timber engineering in the 21st century...timber engineering in the 21st century 04 06 08 32 12 30 34...

21
TIMBER ENGINEERING IN THE 21 ST CENTURY

Upload: others

Post on 03-Apr-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

TIMBER ENGINEERING IN THE 21ST CENTURY

04

06

08 32

3612 30 34

3824

04 RUBNER HOLZBAU 06 WOOD, ENVIRONMENT & CLIMATE PROTECTION 08 SERVICES 10 QUALITY

12 PRODUCTS 24 INDUSTRIAL BUILDINGS 26 COMMERCIAL BUILDINGS 28 SHOPPING CENTRES &

SPECIALIST STORES 30 EDUCATIONAL INSTITUTIONS 32 SPORTS-, LEISURE & CULTURAL FACILITIES

34 RESIDENTIAL BUILDINGS & HOTELS 36 AGRICULTURAL HALLS 38 INFRASTRUCTURE BUILDINGS

TABLE OFCONTENTS

Objects on front page, from left to right:Timber Viewing Tower, Pyramidenkogel (AT) | Football Stadium, Felcsút (HU) | EXPO 2015, Milan (IT)Sports Facility, St Pierre du Perray (FR) | Tesco Supermarket, Taplow (UK) | BSKYB, London (UK)

Objects on rear page, from left to right:Pavilion KA300, Karlsruhe (GER) | Kerakoll Research Centre, Sassuolo (IT) | Stacked Gyms, Ulm (GER)

2 3

RUBNER HOLZBAUWORLDWIDEOPERATIONSIndividual large-scale timber constructions are our core competence. Rubner

Holzbau, which once started out as traditional timber construction factory based

in Austria and Italy, has in the meantime grown and developed to become one of

Europe’s leading timber engineering expert firms today. Our highly complex timber

engineering constructions, multi-purpose halls and architectonically sophisticated

and appealing timber designs experience worldwide demand.

Regardless of whether we are talking about glued laminated timber constructions, roof and wall ele-ments, timber-glass façades or entire building shells – we have gained a solid reputation all over the world with our high-quality, constructive solutions. As timber engineering experts, we proudly look back on the execution of a great number of outstanding and complex projects. Industrial buildings or infrastructure constructions, sports facilities or educational institutions – all these projects have one thing in common: the confident handling of the building material wood, which has been practised in the Rubner company for more than 80 years now.

INTERNATIONAL SALES STRUCTURE

Every year, we produce some 300,000 m² of roof and wall elements and some 85,000 m³ of special-purpose components on the basis of glued laminated timber. Fabrication takes place in Ober-Grafen-dorf (AT), Brixen (IT) and Calitri (IT). Additional company sites in Austria, Italy, France and Germany secure direct and rapid exchange with our business partners. Thanks to this proven infrastructure, we are extremely flexible and able to serve markets all over the world.

INNOVATIVE TOP SERVICES

To secure our lead role, we closely cooperate with universities, research institutes and technically creative designers. We continuously invest not only in optimum production techniques but also in the further training of our experts. Over a period of many decades, we have thus been able to establish a decisive competitive edge on the market on to sustainably secure this competitive advantage.

UNIQUE VALUE-ADDED CHAIN

Rubner Holzbau is part of the Rubner Group, one of Europe’s most important companies in the field of wood processing. The business segments wood industry, timber engineering, large turn-key projects, wood house construction and wood doors cover the entire range of work processes in a gapless vertical value-added chain – starting with the raw material up to the finished object. The family-run business is backed by some 1,500 employees based in Italy, Austria, Germany and France.

4 5

The renewable resource wood is processed in our production sites with the least energy input of all common building materials. With our factory-owned sawmill Rubner Holzindustrie, located in the Austrian region of Styria, we cover the entire value-added chain from raw material to finished project.

Being a CO2 reservoir, wood contributes to environmental and climate protection and thus to the preservation of our habitat. By processing the material to obtain glued laminated timber, façade profiles, roof or wall elements, specific material properties are emphasized, mechanical performance is improved and the material is optimised to meet all requirements in terms of sound- and thermal insulation, fire protection, safety and economic efficiency.

Overall sustainability is a top priority issue in our company. This prioritisation is underlined by using domestic wood from sustainably managed forests. In addition, the low ecological impact of our production sites and recycling of generated production waste clearly speak in our favour. We continuously invest in quality and process optimisation as well as in the improvement of our staff know-how.

