to cn i 1 acoustic positioning, simrad hipap 500 ...plan view 1 i proposed "uc-jks-oi" chevron 06"...
TRANSCRIPT
-
PLAN VIEW
s
i
T 8 to CN
i
3 i i
i
1 6
5.000
+ +
oo ;H
+
26• 13" 00-f
01
+
START OF SURVEY AT P L E T - J K S 5 2 - 0 0
X = 2 , 1 5 1 , 0 2 0 Y = 9 . 5 1 2 , 4 8 3 L a t . = 26 " 12* 2 6 . 2 3 M N L o n . = 9 1 ' 2 6 ' 3 2 . 2 4 M W
n o w — — SEiG. NO. 18415
ROW NUMBER = G29101 TOTAL LENGTH= 66.726.95 FT (12.64ml)
AS-BUI'LT "PF-JKS-02" CHEVRON 10" BLKO PIPEUNE
PROPOSED -UC-JKS-OI - CHEVRON 0 6 ' CONTROL UUBIUCAL SEC|1l&«8
- PROPOSEO ' U P - J K S - O r CHEVRON 09"P0WER UUBIUCML S E G | i 8 « 7 EXISTING "PF-JKS-OI " CHEVRON 10'BLKO SEC#ll8416
ypp.S 12.500
+ 8 O o
BLOCK LINE CROSSING
X = 2 , 1 5 4 . 2 4 0 Y = 9 , 5 1 2 , 5 4 1 L a t . = 2 6 ' 1 2 ' 2 6 . 4 2 ' " N L o n . = 9 1 ' 2 5 ' 5 6 . 8 7 M W
l=9.5to.ooo
+ + + +
-f-
o
26* 12' GOV
Bj II
AS-BUILT " P F - J K S - 0 2 " CHEVRON 10" BLKO PIPELINE SEGMENT#18415 POINT X-COORDINATE Y-COORDINATE DESCRIPTION
1 2.151,020 9.512.463 PLET-JKS32-00 2 2.151.044 ?,512 J483 TAILPIPE ASSMEBLY/START OF SPAN 3 2.151,127 9,bl2.4U4 ENO OF SPAN 4 2,151.529 9.512.492 FIELD JOINT 5 2.191.937 0,512,505 FIELD JOINT 6 2.152.339 9,512,521 FIELD JOINT 7 2.152.733 9,512,534 FIELD JOINT 8 2.153,137 9,512,535 FIELD JOINT 9 2.153,546 9,512,536 FIELD JOINT 10 2,153.952 9,512.539 FIELD JOINT 11 2.154.358 9,512.541 FIELD JOINT 12 2,154,753 9.512,546 FIELD JOINT 15 2,155.161 9,512.54.9 FIELD JOINT 14 2,155,558 9.512.550 FIELD JOINT
1) PIPEUNE COORDINATES ARE THE POSITIONS OF THE R.O.V. (REMOTELY OPERATED VEHICLE) LOCATED
AT THE POINTS USING VERIPOS LD2 ULTRA DGPS RECEIVING SPOTBEAU CORRECTIONS. VERIPOS STANDARD OOPS RECEIVING INMARSAT CORRECTIONS POSITIONING. SONARDYNE FUSION LDL (LONG BASEUNE) ACOUSTIC POSITIONING, SIMRAD HIPAP 500 SSBL ft RDI WORKHORSE DVL POSITIONING.
2) SURVEYED COORDINATES TRANSFORMED FROM WAD83 (CPS DATUM) NAOCON VERSION 2 . 1 .
3) THIS DRAWING IS NOT FOR NAVIGATION. PIPEUNES ANO FEATURES IN THE IMMEDIATE VICINITY ARC OBTAINED FROM BOEU (BUREAU OF OCEAN ENERGY MANAGEMENT) ft BSEE (BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT) DATABASE AND CUENT PROVIDED DATA.
4) AS-BUILT SURVEY DATE: NOVEMBER 1 0 - 1 1 . 2013
LEGEND
WH634
+
AS-BUILT "PF-JKS-02" CHEVRON 10" BLKO PIPEUNE SEC#18413 EXISTING PIPEUNES/UMBIUCALS/FLYING LEADS/JUMPERS PROPOSED PIPEUNES/UMBIUCALS/FLYING LEADS/JUMPERS
LEASE BLOCK BOUNDARIES
MATCHUNE WITH ADJOINING CHART
MOORING WIRES
PROPOSED STRUCTURES
EXISTING STRUCTURES
UTEC AS-FOUND/AS-BUILT STRUCTURES
GEOGRAPHICAL TICKS
UTM TICKS WELLS
GEODESY
Survty Dotum: NAO 27 Elllpiold: Clark* 1B66 Projtcllon: Unlvarsal T r a n t v i n t Uo rec tor ZONC 15N Longltudt of Control Mtrfdlan: 95*w FolM Eotllnfl (m) : 500 000 Fa l l . Northing (m) : 0 Scalf Factor at Central Mfridlan: 0.99960 Unti l : US Survty F.ot
cwiwo comer AS JO m mnomi POSITION OF m AS-BUILT PIPEUNE BASED ON THE SURVEY METHODS NOTED.
