Spiire Australia Pty Ltd ABN 55 050 029 635 T 61 3 5448 2500 spiire.com.au
16 Bridge St PO Box 1064 Bendigo Victoria 3550 Australia
G:\30\300477\R01 002 Drainage Strategy Progress Report .docx Page 1
Report
To Roy Cai
From Spiire Date 13 September 2014
Project Name Beryl Street Oakleigh South Reference 300477R01
Subject Drainage Strategy and Preliminary Modelling/Functional Design Progress Report
1 Meeting with Council
Spiire has met with James Patterson and Adrian Willoughby from the City of Monash on the 10th June
2014 to discuss drainage matters relating to the proposed development site.
Key outcomes were as follows:
- The development is to retard site developed flows back to pre-development levels.
- The development does not need to consider the impacts of increased volume downstream of the
site. Note: This is not usually the case however Council as the responsible authority can overrule
the general requirements of Clause 56 of the Victorian Planning Provisions.
- The development will not require WSUD, however a GPT may be required. Note: This is not
usually the case however Council as the responsible authority can overrule the general
requirements of Clause 56 of the Victorian Planning Provisions.
- The site either needs to be able to convey existing overland flows through the site and or divert
them around the site demonstrating no detrimental impact to surrounding properties.
- 150mm freeboard to garage level and 300mm freeboard to building floor level will be required for
the development from overland flow / storage for the 1 in 100 year ARI levels.
- An auxiliary flow path will be required for events larger than 1 in 100 year ARI.
Key discussions:
- The discussion of diverting external flow around the site was tabled, (it will be very difficult to
convey flows through the site to free board requirements and also provide onsite detention the
separation of internal and external flows will be critical) Council were in favor as long as it could be
demonstrated that no detrimental impact was caused to surrounding properties. It was noted that
this would require alteration to existing traffic calming devices in Beryl Avenue.
- There was discussion about using the open space for a percentage of the storage.
- Council were in favor of the overland flow path to Golf Road.
- There was discussion about two retarding areas to split the site. See attached sketch 1.
- There was discussion about the limitations of the existing drainage depth 1.1m to invert.
-
Spiire Australia Pty Ltd ABN 55 050 029 635 T 61 3 5448 2500 spiire.com.au
16 Bridge St PO Box 1064 Bendigo Victoria 3550 Australia
G:\30\300477\R01 002 Drainage Strategy Progress Report .docx Page 2
2 Preliminary 2 dimensional (2d) Modelling
Spiire have undertaken a preliminary 2d modelling of the site along with additional survey to include
the full road reserve.
Catchment plans have been calculated from Landvic data and XPstorm 2D model conducted based
on the existing terrain. The rational formula method has been used for 100 year (1% probability) inflow
hydrographs.
2.1 Existing Conditions Preliminary Modelling
The existing model indicates flows from catchment A (South East) are directed north up Bakers Rd
and across the existing site due to limited survey. These flows may implicate the existing northern
neighboring properties.
The minimum freeboard to the residents is at Lot 107 with a predicted freeboard of 430mm and Lot 27
with 500 freeboard which is greater than the min 300mm.
2.2 Proposed Development Preliminary Modelling
The proposed development area was eliminated from the 2D model. Results show the 100 year flows
will be redirected away from crossing the proposed development site and the northern properties. An
overland flow will occur to the north of Bakers Rd. Our model though has not allowed this discharge to
occur. The model directs flows around to Golf Rd and Delia St. Our model does not consider flow
levels further North to Golf Rd. The flow levels to Golf Rd are increased in height. The approximate
maximum increase in water depth is 130mm in front of Lot 111. Refer attached diagrams.
Minimum freeboard to the residents is at Lot 107 with a maintained 460mm and Lot 27 with 500mm
freeboard. A manual check of the cross section at Golf Rd confirms the flow heights are consistent
with a manning’s formula check.
The flows are considered acceptable with freeboards to the existing resident’s floor level being above
300mm.
The design levels of the estate will need to consider the flow elevation determined from the 2d model.
In particular floor heights to Bakers Rd. Further investigation of the Bakers Rd flow path will be
-
Spiire Australia Pty Ltd ABN 55 050 029 635 T 61 3 5448 2500 spiire.com.au
16 Bridge St PO Box 1064 Bendigo Victoria 3550 Australia
G:\30\300477\R01 002 Drainage Strategy Progress Report .docx Page 3
undertaken during detailed design and conversations held with council about a provision for overland
flows to be maintained North of Bakers Rd.