WOOD – 21ST CENTURY CONSTRUCTION MATERIAL

Wood, which apart from loam is the world’s oldest building material, today is more efficient than

ever before. Wood not only is a light, stable and renewable material but it also has the capacity

to store carbon, and it is heat insulating and fireproof. There is no other material, which is more

aesthetic and more manifold in its applications than wood and therefore it is the natural answer to

all building challenges of the future.

6 7

FOCUSED EXPERTISE TO ACHIEVE THE BEST RESULT

HIGH PRE-FABRICATION AND CAPACITIES

Profit from our integrated processes. We often execute projects within short timeframes: To do so, we need precision, experience, reliability and sophisticated logis-tics. In these situations, we bring to bear our strengths in terms of statics, construction and material know-how. The high factory pre-fabrication degree of our timber building components and our high production capaci-ties secure flexible delivery of components just-in-time.

Having one central contact person and offering across-trades services, we are able to reduce the number of interfaces during construction thus securing time- and cost efficient project implementation. Once the project has been concluded and if desired, we take care of all necessary maintenance and repair works to preserve the construction's value.

CONSTRUCTION KIT OR ALL-IN-ONE SOLUTION

No matter whether you need simple load-bearing systems or complex timber constructions, construction kits or all-in-one solutions – our approach and our intent is to professionally and reliably assist our business part-ners. At your request, we take care either of the entire project planning process – including detailed engineer-ing and workshop design -, we account for construction site management across different trades or we simply assume production, delivery and assembly of individual building elements.

You are the one to decide on the required scope of services. However, you will always be assisted with our focused expertise at any of your individual project phases. Structural designers, engineers, project man-agers and experienced staff in the fields of sawing, trimming and transport will take care to achieve the best result.

8 9

CONFIDENCE AND SECURITY

INTERNAL AND EXTERNAL QUALITY CONTROL

All product management and fabrication processes are subject to continuous internal quality controls and to external certification procedures by accredited test institutes. This quality control comprises PEFC- certified raw material, ISO 9001 project implementation, as well as production and component construction in accordance with RAL or the EN Euronorm.

The most state-of-the art installations and not least the know-how of our experts guarantee outstanding precision of our constructions. Highest possible pre- fabrication degrees under workshop conditions accele-rate work processes on site, secure exact predictability for other trades and the immediate impermeability of the building shell. Our constructions are able to stand the most excessive strains and to meet all requirements in terms of fire protection, seismic safety, energy efficiency and sound insulation for space-enclosing building components.

ADHERENCE TO COSTS AND SCHEDULE

The more complex the building assignment is, the more important will be the aspects of reliability, competence and security. Adherence to costs and schedule, secu-red processes and successful interface management are indispensable factors. Thanks to our profound material know-how and our technical competence with international background, we are a reliable partner for complex constructions and architectonically appealing building projects. Our timber construction solutions are one-stop services and are not only innovative but also economically efficient.

INTEGRATED PROCESSES

Each project is ruled by integrated processes from design and manufacturing to delivery and assembly by qualified building site staff. From the very beginning, i.e. during consulting and proposal phase already, our internal engineering offices cooperate with sales engineers for structural design and detailed enginee-ring works.

10 11

GLUED LAMINATED TIMBER

Timber material for almost all applications. Individually manufactured building components

of glued laminated timber do not only play an important role in our timber engineering

structures. They also constitute the basis for energy-efficient wall and roof elements as well as for

timber-glass façades.

CNC-PROCESSING

Once the hardening and planing processes have been concluded, CNC machines cut the beams to the exact dimensions, according to the CAD design. Laser-controlled drilling and milling tools provide for quality workmanship of millimetric accuracy. Thanks to our continuous control mechanisms, we achieve a precision of the timber elements, which even falls below tolerance limits. The girders can then be either painted or impregnated depending on requirements. In a final step, the steel elements will then be integrated.

STRONG AS STEELBUT WITH CONSIDERABLY LOWER WEIGHT

Regardless of which type of wood we are talking about – spruce, pine or larch – having a similar load-bearing capacity as steel, glued laminated timber scores with considerably lower weight and therefore allows construc-tions with large span widths but free of thermal bridges. Apart from being an extremely durable material, it also is fireproof and resistant to seismic impacts. Laminated timber components in the common timber strength classes pursuant to Eurocode 5-1-1 are fabricated in our in-house production sites in accordance with individual project requirements.

