42E12NE8ee7 2.14384 LEDUC 010 REPORT ON HUMUS SAMPLING PROGRAM OXALINE LAKE PROPERTY LEDUC TOWNSHIP THUNDER BAY MINING DIVISION, ONTARIO David Laudrum, B. Se. November 28, 1991 . j a'/ S 7

Upload: others

Post on 28-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

42E12NE8ee7 2.14384 LEDUC 010

REPORT ON HUMUS SAMPLING PROGRAM

OXALINE LAKE PROPERTY

LEDUC TOWNSHIP

THUNDER BAY MINING DIVISION, ONTARIO

David Laudrum, B. Se.

November 28, 1991

. j a'/ S 7

Page 2: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

42E12NEea07 2.14384 LEDUC

TABLE OF CONTENTS

SUMMARY AND CONCLUSIONS

INTRODUCTION

PROPERTY

LOCATION AND ACCESS

GEOLOGY AND MINERALIZATION

CURRENT WORK PROGRAM

GRID

HUMUS SAMPLING - METHODOLOGY/SAMPLE DESCRIPTIONS

SIGNIFICANT RESULTS

RECOMMENDATIONS

REFERENCES

page

3

3

3

3

9

010C

FIGURES

FIGURE 1: Location of Claims

FIGURE 2: Humus Goochem Survey - Au (back pocket )

TABLE 1:

TABLE 2:

TABLES

Codes used in Humus Sample Descriptions 6

Anomalous Au Samples which correspond

to Surface Traces of Fraser Filter

VLF-EM Conductors 7

APPENDIX 1:

APPENDIX 2:

APPENDIX 3:

APPENDICES

Humus Sample Descriptions

Certificates of Analysis and Invoice

from Accurassy Laboratories Ltd.

Certificate of Qualifications

Page 3: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

SUMMARY AND CONCLUSIONS

This report discusses a program of grid establishment and

Humus geochem sampling carried out on the Oxaline Lake property

during October and November 1991,

Geological Mapping l Prospecting which was to have taken

place immediately following the Humus Sampling was cancelled due

to heavy snowfalls in the area starting on October 31.

Of 193 Humus samples taken in the program, 1370 returned

values of at least lOppb gold (maximum value returned was 25ppb).

In several cases anomalous values occur in groupings of two or

more contiguous samples and/or are coincident with the surface

trace of Fraser Filtered VLF-EM conductor axis.

It is recommended that detailed Geological Mapping t

Prospecting be carried out as previously planned, when conditions

permit, in order to further evaluate anomalous gold values and

their relationship to coincident conductors.

Page 4: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

INTRODUCTION

The Oxaline Lake Property consists of 5 contiguous

unpatented raining claims located 3.5 km west of the town of

Jellicoe in the Thunder Bay Mining Division. Between October 29

and November 6, 1991 a program of recon grid establishment and

Humus Geochemistry sampling was carried out by the author to test

for the presence of gold mineralisation on the property. This

report presents the methodology and results of that program.

PROPERTY

The Oxaline Lake Property consists of 5 contiguous mining

claims located in Leduc Township, Thunder Bay Mining Division,

Ontario.

Claim Numbers: TB 1172950 - TB 1172953 inclusive

TB 1173785

The above claims were recorded by, and are currently held

by: Vernon Shein, 74 Partridge Street, Kitimat, B.C., V8C-1L5.

LOCATION AND ACCESS

The property is located in the southern part of Leduc

Township 3.5 km west of the Town of Jellicoe. The southwest

corner of the claims is approximately 400m north of the Trans-

Canada Highway //li, the southeast corner falls on the Northern

Ontario Gas Pipeline right-of-way.

GEOLOGY l M INERALIZATION

"The property is located in the Beardmore - Geraldton

Greenstone Belt at the boundary between the Wabigoon Metavolcanic

Subprovince to the north and the Quetico Metasedimentary Belt to

the south.

The property is underlain by eastwardly trending,

southwardly dipping, Archean epiclastic metasedimentary rocks.

The Solomon's Pillars prospect (INCO) located two miles to

the west has an estimated 100,000 tons grading 0.25 oz/ton Au

Page 5: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

2 l 8637061 8"7O | .76a7|S i 768718 768715 768722 768723 l 768725

---r ——-l——4---^-

-rt- / -J- - - -0-/1 H660dGny008 |S!C60IO

-E^TT-T"' *~ jr^i" Jr \

^^AAJk7AT l *'^w l p it ^^-r-^r-.k-y^r l ^ \3L.^ A) /^

- -

' .1 - "' CJJ' r D :i ^ \T.-*'* l ^T ArR r ;pT -;^3M4M l 3"*2 l 100480*''O?.

5M LO** 2 M

dOOO

FIGURE 1. LOCATION OF CLAIMSOXALINE LAKE PROPERTY(from Ontario MNDM Claim Map //G-169 Leduc Twp. )

Page 6: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

.5

starting at the 30.48m vertical level (OGS OFR 5630).

