time and work revised

Upload: vk7

Post on 02-Mar-2016

989 views

Category:

Documents


0 download

TRANSCRIPT

  • 1

    Time and work - 1

    1. A and B together can do a piece of work in 6 days and A alone can do it in 9

    days. In how many days can B alone do it?

    (a) 15 clays (b 16 days

    (c) 18 days (d) 20 days

    2. A and B can do a piece of work in 12 days, B and C in 15 days, C and A in

    20 days. How long would all take to finish the work together?

    (a) 10 days (b) 9 days

    (c) 8 days (d) 172

    days

    3. If 3 men or 4 women can reap a field in 43 days. How long will 7 men and

    5 women take to a reap it?

    (a) 21 days (b 16 days

    (c) 15 days (d) 12 days

    4.

    If 12 men and 16 boys can do a piece of work in 5 days and 13 men,

    together with 24 boys can do it in 4 clays. Compare the daily work done by a

    man with that of a boy.

    (a) 4 : 3 (b 2 : 1

    (c) 3 : 2 (d) 2 : 5

    5.

    A.certain number of men can do a work in 60 days. If there were 8 men

    more it could be finished in 10 days less. How many men were there in the

    beginning?

    (a) 50 men (b) 45 men

    (c) 42 men (d) 40 men

    6. A is twice as good a workman as B; and together they finish a work in

    14 days. In how many days can it be done by each separately

    (a) A = 42, B = 21 (b A = 21, B 42

    (c) A = 52, B = 26 (d) A = 26, B = 52

    7.

    A and B together can do a piece of work in 7 days. If A alone does twice as

    much work as B in a given time, find how long A alone would take to do the

    work?

    (a) 21 days (b) 1102

    days

    (c) 9 days (d) 12 days

    8. A can copy 80 pages in 16 hours, A and B can do 133 pages in 19 hours. In

    how many hours B shall copy 52 pages?

    (a) 13 hours (b 39 hours

    (c) 182

    hours

    (d) 26 hours

    9. A can do a piece of work in 5 days, B in 4 days, and A, B and C

    together in 2 days, In what time could C do it alone?

    (a) 20 days (b) 18 days

    (c) 15 days (d) 12 days

    10.

    B can do a piece of work in 6 hours, B and C do it in 4 hours and A, B and C

    in 223

    hours. In how many hours can A and B do that work?

    (a) 11houre (b 167

    hours

    (c) 327

    hours (d) 337

    hours

    11. A is thrice as efficient as B and is, therefore, able to finish a piece of work 10

    days earlier than B. In how many days A and B will finish it together

    (a) 132

    days (b) 435

    days

    (c) 334

    days (d) 738

    days

    12. A and B can do a piece of work in 28 days. With the help of C they can finish it in 21 days. How long will C take a finish it?

    (a) 60 days (b) 84 days

    (c) 42 days (d) 75 days

    13. A man is twice as fast as a woman and a woman is twice as fast as a boy. If all of them i.e. a man, a woman and a boy can finish together in 4 days, in how many days a boy shall do it alone?

    (a) 28 days (b) 21 days (

    (c) 14 days (d) 7 days

    14. A and B can do a piece of work in 3 days, B and C in 4 days and A in 6 days.

    How long will C take to do it?

    (a) 18 day (b) 20 days

    (c) ) 24 days (d) 30 days

    15. A can do a piece of work in 10 days. He works at it for 4 days and then B finishes it in 9 days. In how many days can A and B together finish the work?

    (a) 6 days (b 8 days

    (c) 182

    days (d) 132

    days

  • 2

    16. A can do a piece of work in 30 days. He works at it for 5 days and then B finishes it in 20 days. In what time can A and B together do it?

    (a) 2163

    days (b) 1133

    days

    (c) 1173

    days (d) 1162

    days

    17.

    A and B can do a piece of work in 12 days and 16 days respectively. Both

    work for 3 days and then A goes away. Find how long will B take to complete

    the remaining work?

    (a) 15 days (b) 12 days

    (c) 10 day (d) 9 days

    18. A, B and C can do a piece of work in 24, 30 and 40 days respectively. They start the work together but C leaves 4 days before the completion of the work. In how many days is the work done?

    (a) 15 days (b 14 days

    (c) 13 days (d) 11 days

    19.

    A man and a woman can do a certain amount of work in 20 days. Their

    efficiency of doing the work is 8 : 5. How many days shall the woman will

    take to do it alone?

    (a) 40 days (b 32 days

    (c) 52 days (d) 65 days

    20.

    For doing a certain work A's ability is equal to the joint ability of B and C. If A

    and B could do it in 9 hours and 36 minutes and C by himself in 48 hours, in what

    time B could do it alone?

    (a) 24 hours (b) 28 hours

    (c) 30 hours (d) 20 hours

    21. Twenty men can finish a certain amount of work in 30 days. If at the end of'every 10 days, 20 more men are employed, in how many days shall now the work will be finished?

    (a) 15 days (b 18 days

    (c) 16 days (d) 20 days

    22. A can do as much work in 2 days as B in 3 days, and B as much in 4 days as C in 5 days. In what time could A, B and C together do a piece of work when A can do it in 11 days

    (a) 142

    days (b) 5 days

    (c) 152

    days (d) 6 days

    23.