Freshly felled and industrially dried, the raw lamellas are delivered from our in-house sawmill to the production site just-in-time to enter the fully automatized processing chain. Following a very strict quality control, up to 50 m long boards are produced by finger-jointing technique. These lamellas are then finally planed and glued and then formed into the desired shape in a pressing jig.

12 13

Our economic roof structures, made of pre-fabricated timber roof elements, and our complete roof constructions score with a large variety of feasible options. In addition, these structures are characterized by convincing features in terms of acoustics, ductility and fire protection. Our roof elements meet the requirements of fire resistance classes REI 30, REI 60 and REI 90 in accordance with EN 13501-2. Due to the high pre-fabrication degree of our building elements, the building owners can profit from rapid and thus cost-efficient implementation, regardless of prevailing weather conditions.

COMPLETE ROOF CONSTRUCTIONS

The pre-fabricated roof elements are delivered to the construction site just-in-time, including the completed roof coverings and transport package. We not only offer all additional roof elements, such as lighting domes, roof light bands, fume extractors and other accessories, which constitute a complete roof system, but we also provide for the necessary assembly services. Our special maintenance contracts, which can be concluded for the servicing and repair of large roof areas, secure the long-term value preservation of your roof construction.

STANDARD- AND SPECIAL DESIGNS

In the standard version, our roof elements are suitable to be used for maximum span widths of 7.5 m. Depending on the load situation, the height of the roof elements ranges from 16 to 28 cm. In addition, we are also able to produce numerous special designs for span widths of more than 10 m with integrated laminated timber supporting structure.

Due to the construction methods that we use, our roof elements open-up individual design possibilities in terms of soffits and roof coverings so that we can fully meet our clients’ individual demands and the different requirements in terms of statics and building physics.

CROSS LAMINATED TIMBER CEILINGS

Depending on the type of project, we use cross laminated timber elements as supporting ceiling and roof elements. The multiple layered solid timber panels can be manufactured in large sizes with lengths of up to 13 m and widths of up to 4 m. Thanks to the crosswise assembly of the multiple layers, the cross laminated timber elements allow for bi-axial load transfer and for dimensional stability. The elements are individually manufactured in the factory and already equipped with all necessary milled holes for joining means, rebate joints or installations – just ready for assembly.

ROOF ELEMENTSNot only industrial and commercial buildings are roofed rapidly and

cost-efficiently. Many other high-quality building projects are also

perfectly well roofed by means of Rubner Holzbau elements.

14 15

WALL ELEMENTS

Timber wall elements are real all-rounders. Energy-efficient, space-enclos-

ing elements made of resource-conserving, compact components, which

provide an aesthetic outside appearance to the building in a short time.

Whether used in multi-storey buildings or for energetic refurbishment, our

wall elements can masterfully display all of their advantages.

CROSS LAMINATED TIMBER AS ADDITIONAL VARIANT

According to the type of project assignment, cross laminated timber wall elements can also be used. The multi-layered, crosswise glued wall elements provide for dimensional and settling stability and can be individually trimmed without limiting grids and pre-fabricated ready for assembly. These elements are particularly appro-priate for stiffening and can even be used for surfaces, which remain visible.

NEW CONSTRUCTION, ADDING OF ADDITONAL FLOORS, REHABILITATION

Depending on the architectonical requirements as to building physics and finishing degrees, we are able to easily adapt our elements to wall and façade construc-tion. Pre-fabricated wall elements can be used not only for multi-storey hybrid constructions but also for the energetic rehabilitation of deteriorated building shells. It is above all in the urban context that these elements score thanks to their reduced dead weight and are thus preferred when additional floors are added or assem-blies are made on to existing structures.

VERSATILE DESIGNS

Flexible structures, with countless inside and outside cladding alternatives, open-up an almost unlimited design freedom. All our wall elements are basically composed of load-bearing glued laminated timber elements and solid structural timber rib elements and additional functional layers.

FLOOR-TO-CEILING AND ACROSS-FLOORELEMENTS

Large formats, high production capacities and project-specific construction of floor-to-ceiling and across floor elements allow to produce an almost joint-free build-ing shell and secure – even for large-scale projects – a resource-saving implementation both in terms of money and time. Optionally, our wall elements can assume all functions of load transfer or stiffening, and they can also be fixed as space-enclosing elements to the supporting structure of a skeleton construction.