The Solomon's Pillars Fault (SPF), and east trending, south

dipping structure has been outlined by Morrison (1986) and

Mackasey (1976). It transects the Oxaline Lake Property at its

northern boundary." (V. Shein, March 1991)

CURRENT WORK PROGRAM

This subject of this report is a program of grid

establishment and Humus geochemistry carried out on the Oxaline

Lake Property between October 29 and November 6, 1991. All work

was supervised l performed by the author.

GRID

A total of 4.9 km of flagged gridlines were established

using hip-chain and compass. Lines are oriented north-south

(true Az. ) and are spaced 150m apart. Grid stations wero marked

in the field with heavy duty orange flagging tape clearly

labelled with line(easting ) and station(northing5 numbers.

In order to maintain good topographic control, and assure

that sample stations can be easily relocated, the ends of grid

lines were tied in to claim posts and/or adjoining grid lines.

The grid cut on this property in 1986-1988 by Seven Mile

High Resources (Morrison 1988) is not well preserved. Some

blazes and flagging tape from the old grid were noted in the bush

but attempts to follow the old lines were unsuccessful l and no

pickets were found.

HUMUS SAMPLING - METHODOLOGY l SAMPLE DESCRIPTIONS

Samples were collected using a 2 1/2 Ib. grubhoe (mattock)

and placed in 10cm x 25cm kraft paper sample bags. During the

later half of the sampling program a short handled shovel was

also used to clear away 15 - 25 cm of snow and icy crust before

samples were taken. Sample bags were labelled with line and

station number using a black felt-tip marker.

Notes were kept describing oach sample taken, a table

Page 7: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

listing the definitions used in sample descriptions is given in

Table #1 below. A complete list of sample descriptions is given

in Appendix #1.

TABLE 1. CODES USED IN HUMUS SAMPLE DESCRIPTIONS IN APPENDIX ffi

Dominant tree type in area of sample.

sp = Spruce

ce = Cedar

bi - B irch

al = Alder

ba s Balsam

po - Poplar

bog = "bog", waterlogged spongy ground made up

primarily or entirely of sphagnum moss (peat).

swp - " swamp", low waterlogged ground, generally with

minor pools of stagnant surface water, */- muddy

stream channels, -W- sphagnum moss,

soc = " shallow outcrop", outcrop is less than 25cm deep

at sample site.

noc = " near outcrop", outcrop is visible within 3m

laterally from the sample site, depth of outcrop

below sample site not determined but is )25cm.

peat = " peat", an accumulation of partially decomposed

sphagnum moss formed by the growth and decay of

vegetation in place, in a water saturated

environment.

_7osa = "__ percent sand", the percentage of the

sample composed of mineral grains. Where

present in the survey area, mineral grains

consisted of well sorted, pale brown to light

grey, sand and silt.

Samples composed of peat (see appendix #1 ) from spruce bogs

or swamps ars composed entiroly of organic material, ("AO

Horizon") generally sphagnum moss, that has formed by growth and

Page 8: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

.7

decay in place. Peat samples should generally be considered as a

distinct sample population and not directly compared to Humus

("Al Horizon") or Humus with a significant mineral component ("A2

Horizon") samples.

All samples were taken at depths between 5cm and 35cm below

ground surface. Peat samples were invariably taken at depths

greater than 20cm while Humus samples were from depths less than

20cm.

SIGNIFICANT RESULTS

Results of the Humus Geochem survey show 25 of 193 samples,

or 137o of samples, returned values of )9ppb gold (see Figure if2

and Appendix //l ).

Some interesting correlations can be seen when comparing the

plot of Humus Geochemistry results (Figure #2 accompanying this

report) to the 1988 Map of Fraser Filtered VLF-EM data from this

property by Seven Mile High Resources (see Morisson 1988). Table

112 below lists the sample stations which returned anomalous

geochem results and which correspond to the trace of VLF-EM

conductors.

TABLE 2.. ANOMALOUS AU SAMPLES WHICH CORRESPOND TO SURFACE

TRACES OF FRASER FILTER VLF-EM CONDUCTORS.

SAMPLE STATION CONDUCTOR (from Morrison 1988)

1 050E 575N " B "

L 350E 600N - 625N " B "

L 350E 525N - 575N " D "

L 500E 550N - 575N " D "

L 050E 225N " F "

L 350E 450N - 475N " F "

L 650E 450N - 475N extension of " F " ?

L 050E 225N " K "

L 350E 225N " K "

L 650E 200N " K "

Page 9: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

Other anomalous Humus Geochem results which may warrant

follow-up occur on Line 350E at DOON - 025N and Line 1100E at

57 5N.

RECOMMENDATIONS

Detailed geological mapping t prospecting should be carried

out on the property in order to evaluate the anomalous gold

results returned from humus geochem sampling.

Particular emphasis should be placed on determining the

relationship between anomalous gold values and VLF-EM conductors

which run parallel to the Solomon's Pillars Fault.

Page 10: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

REFERENCES

Aerodat Ltd., 1988 "Electromagnetic and Total Intensity

Magnetic Survey, Tashota-Geraldton-Longlac area.

District of Thunder Bay." Survey flown for the

Ontario Geological Survey, Map #81322, 1988.