    A, B and C can do a piece of work in 6, 172

    and 10 days respectively. C is

    assisted by A on one day and by B on the next alternately. In how many days

    shall the work be finished,

    (a) 8 days (b 6 days

    (c) 4 days (d) 5 days

    24.

    If A must hire 2 men and 3 boys for 6 days to do the same piece of work

    which 11 men and 5 boys could do in 112

    days, compare the efficiency ratio

    of the men and the boy.

    (a) 7 : 3 (b) 2 : 1

    (c) 3 : 7 (d) 1 : 2

    25. If 25 men would finish a piece of work in 120 days. But at the end of every 10 days, 10 additional men are employed. In how many days will it be finished?

    (a) 40 days (b 50 days

    (c) 1533

    days (d) 60 days

    26. Two pipes, P and Q can fill a cistern in 12 and 15 minutesrespectively. Both are opened together, but at the end of 3minutes the first, is turned off. How much longer will thecistern take to fill?

    (a) 194

    minutes (b) 184

    minutes

    (c) 174

    minutes (d) 182

    minutes

    27.

    Two pipes P and Q, would fill a cistern in 18 and 24 minutes

    respectively. Both pipes being opened,, find when the first pipe-

    must be turned off so that the cistern may be just filled in 12

    minutes

    (a) after 12

    minutes (b) after 9 minutes

    (c) after 182

    minutes

    (d) after 10

    minutes

    28. A cistern which could be filled in 9 hours takes one hour more to be filled owing

    to a leak in its bottom. If the cistern is full in what time will the leak empty it?

    (a) 45 hours (b) 60 hours

    (c) 75 hours (d) 90 hours

  • 3

    29.

    A pipe can fill a cistern in 20 minutes whereas the cisterp-when full can be

    emptied by a leak in 28 minutes. When both pipes are opened, find when the

    cistern will be full? (

    (a)60 minutes (b) 80 minutes

    (c) 70 minutes (d) 48 minutes

    30. A cistern has a leak which would empty the cistern in 20 minutes. A tap is turned on which admits 4 litres a minute into the cistern, and it is now emptied in 24 minutes. How many litres does the cistern hold?

    (a) 480 litres (b) 600 litres

    (c)720 litres (d) 800 litres

    31. Two pipes A and B can fill a cistern in 20 and 30 minutes respectively, and a third pipe C can empty it in 40 minutes. How long will it take to fill the cistern if all the three are opened at the same time?

    (a) 1197

    minutes (b) 1157

    minutes

    (c) 1177

    minutes (d)

    177

    minutes

    32. Pipes A and B can fill a cistern in 8 and 24 minutes respectively. They are opened on alternate minutes. Find in how many minutes, the cistern shall be full?

    (a) 6 minutes (b) 12 minutes

    (c) 18 minutes (d) 24 minutes

    33.

    Pipe A can fill a cistern in 4 minutes and a leakage pipe B can empty the cistern

    in 6 minutes. The cistern is empty. Find after how many minutes, the cistern shall

    be full if A is opened first?

    (a) 18 minutes (b) 202 minutes

    (c) 19 minutes (d) 10 minutes

    34. A alone can do a piece of work in 10 days, B alone can do it in 15 days. If the total wages for the entire job are Rs. 39.60. If they both finish the work together, what is the share of A.

    (a) Rs.23.76 (b)Rs.15.84

    (c) Rs.21.75 (d) Rs.19.26

    35. A man and a boy working together can do a certain amount of job in 40 days and are paid Rs. 1040 for the whole job. The efficiency ratio of the man and the boy is 8 : 5. Find the daily wages of a boy

    (a) Rs. 12 (b Rs. 10

    (c) Rs. 10.50 (d) Rs. 9.75

    36. A and B together can do a job in 20 and 30 days respectively. With the help of C, they finished the job in 8 days and are paid Rs. 3750 for the whole job done. Find the daily wages of C

    (a) Rs. 187.50 (b) Rs. 150.00

    (c) Rs. 150.25 (d) Rs. 156.25

    37. Two men and three boys can do a piece of work in 8 days and three men and two boys can do it in 7 days. If the daily wages of a boy be Rs. 9 what will be the weekly wages of a man.

    (a) Rs. 126 (b Rs. 156

    (c) Rs. 136 (d) Rs. 132

    38. Two taps can separately fill a cistern 10 minutes and 15 minutes respectively and when the waste pipe is open, they can together fill it in 18 minutes. The waste pipe can empty the full cistern in:

    (a) ) 7 min (b) 13 min

    (c) 23 min (d) 9 min.

    39. . If three taps are opened together, a cistern is filled in 12 minutes. One of the taps can fill it in 10 minutes and the other in 15 minutes. How does the third tap work?

    (a) It fills the cistern in 12 min

    (b It fills the cistern in 15 min

    c) It leaks out in 12 min

    (d) It empties the cistern in 10 min

    40. A cistern has three pipes, A, B and C. The pipes A and B can fill it in 4 and 5 hours respectively and C can empty it in 2 hours. If the pipes are opened in order at 1, 2 and 3 A.M. when will the cistern be empty?

    (a) 3 PM (b 7 PM

    (c) 4 PM (d) 5 PM

    41. If two pipes function simultaneously the reservoir wili be filled in 12 hours. One pipe fills the reservoir 10 hours faster than the other. How many hours does the faster pipe take to fill the reservoir?