NATHAN EBY, R.P.L5. TCXAS RCG S6f9S
Thti decumant moy only bn ut«d for tho purpoto for which It wai oommlit lonod and In accordanc* with tho U r m i of ongogtmont for lhal comml i i lon . Unaulhorliod uio of Ih l i documint In any form whatioovor I i undortakon ontlroly at Iho uior'o r l ik .
LOCATION PLAN (N.T.S) 1
Chevron
technip T E C H N I P U S A , Inc.
UTEC 7240 BRITTMOORE RD. SUFTE 110
HOUSTON, TEXAS 77041 Tel 7li-984-8688
U ( . Fax 713-984-8683 Websl e www.utecsurvey.com
JACK & ST.MALO RELD DEVELOPMENT CAMPAIGN AS-BUILT ,,PF-JKS-02n CHEVRON IO'1 BLKO PIPEUNE
SEGMENT#18415^/ u f ^ ^ WALKER RIDGE AREA BLOCK 758 TO WALKER RIDGE AREA BLOCK 718
GULF OF MEXICO
500
Scale 1" = 500' 500 1000 1500
US SURVEY FEET
2000 2500
Rev. No. Date Comment Interor. Checked Appr. 0 03/03/14 ISSUED AS RNAI VR MG IW
A2 01/22/14 ISSUED FOR CLIENT COMMENTS VR MG IW
Al 01/14/14 ISSUED FOR CLIENT COMMENTS VR MG UV
Survey Dates: November 10-11, 2013
UTEC Ref. No. 60 IW-12-048 Plot Size ANSI D
Survey Vessel: HOS Iron Horse
UTEC Drawing No. 601W-12-048-022 Sheet Of 001 007
V
-
PLAN VIEW
1 i
PROPOSED "UC-JKS-OI" CHEVRON 06 " CONTROL UUBilUCAL SEC#ie428
PROPOSED " U P - J K S - O r CHEVRON 09"P0WER UMB1IUCAL SEG#16427
r
i 26" 13' 00-f
Y=9,5I5.000
+ + + +
SEG. NO. 1 8 4 1 5 ROW NUMBER = G 2 9 1 0 1
/ AS-BUIL T "Pr~JKS-02"'
s CHEVRON 10" BLKO PIPELINE
L I?!??!!*?.rJ*1?"0.1,'. _cJl^ow !?!?!^9_ ?EC#i B41 e
o Y=9 15I2.500
20 O O o o
+ o
+ o
+ o o
Y=9.5I0.000 : 6 • i
o " I ^1
+
i i
+
N
+ V
V
+ -
26* 12' 00-K
8 f s •— r -
i l l
AS-BUILT "PF-JKS-02 " CHEVRON 10" BLKO PIPELINE SEGMENT#18415 X-COORDINATE Y-COORDINATE DESCRIPTION
15 2.155.964 9,512,550 FIELD JOINT 1 6 2.156,368 9,512,548 FIELD JOINT 17 2.156.773 9.512.551 FIELD JOINT 18 2.157.178 9.512.554 FIELD JOINT 19 2.157,577 9.512,555 FIELD JOINT 20 2,157,987 9,512,552 FIELD JOINT 21 2,158,390 9,512,556 FIELD JOIN! 22 2,158,757 9,512,550 FIELD JOINT 23 2.159.157 9,517,505 FIELD JOINT 24 2,159.550 9.512.572 FIELD JOINT 25 2,159.953 9.512.575 FIELD JOINT 26 2,160,368 9.512.578 FIELD JOINT 27 2,160,731 9.512.582 FIELD JOINT 28 2,161.157 9,512.583 FIELD JOINT 29 2,161,528 9,512.588 FIELD JOINT 30 2,161.933 9,512.591 FIELD JOINT 31 2,162.339 9,512.595 FIELD JOINT 32 2,162.743 9.512.596 FIELD JOINT 33 2.163,141 9,512,598 FIELD JOINT 34 2,163,547 9.512.598 FIELD JOINT 55 2.163,950 9,512,602 FIELD JOINT 36 2.164,354 9.512,604 FIELD JOINT 57 2,164.751 9,512,606 FIELD JOINT 58 2.165,127 9,512,605 FIELD JOINT 39 2,165,528 9,517,606 FIELD JOINT
camiiasHMaH 40 2,165.924 4 1 ~ 2!l66:33T
9.512,609 DESCRIPTION
9 , 5 1 2 . 6 1 4 FIELD JOINT FIELD JOINT
1) PIPEUNE COORDINATES ARE THE POSITIONS OF THE R.O.V. (REMOTELY OPERATED VEHICLE) LOCATED
AT THE POINTS USING VERIPOS LD2 ULTRA DGPS RECEIVING SPOTBEAM CORRECTIONS. VERIPOS STANDARD DGPS RECEIVING INMARSAT CORRECTIONS POSITIONING. SONARDYNE FUSION LBL (LONG BASEUNE) ACOUSTIC POSITIONING. SIMRAD HIPAP 500 SSBL ft RDI WORKHORSE DVL POSITIONING.
2) SURVEYED COORDINATES TRANSFORMED FROM NAD85 (CPS DATUM) NAOCON VERSION 2 .1 .
