tmc ppt presentation_part 1-housing (1)

14
Chairman : Jaffa r Y ous if Al Ji shi Over-all Co-ordinator : Ravinder Singh Committee Co-ordinator : Thomas Jacob Committee Members : Y atendr a Kulk arni Sandip Kumar Bhadra Johnny Laurant e Calata Construction Management Group

Upload: suzan-thomas

Post on 08-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 1/14

Chairman : Jaffar Yousif Al JishiOver-all

Co-ordinator : Ravinder SinghCommittee

Co-ordinator : Thomas JacobCommittee

Members : Yatendra Kulkarni

Sandip Kumar Bhadra

Johnny Laurante Calata

Construction Management Group

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 2/14

Sl.# Description Action by Remarks

1.1

After receivi ng Letter Of Intent (LOI ), coll ect stamped 'Contrac t

Documens' a long with stamped drawi ngs 'Is sued for Construction'.

Arrange for 'Pre-Contract Meeting'. Ensure that all parties concerned

ar e invi ted for the meeting. Minutes of the meeting shal l be prepared

in the appropr ia te format and s end to a ll parties. Commencement

date, start date and completion date of the project shall be agreed in

the meeting.

S.S.E. To be s igned by t

1.2Is sue dra ft letters regarding 'I nstruction To Commence' &

'Appointment Of Engineer's Representative' as per standard format.S.S.E.

To be si gned by

the Director

1.3

Collect original 'Way Leave' & 'Planning Permiss ion' with allattac hements from Desi gn Section of MoH a nd cl earance to be

obtained from all authorities, by the contractor, prior to

commencement of work at s ite. Keep extra copy of these doc uments in

the si te office. Origi nal 'Wa y Leave' to be col lected ba ck from the

contractor and kept in the custody of SSE. Issue one copy of the

cl eared way leave for contrac tor's reference and record.

S.S.E. &

Contractor

1.0 GENERAL (For Housing & Infrastructure)

Construction Management Group

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 3/14

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 4/14

Sl.# Description Action by Remarks

1.9

Establis h boundary beackon, grid lines for ins pection by MoH.

The foll owing i tems to be checked:

i) Diagonals.

ii ) Setbacks.

ii i) Quib la Direction of the House.

iv) Ali gnment.

vi) Location of Ga ra ge,....etc.

Contrac tor, SSE

& Ins pector

1.10

Collect and is sue to contractor the Infrastructure Drawings, Foot

path levels & Road profiles with section detai ls from MoH, Desi gn

Department prior to starting of the Boundary Wa ll works. Ensure that

suc h detai ls are cons idered by the contrac tor, while designing

boundary walls based on the standard detail s.

Contractor

&S.S.E.

1.01 HOUSING

Construction Management Group

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 5/14

S.

.by R

1.11

Establ ish spr ad s heets / data s heets for deta i ls for prepa ri  

i Al l shop drawi s/ wor i drawi s sha l l be prepa red by the

contractor and agreed by MoH for MEP wor s , Ti le lay out, Alum inum

doors & windows, Ga rage shade structure, Boundary wa l ls etc.

i i Excavation and prepa ration for foundations may proceed.

Contractor, SSE

& Elect. Engr.

1.12

Sub-structure - Bas ic materi a ls such as UG dra inage pipes & f ittings,

sanitary wa re, f loo r & wa l l ti les, electri ca l conduits a nd f ittings etc.

to be f ina l ised by MoH, QM Depa rtment. Shop drawings s ha l l be

based on such items. Contractor to continue submiss ion of a l l  

materi a ls requ i red for the project wel l  in advance for acc eptanc e byMoH. Pri ori ty sha l l be given for substructure items a nd imported

items.

Contractor,SSE

& QM.

1.13Al l openings, s leeves / ducts to be prov ided duri ng sub-structure

activities .Contractor

Fol low up by

S.E./ Ins pector

1.0 HOUSI

Construction Management Group

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 6/14

S  

¡  

¢  

 

£ ¤ ¥ ¦ §  i  ̈  ti ¢ ©  

  

¦  ti ¢ ©   

  

¤ § ¥  

1.14D

 y

 ou

in" # 

i! 

"  in

# p

" $  

ion# 

%  

prop"  

r# 

up"  

r&  

i# 

ion#   

r"  

r"  

quir"  

d by' '  

(  

, S(  

%  

In# 

p" $  

or# ) 

ro0 $  

o0 0 "  

n$ " 0 "    

n! 