    (a) 25 hrs (b) 28 hrs

    (c) 30 hrs (d) 35 hrs

    42. Rahim can do a piece of work in 12 days, Karim in 20 days and Shoba in 30 days. If they work together, they can finish the work in:

    (a) 4 days (b 6 days (c) 8 days (d) 10 days

    43. Two pipes A and B can fill a tank in 4 hrs and 5 hrs respectively. If they are turned up alternately for one hour each, the time taken to fill the tank is:

    (a) 2 hrs 15 min. (b) 4 hrs 24 min

    (c) 5 hrs (d) 3 hrs

    44. Two men A and B can finish a work in 8 hours and 16 hoursrespectively. If they work at it alternately for an hour, Abeginning first, the work will be finished in:

    (a) 8 hours (b 10 hours

    (c) 1102

    hours (d) 11 hours

    45. A and B together can do a piece of work in 8 days. If A alone can do the same work in 12 days, then B alone can do the same work in:

    (a) 20 days (b) 16 days

    (c) 24 days (d) 28 days

    46. Two pipes A and B can fill a tank in 24 minutes and 30 minutes respectively. Both are opened together. But at the end of 8 minutes, the first is turned off. The further time taken to fill the tank is:

    (a) 10 minutes (b) 8 minutes

    (c) 12 minutes (d) 16 minutes

  • 447. 56 workers can reap a field in 8 days. If the work is to be completed in 7

    days, the extra workers required are:

    (a) 7 (b 8

    (c) 14 (d) 16

    48. Two pipes A and B can fill a cistern in 12 minutes and 15 minutes respectively. Both are open together but after 3 minutes A is turned off. After how much more time will the cistern be filled?

    (a) 134

    min (b)

    154

    min.

    (c) 184

    min (d) 194

    min

    49. Two pipes A and B can fi l l a tank in 24 min and 32 min respectively. If both the pipes are opened simultaneously after how much time B should be closed so that the tank is full in 18 min.

    (a) 12 (b) 10

    (c) 8 (d) 6

    50. A cistern is filled by a tap in 13

    2hours. Due to a leak in the bottom of the

    cistern, it takes half an hour longer to fill the cistern. If the cistern is full how long will it take the leak to empty it.

    (a) 7 hours (b 8 hours

    (c) 14 hours (d) 28 hours

    51. 10 men can finish a piece of work in 10 days, where as it takes 12 women to finish it in 10 days. If 15 men and 6 women undertake to complete the work, how many days will they take to complete it?

    (a) 2 (b) 5

    (c) 4 (d) 11

    52. A can do a piece of work in 7 days of 9 hours each whereas B can do same work in 6 days of 7 hours each. How long will 2 they take to do the work together, working 8 -s hours a day?

    (a) 2 days (b 3 days

    (c) 137

    days (d)

    245

    days

    53. A can do a certain job in 12 days. B is 60% more efficient than A. The number of days, it takes B to do the same piece work

    (a) 172

    (b) 6

    (c) 164

    (d) 8

    54. A can do a piece of work in 15 days and B in 20 days. They began the work together but 5 days before the completion of the work, A leaves. The work was completed in:

    (a) 8 days (b) 10 days

    (c) 15 days (d) 3117

    days

    55. A does 14

    of a work in 4 days. He is then assisted by B and they together finish

    the remaining work in 6 days. B alone canfinish the whole work in:

    (a) 9 days (b) 12 days

    (c)16 days (d) 20 days

    56. 4 men and 6 boys finish a job in 8 days, while 3 men and 7 boys finish it in 10 days. 10 boys working together will finishit in

    (a) 40 days (b) 36 days

    (c) 32 days (d) 24 days

    57. A can do a piece of work in 20 days. He worked for it for 4 days and remaining work was finished by B in 16 days.Working together A and B can finish the work in:

    (a) 8 days (b) 10 days

    (c) 12 days (d) 16 days

    58. A cistern is normally filled in 8 hours but takes two hours longer to fill because of a leak in its bottom. If the cistern is full, the leak will empty it in.

    (a) 16 hours (b 20 hours

    (c) 40 hours (d) 25 hours

    59. The quantity of water which flows through a pipe is proportional to the square of its diameter. If a pipe of 1 cm diameter can fill a tank in 1 hour. How long would 3 pipes of 1, 2 and 3 cms diameter together take to fill it?

    (a) 247

    minutes (b) 157

    minutes

    (c) 8 minutes (d) 132

    minutes

    60. In 10 days of 9 hours each, /l00 men complete -rth of a piece of work. What is

    the additional number of men required to complete the rest of the work in 20 days of 8 hours each?

    (a) 200 men (b) 225 men

    (c) 250 men (d) 275 men

    61. A sum of money just sufficent to pay As wages for 10 days orBs wages for 15 days. For how many days can A and Btogether be paid with the sum?

    (a) 4 days (b) 142

    days

    (c) 5 days (d) 6 days

    62. 2 men and 3 boys can do piece of work in 10 days and 3 men together with 2 boys can do the same job in 8 days. In h"ow many days can 2 men and a boy do the work

    (a) 1122

    days (b) 1182

    days

    (c) 25 days (d) 1252

    days

  • 5

    63. A takes twice as long as B and C together take to do a piece of work and B takes twice as long as A and C together. However the 3 men together can complete the work in 30 days. How long would C alone take to do the work?