3 Preliminary On Site Detention Computations and Drainage Layout
Preliminary on site detention calculations for the development site have been conducted. The outcome
of these calculations are:
- Approximately 107 m3 of storage will be required on site to retard developed flows back to
predevelopment levels. This figure needs to be confirmed by obtaining an aerial of the site when it
was occupied by the school to determine the pre development fraction impervious. The allowable
discharge of 593 L/s has currently been estimated base on the previous zoning this needs to be
agreed with council.
- The detention storage is proposed to be stored using a Humes Stormtrap system. Humes has
been contacted and Spiire has supplied information to confirm the detention volume in the
proposed layout and determine costs. The system proposed will utilize a 1.175m internal height
units and have a heavy duty loading suitable for construction traffic.
- Detailed modelling and design needs to occur to ensure the detention storage size and incoming
pipes can convey the Q100 flows to Golf Rd.
The attached functional plans indicate a preliminary drainage layout.
4 Functional Layout.
A functional layout has been developed for services include water and sewerage. This layout is
preliminary only and required further computations and services design. The proposed development
will require a high level of services co-ordination. The existing sewer depths in the proximity of the
development look to have adequate depth the command the development.
5 Detailed Design.
Spiire believe the preliminary design work indicates the drainage strategy can be implemented and
functional design and further detailed design work can proceed to finalise the development.
© Spiire
The information contained in this document is intended solely for the use of the client identified in the ‘To’ field for the purpose
for which it has been prepared and no representation is made or is to be made or is to be implied as being made to any third
party. Other than for the exclusive use of our client, no part of this report may be reproduced, stored in a retrieval system or
transmitted in any form or by any means, electronic, mechanical, photocopying or otherwise, without the prior written permission
of Spiire Australia Pty Ltd.
-
A FUNCTIONAL LAYOUT PLANS
SIM DEVELOPMENT PTY LTD
BERYL AVE SUBDIVISIONFUNCTIONAL LAYOUT
file name 300477F1-FS.dwg layout name F1-1
file location G:\30\300477\ACAD
plotted by Joshua Hall plot date 11/9/2014 3:40 PM
ABN 55 050 029 635 Innovation in
Infrastructure
FUNCTIONAL LAYOUT
FACE SHEET
FUNCTIONAL ARRANGEMENT
SIM DEVELOPMENT PTY LTD
CITY OF MONASHMELWAY -
01
PRELIMINARY
-
R.PLOURDE
-
J.HALL
G.ROZEN
469 La Trobe Street PO Box 16084 Melbourne Victoria 8007 Australia T 61 3 9993 7888
-
ABN 55 050 029 635 Innovation in
Infrastructure
BERYL AVE SUBDIVISION
FUNCTIONAL LAYOUT
CATCHMENT PLAN
SIM DEVELOPMENT PTY LTD
CITY OF MONASHMELWAY -
01
PRELIMINARY
-
J.HALL
-
J.KOEHLER
-
469 La Trobe Street PO Box 16084 Melbourne Victoria 8007 Australia T 61 3 9993 7888
-
IL57.49
IL57.21
IL56.02
IL56.00
IL57.47IL57.27IL57.14
IL5
7.1
5
IL57.16
IL5
7.1
6
IL56.72
IL57
.22
IL56.61
IL5
6.6
3IL
56
.65
IL5
4.9