Cowan M.F., 1984. "Report on the Geology of Oxaline

Lake Claims TB 768715 S TB 768727". Assessment files

M.N.D.M, Thunder Bay.

Mackasey W.O., 1976. "Geology of Walters and Leduc Townships,

District of Thunder Bay", Ontario Dept. Mines, GR 149.

Mason J.K. and White G., 1986. "Gold Occurences, Prospects,

and Deposits of the Beardmore-Geraldton Area, Districts

of Thunder Bay and Cochrane", Ontario Geological Survey,

OFR #5630.

Morrison M.S., 1988. "Geophysical Assessment Report on the

Oxaline Lake Mining Claims", for Seven Mile High Resources

Inc., Assessment Files, M.N.D.M., Thunder Bay.

Shein V., 1991. "OPAP Program Proposal, Oxaline Lake

Property, Leduc Township, Thunder Bay Mining Division."

Page 11: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

APPENDIX l

Page 12: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

Humus sampling

Sample Station Description Gold (ppb)

050E

05 OE

050E

050E

050E

050E

05 OE

050E

050E

DOON025N050N075N100N125N150N175N200N225N250N275N300N325N350N375N400N425N450N475NSOON525N550N575N600N625N650N675N700N725N750N775NSOON325N350NOF LINE)

sp bog, peatsp bog, peatce swp, peatce swp, peatce swp, peatce swp, peatsp bog, peatsp bog, peatsp bog, peatsp bog, peatsp bog, peatsp bog, peatsp bog, peatsp, soc, 307o sasp, socsp bog, peat, nocsp-ce bog, peatsp-ce bog, peatsp, 407,, sa57c sa407o saNO SAMPLE - grassy swamp,sp swp, peatsp, socsoc, 507o sasocsoc, 307, sasoc, 37U sa

9(51385<5656117910(59103710685<5116(5^5 1

1 9

1 5

6deep water

(5(5^<5610 l 9

Page 13: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

Humus Sampling

Sample Station Description

200E OOON025N050M07 5N

200E IOON125N150N175N

200E 200N225N250N275N

200E 300N32 5N250N375N

200E 400N425N450N475N

200E SOON525N550N57 5N

200E 600N625N650N675N

200E 700N725N750N775N

200E SOON325N

(END OF LIME)

sp-bi ,sp-posp-bisp-bisp-alsp-bi,sp-bispsp swpce swpce swp

sp swpsp bogpeatsp bogsp bogsp bogsp bogsp bogsp bogsp-bi,sp-bi,sp-bi,spsp bogpeatce swpea swpce swpCQ SWp

ce swpce swpce swp

soc

swpsoc

, peat, peat, peat

, soc, peat

, peat, peat, peat, peat, peat, peatsocsocsoc

, peat

, peat, (20m from lake), peat, peat, peat, peat, peat

Gold (ppb)

6557977599 ; 6(557(59788^55

5559557

l 5

(5 3

Page 14: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

Humus Sampling

Sample Station Description

350E

350E

350E

350E

350E

350E

350E

(END

DOON025N05 ON075NICON125N150N175N200N225N250N275NSOON325N350N375N400N425N450N475NSOON525N550N575N600N625NOF LINE)

sp-bi,sp-bi,sp-bi ,sp-bi ,sp-bisp-bi ,sp-bi ,^n— hi

SOCSOC,soc ,soc,

5070soc,?enn

207o257.507,

sa407.

sasasa

sa

ce swp, peatce swp, peatce swpce swp, nocsp bi, socsp-bi, noc, 207, sasp-al swp, nocsp-bi, soc, 3070 sasp bog, peatsp bog, peatsp bog, peatsp-bi, soc, 157o sasp bog, peatsp bog, peatsp bog, peatsp bog, peat, (20m from lake)sp bog, peat, (15m from lake)

Gold (ppb)

12177(5

(5 9 6 612 l 8 6I(5 7 (55 (569 l 1 017514II 20 25 9 l 1 0

Page 15: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

Humus Sampling

Sample Station Description Gold (ppb)

500E

500E

500E

500E

500E

500E

500E

(END

OOON02 5NOSON075N100N125N150N175N2QON225N250N275N300N325N350N375N400N425N450N475NSOON525N550N575N600N625N650N675NOF LINE)

NO SAMPLE - pipeline routesp-bisp-bisp-bi , socsp-bi , soc, 207. sasp-bi , socsp-bisp-ba cece swp, peatce swp, peatce swp, peatce swp, peatsp bog, peatsp-bi, soc, 2070 sasp-bi, soc, 3070 sace, socce swp, peatsp~bi , socsp-ce-bi

ce swp, peatce, socsp swp, peatce swp, peatce swp, peatce swp, peatce swp, peatce swp, peatsp-ce bog, peat, (10m from