    (a) 50 days (b) 90 days

    (c) 63 days (d) 72 days

    64. A can do a piece of work in 30 days, B in 50 days and C in 40 days. How soon can the work be done if A is assisted by B on one day and by C on the next day alternately?

    (a) 20 days (b) 321735

    days

    (c) 1 5 days (d) 25 days

    65. 15 men would finish a piece of work in 210 days. But at the end of every 10 days 15 additional men employed. In how many days will it be finished? (a) 60 days

    (a) 60 days (b) 75 days

    (c) 90 days (d) 45 days

    RSA Time and work -2 344 358

    1. A does a work in 10 days and B does the same work in 15 days. In how many days will both of them together will do the work ?

    (a) 5 days (b 6 days

    (c) 8 days (d) 9 days

    2. A can finish a work in 18 days and B can do the same work in half the time taken: by A. Then, working together, what part of the same work they can finish in a day

    (a) 16

    (b) 19

    (c) 25

    (d) 27

    3. A tyre has two punctures. The first puncture alone would have made the tyre flat in 9 minutes and the second alone would have done it in 6 minutes. If air leaks out at a constant rate, how long does it take for both the punctures together to make it flat

    (a) 112

    minutes (b 132

    minutes

    (c) 335

    minutes (d) 144

    minutes

    4. A , B and C can complete a piece of work in 24, 6 and 12 days respectively. Working together, they will complete the same work in : (a) 1

    24day (b 7

    24day

    (c) 337

    days (d) 4 days

    5. A man can do a job in 15 days. His father takes 20 days and his son finishes it in 25 days. How long will they take to complete the job if they all work together ?

    (a) less than 6 days

    (b) exactly 6 days

    (c) Approximately 6 .4 days

    (d) more than 10 days

    6. A man can do a piece of work in 5 days, but with the help of his son, he can do it in 3 days. In what time can the son do it alone ? (a) 16

    2days (b) 7 days

    (c) 172

    days (d) 8 days

    7. A can lay railway track between two given stations in 16 days and B can do the samejob in 12 days. With the help of C, they did the job in 4 days only. Then, C alone cando the job in :

    (a) 195

    days (b) 295

    days

    (c) 395

    days (d) 10 days

    8. A takes twice as much time as B or thrice as much time to finish a piece of work.Working together, they can finish the work in 2 days. B can do the work alone in :

    (a) 4 days (b ) 6 days (c) 8 days (d) 12 days

    9. X can do 1

    4 of a work in 10 days, Y can do 40% of the work in 40 days and Z can do

    13

    of the work in 13 days. Who will complete the work first ?

    (a) X (b) X

    (c) Z (d) X and Z both

    10. P, Q and R are three typists who working simultaneously can type 216 pages in 4 hours. In one hour, R can type as many pages more than Q as Q can type more than P. During a period of five hours, R can type as many pages as P can during 7 hours. How many pages does each of them type per hour ?

    (a) 14, 17, 20 (b 15, 17, 22

    (c) 15, 18, 21 (d) 16, 18, 22

    11. Ronald and Elan are working on an assignment. Ronald takes 6 hours to type 32 pageson a computer, while Elan takes 5 hours to type 40 pages. How much time will theytake, working together on two different computers to type an assignment of 110 pages ?

    (a) 7 hours 30 minutes (b 8 hours

    (c) 8 hours 15 minutes

    (d) 8 hours 25 minutes

  • 6

    12.

    Two workers A and B are engaged to do a work. A working alone takes 8 hours moreto complete the job than if both worked together. If B worked alone, he would need

    142

    hours more to complete the job than they both working together. What time would

    hey take to do the work together ?

    (a) 4 hours (b) 5 hours

    (c) 6 hours (d) 7 hours

    13.

    P can complete a work in 12 days working 8 hours a day. Q can complete the samework in 8 days working 10 hours a day. If both P and Q work together, working 8 hoursa day, in how many days can they complete the work ?

    :

    (a) 155

    days (b 6511

    days

    (c) 5611

    days (d) 6611

    days

    14. A and B can do a work in 12 days, B and C in 15 days, C and A in 20 days. If A, B and C work together, they will complete the work in

    (a) 5 days (b) 576

    days

    (c) 10 days (d) 2153

    days

    15. A and B can do a work in 8 days, B and C can do the same work in 12 days. A, Band C together can finish it in 6 days. A and C together will do it in

    (a) 4 days (b 6 days (c) 8 days (d) 12 days

    16. A and B can do a piece of work in 72 days; B and C can do it in 120 days; A and Ccan do it in 90 days. In what time can A alone do it ? (a) 80 days (b) 100 days_ (c) 120 days (d) 150 days

    17. :A and B can do a piece of work in 5 days; B and C can do it in 7 days; A and C can do it in 4 days. Who among these will take the least time if put to do it alone ? (a) A (b B (c) C (d) Data inadequate

    18. A can do a piece of work in 4 hours; B and C together can do it, in 3 hours, wbj and C together can do it in 2 hours. How long will B alone take to do it ? (a) 8 hours (b 10 hours (c) 12 hours (d) 24 houri

    19. A can do a certain work in the same time in which B and C together can do it. If A and B together could do it in 10 days and C alone in 50 days, then B alone couli it in :

