timber sale appraisal forgotten shorts sale at-341-2020 ... · 7 20 18 19 logging plan of timber...
TRANSCRIPT
District: Astoria Date: November 14, 2019
Timber Sale AppraisalForgotten Shorts
Sale AT-341-2020-W00401-01
Cost Summary
Conifer Hardwood TotalGross TimberSale Value $412,841.96 $155,003.62 $567,845.58
Project Work: $0.00
Advertised Value: $567,845.58
1/10/20 1
District: Astoria Date: November 14, 2019
Timber Sale AppraisalForgotten Shorts
Sale AT-341-2020-W00401-01
Timber Description
Location: Area 1 is located in portions of Section 18, T4N, R7W, W.M., Clatsop County, OR.
Stand Stocking: 80%
Specie Name AvgDBH Amortization (%) Recovery (%)
Douglas - Fir 20 0 97
Western Hemlock / Fir 14 0 97
Alder (Red) 16 0 97
Maple 15 0 97
Volume by Grade 2S 3S & 4S 6"-11" 8" - 9" 10" - 11" 12"+ 6" - 7" 3S 4S Total
Douglas - Fir 1,012 147 0 0 0 0 0 0 1,159
Western Hemlock / Fir 19 2 0 0 0 0 0 0 21
Alder (Red) 0 0 73 93 261 181 0 0 608
Maple 119 0 0 0 0 0 17 46 182
Total 1,150 149 73 93 261 181 17 46 1,970
1/10/20 2
Comments: Pond Values Used: Local Pond Values, November 2019.
Expected Log Markets: Mist, Willamina, Banks, North Plains, Clatskanie, Tillamook, Garibaldi, Forest Grove, Wauna, Warrenton, Elma, WA, Longview, WA, Vancouver, WA, and Chehalis, WA
1. PULP PRICEPulp (Conifer and Hardwood) Price = $3.00/Ton
2. CEDAR PRICEWestern Red Cedar and other Cedars stumpage = pond value - (Douglas-fir) logging cost. $796.93/MBF = $1,100/mbf - $303.07/MBF
3. SPRUCE PRICEWestern Red Cedar and other Cedars stumpage = pond value - (Douglas-fir) logging cost. $144.93/MBF = $448/mbf - $303.07/MBF
4. PROFIT & RISK COSTSMachine Washing for Invasive Weed Compliance = $2,000Flaggers on County road:40 Hours Laborer x2 @ $45/Hour = $3,600Controlled Felling along County road:Move in excavator @ $1,581/excavator = $1,58116 Hours excavator @ $175/Hour = $2,800Total controlled felling cost = $4,381
5. SLASH DISPOSALSlash and Landing Piling (See attatched appraisal)= $4,632.67
6. ROAD MAINTENANCE COST$4.06/MBF (See attatched appraisal)
1/10/20 3
District: Astoria Date: November 14, 2019
Timber Sale AppraisalForgotten Shorts
Sale AT-341-2020-W00401-01
Logging ConditionsCombination#: 1 Douglas - Fir 89.00%
Western Hemlock / Fir 89.00%Alder (Red) 89.00%Maple 89.00%
Logging System: Cable: Large Tower >=70 Process: Manual Falling/Delimbing
yarding distance: Long (1,500 ft) downhill yarding: Notree size: Mature / Partial Cut (900 Bft/tree), 3-5 logs/MBF
loads / day: 8.5 bd. ft / load: 4100
cost / mbf: $195.12
machines: Log Loader (A)Tower Yarder (Large)
Combination#: 2 Douglas - Fir 11.00%Western Hemlock / Fir 11.00%Alder (Red) 11.00%Maple 11.00%
Logging System: Shovel Process: Feller Buncher
yarding distance: Short (400 ft) downhill yarding: Notree size: Mature / Partial Cut (900 Bft/tree), 3-5 logs/MBF
loads / day: 10 bd. ft / load: 4100
cost / mbf: $86.29
machines: Feller Buncher w/ Delimber
1/10/20 4
District: Astoria Date: November 14, 2019
Timber Sale AppraisalForgotten Shorts