The timber frame construction elements are pre-fabri-cated under controlled workshop conditions and can be provided in finished surface qualities both for inside and outside use. It is also possible to combine these elements with post and beam façades and to provide for individual designs in timber, plaster or other façade materials.

16 17

TIMBER-GLASSFAÇADES

Large-scale, versatile and aesthetic. Light-flooded constructions, modern architecture

and inviting openness – aesthetic timber-glass façades are complex building elements,

which offer innovative design possibilities. However, our timber-glass façades are also

pioneering because of their ecological and economic factors.

The constructions can either be fixed to traditional post and beam façades or to fully pre-assembled element façades – including all required insulating panels, window elements or outside claddings. The specifically customized post and beam cross sections are manufactured in high quality and precision using either glued laminated timber (pine, larch or spruce) or wood materials.

AESTHETIC AND DURABLE

The combination of timber, glass and aluminium pro-vides for manifold architectural possibilities to secure a healthy indoor and feel-good climate. Due to the use of sustainable building materials, our façades are extreme-ly durable and resistant to adverse weather conditions. This positive features are enhanced by tested and certi-fied glazing and sealing systems.

Apart from calculation and detailed engineering of highly demanding façade projects, our scope of services also includes construction site management across the different trades up to the turn-key building shell.

LARGE-SCALE AND OF VERSATILE USE

We are specialised in the implementation of very large façade surfaces in multi-storey office buildings, com-mercial constructions, hotels and public buildings. It is above all in the sector of modern hybrid constructions that curtain-type timber-glass façades allow to install an efficient building shell.

ENERGY-EFFICIENT

On the one hand our systems secure the implementation of aesthetic and geometrically detailed specifications of architects. On the other hand, these systems meet the requirements of building owners, which comprise energy conservation, energy saving with thermal transmittance values up to passive house standards or the use of state-of-the-art building techniques such as solar and shading techniques.

18 19

Bearing in mind that construction projects are evaluated in terms of energy- and climate-optimization, extended importance is attributed to timber building shells. When very large buildings are being built, the requirements that are made do not only refer to constructive aspects and to building physics but also to a reliable service provision with only little interfaces.

FROM ONE SINGLE SOURCE - RUBNER HOLZBAU

In this particular aspect, you profit from the combination of our different systems: wall elements, timber-glass façades and roof sealing from one single source are coordinated to finally turn into a timely assembled, durable and secure building shell. Our project managers are specialised to guarantee the efficient interface management and the coordination of all required trades on the construction site.

NEW CONSTRUCTIONS AND ENERGETIC REHABILI-TATION

The almost turn-key building shells can be used for hybrid structures or new constructions but also for the energetic rehabilitation of existing structures. The guaranteed high pre-fabrication degree of individual building components, which allows to execute the en-ergetic rehabilitation of existing buildings within some few weeks, is a great advantage both for building users and architects.

PERFECT INSULATION

Apart from all ecologic aspects, which are related to wood as a building material, the quality of the struc-ture is additionally upgraded by optimized insulation properties in terms of aesthetic appearance and quality of use pursuant to the requirements as to daylight, ambient air, sound insulation or acoustics. All this can be achieved without having to impair the use of the building any longer than absolutely necessary.

BUILDING SHELLS

The implementation of entire building shells for new and already existing

buildings is one of our core competences. We offer the implementation

of high-quality and economic overall solutions with clearly defined central

responsibilities.

20 21

PROJECTS& SOLUTIONS

22 23

05

03

0401

02

INDUSTRIAL BUILDINGS

01 02 CARBON RESERVOIR ENEL, BRINDISI (IT) 03 PRODUCTION HALL CAPITA SNOW- & KITEBOARDS,

FÜRNITZ (AT) 04 SUGAR SILO AGRANA, TULLN (AT) 05 PRODUCTION HALL AND OFFICE BUILDING

CARNITALIA, OSPEDALETTO LODIGIANO (IT)

01 02 Glued laminated timber 3,100 m³, cross laminated timber 44,000 m², steel 384 t. Two hemispherical, geodetic support-ing structures with a diameter of 143 m each and a total surface of 22,000 m².

