tib module performance at x5 test beam – preliminary studies

23
TIB module performance at X5 Test beam – preliminary studies G.Segneri et al. Universita` and INFN - Pisa Test Beam meeting – October 23 2003

Upload: pandora-sims

Post on 31-Dec-2015

23 views

Category:

Documents


3 download

DESCRIPTION

TIB module performance at X5 Test beam – preliminary studies. G.Segneri et al. Universita` and INFN - Pisa. Test Beam meeting – October 23 2003. Outline. Detector behavior under different bias voltages Studies on Detector Response Uniformity. Voltage scan for TIB Detectors. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: TIB module performance at X5 Test beam – preliminary studies

TIB module performance at X5 Test beam – preliminary

studies

G.Segneri et al.Universita` and INFN - Pisa

Test Beam meeting – October 23 2003

Page 2: TIB module performance at X5 Test beam – preliminary studies

Outline

• Detector behavior under different bias voltages

• Studies on Detector Response Uniformity

Page 3: TIB module performance at X5 Test beam – preliminary studies

Voltage scan for TIB Detectors

• Study of the detector properties (noise, charge, S/N, cluster width and response function) as a function of the applied voltage

Used runs: TIB peak: 1198, 99, 1202, 03, 04, 14, 15 -

120 GeV TIB dec.: 30020, 24, 27, 33, 36, 39, 42, 46 – 120 GeV , 25 ns beam

Page 4: TIB module performance at X5 Test beam – preliminary studies

Beam Position in TIB Modules

muon beam pion beam

Page 5: TIB module performance at X5 Test beam – preliminary studies

TIB Voltage scan -peak

• Peculiar behaviour at 300 V – hysteresis effect?

Page 6: TIB module performance at X5 Test beam – preliminary studies

TIB Voltage scan – peak (II)

Page 7: TIB module performance at X5 Test beam – preliminary studies

TIB Voltage scan – dec.

Page 8: TIB module performance at X5 Test beam – preliminary studies

TIB Voltage scan – dec. (II)

20% increase in S/N ratio for Vbias = 2Vfd

Page 9: TIB module performance at X5 Test beam – preliminary studies

Response Function

Page 10: TIB module performance at X5 Test beam – preliminary studies

Cluster ShapePeak modeVbias=200V

Dec. modeVbias=200V

Peak modeVbias=450V

Dec. modeVbias=450V

Page 11: TIB module performance at X5 Test beam – preliminary studies

TIB Voltage scan under controlled environmental

conditionsRun numbers:T<23 oC: 30133, 37, 40,

42, 45, 47, 50R.H.<20%: 30154, (62-

66), (69-74)

120 GeV muon beam

beamT<23 oC

Page 12: TIB module performance at X5 Test beam – preliminary studies

Performance reproducible under controlled RH condition signal and noise depend on RH but not their ratio

TIB Voltage scan under controlled environmental

conditions (II)

Page 13: TIB module performance at X5 Test beam – preliminary studies

Voltage Scan for TOB Detectors

Used runs: 30145, 47, 51, 63, 64, 65 – 120 GeV , 25 ns beam – deconvolution mode

Page 14: TIB module performance at X5 Test beam – preliminary studies

TOB mod # 7 TOB mod # 8

TOB mod # 12TOB mod # 11

TOB mod # 10TOB mod # 9

Page 15: TIB module performance at X5 Test beam – preliminary studies

TOB Voltage scan

Noise constant above 200 V Charge collection improvement at very high voltage

Page 16: TIB module performance at X5 Test beam – preliminary studies

TOB module voltage scan (II)

25% decrease in S/N for Vbias = Vfd

Page 17: TIB module performance at X5 Test beam – preliminary studies

TOB module voltage scan (III)

Less 10% of charge loss at Vbias/Vdepl>1.5 Constant cluster width above Vbias=300 V

Page 18: TIB module performance at X5 Test beam – preliminary studies

Comparison TIB/TOB

95% of S/N highest value at 1.7 (1.5) Vdepl for TOB (TIB) modules

Page 19: TIB module performance at X5 Test beam – preliminary studies

Sensor Uniformity Studies• Study of the TIB sensor properties (noise,

charge, S/N, respone function) as a function of the cluster position

Used runs: Run 1351-3: peak mode, pion beam, approx.

500,000 events Run 1484: dec mode, 25 ns pion beam,

approx. 1,500,000 events

Page 20: TIB module performance at X5 Test beam – preliminary studies

Groups of 16 strips

Page 21: TIB module performance at X5 Test beam – preliminary studies

Groups of 8 strips Groups of 16 strips

Page 22: TIB module performance at X5 Test beam – preliminary studies
Page 23: TIB module performance at X5 Test beam – preliminary studies

Conclusions

• TIB and TOB modules behave as expected except

in some runs to be understood • Dependence on RH to be investigated more

deeply (next talk?)• Uniformity of detector performance as a

function of the position was successfully tested in high statistics runs

• Work still in progress…