, disturbed g66y

^56(55(5 ; is66^(5^59^^ ; <56691610575

lake) 6 1 7

Page 16: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

Humus Sampling

Sample Station

650N

6 5 ON

650E

650E

650E

650E

650E

(END

Description

025N050N07 5N100N125N150N175N200N225N250N275N300N325N350N375N400N425N450N475N500E525E550E57 5N600N625N650N675NOF LINE)

sp-po, socsp-al swpsp-bi , socsp-po-ba,sp-po-bi ,sp-ba, nocsp-bi , nocsp-bi, socsp-ba-po,sp-ba-po,sp-ba-po ,sp po , socsp-ba, 207.ce-al swp,ce-al swp,

207. sasoc, 207. sa

307o sa407o sasoc, 207o sa, 207. sasapeatpeat

ce swp, peatce swp, peatsp-ce, socsp-ba, socsp-ba, 207.bi-basp-ba, socsp-ba-cesp-ce swp,sp-ce, socsp-cesp-ce

, 307. sa, 207o sasa

, 207. sa

peat, 107. sa

Gold (ppb)

6(5 5 (5 (55610

6 ^<5678^ 18 26

o /.^

l ( 5

22

13 ; 12

Page 17: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

Humus Sampl ing

Sample Station Description Gold (ppb)

800E 425N ba-po 7450N al swp 11475N sp-po C5

300E SOON sp~ba-po, soc 3525N sp-ba-po, 3S sa 8550N ba-po 7575N ba-po 5

800E 600N ba-po, 107. sa 5625N 7650N po-ba-bi, 5 7, sa 5/8675N po-ba, 2 01. sa ^

600E 700N ba-po, soc 5725N ba-po, soc ( 5750N ba-po, soc 5 l \5

(END OF LINE)

Page 18: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

Humus Sampling

Sample Station Description Gold (ppb)

950E 425N ba-po, 1070 sa (54SON sp-ba-po, soc, 2070 sa ^'547DN ba-po, 2070 sa (5

950E SOON sp-po, soc, 207, sa 5525N ba-po, 307, sa < 5550M sp-ba, 207. sa (5575N 5

950E 600N ba-po 9625N po-al 5650N po-ba-al 7 l (5675N ^

950E 700N po-ba 6725N sp-al 5750N ba-al (5775N ba-po, 157,, sa (5 l •a

(END OF LINE)

Page 19: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

Humus Sampling

Sample Station Description Gold (ppb)

1100E 450N ba-po 7475N sp-po <5

I100E SOON ba-po, 107. sa 3525N ba-po, soc 6550N sp-po, soc < 5575N sp-po, soc 20

1100E 600N sp-po, soc 7625N sp-po-bi, soc 5650N sp-bi, soc ( 5675N sp-bi, soc 5 l l

1100E 700N sp-al swp < 5725N sp-po, 207, sa ( 5750N bi-po <5775N bi-po 6

1100E SOON sp '(5325N sp-bi, soc, 407o sa ^ l ( 5

(END OF LINE)

Page 20: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

APPENDIX 2

Page 21: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

ACCURASSAY LABORATORIES LTD.CHARTERED CHEMISTS, ASSAYERS, ANALYTICAL CONSULTANTS

Box 426, 3 Industrial Dr., Kirkland Lake Ontario, Canada P2N 3J1

tt 791^8

TEL.: (705) 567-3361 - FAX: (705) 567-8368ra .

Vernon S he in 74 Partridge StreetK IT I MA T , BCV3C ILE

*

TERMS

ne:: 30 day?,. 2.03, per m

"Q\JANTITV"^

343434342st :~

27w. . 'O -V

~? ~~

1 41 41 c;

1 S-; C-

*

*

o nth on overdue a c

DATE ^November 3. 9 . 1991

CUSTOMER ORDER N0

WORK ORDER N"Var ious

DATE SUBMITTED

.•counts .

J:^-.;^:Ui -v : -• : -'^:-.:.;^ff^bEscRiPTioisf:.,ggl^^^l^'^g^^:

Gold Assays Ui.O. tt TSe nip J -s P rep, c e r •c. . ttGold Assays U . 0 . j* TSample Pr^D , cert, ttGo la Assays UJ.O. ttTS a. r n c i r ; P r' T- p . o e r ;; . AG o i ci -Vs s -? y s W . 0 . tt TS 3. r i- p 1 -.-i l"- 1 r e P . c e rt. 4*Gold A.ssaye- Ui , 0 . i? TS a. T: P 1 '2 Pr s p . c ,?r t . ttGold Assays W.O. S TSamp I e Pr op c ar t . tt•3oid Assays ly.O. tt T0,:i'pc.l ? pvec . o^'- - . ttG-.' 1 :! A S3 s y T :^ 0 . 4"S.:,,r;r;. ; P^p . care, tt

A.Tio.. nv, due b-e!"or-e De

:--:^,--o noT.y: Account

910^1.348158-59910913A48131-32910913648160910 r 13C4816191 091 3D481839l00 13E-13137910913^•1B1 "-09 v 0 -i 1 J ,4S1-.9

^ ,, 1Q 501

:.: rnor-i -:. nan 45 days oast d3.^ any cvi.ce discounts

.j^PRICE O';-.lAftLi, i^^ni — ijjili.