1  

h  

ndin2  

o& "  

r o) 

pr o j" $  

# .

In# 

p" $  

o r, S(  

%  

SS(  

1.15

D  

i ly# $  

h"  

dul"  

o) 

S.E. / In# 

p" $  

or# 

ar"  

as f ollo3  

s;

i ) To ch"  

ck / verif y the Da i ly Report.

i i ) To check a l l the Inspection Requests (IR) sub0  

itted by the

Con tractor .

i i i ) Veri f y MAC & ma inta in lo2  

sheet.

iv) Check the Shop Drawin2  

s & comment accordin2  

ly.

v) Prepare required Si te Memos on  da i ly bas is.

vi ) Prepare Draft repl y to the Contractor 's letters withi n 2 days a fter 

receivin2  

.

vi i ) Check the Interi m Va luations.

vi i i ) Follow up with Con tractor f or  pendin2  

 issues / items of wor k.

Si te En2  

ineers /

Inspector s &

Contractor .

Follow up  by 

S.S.E.

US USES

Construction Management Group

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 7/14

Sl. s p n n by s

1.16

Fo l low up the fol low i g i tems by the Si te Supervis ion Team: 

i Bu i l ing Permi t.

i i NAP numbers , Address Cards & Number P lates.

i i i EDD & WDD app l i a tion , Payment of Cap i ta l Contribu tion bi l ls , 

W i ring Certi f i ate, Muni ipa l Clearanc e Certi f icate, Civi l Deffence

Clearance Certi f icate.

iv) 10% Fi rst Sna gging a long wi th H&EMG.

v) Practica l Comp letion Certi f icate (PCC) iss ued wi th Reservation

Lists.

vi ) Status of Reservation Lists.

vi i ) As -Bu i l t Drawings .vi i i ) Operation & Ma intenanc e Manua ls &Guara ntees.

i ) Fina l sna gging and request for f ina l sna gging by Estate

Mana gement.

x) Iss uance of Making Good Defetcs Certi f ic a te (MGDC).

Contractor/

Inspector/SE/

SSE & HEMS.

Fo l low up by

S.S.E.

. SI ( SES)

Construction Management Group

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 8/14

Sl 4  # 5 6 7 8  ri 9   ti @ A  

B  

8  ti @ A C   y D 6 E    ar F 7 

1.17

BLOCK WORK G  

T GROUND FLOOR: 

a )H  

ro vI P  

e DPC.

b) FirQ 

t layer of block wor k Q 

etting out and inQ 

pection.

c) Pro ceed witR  

block wor k up to lintel levelS T  

courQ 

e of block wor k each day).

d) Bloc k wor k above l intelQ 

 U  

ring beaV Q 

.

Con tractorU  

 

MoH Si te Q 

taff.

1.18

LINTELS U  

 RING BEG  

MS: 

a) ForV  

wor k.

b) ReinforceV  

ent.

c) ConduitQ 

 W   Sleeve

Q .

d) Concreting.

Con tractor U    

MoH Si te Q 

taff.

1.19

FIRST FLOOR SLAB U  

 STAIRCASE: 

PrecaQ 

t Slab, StaircaQ 

e erectionU  

grouting. Soild wood or PVC  Q 

hiV Q 

 

T  0x

T  0

V V   

Q ize 

Q hi

V Q over

X  layer

Q of polythene 

Q heet

Q  1000g.

Q hall

be uQ 

ed for l evel l ing andQ 

upporting preY ca

t Q 

labQ 

over beaV Q 

prior

to grouting. Suc hQ 

hiV Q 

 Q 

hall be placed 10V V  

froV  

 the inQ 

ide fa ce of 

the ring beaV Q 

. Non-Q 

hrink grout Q 

hall be uQ 

ed for grouting.

Con tractorU  

 

MoH Si te Q 

taff.

S G ( SES - S PE ST CT E

Construction Management Group

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 9/14

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 10/14

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 11/14

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 12/14

Sample of WAY LEAVE Sample of Municipal Permit

Construction Management Group

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 13/14

Sample of NAP Nos. (Plan)

Sample of Address Card

Sample of NAP Number Plates Lists

Construction Management Group

8/6/2019 TMC PPt Presentation_PART 1-Housing (1)

http://slidepdf.com/reader/full/tmc-ppt-presentationpart-1-housing-1 14/14

Sample of EDD ± SPN Reference

Sample of EDD Application

Construction Management Group