Page 1: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed

Carmax Beaverton

Beaverton, OR

Page 2: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed

Technical Information Project Location: Beaverton, OR Concrete Strength Requirements: 3,000, 4,000, and 5,000 psi Water/Cement Ratios: .33, .38, .39, .40, .45 and .55 Unique or High Volume Admixtures: ASTM C494 – Type A Water Reducer 23.00, ASTM C494 – Type F Water Reducer 64.00

Carmax Beaverton

Page 3: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed

Construction of a new CarMax dealership in Beaverton Oregon consists of a new 146,000 square foot cast-in-place parking structure. The new 3-level parking structure

needed extensive ground improvements including over 500, 25’ long rammed aggregate piers.

Carmax Beaverton

Page 4: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed

The parking structure was 46’8” in height and provided parking accommodations for 210 vehicles. A very challenging aspect of the project was the first floor utilized extensive high bay shoring for the 24’ tall elevated level 1. The assembly and dis-assembly of concrete formwork was carefully thought out with extreme caution

due to the heights involved with this work.

Carmax Beaverton

Page 5: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed

The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed using a post tensioned beam

system combined with wood joist panels.

Carmax Beaverton

Page 6: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed

The large parking structure included two access ramps, one from the North and one from the South. The perimeter crash wall system combined cast in place

concrete walls and a cable rail system embedded through the concrete columns.

Carmax Beaverton

Page 7: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed

Carmax Beaverton

Page 8: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed

Carmax Beaverton

Page 9: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed

Carmax Beaverton

Page 10: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed

Carmax Beaverton