    (a) 15 days (b) 20 days

    (c) 25 days (d) 30 days

    20. A works twice as fast as B. If B can complete a work in 12 days independently. the number of days in which A and B can together finish the work is : (a) 4 days (b 6 days (c) 8 days (d) 18 days

    21. A is twice as good a workman as B and together they finish a piece of work in 14 days. The number of days taken by A alone to finish the work is (a) 11 (b) 21 (c) 28( (d) 42

    22. A is thrice as good a workman as B and therefore is able to finish a job in 60 days less than B. Working together, they can do it in :

    (a) 20 days (b 1222

    days

    (c) 25- days (d) 30 days

    23. A and B can do a job together in 7 days. A is 314

    imes as efficient as B. The

    same job can be done by A alone in :

    (a) 193

    days (b) 11 days

    (c) 1124

    days (d) 1163

    days

    24. A can do a piece of work in 20 days. B is 25% more efficient than A. The number of days taken by B to do the same piece of work is : (a) 15 (b 16 (c) 18 (d) 25

    25. A is 30% more efficient than B. How much time will they, working together, take Ucomplete a job which A alone could have done in 23 days ?

    (a) 11 days (b 13 days

    (c) 3207

    days (d) None of these

    26. A does half as much work as B in three-fourth of the time. If together they take

    18 days to complete the work, how much time shall B take to do it ?

    (a) 30 days (b) 35 days

    (c) 40 days (d) None of these

    27. A is 50% as efficient as B. C does half of the work done by A and B together. If C alone does the work in 40 days, then A, B and C together can do the work in :

    (a) 1133

    days (b) 15 days

    (c) 20 days (d) 30 days

    28. Two workers A and B working together completed a job in 5 days. If A worked twice as efficiently as he actually did and B worked "r as efficiently as he actually did, the work would have been completed in 3 days. A alone could complete the work in :

    (a) 154

    days (b) 164

    days

    (c) 172

    days (d) None of these

  • 7

    29. A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is :

    (a) 14

    (b 110

    (c) 715

    (d) 815

    30. A can finish a work in 18 days and B can do the same work in 15 days. B worked for 10 days and left the job. In how many days, A alone can finish the remaining work

    (a) 5 (b) 152

    (c) 6 (d) 8

    31. A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in :

    (a) 8 days (b) 10days

    (c) 12 days (d) 15 days

    32. A can finish a work in 24 days, B in 9 days and C in 12 days. B and C start the work but are forced to leave after 3 days. The remaining work was done by A in :

    (a) 5 days (b 6 days

    (c) 10 days (d) 1102

    days

    33. A machine P can print one lakh books in 8 hours, machine Q can print the same number of books in 10 hours while machine R can print them in 12 hours. All the machines are started at 9 a.m. while machine P is closed at 11 a.m. and the remaining two machines complete the work. Approximately at what time will the work be finished?

    (a) 11:30 a.m (b) 12 noon

    (c) 12:30 p.m. (d) 1 p.m.

    34. A and B can do a piece of work in 30 days, while B and C can do the same work in 24 days and C and A in 20 days. They all work together for 10 days when B and C leave. How many days more will A take to finish the work ?

    (a) 18 days (b 24 days

    (c) 30 days (d) 36 days

    35. X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone and then after 4 days Y joined him till the completion of the work. How long did the work last ?

    (a) 6 days (b) 10 days

    (c) 15 days (d) 20 days

    36. A and B can together finish a work in 30 days. They worked together for 20 days and then B left. After another 20 days, A finished the remaining work. In how many days A alone can finish the job?

    (a) 40 (b 50

    (c) 54 (d) 60

    37. X can do a piece of work in 40 days. He works at it for 8 days and then Y finishedit in 16 days. How long will they together take to complete the work ?

    (a) 1133

    days (b) 15 days

    (c) 30 days (d) 56 days

    38. A, B and C together can complete a piece of work in 10 days. All the three started working at it together and after 4 days A left. Then B and C together completed the work in 10 more days. A alone could complete the work in

    (a) 15 days (b 16 days

    (c) 25 days (d) 50 days

    39. A (does 45 of a work in 20 days. He then calls in B and they together finish the remaining work in 3 days. How long B alone would take to do the whole work ?

    (a) 23 days (b 40 days

    (c) 1372

    days (d) 40 days

    40. A and B together can do a piece of work in 30 days. A having worked for 16 days,B finishes the remaining work alone in 44 days. In how many days shall B finish thewhole work alone ?

    (a) 30 days (b) 30 days

    (c) 60 days (d) 70 days

    41. Aand B together can do a piece of work in 12 days, which B and C together can 41 in 16 days. After A has been working at it for 5 days and B for 7 days, C finishes 1 in 13 days. In how many days C alone will do the work ?

    (a) 16 (b 24

    (c) 36 (d) 48

    42. A and B can do a piece of work in 45 days and 40 days respectively. They began do the work together but A leaves after some days and then B completed the remaini work in 23 days. The number of days after which A left the work was

    (a) 6 (b) 8

    (c) 9 (d) 12

    43. A can do a piece of work in 14 days which B can do in 21 days. They begin together but 3 days before the completion of the work, A leaves off. The total number of days to complete the work is :

    (a) 365

    (b 182

    (c) 1105

    (d) 1132

    44. A, B, and C can complete a work separately in 24, 36 and 48 days respectively. They I started together but C left after 4 days of start and A left 3Hdays before the completion of the work. In how many days will the work be completed ?