3) THIS ORAWINC IS NOT FOR NAVIGATION. PIPEUNES AND FEATURES IN THE IMMEDIATE VICINITY ARE OBTAINED FROM BOEM (BUREAU OF OCEAN ENERCY MANAGEMENT) ft BSEE (BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT) DATABASE ANO CUENT PROVIDED OATA.
4) AS-BUILT SURVEY DATE: NOVEMBER 1 0 - 1 1 . 2013
WRG34
it
+
+
LEGEND AS-BUILT "PF-JKS-02" CHEVRON 10" BLKO PIPEUNE SEG#ia415 EXISTING PIPEUNES/UMBIUCALS/FLYING LEADS/JUMPERS PROPOSED PIPEUNES/UMBIUCALS/FLYING LEADS/JUMPERS
LEASE BLOCK BOUNDARIES
MATCHUNE WITH ADJOINING CHART
MOORING WIRES
PROPOSED STRUCTURES
EXISTING STRUCTURES
UTEC AS-FOUND/AS-BUILT STRUCTURES
GEOGRAPHICAL TICKS
UTM TICKS WELLS
GEODESY Survty Ootum: NAD 27 Ellipsoid: Clark* 1866 Projec'lon: Unhronol Tronsvorso Morcator ZONE ISN Longlludo of Confrol Utrldlon: 93*W Folio Eaitlng (m): 300 000 Folio Northing (m): 0 Scalo Facior al Conlral Morldlan: 0.99960 Unit i : US Survoy Fool
POSITION OF THE AS-BUILT PIPEUNE BASED ON THE SURVEY METHODS NOTED.
NATHAN EBY, R.P.LS. TEXAS REG /6198
This doaumonl moy only bo ustd for tho purposo for which It was oommlsslonod and In accordanco with Iho forms of ongagsmtnl for lhat commission. Unaulhorlsod uio of Ihls documsnt In any form whalsosvtr Is undsriakon ontlroly a l tho ussr's risk.
LOCATION PLAN (N.T.S)
Chevron
lechnip I f C l I N U ' U S A , Inr.
y UTEC 7240 BRITTMOORE RD. SUITE 110
HOUSTON.TEXAS 77041 Tel 713-984-8688
U i u fax 713-984-8683 Websl e wvvw.utecsurvey.com
JACK & ST.MALO FIELD DEVELOPMENT CAMPAIGN AS-BUILT "PF-JKS-OZ" CHEVRON 10" BLKO PIPELINE
SEGMENT#18415 WALKER RIDGE AREA BLOCK 758 TO WALKER RIDGE AREA BLOCK 718
GULF OF MEXICO
Scale 1" = 500' 500 1000 1500 2500
US SURVEY FEE
Survey Dates: November 10-11,2013
UTEC Ref. No. 601W-12-048 Plot Size ANSI D
Rev. No. Date Comment Interpr. Checked Appr. 0 03/03/14 ISSUED AS FINAL VR IW
A? 01/22/14 ISSUED FOR CUENT COMMENTS VR MG IW
Al 01/14/14 ISSUED FOR CLIENT COMMENTS VR MG UV
Survey Vessel: HOS Iron Horse
UTEC Drawing No. 60IW-12-048-023 Sheet Of 002 007
-
PLAN VIEW
lE.9.512.500
8
s
T 8
i
1=9,513.000
+
o
o —•
26" 13' 00"h
+
SEG. NO. 1 8 4 1 5 ROW NUMBER = 0 2 9 1 0 1
TOTAL LENGTH= 6 6 . 7 2 6 . 9 5 FT ( 1 2 . 6 4 m l )
AS-BUILT PF-JKS-02 CHEVRON 10" BLKO PIPELINE
PROPOSED "UC-JKS-OI" CHEVRON 08" COHTROL UMBIUCAL SEC#1842B
PROPOSED "UP-JKS-01" CHEVRON 09"POWER UMBIUCAL SEC#1B427
, EXISTING "PF-JKS-OI" CHEVRON 10"BU
-
PLAN VIEW
Y. a9.5l5.000
1^9.510.000
O
T 8
7^ 8 o
2r 13' 00't
now
O CO
+
SEG. NO. 1 8 4 1 5 ROW NUMBER = G 2 9 1 0 1
TOTAL LENGTH= 6 6 . 7 2 6 . 9 5 FT ( 1 2 . 6 4 m l )
AS-BU/LT PF-JKS-02 CHEVRON 10" BLKO PIPELINE
PROPOSED "UC-JKS-OI" CHEVRON 06" CONTROL UUBIUCAL SEC#1B428
PROPOSED "UP-JKS-01" CHEVRON 09"P0WER UUBIUCAL SEC#IB427
. .EXISTING "PF-JKS-OI" CHEVRON 10"BLXO SEG#ie41« _
to
•
\
+
o 8 2? O
\
+ +
ULOCK LINE CROSSINC X = 2.185.920 Y • 9.512.787 Urt.B 26* 12' 24.95"N Lon.= 91 ' 20' 09.02"W
•e- o 9o5
I i L
2ft" 12" 00" !
