Page 1: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

PIPELINE QRA SEMINAR

Page 2: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

PIPELINE RISK ASSESSMENTSOFTWARE/TOOLS FOR RISK ASSESSMENT

Page 3: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• Different software/tools for QRA

• Tools (hand calculations) versus software

• Tools (hand calculations) – actually manual development

of simplified software (typically Excel)

• There are software/tools also for qualitative risk

assessment (e.g. linked to different methods –

HAZID/HAZOP)

• Focus on software/tools for QRA

SOFTWARE/TOOLS FOR RISK ASSESSMENT

Page 4: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

Advantages of tools (hand calculations)

• Simple (understanding and execution)

• Flexibility

Disadvantages of tools (hand calculations)

• Standardization (i.e. do we always calculate in the same way?)

• Size and presentation (i.e. number of documents/sheets)

SOFTWARE/TOOLS FOR QRA

Page 5: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

Advantages of software

• More advanced (often)

• Accepted (e.g. could be recommended from authorities)

Disadvantages of software

• Black-box (often)

• Non-flexible (e.g. change of parameters)

SOFTWARE/TOOLS FOR QRA

Page 6: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

Software:

SAFETI from DNVGL

QRA Open from Taylor Associates ApS

Shepherd from Shell

Riskcurves from TNO

• Software/tools established by consultant companies,

authorities, companies (e.g. oil and gas industry and

process industry) and software companies

• Method depending on the situation (e.g. complexity,

stage of project and time)

• Economical and technological aspects (e.g. costs for

license and knowledge of the software)

• No single best software/tool to solve all problems

SOFTWARE FOR QRA

Page 7: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• “Same, same. But different!”

• Similarities in presentation

• Differences in way of calculations/models (exact

differences hard to establish, since often “black-box”)

SOFTWARE FOR QRA

Page 8: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• Software from DNVGL

• Specialized for onshore process facilities and

petrochemical facilities

• Used frequently in the oil- and gas industry (e.g. BP,

Total, Maersk and Shell)

• Connected to the PHAST software

SOFTWARE: SAFETI

Page 9: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• How does it work?

- Accident scenarios (e.g. PHAST and frequencies)

- Population

- Weather conditions

- Ignition sources

- Quantification of the risk (i.e. individual risk and group

risk)

• Compare with presented methodology for quantitative

risk assessment

SOFTWARE: SAFETI

Page 10: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

Advantages of PHAST

• Easy to get some quick results from (compared to

others)

• Interface (i.e. easy to understand and present)

Disadvantages of PHAST

• Black-box (i.e. what happens in the model and change of

parameters)

SOFTWARE: SAFETI

Page 11: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

Guidelines/standards:

Pipeline systems - Steel pipelines on land - Guide to the application of pipeline risk assessment to proposed developments in the vicinity of major accident hazard pipelines containing flammables (BS PD 8010-3:2009) (part of framework BS PD 8010-1:2004) from British Standards

Assessing the risks from high pressure natural gas pipelines (IGEM/TD/2)from Institution of Gas Engineers and managers

• Tools (and guidelines/standards) established by consultant

companies, organizations, authorities and companies (e.g.

oil and gas industry and process industry)

• General difference - two categories of tools:

- Scoring systems (i.e. simple ranking of pipeline segments)

- Traditional QRA (i.e. general methodology)

• Standalone versus included in larger risk management

framework

TOOLS FOR QRA

Page 12: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• Detailed difference - three categories of tools:

- Generic values for leakages

- Possibility to modify values for leakage to account for

special properties and situation (e.g. corrosion)

- Possibility to modify values for leakage to account for

special properties and situation (e.g. corrosion) as well as

including of external hazards (e.g. 3rd party interference and

similar)

• What is best? Depending on the situation (e.g.

complexity). Most important to be aware of what is

included and what is not included.

TOOLS FOR QRA

Page 13: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

How is a QRA carried out?

TOOLS FOR QRA

Page 14: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

EXAMPLE OF QRA

Page 15: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

Ringsted, Denmark

- 30’’ gas pipeline

- 80 bar

- 12 mm

- exposed

- no construction work or agricultural work allowed within 50

meters from the pipeline

- shopping centre (opening hours 08.00-20.00) at 100 meters

- parking lot between shopping centre and pipeline

EXAMPLE OF QRA

Page 16: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• What could go wrong?

- Internal corrosion (expected problems with impurities)

- External corrosion (noted damages to protection from

installation)

• As detailed as want (e.g. is the restriction on

construction work followed and possible natural hazards)

EXAMPLE OF QRA

Page 17: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• What is the frequency for the different scenarios?

• Where could we find information?

- Riser & pipeline release frequencies from International

Association of Oil- and Gas Producers (OGP)

EXAMPLE OF QRA

Page 18: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• Riser & pipeline release frequencies from International

Association of Oil- and Gas Producers (OGP)

- 8.1 x 10-5 per km-year (12 mm wall thickness)

- 18% are medium holes (75 mm hole)

• Frequency for specified scenario:

- 1.5 x 10-5 per km-year

• Just one of several scenarios!