    (a) 15 days (b) ) 22 days

    (c) 25 days (d) 35 days

    45. A, B and C together earn Rs. 300 per day, while A and C together earn Rs. 188 ana B and C together earn Rs. 152. The daily earning of C is :

    (a) Rs. 40 (b Rs. 68 (c) ) Rs. 112 (d) Rs. 150

    46. A, B and C are employed to do a piece of work for Rs, 529. A and B

    together are supposed to do 1923

    of the work and B and C together 823

    of

    the work. What amount should A be paid ?

    (a) Rs. 315 (b Rs. 345

    (c) Rs. 355 (d) Rs. 375

  • 847. Kim can do a work in 3 days while David can do the same work in 2 days. Both of them finish the work together and get Rs. 150. What is the share of

    Kim ?

    (a) Rs. 30 (b) Rs. 60

    (c) Rs. 70 (d) Rs. 75

    48. If A can do 14

    of a work in 3 days and B can do 16

    of the same work in 4

    days, how much will A get if both work together and are paid Rs. 180 in all?

    (a) Rs. 36 (b Rs. 60

    (c) Rs. 108 (d) Rs. 120

    49. A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do it for Rs. 3200.. With the help of C, they completed the work in 3 days. How much is to be paid to C

    (a) Rs. 375 (b) Rs. 400

    (c) Rs. 600 (d) Rs. 800

    50. A sum of money is sufficient to pay A's wages for 21 days and B's wages for 28 days. The same money is sufficient to pay the wages of both for :

    (a) 12 days (b 1124

    days

    (c) 14 days (d) 1242

    days

    51. A can do a piece of work in 10 days; B in 15 days. They work for 5 days. The rest of the work was finished by C in 2 days. If they get Rs. 1500 for the whole work, the daily wages of B and C are :

    (a) Rs. 150 (b) Rs. 225

    (c) Rs. 250 (d) Rs. 300

    52. A and B together can complete a work in 12 days. A alone can complete it in 20 days.If B does the work only for half a day daily, then in how many days A and B together will complete the work ?

    (a) 10 days (b 11 days

    (c) 15 days (d) 20 days

    53. A alone can complete a work in 16 days and B alone in 12 days. Starting with A, they work on alternate days. The total work will be completed in :

    (a) 12 days (b 13 days

    (c) 5137

    days (d) 3134

    days

    54. A, B and C can do a piece of work in 11 days, 20 days and 55 days respectively, working alone. How soon can the work be done if A is assisted by B and C on alternate days ?

    (a) 7 days (b) 8 days

    (c) 9days (d) 10 days

    55. A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how

    many days can A do the work if he is assisted by B and C on every third

    day ?

    (a) 12 days (b 15 days

    (c) 16 days (d) 18 days

    56. A and B can separately do a piece of work in 20 arid 15 days respectively. They worked together for 6 days, after which B was replaced by C. If the work was finished in next4 days, then the number of days in which C alone could do the work will be

    (a) 30 (b35)

    (c) 40 (d) 60

    57. A, B and C can do a piece of work in 36, 54 and 72 days respectively. They started the work but A left 8 days before the completion of the work while B left 12 days before the completion. The number of days for which C worked is :

    (a) 4 (b 8

    (c) 12 (d) 24

    58. Twenty women can do a work in sixteen days. Sixteen men can complete the same work in fifteen days. What is the ratio between the capacity of a man and a woman ?

    (a) 3 : 4 (b) 4 : 3

    (c) 5 : 3 (d) Data inadequate

    59. 10 men can complete a piece of work in 15 days and 15 women can complete the same work in 12 days. If all the 10 men and 15 women work together, in how many days will the work get completed?

    (a) 6 (b) 163

    (c) 263

    (d) 273

    60. Seven men can complete a work in 12 days. They started the work and after 5 days,two men left. In how many days will the work be completed by the remaining men ?

    (a) 5 (b 6

    (c) 7 (d)

    61. 12 men complete a work in 9 days. After they have worked for 6 days, 6 more men join them. How many days will they take to complete the remaining work ?

    (a) 2 days (b 3 days

    (c) 4 days (d) None of these

    62. Three men, four women and six children can complete a work in seven days. A woman does double the work a man does and a child does half the work a man does. How many women alone can complete this works in 7 days ?

    (a) 7 (b) 8

    (c) 12 (d) Cannot be determined

    63. A man, a woman and a boy can complete a job in 3, 4 and 12 days respectively. How 1 many boy must assist 1 man and 1 woman to complete

    the job in 14

    of a day ?

    (a) 1 (b 4

    (c) 19 (d) 41

    64. 10 men and 15 women together can complete a work in 6 days. It takes 100 days for one man alone to complete the same work. How many days will be required for one woman alone to complete the same work ?

    (a) 90 (b) 125

    (c) 145 (d) None of these

  • 9

    65. 12 men can complete a piece of work in 4 days, while 15 women can complete the same work in 4 days. 6 men start working on the job and after working for 2 days, all of them stopped working. How many women should be put on the job to complete the remaining work, if it is to be completed in 3 days?