AS-BUILT M P F - J K S - 0 2 " CHEVRON 10 " BLKO PIPELINE SEGMENT#18415 X-COORDINATE Y-COORDINATE DESCRIPTION X-COORDINATE Y-COORDINATE DESCRIPTION
69 2.177,561 9.512.739 FIELD JOINT 94 2.167.547 9,512,798 FIELD JOINT 70 2.177.952 9.512,737 FIELD JOINT 9b 2.187,914 9,512,805 FIELD JOINT 71 2.178.349 9,512,739 FIELD JOINT 96 2.168,316 9,512,813 FIELD JOINT 72 2.178.756 9,512.740 FIELD JOINT 73 2.179.159 9.512.740 FIELD JOINT 74 2.179.562 9.512.743 FIELD JOINT / 5 2,179,964 9.512,749 FIELD JOINT 76 2.180.371 9.512,754 FIELD JOINT 77 2.180,775 9,512.758 FIELD JOINT 78 2.181,162 9,512,762 FIELD JOINT 79 2,161.581 9,512,766 FIELD JOINT 60 2.181,966 9,512.771 FIELD JOINT 81 2,182,369 9.512.774 FIELD JOINT 82 2.162,756 9.512.776 FIELD JOINT 83 2.163,153 9.512,777 FIELO JOINT 84 2.183,559 9,512,776 FIELD JOINT 65 2,163.963 9.512,779 FIELD JOINT 66 2.184.364 9.512.781 FIELD JOINT 87 2.164,766 9.512.782 FIELD JOINT 88 2.165,172 9.512.764 FIELD JOINT 89 2.185.533 9.512.764 FIELD JOINT 90 2.185.933 9.512.787 FIELD JOINT 91 2.166.339 9.512.766 FIELD JOINT 92 2.166.744 9.512.767 FIELD JOINT 93 2.167.150 9.512.792 FIELD JOINT
1) PIPEUNE COORDINATES ARE THE POSITIONS OF THE R.O.V. (REMOTELY OPERATED VEHICLE) LOCATED
AT THE POINTS USING VERIPOS LD2 ULTRA DGPS RECEIVING SPOTBEAM CORRECTIONS. VERIPOS STANDARD DCPS RECEIVING INMARSAT CORRECTIONS POSITIONING. SONARDYNE FUSION LBL (LONG BASEUNE) ACOUSTIC POSITIONING. SIMRAD HIPAP 500 SSBL & RDI WORKHORSE DVL POSITIONING.
2) SURVEYED COORDINATES TRANSFORMED FROM NAD83 (CPS DATUM) NADCON VERSION 2 . 1 .
3) THIS ORAWINC IS NOT FOR NAVIGATION. PIPEUNES AND FEATURES IN THE IMMEDIATE VICINITY ARE OBTAINED FROM BOEU (BUREAU OF OCEAN ENERCY MANAGEMENT) A BSEE (BUREAU OF SAf ETY ANO ENVIRONMENTAL ENFORCEMENT) DATABASE ANO CUENT PROVIDED DATA.
4) AS-BUILT SURVEY DATE: NOVEMBER 10 -11 . 2013
WH634
+
LEGEND AS-BUILT "PF-JKS-02" CHEVRON 10" BLKO PIPEUNE SEG#184I5 EXISTING PIPEUNES/UMBIUCALS/FLYING LEADS/JUUPERS PROPOSED PIPELINES/UUBIUCALS/FLYINC LEADS/JUMPERS
LEASE BLOCK BOUNDARIES
MATCHUNE WITH ADJOINING CHART
MOORING WIRES
PROPOSED STRUCTURES
EXISTING STRUCTURES
UTEC AS-FOUND/AS-BUILT STRUCTURES
GEOGRAPHICAL TICKS
UTU TICKS WELLS
GEODESY
Survoy Dotum: KAO 27 Elllptold: ClorVo 186« Projoctlon: Untvorvol Trontvono Morcotor ZONE 15N Longttudo of Conlrol Mtrldlon: 9 r w Folio Eaitlng (m): 500 000 Folto Northing (m): 0 Scalo Facior at Conlral Morldlan: 0.99960 Unit i : US Survoy Fool
ctmM coMtcr AS ro m mnomAL POSITION Of TH€ AS-BUILT PIPEUNE BASED ON THE SURVEY UETHODS NOTED.
NATHAN EBY, R.P.LS. TEXAS REG /6I98
Thlo dooumonl may only bo uiod for Iho purpoio for which tt wai oommli i lonod and In accordanco with Iho terms of ongagomonl for that comml i i lon . Unauthorliod uso of this documonl In any form whatioovor !• undortakon ontlroly at tho ussr's risk.
