to: from: subject: updated site plan · — 0.9 spaces/unit for one-bedroom units — 1.0...

16
100 Commerce Valley Drive West Thornhill, ON Canada L3T 0A1 T: +1 905 882-1100 F: +1 905 882-0055 wsp.com MEMO TO: Mark Liddy, P.Eng., 91 Eglinton Limited Partnership FROM: Sharon Sterling, MCIP, RPP, Manager of Traffic Management and Parking, WSP David Lukezic, M.Eng., LEL, RPP, Project Manager, WSP SUBJECT: 91 Eglinton Avenue and 5055 Hurontario Street Transportation Study - Updated Site Plan DATE: January 16, 2019 Dear Mr. Liddy, WSP completed a Transportation Study, dated September 11 th , 2018, for the proposed high-rise residential development located at 91 Eglinton Avenue and 5055 Hurontario Street, in the City of Mississauga. Since the submission of the Transportation Study, an increase of 88-residential unit and an additional access to Thornwood Drive have been proposed for Phase 4 of the subject lands as a result of the addition of the 131 Eglinton Avenue lands to the subject property. This memorandum provides an overview of changes to the findings of the September 2018 Transportation Study as it relates to traffic impact and parking. Please refer to Figure 1 for the updated Site Plan dated January 10 th , 2019. Please refer Appendix A to for the updated site statistics. UPDATED RESIDENTIAL UNIT BREAKDOWN The updated site plan consists of 2,668 residential units, an increase of 88 units compared to the 2580 residential units assessed within the September 2018 study. Please refer to Table 1 below for the updated residential unit distribution per phase.

Upload: others

Post on 25-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15

100 Commerce Valley Drive West

Thornhill, ON

Canada L3T 0A1

T: +1 905 882-1100

F: +1 905 882-0055

wsp.com

MEMO

TO: Mark Liddy, P.Eng., 91 Eglinton Limited Partnership

FROM: Sharon Sterling, MCIP, RPP, Manager of Traffic Management and Parking, WSP

David Lukezic, M.Eng., LEL, RPP, Project Manager, WSP

SUBJECT: 91 Eglinton Avenue and 5055 Hurontario Street Transportation Study -

Updated Site Plan

DATE: January 16, 2019

Dear Mr. Liddy,

WSP completed a Transportation Study, dated September 11th, 2018, for the proposed high-rise

residential development located at 91 Eglinton Avenue and 5055 Hurontario Street, in the City of

Mississauga.

Since the submission of the Transportation Study, an increase of 88-residential unit and an

additional access to Thornwood Drive have been proposed for Phase 4 of the subject lands as a

result of the addition of the 131 Eglinton Avenue lands to the subject property. This memorandum

provides an overview of changes to the findings of the September 2018 Transportation Study as it

relates to traffic impact and parking.

Please refer to Figure 1 for the updated Site Plan dated January 10th, 2019. Please refer Appendix

A to for the updated site statistics.

UPDATED RESIDENTIAL UNIT BREAKDOWN

The updated site plan consists of 2,668 residential units, an increase of 88 units compared to the

2580 residential units assessed within the September 2018 study. Please refer to Table 1 below for

the updated residential unit distribution per phase.

Page 2: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15

Page 2

Table 1 Updated Site Statistics

Development Phases September 2018 Study

Unit Count

Updated January 10th, 2019

Unit Count

Phase 1 (Tower A & B) 921 units 921 units

Phase 2 (Tower D) 434 units 434 units

Phase 3 (Tower E & F) 740 units 740 units

Phase 4 (Tower G) 485 units 573 units

Overall Development 2580 units 2668 units

Based on the above residential unit breakdown, the increase in unit count occurred solely for the

Phase 4 development. Please refer to the section below for an assessment of the residential unit

increase with regards to the proposed development trip generation.