7 .753 , 007 . 7 53 . 007 7 r.3 .007 .753 . 007 .752 . 007.7 1:3.007 .753 .00*/

.e

•.;~''.^!:AMOUNT

253102:2 '5 3j. ^ i^.201

7;-'20':'

31209

31r 08

42i * r x i f.45" y

1 4 r

7 r

O '^75 O0 0' ^

2 i:002 '.;•v 0-: 0

00.." ' ;'' 0

•', ; V

s: i ''

LF-1297

*youi

Page 22: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M .SC., PH. D., c. Chem (Ont.i, c. Chem (U.K.I, M.C.I.c., M.R.s.c., A.R.C.S.T.

48158 Certificate of flnalysisVernon Shein74 Partridge StreetKITIMAT , seVHC i L. s

SAPPLE NUMBERS A c c u a s s a y C u s t o ro w r'

GoldPpb

November 18

Page:

91

Work Order Project

T9i0913

554919554920554921

564923 55^92-''554925554926 55-4927 554928554928554929554930554931554932554933 55493"*554935554936554937 55493 7 55^938554939554940554941554942554943554944554945554946554946

OSOfc 000050E 025050E 050050E 075050E10005 DE 125050E150050E175050E200050E225050E225050E250050E275050c300050E325050E350050E375050E400050E425050E450050E450050E475050E500050E525050E550050E575050E600050E625050E650050Eb75050E675

NNNNNNNNNNNNNMNNNNNNNNNNNNNNNNN

1385

119 -^ t9

10<5 91C 8 7

i /^J. v^

5685<5 116

'5 <b56

Check

Check

Check

LF-30 Per:

CUSTOMER COPY

Page 23: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M.SC., Ph. o., c. Chem lOm.i. c, Chem (U.K.), M.C.I.c., M.R.s.c.. A.R.c.s.T.

48159 Certificate of Analysis2

Vernon Shein74 Partridge StreetK1T1MAT, BCV8C 1L5

November 18 91

Work Order Project

7910913

i M P L E MUM B E" R S A c c i .1 r a s K o y C u s t o m e r

55494x S Ji? 494 f;554949554950554951554962554953554953

050E70C C 5 OH. 725 050E750 050&775

Of. OE 82 5 050E850 05CE650

Gold Ppb

N Sample MissingN <5N (5N <5N (5N 6N 10N 9 Check

LF-30 Per:

CUSTOMER COPY

Page 24: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M.SC., Ph. D., c. Chem (Ont.i, c. chem (U.K.), M.c.i.c,, M.R.s.c.. A.R.C.S.T.

48181 Certificate of AnalysisVernon Shein74 Partridge StreetKITIMAT, BCV8C l L5

November 19

Page

Work Order tt "reject

T910913A

LE NUMBERSACenr assay ustomer

Go i; Ppb

55^954554955

55^956 554957

554959 f.54960554961554962554963 554963 55*964 554963554966554967554968 55496'-"?

554970554971554972 55497i554973554974554975554976 55-19^7 554978 55407O 554980 55498.. 55498!

200E 000 200E 025 200E 050 200E 075 20CE100 2COE125 200E150 200E175 200E200 200E225 200E225 200E250 200E275 200E300 200E325 200E350 2QOE375 200E400 200E425 200E450 200E450 200E475 200E500 200E525 200E550 20CE575 2OOE600 200E625 200E650 200E675 200E675

NN N N N N N N N N N N N

N N N N N N N N N N N

N N N

N

6

Q

7 7 5 9 96 Check

(5 57

(59 -t

8e

I nsufficientc

5559

sample Check

Chec

LF-30 Per:

CUSTOMER COPY

Page 25: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M.SC., PH. D., c. Chem (Ont.i. c. Chem (U.K.), M.C.I.c., M.R.s.c., A.R.C.S.T.

48182 Certificate of AnalysisVernon Shein74 Partridge StreetKIT!MAT, BCV8C i L5

SAMPLE NiJMGEf.RS Aocurassa/ Customer

554982554983 55498- 554985 55498^ 554987 554987

200E700200t-:725 200E750 200E775 200E300

COES25

N N N N N

Gold ppb

78<5 (.5S 7

Page

November 19 o i

Work Order Project

: T910913A

Chec k

LF-30 Per:

CUSTOMER COPY

Page 26: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M .SC.. Ph. o., c. chem (Onu, c. Chem (U.K.), M.C.I.C., M.R.S.C., A.R.C.S.T.

48160 Certificate of AnalysisVernon Shein74 Partridge StreetK IT T.MAT, BCV8C l L 5

November 18

Page:

Work Order Project

SAMPL. i ccur as?a y

NUMBEs'SCustomer

Goldppb

55498855498955A99O K tt, ^ o o [

554 092 55499?554994554995 55^996 554997554997554998554999555000555001555002555003 55500" 555005 5 5 60 Or. 555000 1 550C 7555008555009555010555011555012555013555013

350E 000 350E 025 350E 050 350E 075 35OE1OO 350F.i25 350E150 350E175 350E200 350E225 350E225 350E250 350E275 350E300 350E32S 350E350 350E375 350E400 '350E425 350E450 35GE450 350E475 350E500 350E525 350E550 350E575 350E600 350E625 350Eo25

N N N N N N N N N N N N N N N N N N N

N N N N N N M N N N

177

(5 \ 5

612 8 b 7

(5 7

69

10175

14112025910

Check

Chec K

Check

LF-30

CUSTOMER COPY

Page 27: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M.SC., PH. o ., c . Chem (Om.i, c. Chem (U.K.). M.C.I.c., M R.s.c.. A.R.C.S.T.