LOCATION PLAN (N.T .S)
Chevron
lechnip T E C H N I P U S A . Inc
y UTEC 7240 BRITTMOORE RD. SUITE 110
HOUSTON, TEXAS 77041
Tel 713-984-8688 u .fax 713-984-8683
Websl e www.utecsurvey.com
JACK & ST.MALO FIELD DEVELOPMENT CAMPAIGN AS-BUILT ,•PF-JKS-02,, CHEVRON 10" BLKO PIPELINE
SEGMENT* 18415 WALKER RIDGE AREA BLOCK 758 TO WALKER RIDGE AREA BLOCK 718
GULF OF MEXICO Scale 1" = 500' 500 1000 1500
US SURVEY FEET
2000 2500
Rev. No. Date Comment Interor. Checked Appr. 0 03/03/14 ISSUED AS FINAL VR MG IW
A2 01/22/14 ISSUED FOR CLIENT COMMENTS VR MG IW
Al 0 1 / M / M ISSUED FOR CLIENT COMMENTS VR MG IW
Survey Dates: November 10-11, 2013 Survey Vessel: HOS Iron Horse
UTEC Ref. No. 601W-12-048 Plot Size ANSI D
UTEC Drawing No. 601W-12-048-025 Sheet Of
004 007
-
PLAN VIEW
8
W R 7 6 1
/
s
N
•f now-
•f
SEG. NO. 18415 ROW NUMBER = G29101
TOTAL LENGTH= 66,726.95 FT (12.64ml) AS-BUIL T PF -JKS-02
CHEVRON 10" BLKO PIPELINE
* * * * * 06' C 0 N r « * O ^ U C A L
Or •f
EXISTING - p r - J K S - 0 1 - CHEVRON .O'BIXO SE 0#18«18
• ® — e — e — © — — o — e — e — © — * o
/ / (V /
rf/ S/ 1
/ o' / Ol
/ Of / 4
§ 8
,9 ' v
I
N
22SL
AS-BUILT " P F - J K S - 0 2 " CHEVRON 10" BLKO PIPELINE SEGMENT#18415 POINT X-COORDINATE Y-COORDINATE DESCRIPTION X-COORDINATE Y-COORDINATE DESCRIPTION
97 2,188.684 9,512.815 FIELD JOINT 122 2,194,040 9,513.570 FIELD JOINT yu 2.189.084 9,512,819 FIELD JOINT 123 2.194,429 9,513,682 FIELD JOINT 99 2,189,281 9 ^ 1 2 , 8 2 1 FIELD JOINT 124 2,194.775 9,513.787 FIELD JOINT
100 2,189,405 9.512,823 FIELD JOINT 125 2,195,105 9.513,899 FIELD JOINT 101 2.189,683 9.512.826 FIELD JOINT 126 2,195,550 9,514,01 1 FIELD JOINT 102 2,189,885 9,512.831 FIELD JOINT 127 2.195.937 9,514,128 FIELD JOINT 103 2 J 90,088 9,512,836 FIELD JOINT 128 2,196.323 9.514,241 FIELD JOINT 104 2,190,292 9,512,845 FIELD JOINT 129 2,196,707 9,514.360 FIELD JOINT 105 2,190,494 9,512.854 FIELD JOINT 130 2,197,094 9,514,474 FIELD JOINT 106 2,190,693 9,512,865 FIELD JOINT 131 2,197.482 9,514.588 FIELD JOINT 107 2,190,897 9.512,882 FIELD JOINT 132 2,197,865 9,514.703 FIELD JOINT 108 2,191,097 9,512,902 FIELD JOINT 133 2,198,247 9,514.820 FIELD JOINT 109 2.191.295 9,512.925 FIELD JOINT 134 2,198.640 9,514,937 FIELD JOINT 110 2.191,493 9.512.954 FIELD JOINT 135 2.198.830 9,514,996 FIELD JOINT 111 2,191,691 9,512,986 FIELD JOINT 136 2,199,022 9,515.054 FIELD JOINT 112 2.191.888 9,513,019 FIELD JOINT 137 2,199,211 9.515.113 FIELD JOINT 113 2,192,089 9,513.056 FIELD JOINT 138 2,199,403 9.515.176 FIELD JOINT 114 2,192.288 9.513.096 FIELD JOINT l i b 2,192,488 9,513.138 FIELD JOINT n u 2,192.683 9.513,185 FIELD JOINT 117 2.192,876 9,513,234 FIELD JOINT 118 2.193,072 9,513,287 FIELD JOINT 1 19 2.193.264 9.513,341 FIELD JOINT 120 2.193,463 9.513.397 FIELD JOINT 121 2,193,655 9,513,453 FIELD JOINT
1) PIPEUNE COORDINATES ARE THE POSITIONS OF THE R.O.V. (REMOTELY OPERATED VEHICLE) LOCATED
AT THE POINTS USING VERIPOS LD2 ULTRA DCPS RECEIVING SPOTBEAM CORRECTIONS. VERIPOS STANDARD DCPS RECEIVING INMARSAT CORRECTIONS POSITIONING, SONARDYNE FUSION LBL (LONC BASEUNE) ACOUSTIC POSITIONING. SIMRAD HIPAP SOO SSBL ft RDI WORKHORSE DVL POSITIONING.
2) SURVEYED COORDINATES TRANSFORMED FROM NAD83 (CPS DATUM) NADCON VERSION 2.1 .
3) THIS DRAWING IS NOT FOR NAVIGATION. PIPEUNES AND FEATURES IN THE IMMEDIATE VICINITY ARE OBTAINED FROM BOEM (BUREAU OF OCEAN ENERGY MANAGEMENT) ft BSEE (BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT) DATABASE AND CUENT PROVIDED DATA.