UPDATED TRIP GENERATION AND ASSOCIATED IMPACTS

As per the 88-residential unit increase within Phase 4 of the proposed development, an updated

trip generation assessment was completed. Please refer to Table 2 below for the updated proposed

development trip generation during the weekday AM and PM peak hours, derived as within the

September 2018 study.

Page 3: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15

Page 3

Table 2 Updated Site Trip Generation

Land Use Basis/Parameter

Vehicle Trips

Weekday A.M. Peak Hour Weekday P.M. Peak Hour

Inbound Outbound Inbound Outbound

Residential Phase 1 & 2

(1,355 Units)

ITE Land Use 222 (Multifamily

Housing) 67 326 314 155

Non-Auto Trip Reduction

(13) (104) (79) (23)

Phase 1 & 2 Subtotal 53 221 236 132

Residential Phase 3 & 4

(1,225 Units)

ITE Land Use 222 (Multifamily

Housing) 65 316 305 150

Non-Auto Trip Reduction

(13) (101) (76) (23)

Phase 3 & 4 Subtotal 52 215 229 128

Total

(Updated January 10th, 2019 Plan) 105 436 465 260

Total

(September 2018 Study) 101 422 450 251

Incremental Trip Generation Increase

4 14 15 9

As per the above table, the proposed unit increase is projected to increase the overall development

trip generation by 18 trips during the weekday AM peak hour (4 inbound trips and 14 outbound

trips) and by 24 trips during the weekday PM peak hour (15 inbound trips and 9 outbound trips).

Therefore, the proposed residential unit increase is projected to create a minor increase in site

generate trips of approximately 3% during both the AM and PM peak hours.

This increase in trip generation is minor and is projected to have negligible impacts on the

boundary road network intersection operations. Therefore, the traffic operations analysis findings

and recommendations from the September 2018 study would not change.

Page 4: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15

Page 4

UPDATED PARKING SUPPLY

As per the September 2018 study, parking supply requirement rates were recommended based on

residential unit size and phasing as follows:

— 0.8 spaces/unit for bachelor units

— 0.9 spaces/unit for one-bedroom units

— 1.0 spaces/unit for two-bedroom units

— 1.3 spaces/unit for three-bedroom units; and

— 0.15 spaces/unit for visitors for phases 1 and 2

— 0.10 spaces/unit for visitors for phases 3, and 4

Based on the updated residential unit count proposed, WSP completed a review of the proposed

parking supply using on the recommended parking rates. The proposed supply of 3,246 spaces is

acceptable and will accommodate the additional residential units.

UPDATED BICYCLE PARKING SUPPLY

As per the increased residential unit count, please refer to Table 3 below for the updated bicycle

parking supply review. Bicycle parking requirements were provided by the City through DARC

comments, as documented in the September 2018 study.

Table 3 Updated Bicycle Parking Supply Review

Bicycle Parking Requirement Proposed Number of

Bicycle Parking Spaces

Required Number of Bicycle Parking

Spaces

Residential (Long-term) 0.8/unit

2,255

2,135

Residential (Short-term) 6 (total) 6

Total - 2,141

As per the above table, the proposed bicycle parking supply exceeds the minimum requirements.

The bicycle parking demand related to the additional 88-residential units will be accommodated

within the subject lands.

CONCLUSION

In conclusion, the proposed development Phase 4 unit increase of 88 dwelling unit is not projected

to alter the findings and recommendations made as part of the September 2018 study. The

dwelling unit increase is projected to have a negligible impact on traffic operations at the study

intersections, and the associated increase in vehicular and bicycle parking demand are projected to

be accommodated on-site.

Should you have any questions about the contents of this memorandum, please do not hesitate to

contact us.

WSP

Attachments Figure 1 Updated Site Plan

Appendix A Updated Site Statistics

Page 5: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15

FIGURES

Page 6: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15
Page 7: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15

T

Y

P

E

B

TY

PE

A

TY

PE

B

F

U

T

U

R

E

R

O

A

D

(

A

R

M

D

A

L

E

R

D

)

F

U

T

U

R

E

R

O

A

D

(

T

H

O

R

N

W

O

O

D

D

R

)

EG

LIN

TO

N A

VE

NU

E E

AS

T

AR

MD

AL

E R

D.