05 Glued laminated timber 2,650 m³, timber-glass façades 3,500 m², roof surface 10,200 m², steel 42 t. Reconstruction of the building after a great fire. Decision was taken in favour of a timber construction due to the calculable behaviour of the material in the event of a fire and due to high pre-fabrication degrees of the elements in the factory, which secure the rapid completion of the building.

03 Roof elements 4,100 m² with 2.90 x 18 m, wall elements 2,820 m² with 2.90 x 18 m, glued laminated timber 550 m³.

04 Glued laminated timber 1,000 m³, roof elements 2,000 m², roof rack with a free span of 50 m.

24 25

05

06 07

02

01

03

04

03 Roof elements 4,100 m², glued laminated timber 430 m³. Winner of the Lower Austria Wood Construction Award in the Category of “Timber Engineering”.

04 Glued laminated timber 325 m³, roof surface 2.700 m². Ecology and optimum energy saving potentials were the determining factors to finally opt for timber as building material.

04

01 Glued laminated timber 75 m³, laminated veneer lumber 188 m³, roof elements 750 m², ceiling elements 490 m², steel 12 t (diagonals, slotted plates).

02 Primary supporting structure composed of 32 differently arched larch glulam bows with lengths of up to 9.5 m.

05 Glued laminated timber 540 m³ (max length = 18.20 m), wall elements 2,000 m² (max length = 13.20 m). Once completed, the building is England’s highest multi-storey timber structure.

06 Glued laminated timber 520 m³.

07 Roof cassettes 16,000 m², glued laminated timber: 260 m³ (7,500 lm). Once completed, the building is England’s largest project with timber roof cassettes.

COMMERCIAL BUILDINGS

01 WERKHAUS RAUBLING (GER) 02: CINEMATOGRAPHIC FOUNDATION JÉRÔME SEYDOUX-

PATHÉ, PARIS (FR) 03 BREITWIESER STONE WORLD, TULLN (AT) 04 KERAKOLL RESEARCH CENTRE,

SASSUOLO (IT) 05 BSKYB – BELIEVE IN BETTER BUILDING, LONDON (GB) 06 RESTAURANT EDEN,

RIPALIMOSANI (IT) 07 SKY CENTRAL, LONDON (GB)

26 27

02

01

03

04

05 06

04

SHOPPING CENTRES SPECIALIST STORES

01 SHOPPING CENTRE LE ACCIAIERIE, CORTENUOVA (IT) 02 SPECIALIST STORE HAIDÄCKER PARK,

EISENSTADT (AT) 03 OBI DIY STORE, BRUNECK (IT) 04 TESCO SUPERSTORE, BARNSTAPLE (GB)

05 RETAIL PARK KITZBÜHEL (AT) 06 RETAIL CENTRE THAYAPARK, WAIDHOFEN (AT)

03 Glued laminated timber 1,200 m³, roof surface 6,100 m², wall elements 1,500 m², façade cladding made of corrugated metal sheet 1,500 m².

01 Surface area 58,000 m², cupola diameter 82 m.

02 Glued laminated timber 700 m³, roof elements 13,800 m².Nominated for the Burgenland Wood Construction Award in the Category “Commercial Buildings”.

04 Glued laminated timber structure with 7,300 m² of pre-fabricated roof cassettes.

05 Glued laminated timber 1,105 m³, wall elements 1,020 m², cross laminated timber 70 m². 95 % of the ground- and first floor were executed in timber.

06 Roof elements 8,330 m², wall elements 3,182 m², glued laminated timber 914 m³, solid structural timber 437 m³.

28 29

01

02

03

05

06

04

EDUCATIONAL INSTITUTIONS

01 FREE UNIVERSITY OF BERLIN (GER) 02 BUNDESREALGYMNASIUM WIENER NEUSTADT (AT)

03 KINDERGARTEN GUASTALLA (IT) 04 SOS CHILDREN’S EMBASSY BERLIN (GER) 05 COLLÈGE

FRÖELICHER SISSONNE (FR) 06 MARGARETE-STEIFF-SCHOOL, MÖHRINGEN (GER)

04 Wall elements 1,407 m² (3.90 x 10.60 m) in robinia with membrane façade, post and beam façade 800 m² in spruce, grey glazed with awnings.