4) AS-BUILT SURVEY DATE: NOVEMBER 10 -11 . 2013
LEGEND
WHG34
+
O 1
AS-BUILT "PF-JKS-02" CHEVRON 10" BLKO PIPEUNE SEG#18413 EXISTING PIPEUNES/UMBILICALS/aYINC LEADS/JUMPERS PROPOSED PIPELINES/UMBILICALS/FLYINC LEADS/JUMPERS
LEASE BLOCK BOUNDARIES
MATCHUNE WITH ADJOINING CHART
MOORING WIRES
PROPOSED STRUCTURES
EXISTING STRUCTURES
UTEC AS-FOUND/AS-BUILT STRUCTURES
GEOGRAPHICAL TICKS
UTM TICKS WELLS
GEODESY
Survoy Datum: NAD 27 Elllpiold: Clarko 1866 Projoctlon: Unlvonal Tranivono Morcator ZONE 15N Longlludo ol Conlral Mirtdlan: »TW Falio Eaitlng (m) : SOO 000 Folio Northing (m) : 0 Scalo Factor al Cmlral Morldlan: 0.99960 Units: US Surviy Fool
MW/VW cmecr AS TO mi mimrAL POSIWN OF THF AS-BUILT PIPEUNF BASED ON THE SURVEY METHODS NOTED.
v NATHi \
NATHAN EBY. R.PJ..S. TEXAS REG 06198
Thit documonl may only bo usod for Iho purposo far which II was commlsslonod and In accordanco with Iho lorms of ongagomonl for lhal commission. Unaulhorlsod uso of M l documonl In any form whatioovor Is undortakon ontlroly a l Iho usor's risk.
LOCATION PLAN (N.T.S)
Chevron
lechnip T E C H N I P U S A , Inc.
UTEC 7240 BRITTMOORE RD. SUITE 110
HOUSTON, TEXAS 77041 Tel 713-984-8688
^ , Fax 713-984-8683 Websl e www.utecsurvey.com
JACK & ST.MALO FIELD DEVELOPMENT CAMPAIGN AS-BUILT "PF-JKS-02n CHEVRON 10" BLKO PIPEUNE
SEGMENT#18415 WALKER RIDGE AREA BLOCK 758 TO WALKER RIDGE AREA BLOCK 718
GULF OF MEXICO
Scale 1" = 500' 500 1000 151
US SURVEY FEET
2500
Rev. No. Date Comment Interpr. Checked Appr.
0 03/03/14 ISSUED AS FINAL VR MG IW
A2 01/22/14 ISSUED FOR CLIENT COMMENTS VR MG IW
Al 01/14/14 ISSUED FOR CLIENT COMMENTS VR MG IW
Survey Dates: November 10-11, 2013
UTEC Ref. No. 601W-12-048 Plot Size ANSI D
Survey Vessel: HOS Iron Horse
UTEC Drawing No. 601W-12-048-026 Sheet Of 005 007
-
PLAN VIEW
i
AS-BUILT " P F - J K S - 0 2 " CHEVRON 10" BLKO PIPELINE SEGMENT#18415 POINT X-COORDINATE Y-COOROINATE DESCRIPTION POINT X-COORDINATE Y-COORDINATE DESCRIPTION
139 2.199.596 9,515,242 FIELD JOINT 164 2.203,922 9.517,775 FIELD JOINT 140 2.199.792 9.515,313 FIELD JOINT 165 2,204,072 9.517.906 FIELD JOINT 141 2,199.977 9.515,385 FIELD JOINT 166 2,204.366 9.518.172 FIELD JOINT 142 2.200,159 9.515,459 FIELD JOINT 167 2,204,676 9,518,438 FIELD JOINT 143 2.200.350 9,515,536 FIELD JOINT 166 2,20/. I8B7 9.516.622 FIELD JOINT 144 2,200,533 9.515.615 FIELD JOINT 169 2.205,104 9,518.810 SCR/FLOWLINE TRANSITION 145 2,200.717 9.515,703 FIELD JOINT 170 2,205,406 9.519,071 FIELD JOINT 146 2.200,898 9,515,794 FIELD JOINT 171 2,205,707 9.519.336 FIELD JOINT 147 2.201.075 9.515.887 FIELD JOINT 172 2,206,018 9.519.600 FIELD JOINT 148 2,201.249 9,515.977 FIELD JOINT 173 2,206,319 9.519.861 FIELD JOINT 149 2.201.436 9.516.075 FIELD JOINT 174 2,206,536 9.520,051 START OF ABRASION STRAKES 150 2.201,611 9,516,165 FIELD JOINT 175 2,206,827 9,520.301 ROV FIX 151 2,201.792 9.516.255 FIELD JOINT 176 2.207.119 9.520,560 ROV FIX 152 2,201,971 9.516.349 FIELO JOINT 177 2,207,438 9.520,833 ROV FIX 153 2.202.141 9,516.450 FIELD JOINT 176 2,207.745 9.521.106 CNO Of ABRASION STRAKES/START OF STANDARD STRAKES 154 2.202.319 9,516,556 FIELD JOINT 179 2.208.045 9,521.369 ROV FIX 155 2.202,488 9,516,662 FIELD JOINT 180 2,208,314 9,521.609 ROV FIX 156 2,202,658 9,516.772 FIELD JOINT )b/ 2,202,823 9,516,864 FIELD JOINT 156 2,202,987 9,516,998 FIELD JOINT 159 2,203.145 9,517,121 FIELD JOINT 160 2.203.305 9.517.244 FIELD JOINT 161 2.203.458 9,517.374 FIELD JOINT 162 2.203.617 9,517.505 FIELD JOINT 163 2.203.769 9.517.638 FIELD JOINT
1) PIPEUNE COORDINATES ARE THE POSITIONS Of THE R.O.V. (REMOTELY OPERATED VEHICLE) LOCATED
AT THC POINTS USIHO VERIPOS LD2 ULTRA DCPS RECCIVINC SPOTBEAM CORRECTIONS. VERIPOS STANDARD DCPS RECCIVINC INMARSAT CORRCCTIONS POSITIONINC. SONARDYNC fUSION LBL (LONC BASEUNE) ACOUSTIC POSITIONINC. SIMRAD HIPAP SOO SSBL ft RDI WORKHORSE DVL POSITIONINC.