EXAMPLE OF QRA

Click icon to add picture

Page 19: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• What is the consequence from the different scenarios?

• Choice: human safety – fatalities

• What do we need to consider?

- Gas cloud - flash fire (extent and radiation from)

- Jet fire (radiation from)

- Pin hole

- Rupture

- Large hole

EXAMPLE OF QRA

Page 20: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• As detailed as want (e.g. are there some of the

combinations we can exclude?)

• What do we need to consider?

- Gas cloud - flash fire (extent and radiation from)

- Jet fire (radiation from) (excluded)

- Pin hole (excluded)

- Rupture

- Large hole

• Remember – all scenarios quantified (increasing effort)!

EXAMPLE OF QRA

Page 21: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• What scenario?

- Gas cloud - flash fire (extent)

- Large hole (75 mm)

- LFL and ½ LFL

- All inside a cloud would be fatalities (>37.5 kW/m2)

• Just one of several scenarios!

EXAMPLE OF QRA

Page 22: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• Combine the frequency for the scenario and the

consequence for the scenario to get the actual risk

• What do we know?

- With the frequency 1.5 x 10-5 per year there will be a

release of gas from the pipeline and the cloud will enclose

the parking lot

EXAMPLE OF QRA

Page 23: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• What do we not know?

- Exposure (e.g. how often are there people in the parking

lot and how many people are there in the paring lot)

- Ignition (i.e. what is the probability of ignition of the gas)

- Weather conditions (e.g. how often wind towards the

parking lot)

EXAMPLE OF QRA

Page 24: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• What do we not know?

- Exposure – in average 50 persons in the parking lot from

08.00 to 20.00 every day and a parking guard there 5 days

a week between 07.30 and 20.30

- Ignition – 50% probability of ignite the gas due to the cars

at the parking lot and the electrical signs on the shopping

centre

- Weather conditions – 10% probability of wind towards the

parking lot (defined as south) due to prevailing wind east

EXAMPLE OF QRA

Page 25: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• Combine the frequency for the scenario and the

consequence for the scenario to get the actual risk

(considerations for the parking guard)

- Frequency x ignition x wind x exposure (individual)

- 1.5 x 10-5 x 0.5 x 0.1 x 0.39 per year

- 2.9 x 10-7 per year

EXAMPLE OF QRA

Page 26: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• What does this mean?

- With the frequency 2.9 x 10-7 per year there will be a

release of gas from the pipeline, the cloud will enclose the

parking lot, the cloud will ignite and the parking guard will

be present (fatality)

- The individual risk (for the parking guard) from this

scenarios is 2.9 x 10-7 per year

• Just one of several scenarios!

• Just one of several scenarios!

EXAMPLE OF QRA

Page 27: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• What about the group risk?

- With the frequency 2.9 x 10-7 per year there will be a

release of gas from the pipeline, the cloud will enclose the

parking lot, the cloud will ignite and in average 50 persons

will be present (fatalities)

EXAMPLE OF QRA

Page 28: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• Is the risk (from this scenario) acceptable?

• Risk acceptance criteria for individual risk

- 1.0 x 10-6 (Danish legislation) – YES!

• Risk acceptance criteria for group risk

- (see figure) (Danish legislation) – MAYBE!

- Separate presentation on ALARP

- Most likely not given contribution from other scenarios

EXAMPLE OF QRA

Page 29: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• QRA is a tool to evaluate and support what in the end

are political decisions whether to proceed with

construction/design (or similar) within questionable,

high-risk and/or consequence areas

• Could have a high consequence and a high frequency,

but anyway an acceptable risk

EXAMPLE OF QRA

Page 30: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

• Even the smallest QRA has large complexity

• What has been simplified in this QRA?

- Wind directions (e.g. 4 or 16?)

- Wind speed (i.e. consequences different)

- Ignition probabilities (e.g. models or ignition sources)

- Frequency (i.e. just considered one scenario)

- Consequence (i.e. just considered one scenario)

- Simplified population (e.g. cars on the road and residents)

- Release frequency given per kilometre (e.g. not all releases within

kilometres would give consequences within 1 kilometre)

EXAMPLE OF QRA

Page 31: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

How is a QRA carried out?

EXAMPLE OF QRA

Page 32: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

32

• What is the challenges of quantitative risk assessment?

- Uncertainty (i.e. the risk could be something that has

never happened before)

- Statistic (i.e. availability)

- Assumptions – big effect (e.g. sensitivity analysis)

- Complexity (i.e. how much could/should be included?)

- Ideal model (e.g. would people move from a release?)

EXAMPLE OF QRA

Page 33: Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT SOFTWARE/TOOLS FOR RISK ASSESSMENT

33

QUESTIONS?