BELBIN STREET

KENCOURT DR

EXISTING LOW-RISE COMMERCIAL

EXISTING TOWN HOMES

TO

H

UR

ON

TA

RIO

S

T

F

U

T

U

R

E

R

O

A

D

(

T

H

O

R

N

W

O

O

D

D

R

)

PU

BL

IC

P

AR

K

3

24

1 m

2

0.8

A

CR

ES

OU

TD

OO

R A

ME

NIT

Y

AR

EA

- B

LD

GC

LO

T 1

AR

EA

: 10,443

m

2

LO

T 2

AR

EA

: 5,800

m

2

LO

T 3

AR

EA

: 7,094

m

2

PR

IV

AT

E D

RIV

EW

AY

PRIVATE DRIVEWAY

P

R

I

V

A

T

E

D

R

I

V

E

W

A

Y

TO

WE

RD

LO

AD

IN

G/

GA

RB

AG

E P

IC

K

UP

PA

RK

IN

G E

NT

RY

LO

AD

IN

G/

GA

RB

AG

E

PIC

K U

P

LO

AD

IN

G/

GA

RB

AG

E

PIC

K U

P

PA

RK

IN

G E

NT

RY

LO

T 4

AR

EA

: 11,726

m

2

PR

IVA

TE D

RIV

EW

AY

LO

AD

IN

G

PA

RK

IN

G

EN

TR

Y

PR

IN

CIP

AL

EN

TR

AN

CE

P

R

I

N

C

I

P

A

L

E

N

T

R

A

N

C

E

PR

IN

CIP

AL

/

DR

OP

-O

FF

EN

TR

AN

CE

8-S

TO

RE

Y

PO

DIU

M

LO

AD

IN

G/

GA

RB

AG

E

PIC

K U

P

33 S

TO

RE

YS

LOADING

1 S

TO

RE

Y

OU

TD

OO

R A

ME

NIT

Y

SP

AC

E (L

EV

EL

9

)

50

0m

2

MULTI-USE PATHWAY

PA

RK

IN

G

EN

TR

Y

SLOPE

SLOPE

SLOPE

SLOPE

RE

SID

EN

TIA

L

B

A

L

C

O

N

I

E

S

F.F

.E

@

1

72

.8

5

LO

T 2

D

EV

EL

OP

ME

NT

:

43

4 U

NIT

S

B

A

L

C

O

N

I

E

S

B

A

L

C

O

N

I

E

S

6-S

TO

RE

Y

PO

DIU

M

GR

EE

N R

OO

F

B

A

L

C

O

N

I

E

S

B

A

L

C

O

N

I

E

S

4-S

TO

RE

Y

PO

DIU

M

GR

EE

N R

OO

F

2

-

S

T

O

R

E

Y

P

O

D

I

U

M

1

-

S

T

O

R

E

Y

P

O

D

I

U

M

P

E

N

T

H

O

U

S

E

R

O

O

F

B

A

L

C

O

N

I

E

S

TO

WE

RA

45 S

TO

RE

YS

RE

SID

EN

TIA

L

F.F

.E

@

1

72

.3

5

LO

T 1

D

EV

EL

OP

ME

NT

:

92

1 U

NIT

S

TO

WE

RB

40 S

TO

RE

YS

RE

SID

EN

TIA

L

OU

TD

OO

R A

ME

NIT

Y

SP

AC

E (L

EV

EL

3

)

70

6m

2

2-S

TO

RE

Y

PO

DIU

M

8 STOREYS

6 STOREYS

4 STOREYS

8 STOREYS

6 STOREYS

4 STOREYS

BA

LC

ON

IE

S

11

25

m

2

TO

WE

RE

40 S

TO

RE

YS

RE

SID

EN

TIA

L

F.F

.E

@

1

73

.0

0

LO

T 1

D

EV

EL

OP

ME

NT

:

74

0 U

NIT

S

OU

TD

OO

R A

ME

NIT

Y

SP

AC

E (L

EV

EL

3

)

46

9m

2

2-S

TO

RE

Y

PO

DIU

M

4 S

TO

RE

YS

4 S

TO

RE

YS

TO

WE

RF

35 S

TO

RE

YS

RE

SID

EN

TIA

L

TO

WE

RG

28 S

TO

RE

YS

RE

SID

EN

TIA

L

BA

LC

ON

IE

SB

AL

CO

NIE

S

BA

LC

ON

IE

S

BA

LC

ON

IE

SB

AL

CO

NIE

SB

AL

CO

NIE

S

BALCONIES

DR

OP

-O

FF

EN

TR

AN

CE

DR

OP

-O

FF

EN

TR

AN

CE

OR

IG

IN

AL

P

RO

PE

RT

Y L

IN

E

NE

W P

RO

PE

RT

Y L

IN

E

PROPERTY LINE

PROPERTY LINE

P

R

O

P

E

R

T

Y

L

I

N

E

OR

IG

IN

AL

P

RO

PE

RT

Y L

IN

E

NE

W P

RO

PE

RT

Y L

IN

E

OR

IG

IN

AL

P

RO

PE

RT

Y L

IN

E

N

E

W

P

R

O

P

E

R

T

Y

L

I

N

E

N

E

W

P

R

O

P

E

R

T

Y

L

I

N

E

NEW PROPERTY LINE

NEW PROPERTY LINE

OR

IG

IN

AL

P

RO

PE

RT

Y L

IN

E

NE

W P

RO

PE

RT

Y L

IN

E

PROPERTY LINE

LO

T 5

AR

EA

: 442

m

2

GREEN ROOF

GREEN ROOF

1-STOREY

GR

EE

N R

OO

F

GR

EE

N R

OO

F

GR

EE

N R

OO

F

GR

EE

N R

OO

F

SLOPESLOPE

FU

TU

RE

D

EV

EL

OP

ME

NT

FU

TU

RE

D

EV

EL

OP

ME

NT

EX

TE

NT

O

F

UN

DE

RG

RO

UN

D

PA

RK

IN

G

DA

SH

LIN

ES

IN

DIC

AT

E

TH

E E

XT

EN

T O

F

UN

DE

RG

RO

UN

D

PA

RK

IN

G G

AR

AG

E

8 STOREYS

6 STOREYS

4 STOREYS

BA

LC

ON

IE

S

BA

LC

ON

IE

S

2 STOREYS

OU

TD

OO

R A

ME

NIT

Y

SP

AC

E (L

EV

EL

9

)

42

0m

2

PO

DIU

M

12 S

TO

RE

YS

TO

WN

HO

ME

S

B

LD

GH

1

3 S

TO

RE

YS

TO

WN

HO

ME

S

B

LD

GH

2

3 S

TO

RE

YS

TO

WN

HO

ME

S

B

LD

GH

3

3 S

TO

RE

YS

2 S

TO

RE

YS

GR

EE

N R

OO

F

PR

IN

CIP

AL

EN

TR

AN

CE

BE

LO

W

PR

IN

CIP

AL

EN

TR

AN

CE

BE

LO

W

L

O

A

D

I

N

G

OU

TD

OO

R

AM

EN

IT

Y

AR

EA

EX

IT

S

EX

IT

S

EX

IT

S

PH

AS

E 3

PH

AS

E 1

PH

AS

E 4

PH

AS

E 2

EG

LIN

TO

N A

VE

NU

E E

AS

T

F

U

T

U

R

E

R

O

A

D

(

T

H

O

R

N

W

O

O

D

D

R

I

V

E

)

F

U

T

U

R

E

R

O

A

D

(

A

R

M

D

A

L

E

R

O

A

D

)

Modified:

WS

P_

SiteP

lan

Re

view

_9

1 E

glin

ton

A

ve E

_2

0190114 (G

F).d

wg

_S

ite

1/1

5/2

01

9 2

:3

7 P

M

By:

pa

ulo

.isra

el

J:\01 PROJECTS\2018 Jobs\181-02747-00 - 91 Eglinton Ave E\3.0 Technical\3.4 Calculations or Computer Models\CAD\Site Plan Review\2019-01-14

Plot D

ate:

20

19

/0

1/1

5

Sc

ale

: 1

:1

00

0

Figu

re

1

Up

da

te

d S

ite

P

la

n

91

E

glin

to

n A

ve

nu

e E

ast - T

ech

nica

l M

em

ora

nd

um

So

urce: R

Z-0

1b

.dw

g, fro

m D

IA

LO

G, received January 10, 2019

Page 8: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15
Page 9: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15

APPENDIX

A SITE STATISTICS

Page 10: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15
Page 11: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15

Revision 1

1.1 Site Areasacres sq.m. sq.ft.11.93 48,298.70 519,8833.16 12,794.77 137,7228.77 35,503.93 382,161.15

1.2FSI5.96

2.0

Levels sq.m. sq.m. sq.ft.

211,707.29 2,278,798

2.1Levels sq.m. sq.m. sq.ft.

Level 1 1 x 1,906.77 1,906.77 20,524Level 2 1 x 2,092.27 2,092.27 22,521

Levels 3 1 x 980.59 980.59 10,555Levels 4 1 x 1,128.77 1,128.77 12,150Levels 5 to 6 2 x 984.65 1,969.29 21,197Levels 7 to 8 2 x 866.19 1,732.38 18,647Levels 9 to 45 37 x 795.00 29,415.00 316,620

Levels 3 1 x 980.59 980.59 10,555Levels 4 1 x 1,128.77 1,128.77 12,150Levels 5 to 6 2 x 984.65 1,969.29 21,197Levels 7 to 8 2 x 866.19 1,732.38 18,647Levels 9 to 40 32 x 795.00 25,440.00 273,834

Levels P1 1 x 160.00 160.00 1,722Levels P2 to P5 4 x 110.00 440.00 4,736

45 71,076.10 765,057

2.2Levels sq.m. sq.m. sq.ft.

Level 1 1 x 1,230.51 1,230.51 13,245Level 2 1 x 2,095.88 2,095.88 22,560

Levels 3 to 4 2 x 2,326.91 4,653.83 50,093Levels 5 to 6 2 x 1,870.25 3,740.50 40,262Levels 7 to 8 2 x 1,403.73 2,807.45 30,219Levels 9 1 x 629.18 629.18 6,772Levels 10 to 33 24 x 795.00 19,080.00 205,375

Levels P1 1 x 110.00 110.00 1,184Levels P2 to P4 3 x 60.00 180.00 1,938

33 34,527.35 371,649

2.3Levels sq.m. sq.m. sq.ft.

Level 1 1 x 944.58 944.58 10,167Level 2 1 x 2,192.70 2,192.70 23,602

Levels 3 1 x 626.95 626.95 6,748Levels 4 1 x 866.33 866.33 9,325Levels 5 to 40 36 x 795.00 28,620.00 308,063

Levels 3 1 x 626.95 626.95 6,748Levels 4 1 x 866.33 866.33 9,325Levels 5 to 35 31 x 795.00 24,645.00 265,277

Levels P1 1 x 160.00 160.00 1,722Levels P2 to P5 4 x 110.00 440.00 4,736

40 59,988.84 645,715Total

Proposed Residential GFA- LOT 2: TOWER D

January 10, 2019

Proposed Residential GFA- LOT 1: TOWER A, B, and C

PROJECT STATISTICS 91 EGLINTON Ave E

Proposed Residential DevelopmentMississauga Ontario

Project No. 11153T0100

Existing Total Site AreaProposed Public ConveyancesNet Consolidated Site AreaBased on Total Site Area - Land to be Given to City Parks - Land to be Given for New Road and Road Widening

