Chairman : Jaffar Yousif Al JishiOver-all
Co-ordinator : Ravinder SinghCommittee
Co-ordinator : Thomas JacobCommittee
Members : Yatendra Kulkarni
Sandip Kumar Bhadra
Johnny Laurante Calata
Construction Management Group
8/6/2019 TMC PPt Presentation_PART 1-Housing (1)
http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 2/14
Sl.# Description Action by Remarks
1.1
After receivi ng Letter Of Intent (LOI ), coll ect stamped 'Contrac t
Documens' a long with stamped drawi ngs 'Is sued for Construction'.
Arrange for 'Pre-Contract Meeting'. Ensure that all parties concerned
ar e invi ted for the meeting. Minutes of the meeting shal l be prepared
in the appropr ia te format and s end to a ll parties. Commencement
date, start date and completion date of the project shall be agreed in
the meeting.
S.S.E. To be s igned by t
1.2Is sue dra ft letters regarding 'I nstruction To Commence' &
'Appointment Of Engineer's Representative' as per standard format.S.S.E.
To be si gned by
the Director
1.3
Collect original 'Way Leave' & 'Planning Permiss ion' with allattac hements from Desi gn Section of MoH a nd cl earance to be
obtained from all authorities, by the contractor, prior to
commencement of work at s ite. Keep extra copy of these doc uments in
the si te office. Origi nal 'Wa y Leave' to be col lected ba ck from the
contractor and kept in the custody of SSE. Issue one copy of the
cl eared way leave for contrac tor's reference and record.
S.S.E. &
Contractor
1.0 GENERAL (For Housing & Infrastructure)
Construction Management Group
8/6/2019 TMC PPt Presentation_PART 1-Housing (1)
http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 3/14
8/6/2019 TMC PPt Presentation_PART 1-Housing (1)
http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 4/14
Sl.# Description Action by Remarks
1.9
Establis h boundary beackon, grid lines for ins pection by MoH.
The foll owing i tems to be checked:
i) Diagonals.
ii ) Setbacks.
ii i) Quib la Direction of the House.
iv) Ali gnment.
vi) Location of Ga ra ge,....etc.
Contrac tor, SSE
& Ins pector
1.10
Collect and is sue to contractor the Infrastructure Drawings, Foot
path levels & Road profiles with section detai ls from MoH, Desi gn
Department prior to starting of the Boundary Wa ll works. Ensure that
suc h detai ls are cons idered by the contrac tor, while designing
boundary walls based on the standard detail s.
Contractor
&S.S.E.
1.01 HOUSING
Construction Management Group
8/6/2019 TMC PPt Presentation_PART 1-Housing (1)
http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 5/14
S.
.by R
1.11
Establ ish spr ad s heets / data s heets for deta i ls for prepa ri
i Al l shop drawi s/ wor i drawi s sha l l be prepa red by the
contractor and agreed by MoH for MEP wor s , Ti le lay out, Alum inum
doors & windows, Ga rage shade structure, Boundary wa l ls etc.
i i Excavation and prepa ration for foundations may proceed.
Contractor, SSE
& Elect. Engr.
1.12
Sub-structure - Bas ic materi a ls such as UG dra inage pipes & f ittings,
sanitary wa re, f loo r & wa l l ti les, electri ca l conduits a nd f ittings etc.
to be f ina l ised by MoH, QM Depa rtment. Shop drawings s ha l l be
based on such items. Contractor to continue submiss ion of a l l
materi a ls requ i red for the project wel l in advance for acc eptanc e byMoH. Pri ori ty sha l l be given for substructure items a nd imported
items.
Contractor,SSE
& QM.
1.13Al l openings, s leeves / ducts to be prov ided duri ng sub-structure
activities .Contractor
Fol low up by
S.E./ Ins pector
1.0 HOUSI
Construction Management Group
8/6/2019 TMC PPt Presentation_PART 1-Housing (1)
http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 6/14
S
¡
¢
£ ¤ ¥ ¦ § i ̈ ti ¢ ©
¦ ti ¢ ©
¤ § ¥
1.14D
y
ou
!
in" #
i!
" in
# p
" $
!
ion#
%
prop"
r#
up"
r&
i#
ion#
r"
r"
quir"
d by' '
(
, S(
%
In#
p" $
!
or# )
ro0 $
o0 0 "
n$ " 0 "
n!
1
h
ndin2
o& "
r o)
pr o j" $
!
