MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/2652 Jabalpur, dated:31.08.2018 To As per distribution list Sub: Minutes of 64 th meeting of Operation and Coordination Committee of MP. The Minutes of 64 th meeting of the Operation and Coordination Committee of MP held on 9 th July 2018 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Upload: others

Post on 11-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED

STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected]

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in

No.07-05/SG-9B-II/2652 Jabalpur, dated:31.08.2018

To

As per distribution list

Sub: Minutes of 64th meeting of Operation and Coordination Committee of MP. …

The Minutes of 64th meeting of the Operation and Coordination Committee of MP held on

9th July 2018 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur has been uploaded on

the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Page 2: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email-

[email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email-

[email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email-

[email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura,

Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email-

[email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email –

[email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail-

[email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail-

[email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749,

Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur,

Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited,

Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near

Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email –

[email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email –

[email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046,

[email protected] 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal –

462013., Fax No- 0755-4030130,Email – [email protected] [email protected] 21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical

Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M-9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR).

22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected].

24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected], [email protected]

26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected]

27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected] 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row,

Email- [email protected], Indore – 452010, [email protected]

Page 3: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

The 64TH meeting of Operation & Coordination Committee of MP was held on 09th July 2018 at 11:00 AM at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur. The list of participants is enclosed at Annexure -1.0.

Shri K.K.Parbhakar Chairman OCC & Chief Engineer SLDC welcomed all the guests and participants for 64th OCCM of M.P. Chairman OCC stated that during last two months the voltage, frequency and grid parameters were well within limit and grid operated in smooth, safe & secure manner. He also informed that during the second fortnight of May 2018 there was an abrupt/unexpected increase in demand and at that instant the thermal generators were under maintenance, but fortunately increase in wind generation of about 1400-1500MW supported in managing the increase demand. He also stated that Hydel power stations also helped TO mitigate the increase demand and he appreciated the efforts of MPPGCL, MPPMCL & NHDC for managing the Demand.

Further chairman OCC informed the committee that CERC has notified a draft regulation on “Deviation Settlement Mechanism and related matters-Fourth Amendment Regulations, 2018” & requested all the entities to review it & provide their comments if any. He informed the committee that at present UI rate at 50 Hz is fixed and has been decided according to the coal rate of pit head generating stations in 2014. In this draft regulation it has been proposed that UI rates will be market driven and UI rate at 50 Hz will be the daily average rate of the exchanges which has traded, more that 80% for the previous day and if the there are no exchange having trading of more than 80% then the UI rate will be calculated by taking the weighted average of all the exchange rate. Also, at 50.05 Hz rate will be zero, at 50.00 Hz rate will be according to the exchange and at 49.85 Hz rate will be Rs8.24/kwh. Secondly, at present the provision for sign reversal of deviation is in every 12 time block and there is no penalty for it, but as per the draft regulation the sign reversal of deviation shall be required to be done in every 6 time block by each entity and entity failing to do so will be penalized by 20% of daily DSM as additional charges. Further if there is deviation (O/D, U/D) of more than 3% in Discom energy in a day then 20% of daily DSM will also be imposed/penalized as additional charges on Discom. Similarly, in case of generators if the variation or deviation is more than 1% then they will also be penalized by 20% of daily DSM. Also at present the cap rate for generating stations is fixed i.e., 3.034paisa/kwh, but according to draft regulation it is proposed that the cap rate for generating stations will also be variable as per the draft regulation. He requested all the Discoms, Generating Companies & MPPMCL to furnish their comments if any.

Shri R.A.Sharma Member Secretary OCC & Addl. Chief Engineer, SLDC welcomed all the guests and

participants for 64th OCCM and requested all the participants for formal introduction. He has appreciated the contribution of all the entities in safe, secure and economical grid operation. He has requested all the participants, to be more alert during ensuing monsoon season due to probable high voltage conditions and outage of lines. The generators and licensee’s have been advised to support with MVAR, by adding/withdrawing as and when required for security of the grid. Thereafter the agenda points were taken up which is narrated here under in nutshell:

ITEM NO. 1 : CONFIRMATION OF MINUTES : The committee was intimated that Minutes of 63rd meeting of Operation & Coordination Committee of MP held on 26th APRIL 2018 at SLDC, MPPTCL, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/1825 Jabalpur dated 15.06.2018.

ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS APRIL 2018 TO MAY 2018. 2.1. Frequency Particulars: The committee was apprised that during APRIL 2018 the system frequency was below 49.90 Hz for 12.80% of time against 22.52 % of time during MAY 2018. The system frequency was above 50.05 Hz for 7.63 % of time during APRIL 2018 against 7.42 % of time during MAY 2018. The system frequency was within the IEGC range of 49.90-50.05 Hz for 79.57 % of the time during APRIL 2018 against

MINUTES FOR 64th MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 09th JULY 2018 AT 11:00 AM AT CONFERENCE HALL, SLDC, MPPTCL,

NAYAGAON, JABALPUR.

Minutes of 64th OCC of MP 1

Page 4: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

70.06% of time during MAY 2018. The average monthly frequency was 49.98 Hz during month of APRIL 2018 and 49.95 Hz during month of MAY 2018. The system frequency did not touch 49.20 Hz during the above period.

The detailed frequency particulars for the month of APRIL 2018 and MAY 2018 are enclosed at

Annexure-2.1. The brief detail of frequency profile is given here under:

Month Average frequency

Minimum Integrated frequency over an hour

Maximum integrated frequency over an hour

Instantaneous Minimum Frequency

Instantaneous Maximum Frequency

APR 2018 49.97 Hz 49.81 Hz 50.08 Hz 49.62 Hz 50.20 Hz MAY 2018 49.95 Hz 49.77 Hz 50.10 Hz 49.57 Hz 50.20 Hz

2.2 Operational Matters

2.2.1 Operational Discipline : The committee was apprised that System operated in terms of frequency

profile for the months APRIL 2018 and MAY 2018 is as given below for discussion by the committee :

Month % of time Frequency Below 49.90 Hz

% of time Frequency above 50. 05 Hz

% of time frequency within the permissible range of 49.90-50.05 Hz.

Average monthly frequency

No. of times frequency dipped below 49.20 Hz

APRIL 2018 12.08% 7.63% 79.57% 49.97 Hz 0

MAY 2018 22.52% 7.42% 70.06% 49.95 Hz 0

2.2.2 Voltage Profile: The committee was apprised the maximum and minimum voltage in MP Grid as indicated hereunder:-

APRIL 2018 MAY 2018 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Name of Observed Observed Observed Observed Sr. 400 KV

Voltage Volt

No. Substation Voltage ag Voltage

Date Date Date Date KV e KV KV KV

1 Indore 420 25.04.18 401 02.04.18 419 06.05.18 397 31.05.18

2 Itarsi 419 29.04.18 402 09.04.18 419 06.05.18 400 14.05.18

3 Bina 415 29.04.18 397 15.04.18 416 06.05.18 396 04.05.18

4 Gwalior 416 19.04.18 389 21.04.18 417 16.05.18 389 01.05.18

5 Nagda 425 14.04.18 400 02.04.18 419 06.05.18 396 31.05.18

6 Satpura 423 23.04.18 406 04.04.18 421 01.05.18 407 21.05.18

7 Birsinghpur 420 29.04.18 405 13.04.18 424 16.05.18 406 14.05.18

8 ISP 426 24.04.18 409 04.04.18 426 06.05.18 405 31.05.18

9 Bhopal 415 29.04.18 396 28.04.18 415 06.05.18 395 24.05.18

10 Ashta 421 29.04.18 402 09.04.18 421 06.05.18 396 22.05.18

Minutes of 64th OCC of MP 2

Page 5: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

11 Pithampur 420 25.04.18 404 02.04.18 420 06.05.18 401 31.05.18

12 Singhaji 423 07.04.18 411 03.04.18 422 02.05.18 407 31.05.18

2.2.3 Status of Capacitor Banks in sub-transmission system: The updated information of the status of capacitor banks in sub-transmission system as on 31th MAY 2018 as submitted by DISCOMs, were discussed as detailed below:

The Discom representative were requested to ensure availability & healthiness of capacitor bank in order to maintain quality power supply during the forthcoming rabi season. Central discom was requested to submint a separate report regarding installation of capacitor banks & controlling voltage in Gwalior area during rabi season. Representative from central discom informed the committee that 36 capacitor banks have been purchased for Gwalior region which will be installed and in service prior to upcoming rabi season. The members discussed the matter & noted.

2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 31.05.2018 was informed to the committee:-

The MPPTCL representative was requested to ensure that prior to switching operation of capacitor banks installed at 132 KV and above voltage level the code for performing the switching operation is obtained from SLDC/Sub-LDC’s. The members discussed the matter & noted.