Gross Floor Area (GFA)

Tower B

Below Grade

Total

Tower F

Below Grade

public roads and Public park excluded from site area for fsi calculation

Floor Space Index (FSI)

Proposed Residential GFA- LOT 3: TOWER E AND F

Below Grade

Total

Tower E

City of Mississauga Zoning By-law Revised: 2013 December 31 defines GFA the sum of the areas of each storey of a building above or below established grade, measured from the exterior of outside walls of the building including floor area occupied by interior walls but excluding any part of the building used for mechanical floor area, stairwells, elevators, motor vehicle parking, bicycle parking, storage lockers, below-grade storage, any enclosed area used for the collection or storage of disposable or recyclable waste generated within the building, common facilities for the use of the residents of the building, a day care and amenity area.

overall GFA

Tower A

Page 12: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15

2.4Levels sq.m. sq.m. sq.ft.

Level 1 1 x 2,225.00 2,225.00 23,950Level 2 1 x 2,529.00 2,529.00 27,222

Levels 3 1 x 2,482.00 2,482.00 26,716Levels 4 1 x 2,541.00 2,541.00 27,351Levels 5 1 x 2,398.00 2,398.00 25,812Levels 6 1 x 3,057.00 3,057.00 32,905Levels 7 to 8 2 x 2,914.00 5,828.00 62,732Levels 9 1 x 2,317.00 2,317.00 24,940Levels 10 1 x 2,427.00 2,427.00 26,124Levels 11 to 12 2 x 2,150.00 4,300.00 46,285Levels 13 to 28 16 x 795.00 12,720.00 136,917

Level 1 1 x 803.00 803.00 8,643Levels 2 to 3 2 x 1,079.00 2,158.00 23,229

Levels P1 to P3 3 x 110.00 330.00 3,55228 46,115.00 496,378

2.5 Proposed GFAsq.m. sq.ft.

211,707.29 2,278,798211,707.29 2,278,798

3.0

3.1Total Units Ratio (sq.m.) sq.m. sq.ft.

Total Total Amenity Area PROPOSED (Indoo 2668 x 5.01 m²/unit 13,356.00 143,763

3.2sq.m. sq.ft. sq.m. sq.ft. sq.m. sq.ft.

Level 1 0.00 0 1,466.00 15,780 1,466.00 15,780Level 2 0.00 0 822.00 8,848 822.00 8,848Level 3 706.00 7,599 316.00 3,401 1,022.00 11,001

706.00 7,599 2,604.00 28,029 3,310.00 35,629

3.3sq.m. sq.ft. sq.m. sq.ft. sq.m. sq.ft.

Level 1 1,125.00 12,109 150.00 1,615 1,275.00 13,724Level P1 244.00 2,626 2,471.00 26,598 2,715.00 29,224

1,369.00 14,736 2,621.00 28,212 3,990.00 42,948Lot 1 Provided Ratio Per Unit 7.93

3.4sq.m. sq.ft. sq.m. sq.ft. sq.m. sq.ft.

Level 1 0.00 0 1,159.00 12,475 1,159.00 12,475Level 9 500.00 5,382 166.00 1,787 666.00 7,169

500.00 5,382 1,325.00 14,262 1,825.00 19,644Lot 2 Provided Ratio Per Unit 4.21

3.5sq.m. sq.ft. sq.m. sq.ft. sq.m. sq.ft.

Level 1 0.00 0 1,218.00 13,110 1,218.00 13,110Level 3 469.00 5,048 478.00 5,145 947.00 10,193

469.00 5,048 1,696.00 18,256 2,165.00 23,304Lot 3 Provided Ratio Per Unit 2.93

3.6sq.m. sq.ft. sq.m. sq.ft. sq.m. sq.ft.