5
IL54.8
6
IL56.72
IL5
4.9
0
A FUNCTIONAL DRAWING FOR APPROVAL J.Hall 11/09/14
file name 300477F2-FP.dwg layout name F2-1
file location G:\30\300477\ACAD
plotted by Joshua Hall plot date 11/9/2014 3:43 PM
ABN 55 050 029 635 Innovation in
Infrastructure
BERYL AVE SUBDIVISION
FUNCTIONAL LAYOUT
EXISTING CONDITIONS PLAN
SIM DEVELOPMENT PTY LTD
CITY OF MONASHMELWAY -
02
PRELIMINARY
-
R.PLOURDE
-
J.HALL
G.ROZEN
469 La Trobe Street PO Box 16084 Melbourne Victoria 8007 Australia T 61 3 9993 7888
-
IL57.49
IL57.21
IL56.02
IL56.00
IL57.47IL57.27IL57.14
IL57.1
5
IL57.16
IL57.1
6
IL56.72
IL57
.22
IL56.61
IL56.6
3IL
56.6
5
IL54.9
5
IL54.8
6
IL56.72
IL54.9
0
A FUNCTIONAL DRAWING FOR APPROVAL J.Hall 11/09/14
file name 300477F2-FP.dwg layout name F2-2
file location G:\30\300477\ACAD
plotted by Joshua Hall plot date 11/9/2014 4:37 PM
ABN 55 050 029 635 Innovation in
Infrastructure
BERYL AVE SUBDIVISION
FUNCTIONAL LAYOUT
SHEET LAYOUT
SIM DEVELOPMENT PTY LTD
CITY OF MONASHMELWAY -
03
PRELIMINARY
-
R.PLOURDE
-
J.HALL
G.ROZEN
469 La Trobe Street PO Box 16084 Melbourne Victoria 8007 Australia T 61 3 9993 7888
-
IL54.9
5
IL54.8
6
IL54.9
0
A FUNCTIONAL DRAWING FOR APPROVAL J.Hall 11/09/14
file name 300477F2-FP.dwg layout name F2-3
file location G:\30\300477\ACAD
plotted by Joshua Hall plot date 12/9/2014 9:27 AM
ABN 55 050 029 635 Innovation in
Infrastructure
BERYL AVE SUBDIVISION
FUNCTIONAL LAYOUT
FUNCTIONAL LAYOUT
SIM DEVELOPMENT PTY LTD
CITY OF MONASHMELWAY -
04
PRELIMINARY
-
R.PLOURDE
-
J.HALL
G.ROZEN
469 La Trobe Street PO Box 16084 Melbourne Victoria 8007 Australia T 61 3 9993 7888
-
IL57.21
IL56.02
IL57.27IL57.14
IL57.1
5
IL57.16
IL57.1
6
IL56.72
IL57
.22
IL56.61
IL56.6
3IL
56.6
5
IL56.72
A FUNCTIONAL DRAWING FOR APPROVAL J.Hall 11/09/14
file name 300477F2-FP.dwg layout name F2-4
file location G:\30\300477\ACAD
plotted by Joshua Hall plot date 11/9/2014 4:25 PM
ABN 55 050 029 635 Innovation in
Infrastructure
BERYL AVE SUBDIVISION
FUNCTIONAL LAYOUT
FUNCTIONAL LAYOUT
SIM DEVELOPMENT PTY LTD
CITY OF MONASHMELWAY -
05
PRELIMINARY
-
R.PLOURDE
-
J.HALL
G.ROZEN
469 La Trobe Street PO Box 16084 Melbourne Victoria 8007 Australia T 61 3 9993 7888
-
IL57.49
IL57.21
IL57.47IL57.27IL57.14
IL57.1
5
IL57.16
IL57.1
6
file name 300477F2-FP.dwg layout name F2-5
file location G:\30\300477\ACAD
plotted by Joshua Hall plot date 11/9/2014 4:25 PM
ABN 55 050 029 635 Innovation in
Infrastructure
BERYL AVE SUBDIVISION
FUNCTIONAL LAYOUT
FUNCTIONAL LAYOUT
SIM DEVELOPMENT PTY LTD
CITY OF MONASHMELWAY -
06
PRELIMINARY
-
R.PLOURDE
-
J.HALL
G.ROZEN
469 La Trobe Street PO Box 16084 Melbourne Victoria 8007 Australia T 61 3 9993 7888 A FUNCTIONAL DRAWING FOR APPROVAL J.Hall 11/09/14
-
6.0M
2.15M600 600200
1.35M
750MM
1000
2.15M
1.1
75
2.35
1.1
75
6.0M
9.5M
2.35M 1M0.7M
A FUNCTIONAL DRAWING FOR APPROVAL J.Hall 11/09/14
file name 300477F3-XS.dwg layout name F3-1
file location G:\30\300477\ACAD
plotted by Joshua Hall plot date 12/9/2014 9:29 AM
ABN 55 050 029 635 Innovation in
Infrastructure
BERYL AVE SUBDIVISION
FUNCTIONAL LAYOUT
SIM DEVELOPMENT PTY LTD
CITY OF MONASHMELWAY -
07
PRELIMINARY
-
R.PLOURDE
-
J.HALL
G.ROZEN
469 La Trobe Street PO Box 16084 Melbourne Victoria 8007 Australia T 61 3 9993 7888