48161 Certificate of AnalysisPage

Vernon Shein?4 Partridge StreetKITIMAT, BCVnC lL5

November 18

A c c 'J r a s s K y

55501" 55501 5555016555017555018555019555020555021555022555023 555023 55502 A55502555502655502.7555028555029555030555021555032

555033 55503a555035555036555037 555Oo8 t55039555040555041

u :s r, o- mer

500E 000500E 02550OE 050500E 075500E100500E125500E150500r-:i75500E2OO500E225500E225500E25050CE275500E300SOOE325500E350500E37550CE-1005OOK425500E450500E4505 GOE -i 7 5500FI500500E525500E550500E575500E600500E625500E550500E675500E-S75

NNNNNNNNNNNNNN

NNN

r-j

NNNMNNNNi MNNNM

Work Order Pro jeer.

T 1l091 3C

Goldppb

Sample Missing 6-

56

'55

(5 (56

( 5<5 (5

(\ 5( 565916 10

o7

ChecK

Chec

Check

Per:t\

CUSTOMER COPY

Page 28: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M .SC., PH. D., c. chem lOm.i. c. Chem IU.K.I, M.c.i.c., M.R.s.c., A.R.C.S.T.

48183 Certificate of RncilysisVernon Shein74 Partridge StreetKJ.TItfAT , BCV8C "J L 5

NUMBERSCustomer

Gold

November 19

Work Order tf Project

55504?5530435550445550455550^0555C47555048555049555050^ 5 "" 0 n ^5 5 50 51555052555053.555054555055555056555057555055535O5 ?5550505550605550615550o21C, -r, ^ A /^ O

5 5 505 A5550b55550505550(7?5350i. ;?555066

650E 0256505 05065 OE 075650E100650E125650(1150650E175650E200650E225650E250650E250650E27565CE300650E325o50E25C650E275650E400650E4256 30E45065CE475650E-i7565CE5CO650E525550E55C^50^.575o50E60O550E62565015S50D50E675o 505 .'.i 7 5

NNNNNNNNNNNMNNNNNNNMNNNNNNNNNN

6^5s

t 5s 556

* P.0. -.^

x5\ 5^ Checkb

< 5<5678

(5182622 Check< 5656

<510< 5i p

1 2 C he" K

LF-30 Per:

CUSTOMER COPY

Page 29: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED, REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M.SC., Ph. D., c. Chem (Om.i, c. Chem IU.K.I, M.C.I.c., M.R.s.c., A.R.C.S.T.

48157 Certificate of flnalysisVernon She in74 Partridge StreetKITIMAT, BCV8C lL5

November 18 91

Work Order tt Project

T910913E

SAMPLEr- ecu r assay

55506955507C5550715550725550?3555074555075555076555077555078555078555079555080555081555082555032

NUMBERSCustomer

800E42580CE450300E475800E50080GE525800E550800E575800E600800E625800E650800E650800E675800E7CO8COE725800E750800E750

NNHNNNNNNNNh!NNNN

GoldODD

7il\388755758 Check^5

( 55

<5 C heck

LF-30 Per:

CUSTOMER COPY

Page 30: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

•H.ACCURASSAY LABORATORIES

A DIVISION OF BARRINGER LABORATORIES LIMITED. REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M.SC., Ph. D., c. Chem (Ont.i, c. Chem (U.K.i, M.C.I.C.. M.R.S.C., A.R.C.S.T.

48140 Certificate of flnalysisr- ri ?

Vernon ohe in74 Partridge St.reet•-aTIMAT, BCV^C 1L6

S H i -li- H C '.' ' ' ;" c . ..'^'^N

5^03.-.5S5OB45 5 SO -3 1 ?6550'^H5550ft/U"550KH

55508 05. H 5 1) s- O'7 5 f- C j 9 j.5550^,:55509265509355509';!

565095S55C'J -s

-M. E NUMBERSi -';.i s t n rner

950E426950E4 K 0C) 50E47o

950E5009 5 Oil 5? :SO C Q p Z . ^ Q

950E 57S^'50^600^50E.62'3950Efo50950E650950E675950r.700950^7259 5 OP 7 5,,

NNNNNIs-!

NNNNNNiM

NN

Goldppb

-.'5

(5(5s\5^ 55957*

^5(S

f-,E!

< ~,

Novembe

: r9l09ioFProject-.

Chec k

9 h OF 77 S Chec

LF-30

\i \

Per:

CUSTOMER COPY

Page 31: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

ACCURASSAY LABORATORIESA DIVISION OF BARRINGER LABORATORIES LIMITED. REXDALE, ONTARIO

BOX 426KIRKLAND LAKE, ONTARIO, CANADA P2N 3J1

TEL.: (705) 567-3361

President: Dr. GEORGE DUNCAN, M.SC., Ph. D., c. Chem (Om.i. c. Chem (U.K.i, M.C.I.c., M.R.s.c.. A.R.c.s.T.