Sale AT-341-2020-W00401-01
Logging CostsOperating Seasons: 3.00 Profit Risk: 10%
Project Costs: $0.00 Other Costs (P/R): $9,981.00
Slash Disposal: $4,632.67 Other Costs: $0.00
Miles of Road
DirtRock
(Contractor)Rock
(State) Paved
0.0 0.0 0.0 0.0
Road Maintenance:
Hauling Costs
Species $ / MBF Trips/Day MBF / Load
Douglas - Fir $0.00 3.0 4.5
Western Hemlock / Fir $0.00 3.0 3.5
Alder (Red) $0.00 3.0 3.5
Maple $0.00 3.0 3.5
$4.06
1/10/20 5
District: Astoria Date: November 14, 2019
Timber Sale AppraisalForgotten Shorts
Sale AT-341-2020-W00401-01
Logging Costs Breakdown
Logging RoadMaint
FireProtect Hauling Other
P/R applProfit &
RiskSlash
Disposal Brand & Paint Other Total
Douglas - Fir
$183.15 $4.18 $6.68 $72.48 $5.07 $27.16 $2.35 $2.00 $0.00 $303.07
Western Hemlock / Fir
$183.15 $4.18 $6.68 $93.19 $5.07 $29.23 $2.35 $2.00 $0.00 $325.85
Alder (Red)
$183.15 $4.18 $6.68 $93.19 $5.07 $29.23 $2.35 $2.00 $0.00 $325.85
Maple
$183.15 $4.18 $6.68 $93.19 $5.07 $29.23 $2.35 $2.00 $0.00 $325.85
Specie Amortization Pond Value Stumpage Amortized
Douglas - Fir $0.00 $654.93 $351.86 $0.00
Western Hemlock / Fir $0.00 $565.67 $239.82 $0.00
Alder (Red) $0.00 $560.39 $234.54 $0.00
Maple $0.00 $394.00 $68.15 $0.00
1/10/20 6
District: Astoria Date: November 14, 2019
Timber Sale AppraisalForgotten Shorts
Sale AT-341-2020-W00401-01
Summary
Specie MBF Value Total
Douglas - Fir 0 $0.00 $0.00
Western Hemlock / Fir 0 $0.00 $0.00
Alder (Red) 0 $0.00 $0.00
Maple 0 $0.00 $0.00
Specie MBF Value Total
Douglas - Fir 1,159 $351.86 $407,805.74
Western Hemlock / Fir 21 $239.82 $5,036.22
Alder (Red) 608 $234.54 $142,600.32
Maple 182 $68.15 $12,403.30
Amortized
Unamortized
Gross Timber Sale Value
Recovery: $567,845.58
Prepared By: Avery Petersen Phone: 503-338-1363
1/10/20 7
))))
)))
)))))
))))
))))))
)))))))))))))
))
)))))
))
))))))))
)
)))))))))
)))
))
))
))
)))))
)))))))
)))))))
âÑâÑ
âÑâÑ
âÑâÑ
âÑâÑ
âÑâÑ
âÑâÑ
âÑâÑ
âÑâÑ
âÑ
âÑ
âÑâÑ
âÑ
âÑâÑ
âÑâÑ
âÑâÑ
âÑâÑ
âÑâÑ
âÑâÑ
âÑâÑ
âÑ
âÑ
âÑâÑ
âÑâÑ
âÑâÑ
âÑ
âÑâÑâÑâÑâÑ
âÑâÑâÑâÑâÑâÑ
âÑ
â Ñ
âÑ
âÑâÑ
âÑ
âÑâÑâÑ
âÑâÑ
âÑâÑâÑ
âÑâÑâÑ
âÑâÑ
âÑâÑâ Ñâ Ñ
â Ñâ Ñ
â Ñâ Ñ
â Ñâ Ñ
â Ñ
âÑ
â Ñâ Ñ
â Ñâ Ñ
â Ñâ Ñ
â Ñâ Ñ
â Ñâ Ñ
â Ñâ Ñ
â Ñâ Ñ
â Ñâ Ñ
â Ñâ Ñ
â Ñ âÑ âÑ âÑ âÑ âÑ âÑ âÑ
âÑâÑ
âÑâÑ
âÑ
"J"J
"J
"J
"J
"J"J
"J
!(
!(
!(
;;;
;;
;
ÑÜ
Unit 1
1819
1324
STATEPRIVATE
LowerNehalemCounty Road
Neha le mRiver
Lost
Lake
Road
STATEPRIVATE
STATE
PRIVATE
1720
1819
LOGGING PLANOF TIMBER SALE CONTRACT NO. 341-2020-W00404-01
FORGOTTEN SHORTSPORTIONS OF SECTION 18, T4N, R7W,
W.M., CLATSOP COUNTY, OREGONArea 1 (MC) = 65 Acres
0 1,000 2,000500Feet
³
LegendâÑ âÑ âÑ âÑ âÑ Timber Sale Boundary
Paved RoadSurfaced RoadOwnership BoundarySeasonally Restricted Road40' ContourType F StreamType N StreamGreen Tree Retention AreaControlled Felling AreaNonPosted Stream Buffer
))))
))))))))
))))
)))))))) Posted Stream Buffer"J Survey Monument!( Existing Landing; Yarding Area - Tractor
Yarding Area - CableB QuarryÑÜ Stockpile
Tractor - 7 Acres (11%)Cable - 58 Acres (89%)
Logging Breakdown
1 inch = 1,000 feet
Page 1 of 1