    (a) 15 (b 18

    (c) 22 (d) None of these

    66. Twelve children take sixteen days to complete a work which can be completed by eight adults in twelve days. Sixteen adults started working and after three days ten adult* left and four children joined them. How many days will they take to complete the j remaining work

    (a) 3 (b) 4

    (c) 6 (d) None of these

    67. 10 women can complete a work in 7 days and 10 children take 14 days to complete the work. How many days will 5 women and 10 children take to complete the work I

    (a) 3 (b 5

    (c) 7 (d) Cannot be determined

    68. Sixteen men can complete a work in twelve days. Twenty-four children can complete the same work in eighteen days. Twelve men and eight children started working and after eight days three more children joined them. How many days will they now take to complete the remaining work to complete the remaining work ?

    (a) 2 days (b 4 days

    (c) 6 days (d) 8 days

    69. Twenty-four men can complete a work in sixteen days. Thirty-two women can complete the same work in twenty-four days. Sixteen men and sixteen women started working and worked for twelve days. How many more men are to be added to complete the remaining work in 2 days ?

    (a) 16 (b) 24

    (c) 36 (d) 48

    70. 5 men and 2 boys working together can do four times as much work as a man and a boy. Working capacities of a woman and a boy are in the ratio :

    (a) 1 : 2 (b 2 : 1 (c) 1 : 3 (d) 3 : 1

    71. If 12 men and 16 boys can do a piece of work in 5 days; 13 men and 24 boys can do it in 4 days, then the ratio of the daily work done by a man to that of a boy is :

    (a) 2 : 1 (b) 3 : 1

    (c) 3 : 2 (d) 5 : 4

    72. 4 men and 6 women can complete a work in 8 days, while 3 men and 7 women can complete it in 10 days. In how many days will 10 women complete it ?

    (a) 35 (b 40 (c) 45 (d) 50

    73. One man, 3 women and 4 boys can do a piece of work in 96 hours, 2 men and 8 boys can do itvin 80 hours, 2 men and 3 women can do it in 120 hours. 5 men and 12 boys can do it in :

    (a) 13911

    hours (b) 74211

    hours

    (c) 74311

    hours (d) 44 hours

    74. If 6 meii and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be :

    (a) ) 4 days (b 5 days

    (c) 6 days (d) 7 days

    1. A can do a piece of work in 6 days, and B can do it in 12 days. What time will they require to do if working

    together

    2. A and B together can do a piece of work in 6 days. A alone can do it in 10 days, what time will B require to

    do it working alone?

    3. A can do a piece of work in 15 days and B in 20 days. With the help of C, they finish the work in 5 days.

    How long will it take C to finish the work?

    4. A and B can do a piece of work in 18 days, B and C in 24 days, A and C in 36 days. In what time can they

    do it all working together?

    5. A can do a piece of work in 40 days. He worked at it for 5 day's then B finished it in 21 days. In how many

    days can A and B together finish the work?

    6. A, B and C can do a piece of work in 24, 30 and 40 days respectively. They began the work together but C

    left four days before the completion of the work. In how many days was the work done?

    7. A and B can do a piece of work together in 40 days Their skills of doing the work are in the ratio 8 : 5. How

    many day will A take, if engaged alone?

    8. A is three times as fast as B and together they can finish the work in 12 days. In how many days B alone

    will finish the work.?

  • 10

    9. A is three times as fast as B and is able to finish a piece of work 10 days earlier than B. In how many days

    A and B will together do the work?

    10. A works twice as fast as B and thrice as fast as C. If C can finish the work alone in 11 days, in how many

    days can A, B and C together finish the work?

    11. A can do a work in 30 days. He worked for 5 days and the remaining work was finished by B in 15 days. Working together A and B can finish the work in....

    12. If 5 men and 2 boys, working together, can do four times as much work per hour as a man and a boy together. The ratio of the work done by a man and that of a boy for a given time is:

    13. A does 1

    3 of a work in 5 days. He is then assisted by B and they together finish the remaining work in 6

    days. B alone can finish the whole work in how many days?

    14. If 2 men and 3 boys can do a piece of work in 8 days and 3 men and 2 boys can do it in 7 days, how long

    ivill 5 men and 4 boys take to do it?

    15. A and B can do a piece of work in 20 days. After A has worked for 15 days, B finished the remaining work in

    21 days. In how many days A alone can do?

    16. A, B and C can do a piece of work in 20, 15 and 12 days respectively. A is assisted by B on one day and by

    C on the next day alternately. How long the work would take to finish?

    17. A.and B together can do a piece of work in 12 days which B and C together can finish in 16 days. After A

    worked on it for 5 days and B for 7 days, C finishes it in 13 days. In how many days can A finish the work?

    18. A and B can separately do a work in 20 days and 15 days respectively. They worked together for 6 days

    after which B was replaced by C. If the work was finished in next four days, the number of days in which C

    alone could do the work will be...

    19. A does half as much as B and C does half as much work as A and B together. If C alone can finish the work

    in 40 days, then together they all will finish the work in how many days?

    20. B and C can do a work in 36, 54 and 72 days respectively. They started the work together but A left 8 days

    before the completion of the work while B left 12 days before the completion. The number of days for which

    C worked is:

    21. A can finish a piece of work in 15 days of 8 hour: each and B finishes it in 26

    3 days of 9 hours each. Find in

    how many days can they finish it together, if they work 10 hours each day?

    22. Pipe A can fill a tank in 4 hours and pipe B can fill it in 6 hours. If they are opened for one hour alternately

    and pipe A is opened first, when will the tank be full?