06 Timber-glass façade 1,650 m² (2,300 lm of post and beam construction), glued laminated timber in spruce, 50 × 220 mm.

05 Façades and interior walls 2,200 m², glued laminated timber 260 m³, greened roof surface and terraces 4,450 m².

01 Timber-glass façade 5,000 m², timber elements façade 6,000 m² made of glazed Alaska yellow cedar.

02 420 m²/654 lm of timber-glass façade including roof glazing.

03 Glued laminated timber 200 m³, roof surface 1,100 m². Glued laminated timber supporting structure to secure high stability in an earthquake-prone region.

30 31

02

01

03

07

05 06

04

08

SPORTS, LEISURE & CULTURE

01 TOP MOUNTAIN CROSSPOINT, HOCHGURGL (AT) 02 STACKED GYMS, ULM (GER) 03 TIMBER

VIEWING TOWER AM PYRAMIDENKOGEL, KEUTSCHACH AM SEE (AT) 04 AUDITORIUM OF THE

KWASIZABANTU MISSION, DURBAN (SA) 05 ST. FRANCIS OF ASSISI CHURCH, IMOLA (IT) 06 FOOTBALL

STADIUM, FELCSÚT (HU) 07 AFRICARIUM-OCEANARIUM, ZOO WROCLAW (PL) 08 WATER PARK

ACQUAWORLD, CONCOREZZO (IT)

02 Timber-glass façade 660 m² in spruce glued laminated timber.3 stacked gyms with 27 x 15 m, curtain type façade structure made of white aluminium lamellas.

03 Glued laminated timber 500 m³, cross laminated timber 1,000 m². Once concluded and with a height of some 100 m, the world’s highest timber viewing tower with the longest slide in Europe.

01 Wall elements 1,000 m², glued laminated timber 800 m³, roof surface 6,000 m², total net floor area 6,060 m², sea level 2,175 m, 2,600 m² motorbike museum.

04 Glued laminated timber 400 m³.

05 Glued laminated timber 200 m³, roof surface 2,000 m².

06 Glued laminated timber 1,700 m³.

07 Glued laminated timber 800 m³, roof surface 8,800 m².

08 Glued laminated timber 1,090 m³. 54 different glued laminated timber bows. 7 main and 91 secondary beams have been joint by more than 1,700 different connecting elements.

32 33

0403 07

08

05

06

01

02

RESIDENTIALBUILDINGS & HOTELS

01 ARI – ASSISTED LIVING, MARSEILLE (FR) 02 HOTEL & HEALTH RESORT LANSERHOF, MARIENSTEIN

AM TEGERNSEE (GER) 03 APARTMENT COMPLEX AM MÜHLGRUND, VIENNA (AT) 04 FALKENSTEINER

RESORT, KATSCHBERG (AT) 05 MARINA VERDE WELLNESS RESORT, CAORLE (IT) 06 SCIENCE CITY ZURICH

(CH) 07 APARTMENT COMPLEX DOMAGKPARK, MUNICH (GER) 08 STUDENT’S RESIDENCE MAISON DE

L'INDE, PARIS (F)

05 Glued laminated timber 1,870 m², ceiling surface 10,500 m². 73 high-quality residential units. In 2012, the first six-storey timber building in Italy.

06 Building volume 73,800 m³, façade elements 7,770 m² with 750 opening elements, glazing 2,250 m², glued laminated timber & solid structural timber 463 m³. Curtain-type cladding made of extruded ceramics.

07 Façade elements 3,000 m², douglas fir unplaned cladding 400 m², fire resistant façade 280 m², aluminium supporting construction, plaster base plates.

08 Glued laminated timber 2,335 m². Multi-storey timber construction with seven floors. Implementation of a “macro construction lot” including building shell, timber construction, outside and inside frame, cladding and roof.

01 Glued laminated timber supporting frame 20 m³, cross laminated timber 4,770 m². Exterior wall elements 1,780 m², outside battens in prematurely greyed larch.

02 Building shell 3,500 m² with 5.700 lm of timber-glass façade including sliding shutters.

03 Wall elements 6,490 m², façades made of unplaned larch wood.

34 35

02

05

08

01

03

04

0706

04 Spruce glued laminated timber elements 129 m³, ridged roof, roofing with PU panels, larch wall cladding.

01 Glued laminated timber 210 m³, roof surface 2,576 m².

06 Spruce glued laminated timber elements 335 m³, ridged roof, roofing & wall cladding with PU panels.

07 Spruce glued laminated timber elements 129 m³, ridged roof, roofing with PU panels, wall cladding by trapezoidal sheet.