Level 1 435.00 4,682 1,101.00 11,851 1,536.00 16,533Level 9 420.00 4,521 110.00 1,184 530.00 5,705

855.00 9,203 1,211.00 13,035 2,066.00 22,238Lot 4 Provided Ratio Per Unit 3.61

3.7 Total Amenity Area Providedsq.m. sq.ft.

Indoor 9,457.00 101,794Outdoor 3,899.00 41,968

13,356.00 143,763

Outdoor Amenity Area

Outdoor Amenity Area

Outdoor Amenity Area

Tower G

Town homes H

Below Grade

Total

Proposed Residential GFA- LOT 4: TOWER G

Indoor Amenity Area

Lot 3- Tower E&F- Amenity Area Provided

Outdoor Amenity Area

Outdoor Amenity Area

Total Amenity Area

Total Amenity Area

Includes Lot 1 Tower A, and B and Building C (3.2&3.3)

Indoor Amenity Area

Total Amenity Area

Lot 1- BLDG C- Amenity Area Provided Indoor Amenity Area

Indoor Amenity Area

Lot 4- Tower G- Amenity Area Provided Indoor Amenity Area

Amenity Area

Total Amenity Area PROPOSED (Indoor & Outdoor)

Total Amenity Area

Total

Total

Total Amenity Area

Total Residential GFA

(Overall Average Ratio)

Total

Total

Total

Total

Total

Lot 1- Tower A&B- Amenity Area Provided

Lot 2- Tower D- Amenity Area Provided

Page 13: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15

4.0 Unit Count4.1

Levels UnitsLevel 1 1 x 16 16Level 2 1 x 23 23

Level 3 1 x 12 12Level 4 1 x 15 15Levels 5 to 6 2 x 14 28Levels 7 to 8 2 x 12 24Levels 9 to 18 10 x 12 120Levels 19 to 45 27 x 10 270

Level 3 1 x 12 12Level 4 1 x 15 15Levels 5 to 6 2 x 14 28Levels 7 to 8 2 x 12 24Levels 9 to 15 7 x 12 84Levels 16 to 40 25 x 10 250

45 921

4.2Levels Units

Level 1 1 x 9 9Level 2 1 x 25 25Levels 3 to 4 2 x 28 56Levels 5 to 6 2 x 24 48Levels 7 to 8 2 x 18 36Level 9 1 x 8 8Levels 10 to 15 6 x 12 72Levels 16 to 33 18 x 10 180

33 434

4.3Levels Units

Level 1 1 x 5 5Level 2 1 x 23 23

Levels 3 1 x 9 9Levels 4 1 x 12 12Levels 5 to 40 36 x 10 360

Levels 3 1 x 9 9Levels 4 1 x 12 12Levels 5 to 35 31 x 10 310

40 740

4.4Levels Units

Level 1 1 x 17 17Level 2 1 x 27 27

Levels 3 1 x 35 35Levels 4 1 x 33 33Levels 5 1 x 31 31Levels 6 1 x 40 40Levels 7 to 8 2 x 38 76Levels 9 1 x 30 30Levels 10 1 x 32 32Levels 11 to 12 2 x 31 62Levels 13 to 20 8 x 12 96Levels 21 to 28 8 x 10 80

1 x 14 1428 573

4.5Units

Total Units 2,668

Total

Total

Total

Total

Tower A

Tower B

Estimated Unit count- LOT 2: TOWER D

Estimated Unit count- LOT 3: TOWER E AND F

Tower E

Estimated Unit count- LOT 4: TOWER G

Tower F

Estimated Unit count- LOT 1: TOWER A AND B

Unit/ LevelTower G

Town homes H

Estimated Total Unit count

Unit/ Level

Unit/ Level

Unit/ Level

Page 14: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15

5.0 Parking5.0.1 proposed parking requirement

Bachelor or suite 5% 0.80 /unit1BD 60% 0.90 /unit2BD 25% 1.00 /unit3BD 10% 1.30 /unit4BD 0% NAVisitors NA 0.15 /unit