48129 Certificate of AnalysisVernon She in74 Partridge StreetKITTMAT, BC

SAMPLEj " : v i. -i i n -T - ,. o 7

5550965550995551005551015551025551 C 355F;104S' : 5105

55510655510755510755510855510955 51 1C555 -- l iC - r, i 1 -j

5 5 5 l 13

NUMBERSCustomer

1IOOE450L100E475",. 100E5001100E5251100E5501 10GE5751100E6001100E6251100E6501100E675110GE6751100E700110CE7251100E7501 100E775I'LOOEOCOi 100E825

NNNNNNNNNNNNNNNNN

Goldppb

7( tr

eo^2075^55-7

(5{5^b(' 5

t' ^

November ''.4

Work Order tt : T9100 l3G

Check

:hec;

LF-30 Per:

CUSTOMER COPY

Page 32: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

APPENDIX 3

Page 33: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

CERTIFICATE OF QUALIFICATIONS

THIS IS TO CERTIFY THAT:

I currently reside at 319 St. Vincent St., Thunder Bay,

Ontario, P7A-3X8.

I attended Sir Sandford Fleming College, Lindsay, Ontario

from September 1978 to December 1980 -Geological Technician

Program.

I am a graduate of Lakehead University, Thunder Bay, Ontario

with a B.Se. Degree, specialization Geology, completed 1987.

I have been actively involved in the Canadian mining

industry since 1979 and have been employed full-time as a

Geologist since 1987.

I am a member of the Geological Association of Canada and

the Canadian Institute of Mining and Metallurgy.

This report is based upon my own observations while

working on the property during the period October 29

to November 6, 1991.

I have no interest, direct or indirect, in the property

described, nor do I anticipate any such interest.

Thunder Bay, Ontario

December 3, 1992 David Laudrum, B. Se.

Page 34: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

ntario 42EiaNEOaei7 2 . l 4384 LEDUC 300

Ministry of Ministere duNorthern Development D6veloppement du Nordand Mines et des Mines

February 24, 1992

Mining RecorderMinistry of Northern Developmentand Mines435 James Street SouthTHUNDER BAY, OntarioP7C 5G6

Dear Sir:

SUBJECT:

Mining Lands Branch Geoscience Approvals Section 159 Cedar Street, 4th Floor Sudbury, Ontario P3E 6A5

Toll Free: 1-800-465-3880Telephone: (705) 670-7264Fax: (705) 670-7262

Our File: 2. 14384Your File: W. 9140. 5078

APPROVAL OF ASSESSMENT WORK SUBMITTED ON MINING CLAIMS TB. 1172950 ET AL, IN LEBEL TOWNSHIP.

The assessment work credits for the Geotechnical Survey, under Section 13, of the Mining Act Regulations, submitted on the above work report have been approved as of the February 13, 1992.

Please indicate this on your records.

Yours sincerely,

Ron C. GashinskiSenior Manager, Mining Lands BranchMines and Minerals Division

c C: .Assessment Files Office Toronto, Ontario

Resident Geologist Thunder Bay, Ontario

.

Page 35: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

Ministry ofNorthern Developmentand Mines

Ontario

Report of Work Conducted After Recording Claim

Mining Act

Transaction Number

Personal InforrrraKn collected on this form is obtained under the authority of the Mining Act. This information will be used for correspondence. Questions about this collection should be directed to the Provincial Manager, Mining Lands, Ministry of Northern Development and Mines, Fourth Floor, 159 Cedar Street, Sudbury, Ontario, P3E 6A5, telephone (705) 670-7264.

Instructions:

^V * r* ^2 . 14384- Please type or print and submit in duplicate. **"- Refer to the Mining Act and Regulations for requirements of filing assessment work or consult the Mining

Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form in duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.

Recorded Holder(t) v

\j

Mining Di f\ oBa Township/ M or G Plan No

A \Work Performed (Check One Work Group Only)

Work Group

Geotechnical Survey

Physical Work, Including Drilling

Rehabilitation

Other Authorized Work

Assays

Assignment from Reserve

Type

Vkws (oeoc\\ejf^^\r\) S^coeO

Total Assessment Work Claimed on the Attached Statement of CostsNote: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded

holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.

Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)

M . MAddress

{attach a schedule If necessary)

Certification of Beneficial Interest * See Note No. 1 on reverse side

l certify that at the time the work was performed, the claims covered in this work report were recorded in the current holder's name or held under a beneficial interest by the current recorded holder.

Late iture)

Certification of Work Reportl certify that l have a personal knowledge of the facts set forth in this Work report, having performed the work or witnessed same during and/or after its completion and annexed report is true.

li,ttUU 6 330 tt

Page 36: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

Ontario

Ministry of^Northern Development and Mines

dudu Nord

mines

Statement of Costs for Assessment Credit

Etat des couts aux fins du credit devaluation

Mining Act/Loi sur ies mines

Transaction No./N 0 de transaction

Personal information collected on this form is obtained under the authority of the Mining Act. This information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.