# .
In#
p" $
!
o r, S(
%
SS(
1.15
D
i ly# $
h"
dul"
o)
S.E. / In#
p" $
!
or#
ar"
as f ollo3
s;
i ) To ch"
ck / verif y the Da i ly Report.
i i ) To check a l l the Inspection Requests (IR) sub0
itted by the
Con tractor .
i i i ) Veri f y MAC & ma inta in lo2
sheet.
iv) Check the Shop Drawin2
s & comment accordin2
ly.
v) Prepare required Si te Memos on da i ly bas is.
vi ) Prepare Draft repl y to the Contractor 's letters withi n 2 days a fter
receivin2
.
vi i ) Check the Interi m Va luations.
vi i i ) Follow up with Con tractor f or pendin2
issues / items of wor k.
Si te En2
ineers /
Inspector s &
Contractor .
Follow up by
S.S.E.
US USES
Construction Management Group
8/6/2019 TMC PPt Presentation_PART 1-Housing (1)
http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 7/14
Sl. s p n n by s
1.16
Fo l low up the fol low i g i tems by the Si te Supervis ion Team:
i Bu i l ing Permi t.
i i NAP numbers , Address Cards & Number P lates.
i i i EDD & WDD app l i a tion , Payment of Cap i ta l Contribu tion bi l ls ,
W i ring Certi f i ate, Muni ipa l Clearanc e Certi f icate, Civi l Deffence
Clearance Certi f icate.
iv) 10% Fi rst Sna gging a long wi th H&EMG.
v) Practica l Comp letion Certi f icate (PCC) iss ued wi th Reservation
Lists.
vi ) Status of Reservation Lists.
vi i ) As -Bu i l t Drawings .vi i i ) Operation & Ma intenanc e Manua ls &Guara ntees.
i ) Fina l sna gging and request for f ina l sna gging by Estate
Mana gement.
x) Iss uance of Making Good Defetcs Certi f ic a te (MGDC).
Contractor/
Inspector/SE/
SSE & HEMS.
Fo l low up by
S.S.E.
. SI ( SES)
Construction Management Group
8/6/2019 TMC PPt Presentation_PART 1-Housing (1)
http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 8/14
Sl 4 # 5 6 7 8 ri 9 ti @ A
B
8 ti @ A C y D 6 E ar F 7
1.17
BLOCK WORK G
T GROUND FLOOR:
a )H
ro vI P
e DPC.
b) FirQ
t layer of block wor k Q
etting out and inQ
pection.
c) Pro ceed witR
block wor k up to lintel levelS T
courQ
e of block wor k each day).
d) Bloc k wor k above l intelQ
U
ring beaV Q
.
Con tractorU
MoH Si te Q
taff.
1.18
LINTELS U
RING BEG
MS:
a) ForV
wor k.
b) ReinforceV
ent.
c) ConduitQ
W Sleeve
Q .
d) Concreting.
Con tractor U
MoH Si te Q
taff.
1.19
FIRST FLOOR SLAB U
STAIRCASE:
PrecaQ
t Slab, StaircaQ
e erectionU
grouting. Soild wood or PVC Q
hiV Q
T 0x
T 0
V V
Q ize
Q hi
V Q over
X layer
Q of polythene
Q heet
Q 1000g.
Q hall
be uQ
ed for l evel l ing andQ
upporting preY ca
Q
t Q
labQ
over beaV Q
prior
to grouting. Suc hQ
hiV Q
Q
hall be placed 10V V
froV
the inQ
ide fa ce of
the ring beaV Q
. Non-Q
hrink grout Q
hall be uQ
ed for grouting.
Con tractorU
MoH Si te Q
taff.
S G ( SES - S PE ST CT E
Construction Management Group
8/6/2019 TMC PPt Presentation_PART 1-Housing (1)
http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 9/14
8/6/2019 TMC PPt Presentation_PART 1-Housing (1)
http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 10/14
8/6/2019 TMC PPt Presentation_PART 1-Housing (1)
http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 11/14
8/6/2019 TMC PPt Presentation_PART 1-Housing (1)
http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 12/14
Sample of WAY LEAVE Sample of Municipal Permit
Construction Management Group
8/6/2019 TMC PPt Presentation_PART 1-Housing (1)
http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 13/14
Sample of NAP Nos. (Plan)
Sample of Address Card
Sample of NAP Number Plates Lists
Construction Management Group