DISC

OM

Capacitor bank installed in good condition (No)

Capacitor Banks healthy but not in service due to control ckt problem

Capacitor bank installed but defective & are repairable (No)

Requirement of repair against each unit (No)

Requirement against non-repairable capacitor banks

Capacitor banks already covered under ADB T-V

Balance capacitor banks to be covered in other schemes

600 KVAR

1200 KVAR

1500 KVAR

600 KVA

R

1200 KVA

R

1500 KVA

R

600 KVAR

1200 KVAR

1500 KVAR

No of 100 KVAR Units

required

600 KVAR

1200 KVAR

600 KVAR

1200 KVAR

600 KVAR

1500 KVAR

EZ 412 142 38 20 12 1 17 5 0 25 - - - - - -

CZ 5 688 780 - - - 1 0 0 3 0 0 0 0 0 0

WZ 637 551 701 5 6 6 15 11 16 148 2 8 - - - 3

Voltage Class

Capacitor bank installed as on

31.01.18(MVAR)

Capacity Added after Last OCC

Meeting (MVAR)

Capacitor banks already covered under ADB T-V

TOTAL CAPACITY AS ON 31.05.18

(MVAR)

Capacitor Bank Installed but

defective & are not repairable (No &

MVAR) 220 KV 100.00 0.00 - 100.00 All in Service

132 KV 1238.00 0.00 - 1238.00 33 KV 5104.50 0.00 - 5104.50 Total 6442.50 0.00 - 6442.50

Minutes of 64th OCC of MP 3

Page 6: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The committee was updated regarding the various ongoing Transmission Schemes completed during the financial year 2017-2018 (up to MAY 2018) and plan for completion of various ongoing Transmission Schemes for the Year 2017-2018. The same is enclosed as Annexure 2.2.5(i) and 2.2.5(ii) respectively.

2.2.6 U/F and df/dt Relay Operation (i) U/F and df/dt Relay Operation: Frequency did not touch 49.20 Hz during APRIL 2018 and MAY 2018.

There was no df/dt operation during the same period. The committee was apprised that settings of U/F & df/dt relay is under discussion at CERC and is likely to be revised and shall be adopted as per the regulation. Member secretary OCC requested MPPTCL to ensure submission of consolidated report of healthiness of U/F & df/dt relay on monthly basis.

(ii) Defective u/f, df/dt relays: MPPTCL has informed that All the df/dt and U/F relays are in operation,

where the U/F relays are not available, the numerical relays programmed for under frequency operation. Defective df/dt relay at 220KV Sagar & 220KV S/S Chhatarpur have been replaced & ABB make df/dt relay at 132KV S/S Chapda is being replaced shortly, except this all U/F stages are in good/ healthy working condition. Representative from MPPTCL informed the committee that the defective df/dt relay at 132 KV S/s Chapda has been replaced on 27.06.2018.

2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to 33 KV feeders:

(i) Details of DISCOM wise Power supply given to various domestic categories during the period

APRIL 2018 and MAY 2018, was apprised to the committee and same is enclosed as Annexure

2.3(i).

(ii) Group Allocation to Newly Commissioned existing EHV substations: - The region wise list of

33 KV feeders emanating from various newly commissioned/existing EHV substations for which

groups have not been allocated as given in Annexure 2.3 (ii) and the DISCOM wise details of pending

group allocation to 33 KV feeders as given below, were apprised to the committee for discussion: -

SN DISCOM Region No of 33 KV feeders for which groups to be allocated

01

EAST

Jabalpur 0 02 Sagar 0 03 Rewa 1 04 Total 1 05

WEST Indore 08

06 Ujjain 02 07 Total 10

Minutes of 64th OCC of MP 4

Page 7: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

08 CENTRAL

Bhopal 18 09 Gwalior 19 10 Total 37

TOTAL Grand Total 48

Discoms are requested to furnish the details as per list enclosed at Annexure-2.3(ii) in the meeting. Representative from East discom informed the committee that the proposal for one feeder 33KV

Jaithari feeder (Mojer bear) has to be provided by site and is under process. Representative from West Discom informed the committee that 33 KV mokdi & Kanwas from Ujjain

region and 33KV Panther-I, Khandwa Oil (Previously known as Chichgaon), 33KV Amalpura, 33KV AKVN-I, 33KV AKVN-II feeders of Indore region have been group allocated. Further he also informed that from remaining there, the proposal for two feeders have been received from site and will be group allocated at the soon.

Representative from East Discom informed the committee that the feeders mentioned in the list of unallocated feeders have not been constructed till date and only its feeder bay is constructed/charged. Hence group cannot be allocated until the feeder is constructed. Further he also informed the committee that group allocation process for remaining in under progress.

Member Secretary OCC stated that a consolidated/updated list of such bay from central discom shall be submitted to P&D, MPPTCL under intimation to this office for which feeders which have not been constructed, therefore such bay shall be removed from the list of unallocated feeders.

Further he requested that the order copy of the feeders which have been group allocated shall be submitted to

P&D, MPPTCL under intimation to SLDC.

The members discussed the matter & noted.

ITEM NO. 3 : OPERATIONAL PLANNNING: 3.1 Generating Units under planned outage and proposed maintenance programme: The annual maintenance /outages of thermal generating units of MPPGCL during JULY 2018 to AUGUST 18 as intimated by ED(O&M:Gen.), MPPGCL, Jabalpur is as follows:- S.NO UNIT FROM DATE TO DATE REASON

1. SATPURA # 10 28.06.2018 31.07.2018 C.O.H 2. AMARKANTAK # 5 01.07.2018 28.07.2018 A.O.H 3. SGTPS # 4 01.07.2018 30.07.2018 C.O.H 4. SATPURA # 8 15.07.2018 29.07.2018 A.O.H 5. SATPURA # 7 01.08.2018 25.08.2018 A.O.H 6. SGTPS # 2 01.08.2018 15.08.2018 A.O.H 7. SSTPS # 1 10.08.2018 24.08.2018 A.O.H 8. SSTPS # 2 10.08.2018 16.08.2018 A.O.H 9. SGTPS # 1 26.08.2018 15.09.2018 A.O.H The matter was discussed in the meeting.

Minutes of 64th OCC of MP 5

Page 8: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

3.2 Proposed shutdown programme of Transmission lines / Transformers: The proposed shutdown of transmission elements for the period 01.06.2018 to 31.07.2018 submitted by MPPTCL is enclosed as Annexure-3.2.

The members have noted the points. 3.3 Long Outages of transmission elements and protections: The status submitted by MPPGCL /MPPTCL are given below:-

Sr. No

Line/Transformer/ etc under long Outage

Outage date Reason Response from Utility

1. 40 MVA, 132/33 KV CGL make X’mer, Sr. No. T-8362-3 at 220kv s/s Ujjain.

22.06.2017 Tripped on differential indication.

Transformer has been declared failed and being replaced by 20 MVA X’mer. MPPTCL informed that the X’mer will be replaced by 15th July 2018.

2. 40MVA, 132/33KV, BBL X’mer at 132 KV S/s Betma.

- -

Transformer taken out of service and sent to works of M/s BBL, for inspection and checking due to high content of key gases. Another 40MVA BBL transformer commissioned in place of defective transformer on Dt. 21-05-18.

3. 315MVA, 400/220,BHEL X’mer-I at 400kv S/s Bina 15.01.2018 Differential, Buchholz

and PRV indications MPPTCL informed that X’mer charged on 02.05.2018.

4 315MVA, 400/220 X’mer-II at 400kv S/s Bina. 14.02.2018 Differential, Buchholz.

MPPTCL informed the committee that another X’mer will be available by end of July-2018. Representative from MPPTCL informed the committee that the X’mer has been brought on plinth and will be commissioned by the end of July-2018.

5 40MVA 132/33KV ECE at 132 KV S/s Lakhnadon.

24.02.2018 Tripped on Differential indications

MPPTCL informed the committee that the X’mer replaced by 16 MVA X’mer on 14.06.2018.

6 STPS Unit #9-GT 24.08.2017 GT Burnt

MPPGCL informed that Unit synchronized on Dated 01.05.2018.

7 UAT-B, U#11, STPS, Sarni FEB-18 -

MPPGCL informed that UAT taken on service on 27.05.18

8. 500 MVA, 400/220 KV X’mer at STPS. 19.04.2018

X’mer tripped at 21:55 Hrs. due to LA Burst. Emergency shutdown taken for 15 days from

21.04.18 to 05.05.18 for CPRI oil filtering and

MPPGCL informed that Owing to adverse report of RLA conducted on ICT during shutdown, proposal for permanent discontinuation of ICT from service has been submitted. Chairman OCC stated that MPPGCL

Minutes of 64th OCC of MP 6

Page 9: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

RLA testing work. shall inform and take consent from MPPTCL/WRLDC well in advance so that prior planning for strengthening of transmission grid can be done prior to dismantling of the ICT.