Les renseignements personnels contenus dans la presente formule sont recueillis en vertu de la Lol sur Ies mines et serviront a tenir a jour un registre des concessions minieres. Adresser toute quesiton sur la collece de ces renseignements au chef provincial des terrains miniers, ministers du Developpement du Nord et des Mines, 159, rue Cedar, 4e etage, Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.

1. Direct Costs/Couts directs

Type

Wages Salalres

Contractor's and Consultant's Fees Drolls de ('entrepreneur et de I'expert- consell

Supplies Used Fournltures utlllsees

Equipment Rental Location de materiel

Description

Labour Main-d'oeuvre

Field Supervision Supervision sur le terrain

Type \ 1 i.cor&vOTftAAacMv ^.e:s

/

fjotitfJ'^atao\wntf)[* * i

Type

Amount Montant

^"H)~*sw#

# *'OT-J2

Total Direct Costs Total des couts directs

Totals Total global

2fltf3i

*isa^

*w*

2. Indirect Costs/CoOts Indirects* * Note: When claiming Rehabilitation work Indirect costs are not

allowable as assessment work.Pour le remboursement des travaux de rehabilitation, Ies couts indirects ne sont pas admissibles en tant que travaux d'evaluation.

Type

Transportation Transport

Food and Lodging Nourriture et hebergementMobilization and Demobilization Mobilisation et demobilisation

Description

^(X tilt&A^

Amount Montant

Hs\^

Totals Total global

Nai^Sw-fe

Sub Total of Indirect Costs Total partlel des couts Indirects

Amount Allowable (not greater than 20H of Direct Costs) Montant admissible (n'excedant pas 20 W des couts directs)Total Value of Assessment Credit Valeur totale du criditj^ (Total of Direct and Allowable d'evaluation Indirect costs) (Total de* coott direct*

•t Indirect* admissible*

^^

to**to^hw*

Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.

Note : Le titulaire enregistr6 sera tenu de verifier Ies depenses demandees dans le present 6tat des couts dans Ies 30 jours suivant une demande 6 cet effet. Si la verification n'est pas effectuee, le ministre pout rejeter tout ou une partie des travaux d'evaluation preserves.

Filing Discounts

1. Work filed within two years of completion is claimed at 10007o of the above Total Value of Assessment Credit.

2. Work filed three, four or five years after completion is claimed at 5007o of the above Total Value of Assessment Credit. See calculations below:

Total Value of Assessment Credit Total Assessment Claimed

x 0.50

Certification Verifying Statement of Costs

l hereby-certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.

that as am authorized(Recorded Hower, Agent, Position in Company)

to make this certification

Remises pour dep6t

1. Les travaux deposes dans Ies deux ans suivant leur achievement sont rembourses a 100 ofa de la valeur totale susmentionnee du credit d'evaluation.

2. Les travaux deposes trois, quatre ou cinq ans apres leur achievement sont rembourses a 50 "/o de la valeur totale du credit d'evaluation susmentionne. Voir Ies calculs ci-dessous.

Valeur totale du credit d'evaluation

x 0,50

Evaluation totale demandee

Attestation de I'etat des coutsCT3f~Ti

J'atteste par la presente : to . . ;y; r . que Ies montants indiques sont le plus exacjposjiblocet^ue ces depenses ont ete engagees pour effectuer leigrav^lJXsBe^ajuation sur Ies terrains indiques dans la formule de rapfiprt dSJrgyail ci-joint.

t-* '^Et qu'a litre de ___________ ^— je suis autoris6

{titulaire enregistre, representanl, poste occup6 dtms la compagnie)

a faire cette attestation.

Signat Date

0?1? (W91) Nota : Dans cette formule lorsqu'il designe des personnes, le masculin est utilise- au sens neutre.

Page 37: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

Walt

ers

Twp.

G-l7

1

s Q

O

55"

— 4- Q CO P

i ro

Lega

ult T

wp. G

-170

IV e~iea

s s

2 2

S 5

SS

g g

* z l

gE

S m

5 *2

* o

0 a

: M

5

w g

w0

a:

so ^

v, ^

0 ^

5 E

5*

z w

5 0

y

W

X

30|~

*

* g

w 55

SS -w

w

U

® S

W I* S-j

5

*

o g" cr o l S

^ l

S j

i ; i y

m H x D ;u

O "D

O O

r-, A-

O IS O H CO

•^^

c:o

j5 O

cr "

t :r

^

C?

flWT

OU

Q3J

Page 38: THUNDER BAY MINING DIVISION, ONTARIO · 2017-01-17 · unpatented raining claims located 3.5 km west of the town of Jellicoe in the Thunder Bay Mining Division. Between October 29

M

- 800 M -

- 700 M -

W -

- 300 M -

- iOO KJ -

- 000 M -

•6

<5

<5

uJ o

'D

aa

D

-(o

7. D

ut o

Au

,14384(jfc

50 15 100Ledvxc

4aEI2NE0007 2 .14384 LEDUC