tm long term monitoring guide vertical tube deployments library/documents/guides/long... ·...

2
Stop Bolt Long Term Monitoring Guide Vertical Tube Deployments September 2014 Rev A TM EXOwater.com MATERIALS SCH 40 or SCH 80 - 4” PVC Pipe 1/2” SS Bolt, 6” Long 1/2” Flat Washers, Lock and Nut 4” Lockable Well Cap, Plastic or Aluminum 5200 Marine Sealant (for bonding pipe to cap) Lockable Well Cap Expected High Water 12.0” 12.0” 6.0” 12.0” 12.0” Open Bottom INSTRUCTIONS Vent or tube flushing hole pattern: 2.5” internal diameter. Start one set 6” from end or top of sensor holes. Drill two holes at 0° and 180°. Start second set of two holes at 12” from sensor holes, drill at 90° and 270°. Sensor area hole pattern: 1.0” internal diameter, 1.5” on center from 1.0” above stop pin. NOTES • Clean and degrease pipe prior to modifications • In marine and other fouling sites paint inside and out with anti-fouling paint • Clean pipe at least twice a year Copper Design Mounted to Pier

Upload: others

Post on 30-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Stop Bolt

    Long Term Monitoring Guide Vertical Tube Deployments

    September 2014 Rev A

    TM

    EXOwater.com

    MATERIALS

    • SCH 40 or SCH 80 - 4” PVC Pipe

    • 1/2” SS Bolt, 6” Long

    • 1/2” Flat Washers, Lock and Nut

    • 4” Lockable Well Cap, Plastic or Aluminum

    • 5200 Marine Sealant (for bonding pipe to cap)

    Lockable Well Cap

    Expected High Water

    12.0”

    12.0”

    6.0”

    12.0”

    12.0”

    Open Bottom

    INSTRUCTIONS

    Vent or tube flushing hole pattern: 2.5” internal diameter.

    Start one set 6” from end or top of sensor holes. Drill two holes at 0° and 180°. Start second set of two holes at 12” from sensor holes, drill at 90° and 270°. Sensor area hole pattern: 1.0” internal diameter, 1.5” on center from 1.0” above stop pin.

    NOTES

    • Clean and degrease pipe prior to modifications

    • In marine and other fouling sites paint inside and out with anti-fouling paint

    • Clean pipe at least twice a year

    Copper DesignMounted to Pier

  • MATERIALS

    • SCH 40 or SCH 80 - 4” PVC Pipe, 36” Long

    • 1/2” SS Bolt or Eye Bolt, 6” Long

    • 1/2” Flat Washers, Lock and Nut

    • 4” Lockable Well Cap, Plastic or Aluminum • 5200 Marine Sealant (for bonding pipe to cap)

    • Two heavy weighted slabs to support pipe

    Lockable Well Cap

    Stop Bolt + Open Bottom

    NOTES

    • PVC pipe must be firmly secured to its base or mount to prevent loss in high flows

    • Mount and pipe should be treated with anti-fouling paint if in fouling environment

    • Secure submerged parts to shore with chain or SS wire rope to a fixed object

    • Never clamp sonde directly to mount

    FLOWSensors

    ~45° to flow

    Chain to fixed object or anchor on shore

    INSTRUCTIONS

    Vent or tube flushing hole pattern: 2.5” internal diameter.

    Drill one set of two, starting 6” from sensor holes at 0° and 180°. Drill second set of two 12” holes upwards at 90° and 270°. Sensor area hole pattern: 1.0” internal diameter, 1.5” on centers 12” area from 1” above stop bolt.

    Long Term Monitoring Guide Horizontal Tube Deployments

    TM

    36”

    12.0”

    12.0”

    6.0”

    September 2014 Rev A EXOwater.com

    Shows exposed sensors. No debris deployments only.