09. Line Reactor at 400KV Sarni-Asta Line

Make GE 50 MVAR

Out from 31.03.18 due to Acetylene gas contain

is on higher side i.e 70 PPM

MPPGCL has informed that estimate for the same has been approved for rectification work and tender will be float shortly.

11. UAT – 7B at STPS 30.06.2018 Bucholz relay operated. Representative from MPPGCL informed the committee that inspection work is under progress.

12. 40 MVA X’mer, at 132 KV S/s Piparia. 24.06.2018 -

The representative of MPPTCL has informed that defect in B phase winding is developed and transformer is being replaced by another 40 MVA Transformer.

Chairman OCC stated that the details of long outage submitted to SLDC & CRA Cell by MPPTCL are different. Therefore, sometimes report submitted by CRA CELL and SLDC to MPERC did not match. The difference in report from both the offices creates discrepancy at MPERC level.The MPPTCL representative were requested to ensure to submit a proper report/complete report to both SLDC & CRA cell to avoid such issues. The representative of all utilities was also requested that itransmission element/ EHV element under outage, should invariably be intimated to SLDC. All entities are requested to ensure the same. ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF APRIL 2018 AND MAY 2018: The details of actual generation, Schedule from Central Sector, demand etc. were tabled for discussion: Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of

MPPGCL & NHDC Hydel Units. Annex. 4.2 Power Supply Position. Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs. ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING OF APRIL 2018 AND MAY 2018: The Grid Disturbances and Grid Incidents in MP during these months as indicated in Annexure 5 were apprised to the committee.. Member Secretary OCC requested MPPTCL/NHDC/MPPGCL to submit the report timely and along with DR/EL in soft copy.

Minutes of 64th OCC of MP 7

Page 10: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- The present status regarding schedule and commissioning of reactors / transmission elements is as below:-

S.No. 400 KV S/s Size MVAR

Implementing Agency

Expected Date of Commissioning as intimated in last OCC

1. Bus Reactor : ISP 125 MVAR NHDC

In 63rd from ISP informed the committee that the reactor has been installed and the inspection by the engineer from CEA has been done, the report of which is still awaited. Hence it is expected that the reactor will be taken in service by end of May 2018. Representative from NHDC informed the committee that as per instructions issued by CEA, mulsifyre system needs to be installed, hence the reactor is expected to be commissioned by 10th August 2018.

2. Line Reactor on 400 kV Satpura–ISP line at STPS

50 MVAR MPPGCL

MPPGCL informed that the price bid has to be opened and the reactor will be commissioned by December 2018. MPPGCL informed the committee that Civil work issue in commissioning of reactor has been resolved and the price bid will be opened shortly.

3. Bus Reactor at SSTPS

125 MVAR MPPGCL

Work will be carried out under PSDF as intimated by MPPGCLin 62nd OCC MPPGCL informed the committee that the reactor is under procurement and will be commissioned by December 2018. MPPGCL informed the committee that on 23.06.2018 order has been placed.

6.2 Load Dropping Scheme/ System Protection Schems (SPS) at substations in M.P to handle emergency condition: - The committee was briefed that in 63rd OCC, MPPTCL was requested to review

the existing load drop scheme (SPS) and to implement new load drop scheme as per requirement as per

updated network and same may be submitted to SLDC. Further it was also intimated that WRLDC vide e-

mail dtd-18.06.2018 has also requested to submit the updated load trimming schemes details, SPS

implemented in MP system. Considering above MPPTCL representative was requested that the complete details of all SPS

commissioned in MP along with load shed quantum, may be submitted to SLDC so that the copy of the same

could be placed in Control room of SLDC and concerned substation / power station for reference & record

and the same can also be submitted to WRLDC.

The matter was discussed in the meeting.

6.3 Providing the region-wise-District wise details of quantum of solar roof top installed in MP

system :- It was apprised to the committee that Ministry of New & Renewable Energy, Govt. of India is

Minutes of 64th OCC of MP 8

Page 11: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

implementing grid connected roof top power programme. As a sequel to above roof top power plant have

been installed in government building as well as other prominent buildings. Presently the amount of roof top

generation is not available with SLDC. It is felt that the installed capacity of solar roof top plant, be

considered for modeling of power system network in PSS system. It is intimated that now a days PSS

software are being used for study purpose of power system network for future planning and operation of grid. It is therefore desired that region-wise-District wise quantum of grid connected solar roof top plant

(Region-wise) installed in your Discom may please be provided to SLDC so that the above quantum of

solar roof top installed in the system may be accounted for and updated in PSS power system network.

Monthly region-wise-District wise updation of roof top solar, in each Discom jurisdiction may also be

provided regularly to SLDC in the first week of every month, for keeping the PSS update.

The management has desired that the compliance on the above matter may please be adhered to.

Member Secretary OCC stated letter have been issued to all the Discom for providing desired

information and therein it is is requested to submit the required details. Further it was also requested that the

updated status should be submitted on monthly basis. The DCC representative were also asked to peruse

the matter with respective officers of discom.

The members have noted the points.

6.4 One Hour 20 minutes interruption to 220 KV substation Shahdol on dtd 01.06.2018 and non-reporting thereof: - It was apprised to the committee that at 16:53 hrs on dtd 01.06.2018, AE 220 KV

substation Shahdol had forwarded shutdown proposal on 40 MVA 132/33 KV transformer to attend hot point

on 33 KV main bus R-phase isolator jaw. Subsequently it was gathered that 40 MVA 132/33 KV transformer

had already been hand tripped at 16:30 hrs without obtaining code from SLDC. The Executive Engineer

(Testing) MPPTCL Shahdol was requested to furnish the details of incidence took place. However, Shahdol

substation was trying to hide the facts and 40 MVA transformer was charged without obtaining code from

SLDC. Thereafter at late night hours it was gathered that 20 MVA 132/33 KV transformer at 220 KV

substation Shahdol was also hand tripped at 16:30 hrs (01.06.2018) along with 40 MVA transformer.

Therefore, this caused one hours 10 minutes interruption to Shahdol substation. Nevertheless, long duration

interruption to Commissioner Head Quarter is not desirable, moreover the facts were concealed. It was aso mentioned in the meeting that keeping the EHV elements out of service without permission

of SLDC is violation of grid code. Obviously, the EHV Elements could be hand tripped without obtaining

code from SLDC in case of exigency but it should be informed immediately to SLDC and Elements should

have charged after obtaining code from SLDC. It was also informed to the representative of MPPTCL that it

is generally observed that the EE (Testing) Shahdol is intended to indulge in disputes rather than addressing

the real issue. It is therefore MPPTCL was requested to address the issue and suitable directives may be

issued to concerned official to adhere with provisions of grid code.

Representative from MPPTCL informed the committee that the explanation has been call from Shahdol

and the details will be submitted shortly.

Minutes of 64th OCC of MP 9

Page 12: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

6.5 Abnormal delay in normalization of transmission elements after tripping at Sarni TPS:- It was apprised to the committee that 400 KV Astha-Sarni line tripped at 14:50 hrs on 09.06.2018 from both end

with following indication:-

Astha – B Ph. Zone-1, Location- 77.4 KM

Sarni – B Ph. Zone-1, Location – 16.08 KM

The line could be normalized at 16:05 hrs on 09.06.2018 after 01 hour 15 minutes of tripping. The

committee was informed that that abnormal delay had been done for normalization of above line. In the

above context, it have been pointed out that it is generally observed that whenever any tripping took place at

Sarni Power House, abnormal delays were noticed for normalizing the lines, on plea of yard checking/

testing etc.

Accordingly MPPGCL representatives were requested that the concerned officials may please be

instructed that whenever any tripping or disturbance occurred on EHV elements, the same should be

conveyed with relay indications and all relevant details to SLDC within reasonable time slot and system

should be normalized promptly in due course of time so that undesired delay in restoration of EHV elements

could be avoided. The prolong outage of EHV elements also involved commercial issues therefore it is

desired to arrange to ensure timely restoration of tripped EHV elements.

Representative from MPPGCL stated that the control room for 400 KV STPS – Ashta ckt – I & II is

separate and is situated at a distance from the existing control room and there are no staff posted at Asha

control room. Hence on occurrence of trappings generally delay took place , as staff rushed from main

control room for taking further course of action.

The MPPGCL was requested to arrange availability of staff at separate control room of 400 KV STPS-

Ashta ckt - I & II at STPS so that such occurrence could be avoided. .

The members have noted the points.