2) SURVEYED COORDINATES TRANSFORMED FROM NAD83 (CPS DATUM) NADCON VERSION 2.1 .
3) THIS DRAWING IS NOT FOR NAVIGATION. PIPEUNES AND FEATURES IN THE IMMEDIATE VICINITY ARE OBTAINED FROM BOEM (BUREAU OF OCEAN ENERCY MANAGEMENT) ft BSEE (BUREAU OF SAFETY ANO ENVIRONMENTAL ENFORCEMENT) DATABASE AND CUENT PROVIDED DATA.
4) AS-BUILT SURVEY DATE: NOVEMBER 10 -11 . 2013
LEGEND
WR634
+
AS-BUILT "PF-JKS-02" CHEVRON 10" BLKO PIPEUNE SEG#1841S
EXISTING PIPEUNES/UMBIUCALS/FLYING LEADS/JUMPERS
PROPOSEO PIPEUNES/UMBIUCALS/FLYING LEADS/JUMPERS
LEASE BLOCK BOUNDARIES
MATCHUNE WITH ADJOINING CHART
MOORING WIRES
PROPOSEO STRUCTURES
EXISTING STRUCTURES
UTEC AS-FOUND/AS-BUILT STRUCTURES
GEOGRAPHICAL TICKS
UTM TICKS WELLS
GEODESY
Survoy Dotum: NAD 27 Elllpiold: Clark. lB6ft Projoctlon: Unlv inal Tranivorto Morcator ZONE ISN Longlludo of Control Meridian: 9S'W Folio Eaitlng (m): 500 000 Folio Northing (m) : 0 Scolo Factor ol Conlral Morldlan: 0.99960 Unit i : US Survoy Fool
cmm comer AS TO WE mmomi POSIWN OF THF AS-BUILT PIPFUNE BASED ON THE SURVEY METHODS NOTED.
P.
m..i •y.w
NAIHAN EBY. R.P.LS. TEXAS REG 06198
Thl« documonl may only bo usod lor Iho purpoio for which It was oommlsslonod ond In accordanco with Iho forms of ongagomonl for Ihoi comml i i lon. Unoulhortiod uio ol Ih l i documonl In ony form whatioovor Is undortakon ontlroly ot tho ussr's risk.
LOCATION PLAN (N.T.S)
Chevron
lechnip ! I C H N I P U S A . Inc,
y UTEC 7240 BRITTMOORE RD. SUITE 110
HOUSTON, TEXAS 77041 Tel 713-984-8688
U l . Fax 713-984-8683 Webslle www.utecsurvey.com
JACK & ST.MALO RELD DEVELOPMENT CAMPAIGN AS-BUILT "PF-JKS-02" CHEVRON 10" BLKO PIPEUNE
SEGMENT* 18415 WALKER RIDGE AREA BLOCK 758 TO WALKER RIDGE AREA BLOCK 718
GULF OF MEXICO
Scale 1" = 500' 50^^_ 1000 1500 |500
US SURVEY FEET
Rev. No. Date Comment Interpr. Checked Appr.
0 03/03/14 ISSUED AS FINAL VK MG IW
A2 01/22/14 ISSUED FOR CLIENT COMMENTS VR MG IW
Al 01/14/14 ISSUED FOR CLIENT COMMENTS VR MG IW
Survey Dates: November 10-11, 2013
UTEC Ref. No. 601W-12-048 Plot Size ANSI D
Survey Vessel: HOS Iron Horse
UTEC Drawing No. 601W-12-048-027 Sheet Of 006 007
-
PLAN VIEW
7
0
UNION OIL 10 BLKO CROSSINC SEC#ia385
X = 2,210.100 Y = 9.523.118 Lot." 26" | 4 ' 04.13"N Lon.= 91* 15' 42.05"W
7
now—— SEG. NO. 18415
& ROW NUMBER = 029101 v TOTAL LENGTH= 66.726.95 FT (12.64ml)
BUiLT PF ~ JKS-02 ON 10" BLKO PIPFLINF
CHEVRON 24" OIL SCR CROSSING SECdl16329 X = 2.210.270^ Y = 9.525.258 Lal.= 26' 14' 05.48 H N Lon.= 91* 15* 40.15MW
ENBRIDGE 10.75 GAS CROSSING SEG)fll6327
X • 2.210.412 Y = 9.523.373 Lot.= 26* 14' 0 6 . 6 r N Lon.= 9 1 ' 15* 38.58"W
Or
9 ^
END OF SURVEY AT I A I : : O A ' - HLAD
X = 2.2 13.654 Y = 9.5:26,045 Lat.= 26* 14* 3 2 . 6 4 ^ Lon.= 9 1 ' 15* 02.58"W
\
UNION OIL 10"BLKO CROSSING SEG#18386
X = 2.209.855 Y = 9.522.915 Lot.= 26' 14' 02.15 MN Lon.= 91" 15' 44.76"W
%3K
\ 0 " 0C.