100% 1.11

5.1 Parking Required- Lot 1- Tower A&B (Based on proposed parking ratio 1.11)

Parking RatioResidents 921 x 0.96 /unit 885Visitors 921 x 0.15 /unit 139

921.00 1.11 1,023

5.2 Parking Required- Lot 2- Tower D (Based on proposed parking ratio 1.11)

Parking RatioResidents 434 x 0.96 /unit 417Visitors 434 x 0.15 /unit 66

434.00 1.11 482

5.3 Parking Required- Lot 3- Tower E&F (Based on proposed parking ratio 1.11)

Residents 740 x 0.96 /unit 711Visitors 740 x 0.15 /unit 111

740.00 1.11 822

5.4 Parking Required- Lot 4- Tower G (Based on proposed parking ratio 1.11)Parking Ratio Parking Spaces

Residents 573 x 0.96 /unit 551Visitors 573 x 0.15 /unit 86

573.00 1.11 637

5.5 Parking Provided - lot 1 Tower A&BResidents Visitors BF Type A* BF Type B* Parking Spaces

Surface 0 0 0Level P1 12 139 7 10 151Level P2 245 6 9 245Level P3 253 253Level P4 253 253Level P5 253 253

1,016 139 13 19 1,155

5.6 Parking Provided - lot 2 Tower DResidents Visitors BF Type A* BF Type B* Parking Spaces

Surface 0 0 0 0 0Level P1 34 66 3 3 100Level P2 107 3 3 107Level P3 107 0 0 107Level P4 107 0 0 107Level P5 107 0 0 107

462 66 6 6 528

5.7 Parking Provided - lot 3 Tower E&FResidents Visitors BF Type A* BF Type B* Parking Spaces

Surface 0 0 0 0Level P1 0 133 6 5 133Level P2 168 4 5 168Level P3 168 168Level P4 168 168Level P5 168 168Level P6 134 134

806 133 10 10 939

* Included in Resident and Visitor parking spaces

5.8 Parking Provided - lot 4 Tower GResidents Visitors BF Type A* BF Type B* Parking Spaces

Surface 28 6 0 34Level P1 153 80 5 8 246Level P2 239 5 8 252Level P3 118 118

538 86 10 16 650

Total

Total

Total

Total

Total

Total

Proposed Unit mix Proposed Parking Requirement Ratio

Parking Ratio Parking Spaces

Parking Spaces

Parking Spaces

Unit Type

Total

Total

Total

Page 15: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15

6.0 Bicycle Parking

6.1 Total Bicycle Parking RequiredNo. of Units Ratio Bicycle Parking Spaces

Residents 2668 x 0.68 /unit 1,814Visitors 2668 x 0.07 /unit 187

Total Total Bicycle Parking Required 2,001

6.2 Bicycle Parking Provided - lot 1Bicycle Parking Spaces

Level 1 Outdoor 0Level 1 Indoor 0Level P1 indoor 722

Total Bicycle Parking Provided - lot 1 722

6.3 Bicycle Parking Provided - lot 2Bicycle Parking Spaces

Level 1 Outdoor 0Level 1 Indoor 0Level P1 indoor 389

Total Bicycle Parking Provided - lot 2 389

6.4 Bicycle Parking Provided - lot 3Bicycle Parking Spaces

Level 1 Outdoor 0Level 1 Indoor 0Level P1 indoor 779

Total Bicycle Parking Provided - lot 3 779

6.5 Bicycle Parking Provided - lot 4Bicycle Parking Spaces

Level 1 Outdoor 0Level 1 Indoor 0Level P1 indoor 365

Total Bicycle Parking Provided - lot 4 365

6.6 Total Bicycle Parking ProvidedNo. of Units Bicycle Parking Spaces

Total Total Bicycle Parking Provided 2668 x 2,255Total Ratio Provided

0.80 /unit

Page 16: TO: FROM: SUBJECT: Updated Site Plan · — 0.9 spaces/unit for one-bedroom units — 1.0 spaces/unit for two-bedroom units — 1.3 spaces/unit for three-bedroom units; and — 0.15