6.6 Creation of GIS based Energy Map of India by NITI Aayog:- The committee was informed that

the Director, CEA, New Delhi vide letter o. 07/02/ceA/pfam/Niti Aayog/2018 dtd. 09.02.2018 (copy

enclosed), addressed to CMDs/MDs/Chairperson of Discoms / Power Utilities, has requested to provide

data pertaining to power utilities in attached format (Annexure-6.6) for development of Geospatial Energy

Map of India. Accordingly, it has been requested to provide soft copy of these data to email Id-

[email protected].

The Niti Aayog is developing a user friendly GIS based Energy Map of India which would provide true

locations of energy resources in India including Power Plant, coal, and oil reserves, transmission lines,

refineries etc. The CEA is nodal agency to collect all data pertaining to the power sector of India by

collecting it from different utilities of power factor.

Minutes of 64th OCC of MP 10

Page 13: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

In view of above, respective members were requested that consolidated information pertaining to their

Company in prescribed format be made available in soft copy to CEA, New Delhi under intimation to this

office. The above data may be emailed to mail Id - [email protected].

The matter was discussed in the meeting.

6.7 Procedure for availing outage on ISTS EHV elements and OCC approval thereof: - It was

apprised to the committee that as per standard procedure of WRPC, all EHV elements which have been

listed under the list of important grid elements of Western Region, the outages for such elements required

OCCM approval. All such proposed outages of interstate and 400 KV transmission elements of next months

should be got approved in the OCCM of WRPC in the current month. All the constituents of WR shall inform

to the WRPC for readiness for availing outage of transmission elements on D-3 basis. Further, as decided

non-OCCM outages should be discouraged. Only under exceptional cases, the request for transmission

outage after issue of OCCM minutes must be posted through email for concurrence of WRPC Member at

least three days in advance. It has been seen that Occam outage proposal which are being submitted and

got approved, however the same are not being availed in real time. It have also been observed that the

occm proposal are being submitted very casual manner without accentuating actual requirement, moreover

the proposal of a few lines is being submitted regularly in repeated pattern but the outage on the same are

not being availed. Where as it is always tried to get approval of non occm outage, which unnecessarily

creates disputes with WRLDC/WRPC. All utilities were requested that actual requirement of shutdown on

EHV Elements be planned and accordingly outage proposal be submitted to SLDC for approval of OCCM.

The work related with construction activities / shifting work, new addition etc. invariably incorporated in

OCCM proposal. In the above context EHT Construction has been requested to arrange to send their OCCM

outage proposal through CE ( T &C ) within stipulated time as from EHT Construction , OCCM proposal

never being received in accordance with laid down procedure they generally insisted upon non OCCM

outage approval just before targeted date. The committee was also apprised with the details of WRPC-OCC approved outages and the availed

outages as detailed below:

Minutes of 64th OCC of MP 11

Page 14: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

It was brought to the notice that the maximum WRPC-OCC approved are not availed by the entity.

Hence it was requested that such practice should be avoided.

The members have noted the points.

6.8 Delay In Submission of Documents For First Time Charging of Elements:- The procedure for

interconnection of new transmission elements have been briefed to the members as narrated hereunder:- • Intimation by Transmission Licensee to RLDC / SLDC(Annexure A1-A5): 10 days prior to anticipated date

of first time charging.

• Acknowledgement and comments of RLDC/ SLDC to Tr. Licensee ( Format-II): Within 3 days.

• Submission of request for first time charging by Tr. Licensee to RLDC//SLDC (Annexure B1-B5): 3 days

prior to anticipated date of first time charging.

• RLDC shall issue Provisional Charging Approval for first time charging to licensee and in case of

interregional element RLDC to issue consent/ request to NLDC for IR lines. In case of intrastate line

charging approval shall be conveyed by SLDC: (within 2 days).

• Licensee to submit dummy SEM reading to RLDC to ensure that the Meter processing Software is able to

read the SEM data from the new meters.

• Licensee to take Operational Code from RLDC /SLDC Control Room for switching operations. The code

shall be issued keeping view of grid reliability.

• Transmission Licensee submit Post Charging documents (Annexure C1 to C4).

• RLDC/ N LDC shall verify the post charging documents and issue certificate for interstate / Interregional

lines / ISTS lines.

• The respective testing department shall furnish regarding measures taken to take care new element

interconnection for protection co-ordination for adjacent s/s and accordingly undertaking shall be

provided.

All utilities were requested that licensee / utilities shall strictly adhere with time schedule for documentation

of first time charging of new transmission elements of all interstate line and all EHV elements 400kv and

above and to ensure that FTC formalities should have completed before availing outage for integration of

element. It have also been mentioned that the authority submitted FTC document should ensure compliance

of protection/ metering issue in coordination with T&C official. The utilities were requested to ensure correct

and complete in all respect FTC document should should be submitted. It is also informed that Non

attachment of requisite papers/ SLD/ document of standing committee approval /approval of Electrical

inspector /noncompliance of relay coordination of adjacent s/s / providing information incorrectly caused

delay in obtaining FTC approval.

The members have noted the points.

6.9 Reporting Of Flash Report, DR and EL of Transmission Elements & Detailed Tripping Report:- It was apprised to the committee that as per the provisions of Regulation 5.2 (r) of CERC (Indian

Electricity Grid Code) Regulations 2010 and Regulation of 5(9) of CERC (Indian Electricity Grid Code) (First

Amendment) Regulations, 2012 all the Regional Entities of the Region shall furnish the tripping details

including DR & SEL output to RLDC with in 24 hrs of the event for analysis and identify the real time

Minutes of 64th OCC of MP 12

Page 15: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

measures required in future to ensure secured grid operation. The flash report is also required to be

furnished to SLDC within an hour of tripping. It is observed that FLASH REPORT, DR & EL of station is not

made available after tripping of transmission grid element by the State Grid Entities and the flash report is

also not being sent after repeated pursuation. It is also to inform that in the 508th WRPC OCCM , WRLDC also marked some events for which

the above details are not provided, which are also required to be provided in WR PCM, the events are as

below:-

S no Event at Event date Status 1 220KV s/s

BARWAHA 03.05.18 DR/EL not provided

2 220KV s/s SIDHI 12.05.18 DR/EL not provided

3 JP BINA & BINA MPPTCL 13.05.18

Detailed tripping report and DR/EL not

provided

4 OSP NHDC 26.05.18 DR/EL not provided in .dat & .cfg format

All intra-state entities are requested to submit the FIR, DR & EL in (.cfg & .dat format) of station during tripping of transmission grid elements.

The matter was discussed in the meeting.

6.10 Ten Daily Reservoir operation table of MPPGCL HPS:- It was apprised to the committee that in

the meeting held in Regional Office of MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar

Sarovar Project, ISP & OPS and State Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily

reservoir operation table from WRD and NVDA for their operation of their hydro generators. In last 54th , 55th &

56th OCCM, request has been made to MPPGCL for furnishing the same to SLDC within a week, In last meeting MPPGCL has submitted the Ten Daily Reservoir Table of Bargi and Bansagar Hydel Power

Stations. It was requested that MPPGCL shall submit the Ten Daily Reservoir Table of remaining hydel power

stations in coordination with NVDA and WRD for optimum utilisation of available water in the reservoirs during

the summer season.

6.11 CONTROLLING HIGH VOLTAGE DURING OFF-PEAK HOURS :- It was apprised to the

committee that Switchable Shunt Reactors are being taken in service during high voltage conditions. However,

in view of inadequate shunt reactive compensation, the generating units are advised to contribute in voltage

regulation by operating their units in under-excited mode (absorb Reactive Power) within the capability curve.

The MW, MVAR and Voltage of generating units was analyzed for the month of Feb 2017 with the help of

SCADA data available at WRLDC.

Minutes of 64th OCC of MP 13

Page 16: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

In 494th OCC meeting of WRPC, WRLDC has drawn attention regarding MVAR generation at Satpura

Power Station when bus voltage was above nominal. The scatter plot of MW Vs MVAR of unit and Bus Voltage

Vs Reactive Power Injection by the unit has been plotted. It has been observed that generating unit at Satpura

Unit No. 10 & 11 was injecting reactive power into the grid even when the bus voltage was above nominal. Such

operation is not desirable and it has been requested that AVR setting and the GT taps may be reviewed /

adjusted so as to enable the unit to contribute in voltage regulation within the capability curve. The directives in

this regard may please be adhered to control the high voltage during off peak hours.

Member secretary OCC requested MPPGCL/NHDC/JP Bina to provide MVAR support as per the system

requirement and absorb MVAR when voltages are high to the extent as per their capability curve.