\
0'<
V,
^
5fe QP
AS-BUILT " P F - J K S - 0 2 , , CHEVRON 10" BLKO PIPELINE SEGMENT#18415 X-COORDINATE Y-COORDINATE DESCRIPTION
2,208.609 9,521,865 ROV FIX
182 2.208.900 9,522,123 ROV FIX
185 2,209,200 9,522,373 ROV FIX 184 2,209,502 9,522,621 ROV FIX 185 2,209,686 9.522,774 ROV FIX 18G 2.209.855 9,522,915 UNION OIL ICBLKO CROSSING 187 2,210,100 9,523.118 UNION OIL 10"BLKO CROSSING 188 2.210.270 9.523.25B CHEVRON 2 4 " OIL SCR CROSSING 189 2,210,412 9.523.373 ENBRIDGE 10 .75 ' GAS CROSSING 190 2.210.704 9.523,614 ROV FIX 191 2,211,005 9.523.862 ROV f IX
192 2,211,326 9,524.133 ROV f IX 193 2.211.622 9,524.388 ROV FIX 194 2.211.924 9.524,634 ROV FIX 195 2.212.224 9.524.883 ROV FIX 196 2.212.527 9,525,128 ROV FIX "97 2,212,815 9,525,369 END OF STANDARD STRAKES/START OF ANTI-fOUUhC STRAKES
198 2,213,104 9,525.608 ROV FIX
199 2.215,450 9,525.673 ROV MX
200 2.213,610 9,526,012 END OF ANTI-FOULING STRAKES 201 2,215,029 9,526,026 PIPELINE ENTERS MATTRESS 202 2,215,646 9.526.039 FLEX JOINT ASSEMBLY
203 2.213.653 9.526.044 FLANGE LENCTH OF SURVEY POINTS 1 THROUGH 204: 204 2.213.654 9.526.045 LAYDOWN HEAD 66.726.95 ' = 12.64 MILES
1) PIPEUNE COORDINATES ARE THE POSITIONS OF THE R.O.V. (REMOTELY OPERATED VEHICLE) LOCATED
AT THE POINTS USING VERIPOS LD2 ULTRA DCPS RECEIVING SPOTBEAM CORRECTIONS, VERIPOS STANDARD DCPS RECEIVING INMARSAT CORRECTIONS POSITIONINC. SONARDYNE FUSION I f l l (LONC BASELINE) ACOUSTIC POSITIONING, SIMRAD HIPAP SOO SSBL ft RDI WORKHORSE DVL POSITIONING.
2) SURVEYED COORDINATES TRANSFORMED FROM NAD83 (CPS DATUM) NADCON VERSION 2 .1 .
3) THIS DRAWING IS NOT FOR NAVIGATION. PIPEUNES AND FEATURES IN THC IMMEDIATE VICINITY ARE OBTAINED FROM BOEM (BUREAU OF OCEAN ENERCY MANAGEMENT) ft BSEE (BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT) DATABASE ANO CUENT PROVIDED DATA.
4) AS-BUILT SURVEY DATE: NOVEMBER 10 -11 , 2013
WRe34
t
+
LEGEND AS-BUILT "PF-JKS-02 ' CHEVRON 10 ' BLKO PIPEUNE SEC#184I5
EXISTING PIPCUNES/UMBIUCALS/FLYING LEADS/JUMPERS
PROPOSED PIPELINES/UMBILICALS/FLYINC LCADS/JUMPCRS
LEASE DLOCK BOUNDARIES
MATCHUNE WITH ADJOINING CHART
MOORING WIRES
PROPOSED STRUCTURES
EXISTING STRUCTURES
UTEC AS-FOUND/AS-BUILT STRUCTURES
GEOGRAPHICAL TICKS
UTM TICKS
WELLS
GEODESY
Survty Datum: NAD 27 Elllpiold: Clarko 1666 Prolocllon: Unlvonal Tranivono Mircolor ZONE 15N Longlludi of Control Mirtdlan: 93*W
Folio Coiling (m) : SOO 000 Folio Northing (m) : 0 Scalo Factor at Control Morldlan: 0.99960 Unit i : US Survoy Foil
BRVD dOMMT AS Td M mi20MAL POSITION Of THf AS-BUILT PlPEUNf BASfD ON THf SURVCY MfTHOOS NOTfD.
* "i.-y.
p NATHAN J EBY
eiii
^ 0