    23. Two labourer's Ramesh and Suresh can do a piece of work independently in 4 days and 6 days. If they are

    working on alternate days and Suresh starting, how long the work will take to be finished?

    24. A and B can do a piece of work separately in It days and 12 days. If they work alternate days, A starting

    when will tht work be finished?

    25. If in the above example 24, B starting, in how many days, the work is finished.

    Short cut method: When the difference of period of doing the work of two individuals is 2 days only. Say A can do a job in x days and B in y days where (y - x) = 2 and y > x, working alternately.

  • 11

    Case 1. If A begins, then the work will take: total no of days = xxy

    days.

    Case 2. If B begins Total no. of days = (x+ 1) days

    This short cut method should be used when the difference of x and y is 2 and both are even numbers.

    When x and y are odd, it should not be used.

    26. A can do a job in 7 days and B can do it in 9 days. If they work for a day alternately, when will the work be

    finished if CO A begining the work and (ii) B begining the work?

    27. Sunita and Anita working separately can do apiece of work in 8 and 12 hours respectively. If they work for

    an hour alternately, Sunita begining at 8 A.M. when will the work be finished?

    28. A, B, C are three pipes attached to a certain lank. A and B can fill it in 20 minutes and 30 minutes respectively, while C can empty it in 15 minutes. If A, B and C be kept open successively for 1 minute each, how soon will the cistern be filled?

    29.

    A bath can be filled by the cold water pipe in 10 minutes and by hot water pipe in 15 minutes. A person

    leaves ihe bath room after turning on both pipes simultaneously and returns at the moment when the bath

    should be full. Finding, however, that the waste pipe has been open, he now closes it. In 4 minutes more

    the bath is full. In what time would the waste pipe empty it?

    30. In what time would a cistern be filled by three pipes whose diameters are 1 cm, 11

    3, cm, 2 cm, running

    together, when the largest alone will fill it in 61 minutes; the amount ofwater flowing in by each pipe being

    proportional to the square of its diameter?

    31. A cistern is filled by pipe A in 10 minutes and can be leaked out by a waste pipe B in 12 minutes. If both the pipes are opened, in what time the cistern is full?

    32. A cistern is filled in 9 hours and it lakes 10 hcurs ivhen there is a leak in its bottom. If the cistern is full, in what time shall the leak empty it?

    33. Three pipes A, B and C can fill a cistern in 6 hours. After working at it together for 2 hours, C is closed and

    A and B fill it in 7 hours more. How many hours will C alone take to fill the cistern?

    34. Two pipes A and B would fill a cistern in 20 and 24 minutes respectively. Both pipes being opened, find

    when the first pipe must be turned off so that the cistern may be just filled in 12 minutes

    35. A cistern has a leak which would empty it in 8 hours. A tap is turned on which admits 6 litres a minute into

    the cistern, and it is now emptied in 12 hours. How many litres does the cistern hold?

    36. Two pipes can fill a tank in 8 and 12 hours respectively whereas an escape pipe can empty it in 6 hours. If

    the three pipes are opened at 1 pm, 2 pm and 3 pm respectively at what time will the tank be filled?

    37. A water tank of 1000 litres capacity is connected to a tap which can fill it at the rate of 20 litres per minute

    and water is let out at the same time at the rate of 5 litres per minute. After an hour the outlet is shut off.

    Find how long will it take noiv for the tank in become fuW.

    38. A pipe can fill a cistern in 8 hours and another in 10 hours. Both are opened at the same time. If the second

    pipe is closed 2 hours before the cistern is filled up, find in what time, the cistern will be filled up?

    39. 25 men can reap a field in 20 days When should 15 men leave the work, if the whole field is to be reaped in

    1372

    days after they leave the work?

  • 12

    RLG

    40. Worker A takes 8 hours to do a job. Worker B takes 10 hours to do the same b. How long should it

    take both A and B, working together but independently, to do

    41. A and B czn together complete the same work in 12 days, in how many days can B alone complete

    that work?

    42. A can do a piece of work in 7 days of 9 hours each and B can do it in 6 days of 7 hours each. . How

    long will they take to do it, working together 285

    hours a day

    43. A and B can do a piece of work in 18 days; B and C can do it in 24 days. A and C can do it in 36

    days. In how many days will A, B and C finish it, working together and separately

    44. A is twice as good a workman as B and together they finish a piece of i in 18 days. In how many

    days will A alone finish the work

    45. A can do a certain job in 12 days. B is 60% more efficient than A. How many days does B alone take

    to do the same job ?

    46. A can do a piece of work in 80 days. He works at it for 10 days and then B alone finishes the

    remaining work in 42 days. In how much time will A and B, working together, finish the work ?

    47. A and B undertake to do a piece of work for Rs. 600. A alone can do it in ' days while B alone can do

    it in 8 days. With the help of C, they finish it in 3 days. Find the share of each

    48. A and B working separately can do a piece of work in 9 and 12 days respectively. If they work for a

    day alternately, A beginning, in how many days, the work be completed ?

    49. 45 men can complete a work in 16 days. Six days after they started working, I more men joined

    them. How many days will they now take to complete the remaining work?

    50. 2 men and 3 boys can do a piece of work in 10 days while 3 men and 2 turn can do the same work in

    8 days. In how many days can 2 men and 1 hoy do the work'