6.12 MONITORING OF SCHEMES FUNDED FROM PSDF :- It was apprised to the committee that it was

decided in the 6th meeting of NPC held on 19th December 2016 at Bengaluru, that all the RPCs in the monthly

OCC meetings may follow up with the utilities to expedite the completion of schemes by giving due priority. The

implementation of most of the schemes are based on the recommendation of the enquiry committee on grid

disturbance of July 2012 headed by Chairperson, CEA. Therefore timely implementation of these schemes

would enhance the grid security and reliability. Accordingly the details of grant sanctioned from PSDF for the

schemes of MP is enclosed at Annexure- 6.12A. The status of implementation of above schemes (physical as

well as financial progress) may please be reviewed and the entities are requested to expedite implementation of

the schemes. The utilities were advised to furnish the information in the format enclosed at Annexure – 6.12B

by first week of every month on regular basis to Member Convener, PSDF project monitoring group (AGM,

NLDC, POSOCO) with a copy to NPC, WRPC division and SLDC. The status of the same is being monitored by

WRPC in OCC meeting of WRPC every month.

The matter was discussed in the meeting.

6.13 POWER SYSTEM STABILIZER (PSS) IN AVR TUNING OF GENERATOR AND ITS RESPONSE PLOT:- It was apprised to the committee that in 129th Protection Committee Meeting of WRPC,

it has been decided that all generators would furnish PSS settings and step-test response plot of time Vs

terminal voltage in excel sheets to WRLDC/ WRPC. As a sequel to above, MPSLDC vide various e-mail

communication all generators under our periphery were requested to provide PSS settings and the step test

response plot of time Vs terminal voltage in excel sheet to WRLDC/ WRPC. Inspite of repeated pursuance, the

details of SGTPS Birsinghpur Power House only receipt, no any other generators have provided the desired

information. However, SGTPS has also not provided desired graph plot in excel sheet. The above data /plot

required to be provided to WRLDC/ WRPC on urgent basis, it is therefore respective members were requested

that all generators may provide the same so that the same may be forwarded to WRLDC/ WRPC.

The matter was discussed in the meeting.

Minutes of 64th OCC of MP 14

Page 17: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

6.14 RGMO/FGMO compliance by generators in the region:- It was apprised to the committee that it

is to intimated that as per IEGC 5.2(f), RGMO/FGMO is mandatory for all thermal Units above 200MW & Hydro

Units above 10MW for grid security and reliable grid operation. Further vide 5th amendment to IEGC dtd-

12.04.2017, it has been provided in clause-5.2(h) that “ RLDCs/SLDCs shall not schedule the generating station

or unit(s) thereof beyond ex-bus generation corresponding to 100% of the installed capacity of the generating

station or unit(s) thereof and that the generating station shall not resort to Valve Wide Open operation of units”

so that primary response is ensured. In view of the above it is requested to kindly submit the required details in prescribed format enclosed

as Annexure- 6.14 to SLDC at immediately. The required data has been received from MPPGCL.

It was also intimated that generation of some units are above 100% which shall not be above 100%. As

during any incident there will be no response of RGMO/FGMO in such cases where generation is above 100%.

The matter was discussed in the meeting.

6.15 ABNORMAL VOLTAGE VARIATION OBSERVED IN PMU AT 400 KV S/s BINA:- It was

apprised to the committee that the abnormal voltage variations is being observed in PMU’s at 400 KV S/s Bina

(plots enclosed as Annexure-6.15 (3 pages) since May 2018. SLDC has taken up the matter with T&C,

MPPTCL and M/s GE. M/s GE engineer visit was arranged to 400 KV S/s Bina to investigate the problem in PMUs & it has

been informed by GE site engineer that the voltage spikes are also observed in the input values of PMU from

Bus PT’s & line CVT secondary, hence it can be gathered that these PMU’s are showing correct values and

there is no issue in PMU.

Further it is also to intimate that the abnormal voltage spikes are still being observed in the PMU of 400

KV Main Bus I & II and 400 KV Bina(M.P) – JP BinaCkt installed at 400 KV S/s Bina and the magnitude

&frequency of spikes is continuously increasing with time .In addition to above, it is to also intimate that the

voltage spikes are observed in 400 KV Bina-JP BinaCkt even when the line is hand-tripped from both ends.

In view of the above MPPTCL is thus requested to kindly arrange for testing of Bus PT’s, line CVT &

related equipments installed at 400 KV S/s Bina for investigation of root cause of these voltage spikes observed,

for its rectification and ensure healthiness of equipments at site. Further it is also requested to intimate SLDC

about the necessary action plan at the earliest.

Representative from MPPTCL informed the committee that the testing if CT/CVT & PT as been done at

400 KV Bina end and no significant cause for such voltage variations can be concluded and the matter is

still under investigation. The MPPTCL representative were requested to examine the cause of fluctuation

so that remedial action could be taken. The matter was discussed in the meeting.

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : Black Start mock drill of Hydel stations of MPPGCL:- It was apprised to the committee during 2017-18 the

black start mock drill successfully carried out at Bargi and Pench Hydel power station on dtd 23.05.2017 and

06.06.2017 respectively. The Black Start Mock drill exercise at Gandhi Sagar Power station was also carried

Minutes of 64th OCC of MP 15

Page 18: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

out on dtd 30.05.2017 but synchronization of islanded system with national grid was not successfully done due

to problem in bus coupler breaker at Gandhi Sagar Power Station. Black Start Mock Drill at Birsinghpur HPS,

Tons HPS & ISP HPS was successfully carried out on 17.10.2017, 23.01.2018 & 10.02.2018 respectively. The

Joint Black Start Mock Drill of Pench & Bargi was successfully conducted on 11.04.2018. MPPGCL may apprise

the same in the meeting.

The black start mock drill exercise of OSP was to be held in April 2018 but due to non-availability of Bus

Coupler Breaker at OSP the Mock Drill date cannot be finalized. In 63rd OCC OSP informed the committee that

the purchase of Bus Coupler Breaker is under process and the tender is being awarded.

In view of the above OSP HPS was requested to inform the latest status of Bus Coupler Breaker so that

at the earliest Mock Drill exercise may be organized. Representative from OSP informed the committee that one

of the CT’s is being repaired and Bus Coupler Breaker is expected to be in service by 15th August 2018.

Thereafter the Mock Drill at OSP can be conducted in the month of October 2018.

It was apprised to the committee that the black start mock drill of Gandhinagar HPS was conducted

successfully on 06.07.2018.

ITEM NO. :- SUPPLEMENTARY MINUTES: Item SA-1: Repeated incidence of cable thief in Power Grid bays of 400 KV Satpura - Itarsi & Satpura

- Koradi lines at Satpura Thermal Generating Stations:- The General Manager Asset Management , PGCIL

WRTS-II Vadodara vide letter No. WRTS-II/AM/246/AV/1065/ 1410 dtd 20.06.2018 has pointed out repeated

incidence of cable theft in Power Grid bays at Sarni Power House. Therein, Power Grid has mentioned

incidences of theft of control cables as narrated hereunder:-

Sr.

No.

Date Feeder details Cable details

1. 06.05.17 400 KV Satpura Koradi 01 No 14CX2.5 sq. mm. of Circuit Breaker

2. 14.09.17 400 KV Satpura Itarsi 03 Nos 7CX2.5 sq. mm. of line CVT.

01 No. 14CX2.5 sq. mm. of Circuit Breaker.

3. 07.06.18 400 KV Satpura Itarsi 01 No. 19CX2.5 sq. mm. of line CVT

The G.M. (Asset Mgmt.) (letter enclosed as Annexure SA-1) has mentioned that for replacement of

aforesaid cable around 3 Kms cables have been laid. Such persisting theft incidence at Sarni Generation Power

Station is not desirable. Such incidences not only cause of loss of revenue but also theft of cables may cause

security concerns of integrated system. The MPPGCL representative were requested to look into the matter

and necessary steps may kindly be taken so that reoccurrences of theft incidence could be eliminated.

The matter was discussed in the meeting. Thereafter Member Secretary OCC stated that outage of such

important grid elements is not safe for grid operation and STPS, MPPGCL authorities shall discuss the matter

Minutes of 64th OCC of MP 16

Page 19: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

with higher officials and take necessary decision/action for providing advance security arrangements (like CCTV

Camera, additional security staff, etc) at STPS switchyard to avoid such theft incidences. Item SA-2: REGARDING NON-CLOSING OF SIDHI HINDALCO CKT FROM HINDALCO END AFTER

AVAILING OUTAGE BY TLM:- The outage was availed on 220 KV Sidhi – Hindalco Ckt-1 on dtd-03.07.2018 at

09:47 Hrs. by AE TLM and shut down was normalized at 18:09 Hrs. on the same day from Sidhi end. The line

was kept out from Hindalco end however this was not reported to SLDC. The line got charged from Hindalco

end on dtd-06.07.18 at 13:41 Hrs. when the outage of 220 KV Sidhi – Hindalco Ckt-2 was required. It is not

understood, why this line was kept open from Hindalco end. It was pointed out that the prolonged opening of line

from Hindalco end may cause reliability concerns to M/s Hindalco. EHT-M and T&C representative were

requested to look into matter.