08 Spruce glued laminated timber elements 385 m³, ridged roof, covering of roof elements, wall cladding, wall elements.

AGRICULTURALHALLS

01 AGRICULTURAL ESTABLISHMENT, REISCHACH (IT) 02 RIDING HALL RIVIERA HORSES, SAN GIOVANNI

IN MARIGNANO (IT) 03 HORSE PARK MAGNA RACINO, EBREICHSDORF (AT) 04 RIDING HALL SCHACH-

INGER, MÜHLHEIM AM INN (AT) 05 CATTLE FREESTALL BARN HACKL, BAD ZELL (AT) 06 VEGETABLES

DEPOT SCHEIBLHOFER, ANDAU (AT) 07 BAUMÜHLNER DEPOT, NITZING(AT) 08 SOMMERSGUTER DEPOT,

FISCHBACH (AT)

05 Spruce glued laminated timber elements 81m³, single-pitch roof, covering of roof elements, larch wall cladding, curtain-type system. Winner of the Upper Austrian Wood Construction Award.

36 37

01

02

04

05

03INFRASTRUCTUREBUILDINGS

01 TRAIN STATION AND REMISE LAUBENBACHMÜHLE (AT) 02 PEDESTRIAN BRIDGE, AGORDO (IT)

03 SERVICE AREA AUTOGRILL VILLORESI EST, LAINATE (IT) 04 MACTAN CEBU INTERNATIONAL AIRPORT,

PHILIPPINES 05 SALT DEPOSIT BERG (GER)

01 Glued laminated timber 1,500 m³, roof elements 6,500 m², wall elements 600 m². Winner of the Lower Austrian Wood Construction Award in the Category of “Public Buildings”.

02 Glued laminated timber 150 m³, length 76 m.

03 Glued laminated timber 550 m³, roof surface 4,000 m².

04 Glued laminated timber 4.500m³, terminal area 65,000 m². When construction works were started, it was Asia’s only airport building entirely made of glued laminated timber elements.

05 Roof elements 780 m², wall elements 450 m². Timber con-struction with glued rib elements for walls and roof structure. No metallic connection elements have been used, all surfaces that come into contact with salt have been made of timber. 450m² of flamed larch cladding.

38 39

AustriaRubner Holzbau GmbHRennersdorf 623200 Ober-Grafendorf, AustriaPhone: +43 2747 [email protected]

Branch Office VillachKanzianibergweg 149584 Finkenstein, AustriaPhone: +43 4254 50 [email protected]

GermanyRubner Holzbau GmbHAm Mittleren Moos 5386167 Augsburg, GermanyPhone: +49 821 710 [email protected]

FranceRubner SAS36 avenue des Frères Montgolfier69680 Chassieu, FrancePhone: +33 472 790 [email protected]

ItalyRubner Holzbau S.p.A.Alfred Ammon Str. 1239042 Brixen (BZ), ItalyPhone: +39 0472 822 [email protected]

Rubner Holzbau Sud S.p.A.Zona Industriale83045 Calitri (AV), ItalyPhone: +39 0827 308 [email protected]

Imprint:Editor and responsible for the content: Rubner Ingenieurholzbau AG, [email protected], www.holzbau.rubner.com. The document, including all its parts, is protected by copyright. Reprints, even of extracts, are allowed only with the express authorisation of the editor.Concept, layout/design: Serendipity – Agency for advertising, public relations & event management, [email protected]: Rubner Holzbau, B & K Structures, Archipente, Simon Kennedy, Alexander Maria Lohmann, IDA Hong Kong, Marc Winkel-Blackmore, Achim Birnbaum, ETH Zürich/Alessandro Della Bella, C+P Schlüsselfertiges Bauen, Gerhard Figl, Werkhaus Raubling, Frener & Reifer Fassaden, Fausto Franzosi, IMAGESinAIR Productions, Frank Dinger, Conné van d’Grachten, Döme László, Ferenc-Puskás-Akademie, ArC2 Fabryka Projektowa, Asylum, Jürgen Eheim, Land Oberösterreich, Zieser Ziviltechniker, Federico Brunetti, Ulrich Schwarz.