tmall 0143 presentation engelsk v 1.0 1000 to 30 tomas winnerholt

8
TMALL 0143 Presentation engelsk v 1.0 1000 to 30 Tomas Winnerholt

Upload: clarence-mason

Post on 05-Jan-2016

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: TMALL 0143 Presentation engelsk v 1.0 1000 to 30 Tomas Winnerholt

TM

ALL

014

3 P

rese

ntat

ion

enge

lsk

v 1.

0

1000 to 30

Tomas Winnerholt

Page 2: TMALL 0143 Presentation engelsk v 1.0 1000 to 30 Tomas Winnerholt

2

How many documents do you need

• A survey showed that we had 1000 + documents that governed the building of roads and railways

• The content was a mixed bag of odds and ends• Clarity and easy use • Can one make some saving in this?

Page 3: TMALL 0143 Presentation engelsk v 1.0 1000 to 30 Tomas Winnerholt

3

How Trafikverket is looking at the documents

General requirements

National regulations

Technical requirements and specifications

Advice

Page 4: TMALL 0143 Presentation engelsk v 1.0 1000 to 30 Tomas Winnerholt

4

General requirements

National regulations

Technical requirements and specifications

Advice

HandbooksInformation

In every project and in every stage of the process

Designers, contractors, project leaders

Several

Work done by the Transport Agency

A lot is going on…

Page 5: TMALL 0143 Presentation engelsk v 1.0 1000 to 30 Tomas Winnerholt

5

What areas?

1. Planning

2. Bridge and Tunnels

3. Power

4. Roads and Rail-substructure

5. Rail - superstructure

6. Signal

7. Traffic management

8. Tele

9. Road and rail – geometric design

10. Documentation

Page 6: TMALL 0143 Presentation engelsk v 1.0 1000 to 30 Tomas Winnerholt

6

Who is doing the work?

Trafikverkets expert group

Project manager for each area

TRAFIKVERKET CONSULTANTS

Consultants project manager

Steering comitte @ Trafikverket Project coordinator

Client board of directors

Page 7: TMALL 0143 Presentation engelsk v 1.0 1000 to 30 Tomas Winnerholt

7

Area 4: Roads and Rail - substructure

• Pavement design• Geotechnical engineering• Railway substructure• Dewatering and drainage• Road equipment

• Started out with approx. 50 different documents• Goal is set at 2 – 6 documents

Page 8: TMALL 0143 Presentation engelsk v 1.0 1000 to 30 Tomas Winnerholt

8

Area 4 has reached half way

• We have made a first rough cut and divided everything into – National requirements– Requirements/Specifications– Advice– Handbook/Information

• Structural work on the documents is beeing done– Table of content– Definitions

• Good and useful discussions • Should work equally good regardless of B, DB or DBOM type of

projects