The matter was discussed in the meeting.

ITEM NO. 08: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 8.1 Status of AMR system installed at SLDC: SLDC representative informed the Committee about the status of data received through AMR system in

the month of May 2018. He informed that the complete data of 591 meters was received through AMR system

and data of 33 Nos meters (Monthly- 25 & Partial – 08) was not received through AMR system, the availability of

data was around 95%. He also informed that status of data received through AMR system is invariably sent to

all concerned offices including SE(T&C) offices through email for furnishing the missing data alongwith monthly

JMR data latest by 4th of every month. Further, the following points are discussed and resolved as under:-

1. SLDC representative requested the CE(T&C) office to take up the matter with M/s Secure Meters Ltd

for resolving the site related issues of the 33 Nos meters not read during the month of May 2018.

Details are shown in enclosed Annexure-8.1.i. CE(T&C) office have assured to take up the matter with

M/s Secure Meters Ltd. for resolving the issues related with 33 Nos. meters not read during the month

of May’2018.

2. SLDC representative informed that around 145 Nos. ABT meters are installed at the interface points

of newly commissioned substation / Xmers / HT consumers / OACs, after repeated pursuance with

M/s Secure Meters Ltd only 72 Nos meters are successfully integrated with AMR system of SLDC and

balance 66 Nos meters are yet to be integrated with AMR system. He requested the CE(T&C) Office

to advice M/s Secure Meters Ltd. and field offices for integrating the balance ABT meters (66 Nos)

and also requested to include the new meters installed at the interface points under AMC contract of

M/s Secure Meters Ltd. The list of 66 Nos. meters required to be integrated with AMR system is

shown in Annexure-8.1.ii. CE (T&C) office have assured to take up the matter with site officials and

M/s Secure Meters Ltd. for integrating the balance 66 meters with AMR System. Further, SLDC is

repeatedly requesting CE(T&C) office to take up the matter with CE(Procurement) office for including

the new meters installed at the interface points under AMC contract. CE(T&C) office representative

Minutes of 64th OCC of MP 17

Page 20: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

intimated that proposal for including 150 Nos. New ABT meters under AMC contract is under process

at CE(Procurement) office.

3. SLDC representative informed that as already requested in 63rd OCCM that as per Regulations 10

and 18 of Central Electricity Authority (Installation and operation of meter) Regulation 2010, the

interface meter are required to be tested at least once in five years. He also requested CE(T&C)

office to advice the concerning site officials to verify the monthly JMR data for its correctness before

sending to SLDC. CE(T&C) office representative have assured that instructions will be issued to Site

Officials for testing of meters and verifications of JMR.

4. SLDC representative intimated that in 63rd OCCM, CE(T&C) office was requested to issue instructions

to all circle offices for furnishing the JMR data in standard format enclosed herewith as Annexure-

8.1.iii to SLDC on email id- [email protected], but, except Gwalior Circle none of the circle

offices are furnishing the data in the required format. He again requested CE(T&C) office to issue

instructions to field offices for furnishing the data in required format. CE(T&C) office representative

has assured that instructions will be issued to field offices for furnishing the data in required format.

8.2 Non receipt of meter data timely of ABT meters installed at the Railway TSS: SLDC representative informed that monthly meter data of ABT meters installed at the Railway TSS is

downloaded through AMR system installed at SLDC. In case of non-availability of meter data through AMR

System, SLDC intimates the missing data list to concerned T&C circle office and coordinate with field offices for

manual data downloading through MRI of the ABT meters installed at TSS. But, every month difficulty is being

faced by field officials in manual downloading of data through MRI as proper cooperation and support is not

provided by the Railways as a result the data gets delayed. The issue could not be discussed as no officer from

Railways has attended the meeting.

8.3 AMR facility for the ABT meters installed at MPPGCL :

SLDC representative informed that MPPGCL has provided AMR facility on 107 Nos ABT meters

installed at the interface points and all the meters were successfully integrated with AMR server. He also

informed that ABT meter data of 38 Nos meters were not received through AMR system in the month of May

2018, the status of data received through AMR system was also emailed to GCC, MPPGCL on 19th May 2018.

He requested MPPGCL to take up the matter with site officials and M/s Secure Meters Ltd. to resolve the

problems related with non readability of meters integrated successfully and provide AMC of AMR facility to M/s

Secure Meters Ltd. so that complete data is received by SLDC. MPPGCL intimated that matter is taken up with

M/s Secure Meters Ltd for AMC of AMR system.

Minutes of 64th OCC of MP 18

Page 21: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

SLDC representative also requested to MPPGCL to instruct the Gandhi Sagar HPS & Silpara HPS

officials for considering the ABT meters with AMR facility as main meters and furnish the JMR data accordingly.

MPPGCL have assured to take up the matter with Gandhi Sagar and Silpara HPS.

SLDC representative also requested MPPGCL to furnish the meter master of ABT meters installed at

the interface points as main, check and standby meters alongwith modem and SIM details. MPPGCL assured to

furnish the same.

SLDC representative informed that in case of Thermal Power Stations of MPPGCL, the injection

recorded by the ABT meters installed at the outgoing feeders generally do not match with the generation

recorded at Generator end. He requested MPPGCL to advise the site officials for monthly checking / verification

of feeder wise data with Generator and Station Xmer wise data and testing / calibration of meters installed at the

Power Stations as per CEA regulations. MPPGCL have assured to issue instructions to site officials for checking

/ verification of data .

SLDC representative informed that Satpura TPS, the ABT meters installed at Generator no. 6&7

(MPC63019,MPC63023) and at Station Xmer No. 3&4 (MPC63022,MPC63024) are having time drift as such

data of these meters are not being utilized by SLDC. MPPGCL is requested to issue instructions to concerned

officials at Sarni TPS for time synchronization through GPS of these meters. MPPGCL has assured to issue

instructions to site officials for checking of time drift.

8.4 Non receipt of monthly injection data (JMR) of newly commissioned Wind & Solar Power Project for issuance of monthly State Energy Account : SLDC representative informed that the concerned SE(O&M)’s do not furnish the monthly injection data of

following newly commissioned Wind & Solar Power Project connected at 33KV level. However, SLDC is

incorporating the injection data recorded in ABT meter in SEA, but, verification of data of the following REGs

could not be done.

i) 15MW Solar Power Project of M/s Simcom Pvt. Ltd. (Simcom(1MW), Eastman(4MW) & Made

Easy(10MW) connected at 220KV Ganjbasoda. –SE(O&M) Vidisha.

ii) 6 MW Biomass Power Project of M/s Ramnik Power & Alloy connected at 33KV Wara Seoni

substation - SE(O&M) Chhindwara.

iii) 30MW Baggase Power Project M/s Narmada Sugar Mills connected at 132KV Pondar substation -

SE(O&M) Narsinghpur.

iv) 30MW Baggase Power Project of M/s Narmada Sugar Mills connected at 132KV Ponder substation

- SE(O&M) Narsinghpur.

SLDC representative requested DDC, Bhopal & Jabalpur to take up the matter with their Commercial

Sections for issuance of directives to concerned SE(O&M)’s for furnishing the wind & solar generation JMR

data by 3rd or 4th of every month. DCC’s have assured to take up the matter with their Commercial Sections.

Minutes of 64th OCC of MP 19

Page 22: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Further, SLDC representative informed that the concerned SE(O&M)’s do not furnish the the JMR/AMR

injection data of the following wind generators connected at 33KV level is not furnished at the time of issue of

provisional SEA .

i) 30MW Wind Power Project of M/s Sudheer Project Pvt. Ltd. connected at 132KV Maxi Substation. –

SE(O&M) Ujjain

ii) 30MW Wind Power Project of M/s Kshema Power & Infra connected at 132KV Ghosla substation.

SE(O&M) Ujjain

iii) 30MW Wind Power Project of M/s Kshema Power & Infra connected at 132KV Behrugarh. SE(O&M)

Ujjain

iv) 29.4MW Wind Power Project of M/s Suzlon Gujrat Wind Park Ltd. connected at 132KV Khachrod

substation. –SE(O&M) Ujjain

v) 28 MW Wind Power Project of M/s Inox Betul (Giriraj) connected at 132KV Gudgaon substation -

SE(O&M) Betul

SLDC representative requested DDC, Indore & Bhopal to take up the matter with their Commercial

Sections for issuance of directives to concerned SE(O&M)’s for furnishing the wind & solar generation JMR

data by 3rd or 4th of every month. DCC’s have assured to take up the matter with their Commercial Sections.

