15PLB 20PLB 25PLB 40PLB 50PLB 80PLB 100PLB 150PLB 200PLB 250PLR 300PLR 350PLR 400PLR 450PLR 500PLR 600PLR 650PLR 700PLR 750MPL 900MPL 1000MPL 1200MPL 1250

DN122025405080100150200250300350400450500600650700750900100012001250

DN Inches1/23/41

1 1/2234681012141618202426283036404850

A28828828853053055869886295212121342151216922108228227122800300032003800374243524780

B1441441442652652793494314766066717568461054114113561400150016001650187121762426

C13813813820420419223131128040851558663067068583082583088011509259981252

D5656569292112125165180235313342370408427500505520530760840950932

E3,73,73,73,73,73,73,73,73,73,73,73,73,73,73,73,74,54,54,54,54,54,54,5

150#2

170170170218218256268290330406,4406,450050050060071671680085090090010001000

300#1781781782262262682803024005005506007007008208209009009501100

600#216216216292292356438438533,555059675078690096011001300130013251556

ANSI 150#160160160200200220220280280400400450450450500650650700750800

ANSI 150#888,52628435393120230295470550730101016721800185028003100

150#255255255280280300306380390520NANANANANANANANANANA

150#NANANANANANANANANANA350400400400500500500500500500

Dimensions in mm (Rating ANSI 150#)

Consult your ONIS Distributor to obtain datas on these line blinds

L1LWeight (Kgs)F (Butt Weld)F (Face to face)1

All data included must be confirmed by ONIS before use 1When using graphite gaskets, consult ONIS distributor for F dimension2Full rating design can be optimised in case of lower design pressure on demand

Right position of pipes

Right parallel position

Clearance between flanges equal to the length of the Line Blind with seals

OK

OK

OK

OK

Model PLR

ONIS CONCEPT AND OPERATIONAL SEQUENCE

Model PLB

Page 16: to minimize downtime and improve safety Quick-Action · 2015. 5. 4. · Engineered for critical applications to minimize downtime and improve safety Quick-Action Line Blind Technology