SLDC representative informed that JMR injection data of the following wind & solar generators

connected at 132KV level and above is not furnished by the concerned EE(T), MPPTCL, SLDC consider the

data received through AMR or through MRI by site official in monthy SEA, but verification of data of the

following REGs could not be done.

i) 42MW Wind Power Project of M/s Suzlon Gujrat Wind Park Ltd. connected at 220KV Badnagar

substation through 132KV Ckt.

ii) 21MW Wind Power Project of M/s Sarjan Realities Ltd. connected at 220KV Badnagar substation

through 132KV Ckt.

iii) 50 MW Kukru Wind Power Project connected at 132KV Gudgaon substation through 132KV Ckt.

iv) 49.5 MW Betul Wind Power Project connected at 132KV Gudgaon substation through 132KV Ckt.

He requested CE(T&C) office to issue necessary directives to field offices for furnishing the JMR data

of the above RE Projects. CE(T&C) office have assured to issue instructions to field offices for furnishing the

JMR data of above mentioned RE Projects connected at 132KV level and above.

Minutes of 64th OCC of MP 20

Page 23: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

8.5 MPREC( Forecasting,Scheduling,Deviation Settlement Mechanism and related matters of Wind and Solar Generating Station) Regulations 2018:

SLDC representative informed that The Hon’able Madhya Pradesh Electricity Regulatory Commission

has notified the MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of

Wind and Solar Generating Stations) Regulations 2018 on 20th April 2018. These regulations have come in

force from the date of notification of regulations. The regulations are applicable to all Wind Generators having a

combined installed capacity of 10MW and above and Solar Generators with an installed capacity of 5 MW and

above including those connected via pooling statins and selling power within or outside the State.

He also informed that in accordance with regulatory provisions, SLDC has to compute the deviation

charges of qualified Wind and Solar Generating Stations on the basis of Schedules issued by SLDC and actual

injection recorded in ABT meters installed at the pooling stations. The actual generation data of Wind and Solar

Generators connected at 132KV level and above is received by SLDC through AMR system. However, complete

meter data of Wind and Solar Generators connected at 33KV level is not received by SLDC through AMR

system.

He further informed that SLDC has already issued instructions to Wind and Solar Generators not integrated

with AMR server of SLDC and connected at 33KV level for providing separate modem, antenna, Optical cable &

SIM for data downloading at SLDC remotely.

SLDC representative informed that in order to implement the above regulations the actual generation

data of Wind and Solar Generating Stations connected at 33KV level is essentially required by SLDC through

AMR or manual downloading through MRI. SLDC has already requested the CE(Comml) West and Central vide

letter no.07-05/FS_DSM/154/1899 dated 21.06.2018 and letter no. 07-05/FS_DSM/154/1903 dated 22.06.2018

for appointment of nodal officer for providing the meter details, AMR facility and meter data. Central Discom has

appointed the nodal officer, but, West Discom has yet to appoint the nodal officer. He requested DCC Indore to

take up the matter with CE(Comml), office for appoint of nodal officer. DCC Indore has assured to take up the

matter with CE(Comml) for appointment of nodal officer.

ITEM NO. 9: SCADA and E&T RELATED ISSUES: 9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS & HAVING TRACTION FEEDERS-

It was informed during the meeting that integration of telemetry of around Seven RTUs (132KV Biora,

132 KV Mandla, 132 KV Raghogarh, 132 KV Isagarh, 132 KV Pratappura, 132 KV Maneri, 132 KV Dabra )

with SLDC SCADA is pending.

Further, SLDC informed that telemetry of Birsingpur HPS and Zinna HPS is also not available and

same needs to be provided by MPPGCL.

Minutes of 64th OCC of MP 21

Page 24: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

It was also informed by SLDC that most of the RTUs commissioned recently is not working properly

and functioning intermittently. It was also brought to the notice of OCC that MPERC vide Letter dated 09-

08-2017 has directed to ensure proper functioning of RTUs.

In response, MPPTCL representative assured to look into it and arrange commissioning of telemetry of

balance RTUs as well as arrangement for round the clock smooth functioning of these newly commissioned

RTUs. Regarding telemetry of Birsinghpur HPS and Zinna HPS it was informed by MPPGCL, that NIT for

procurement of RTUs for these two power stations along with replacement of RTUs for other hydel power

stations has already been issued and procurement is under process.

SLDC further informed in the meeting that in the information conveyed to MPERC, it is mentioned that

the commissioning of RTU at Morwa is pending due to wideband node commissioning at 132KV Waidhan S/s.

It is informed by SLDC that the commissioning of wideband node at 132KV Waidhan S/s is not expected in

near future and RTUs of Morwa is out since last two years. Accordingly, SLDC is constantly pursuing the

matter with MPPTCL for restoration of RTU of 132KV Morwa through alternative arrangement like

PLCC/leased line etc. It was also clarified by SLDC that commissioning of wideband nodes under Master

telecom Project is being done by PGCIL for which work is assigned by MPPTCL and SLDC is only

coordinating agency.

SLDC also informed that as per grid code, telemetry of new sub stations is required to be provided

before its charging. Accordingly, WRLDC is insisting for arranging telemetry of 220 KV Suwasra Sub Station

before its charging. However, telemetry of 220 KV Suwasra, was commissioned by utilizing modems/data

channel of important functioning telemetry (Gandhi Sagar & 220 KV Bhanpura) resulting in outage of earlier

existing telemetry, which is not advisable. SLDC requested MPPTCL to issue instructions in the matter, so that

such incident may not be repeated in future.

9.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS The present status of telemetry discrepancy including upgradation requirement was discussed in detail

(enclosed as Annexure-9.2). The list of following important locations where RTU upgradation is required to

accommodate renewable feeders/other feeders/transformers was discussed in detail:-

Sl

No. Name of Substation

whose RTU is required to be upgraded

Name of feeders/transformers required to be included in telemetry

01 400 KV Birsingpur TPS

1.Wrong telemetry of 400/220 KV Xmer CB status

(Both Sides), Bus Coupler CB status, Station Xmer 5A

& 5B CB status,Gen-1 CB status, 220 KV Panagar CB

status, Gen-2 CB status,220 KV Shahdol CB status,

220 KV Amarkantak-2 CB status,220 KV Transfer Bus

Minutes of 64th OCC of MP 22

Page 25: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Coupler CB status.

2. Wrong values of 220 KV Bus-II Voltage &

frequency, 400 KV Bus-1 Frequency.

3.Non availability of telemetry of 220/33 KV Xmer.

These discrepancies are persisting since last 1 year.

02 400 KV Satpura TPS

Telemetered values of

1.Generating Transformer 6,7,8,9 MW,MVAR,

2.400 Satpura-Astha I & II Line Reactors,

3. 220 KV Bus I & II Voltage & frequency,

4.CB Status of complete 220 KV yard

5.SOE to be verified.

6. Station Xmer-3 MW,MVAR

These discrepancies are persisting since last 1 year.

03 220 KV ATPS

1. Station Transformer 5A CB & 132/33 KV

transformer CB, 220/132 KV 63 MVA Xmer CB.

2. 220 KV Bus-1 Voltage & Frequency.

04

220 KV Tons

Telemetered values of following feeders is wrong:-

1. 220 KV Tons-Sirmour

2. 220 KV Tons-Rewa

3. 220 KV Tons-Satna

4. 220 KV Tons-Kotar

Above discrepancy is pending since more than year.

In Last OCCM it was ensured by MPPGCL that the

same shall be rectified within a week but no action

has been taken till now.

CB status of 220 KV Tons-Rewa II, Gen-1 & 220 KV

Tons-Kotar-1

05 Rajghat HPS Wrong CB status of Gen-2 & 3

06 400 KV ISP

1,Telemetered values of 400 KV Nagda MVAR is 10

times of actual value.

2. Telemetred values of 400 KV Bus-1,2 Voltage &

Frequency, 400 KV Indore-1& 2 MVAR.

07 220KV Birsingpur S/s

CB status of 220 KV I/C II, 220 KV Traction-1

Minutes of 64th OCC of MP 23

Page 26: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

08 132KV Kotma S/s 1.132KV Anuppur feeder II telemetry not available.

2. Wrong CB status of 132 KV Anuppur-1 & 2.

09 220 KV Seoni i.Wrong CB status of 160 MVA Xmer II (Secondary

side)

ii.Wrong value of 220 KV Bus II Voltage

iii. Wrong value of 220 KV Seoni-Seoni(PG)-1 & 2

10 400 KV Bhopal 80 MVAR Reactor I Main CB , 400 KV Bina-2 Main

CB, 315 MVA Xmer-IV Main & Tie CB, 220 KV

Ganjbasoda CB

11 400 KV Astha (i)400/220 ICT-1 MW Value is wrong.

(ii) 400 KV Bus Coupler CB Status

(iii)Frequency of 400 KV & 220 KV Bus is wrong.

12 220 KV SHAHDOL (i) CB status of 132 KV Bus Coupler

13 220 KV Rajgarh Biaora 220 KV Bus Coupler & TBC CB status

132 KV Voltage & Frequency

14 132 KV Polaikalan All telemetered data is wrong

SLDC informed that there is no progress in rectification of telemetry discrepancies of substations pertaining to MPPGCL since long time. MPPGCL informed that they will arrange a meeting in SLDC for resolving these discrepancies.

ISP informed that there was some problem in MFM & new MFM have been purchased but they are

unable to configure the same for which SLDC requested ISP to arrange for its rectification at the earliest.

MPPTCL informed that there is some problem in DFE RTU in Polaikalan & they will arrange for its

rectification at the earliest. SLDC further requested MPPTCL to seal all the wide band communication

panels/RTU panels to avoid the entry of rodents for which MPPTCL agreed.

SLDC further informed that the status of telemetry is being monitored by MPERC through MIS report

and hence telemetry is required to be maintained properly with highest possible availability.

It was also informed by SLDC that lot of inconvenience in grid management is observed due to above

discrepancy and hence upgradation of above mentioned RTU is to be taken up on top most priority for which

MPPGCL and MPPTCL agreed.

9.3 Extension of RGMO/FGMO signal to SLDC/WRLDC :-

SLDC informed that as per IEGC 5.2(f), RGMO/FGMO is mandatory for all thermal units above 200

MW and hydro units above 10 MW. Further considering the high penetration of renewable to grid and also the

Government target to achieve 175 GW, it is essential to monitor operation of RGMO/FGMO at SLDC/RLDC for

ensuring grid security and compliance of regulation. Subsequently SLDC vide letter no. 07-05/RPC-27/3739

dated 18-01-2017, letter No. SE/LD:E&T/693 dated 23-01-2017, letter No. SE/LD:E&T/34 dated 13-04-2017,

Minutes of 64th OCC of MP 24

Page 27: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

letter No. SE/LD:E&T/143 dtd.26-05-17, , letter No. SE/LD:E&T/309 dtd.19-07-17, letter No. SE/LD:E&T/980

dtd.14.03.18 requested MPPGCL/NHDC for integration of telemetry of RGMO/FGMO in RTU installed at

power station and forward the object address configured in RTU so that same may also be configured in

SLDC SCADA and RGMO/FGMO status may be displayed in SCADA system. The matter was again taken up

vide this office UO No.38 dated 21/08/2017. However, extension of RGMO/FGMO signal of following

generating units is still to be extended to SLDC SCADA system:-

S.No. Name of Generating Station Unit.No.

1 Satpura TPS 6,7,8,9 2 SGTPS 1,2,3,4 3 BARGI HPS 1,2 4 PENCH HPS 1,2

In addition to above, the RGMO/FGMO status of Tons HPS is showing incorrect.

SLDC informed that in 63rd OCCM it was stated by MPPGCL that extension of RGMO/FGMO signal

of Bargi HPS shall be completed by June 18 and confirmed that balance shall be completed shortly. However

no progress in the matter was observed

SLDC requested to expedite the extention of telemetry of RGMO/FGMO of above generators for which

MPPGCL agreed.

9.4(a) Non Availability/ Unreilable telemetry of Hydel Power Stations :-

SLDC informed that the telemetry of Bansagar III, Tons, Pench, Bargi, Bansagar II,Madikheda

is very unreliable & frequent long outage with abnormal delay in restoration of same is observed. The RTU

availability of MPPGCL HPS is as detailed here under :-

Name of HPS Present

Status Availability

Feb-18 Mar-18 Apr-18 May-18

Pench Intermittent 0 % 0% 0% 22% Bansagar-III Intermittent 0 % 0% 0% 0% Bansagar-II Intermittent 37% 39% 58% 97% Madikheda Intermittent 63% 58% 15% 61% Rajghat Intermittent 90% 85% 94% 90% Gandhisagar Intermittent 24% 75% 88% 87% Bargi Intermittent 92% 95% 92% 78% Tons Intermittent 96% 98% 94% 44% Birsingpur HPS Telemetry not provided to SLDC. Zinna HPS

It was also informed that as per CERC communication regulation 2017, availability of

telemetry is required to be ensured more than 99.9% however as indicated above the telemetry availability of

Hydel Power Stations is very low.

Minutes of 64th OCC of MP 25

Page 28: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

SLDC also informed that MPPGCL was requested to provide the contact details of officers at each power

house looking after telemetry work & arrange required spares (PLCC/RTU/MFM etc.) at Power Stations so

that availability of telemetry may be achieved as desired by CERC. SLDC again requited MPPGCL to issue

order regarding telemetry site coordinators and provide the copy to SLDC for which MPPGCL agreed.

9.4(b) Non Availability/ Unreliable voice communication Between SLDC to Thermal/ Hydel Power Stations :-

SLDC informed that despite constant pursuance most of the PLCC voice communication of various

power stations to SLDC is out since long time. The details of outage are here as under:-

Name of HPS/TPS PLCC No. Present Status Remark

Pench 076-80 Out since last 2 year Problem in PLCC cabinet at Pench end.

Bansagar-III 068-35 Out since last 3 year Site personal inform that, they have no instruction to restore the PLCC voice communication.

Bansagar-II 068-20/30 Out since last 3 year Site personal inform that, they have no instruction to restore the PLCC voice communication.

Bansagar-IV - PLCC voice communication is not established.

Madikheda 064-31 Out since last 1 year Problem in PLCC channel.

Rajghat 063-22 Out since last 2 year Problem in PLCC channel.

Tons 069-20/30 Out since 13/06/2018 Birsinghpur HPS 025-20/30 Since long time Gandhisagar 32-21 Out since 19/06/2018 -. Birsinghpur TPS 015-20/30 Out since last 3 year. New Exchange at

Birsinghpur TPS yet to be commissioned.

Satpura TPS 055-20/30 Out since last 1 year Problem in PLCC cabinet at Satpura TPS side.

SLDC informed that the restoration of above PLCC voice Communication is of utmost importance as

lot of inconvenience in system operation is observed by SLDC as voice communication through Mobile/ P&T

lines is not reliable and remains out /unreachable for most of the time. MPPGCL agreed to discuss this matter

with its higher officials.

Minutes of 64th OCC of MP 26

Page 29: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

9.5 NON AVAILABLITY OF SOE AT SLDC SCADA SYSTEM SLDC informed that the problem in receipt of SOE from field is observed. WRLDC vide letters dtd.

03.05.17 & 15.05.17 intimated that SOE of grid disturbance at 220 KV S/s Mahalgaon & 400 KV S/s Indore is

not received in Back-up LDC SCADA/Sub-LDC SCADA system respectively. SLDC is carrying out data

validation of various substations periodically & it is observed that SOE from various substations like 400 KV

S/s Satpura, 400 KV S/s Astha, 220 KV S/s Damoh, 220 KV Itarsi, 220 KV Barwaha, 220 KV Chhindwara, 220

KV Pandhurna, 220 KV Sabalgarh, 220 KV Shivpuri, 220 KV S/s Tikamgarh, 220 KV S/s Mahalgaon, 220 KV

S/s Hoshangabad, 220 KV Shujalpur, 220 KV S/s Badod was not received at SLDC SCADA system.

Subsequently SLDC vide letter SE/LD:E&T/200 dtd. 14-06-17 requested MPPTCL to arrange simulation

testing for SOE of all RTUs.

SLDC informed that the SOE verification was taken up in Indore and Jabalpur area and wrong SOE with

wrong time was observed in 220 KV S/s Badod, 132 KV Dewas BNP, 220 KV Ujjain, 132 KV Sonkatch, 220

KV Shujalpur, 132 KV Suwasra, 132 KV Chapda, 400 KV Julwaniya, 132 KV Depalpur, 220 KV Rajgarh, 220

KV Barwaha, 220 KV Neemuch. The matter was taken up and initially filed persons were reluctant to verify the

same in RTU. However, after long pursuance, the matter was investigated and it was found that the settings

“inf code 2” & “inf code 4” were not correct at the RTU end. These settings have now been changed & correct

time stamping of above stations is now available to SLDC.

SLDC requested MPPTCL to arrange simulation testing & provide the schedule for simulation testing of

SOE of all RTU’s in coordination with SLDC SCADA/Back Up SLDC/Sub LDC SCADA system before 15th

August & also issue necessary instructions to sort out the issues for ensuring proper receipt of SOE in SLDC

SCADA system for which MPPTCL agreed.

9.6 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS & INTERMITTENT TELEMETRY DUE TO NOISE IN COMMUNICATION CHANNEL :- The long outage of telemetry & substations having intermittent telemetry due to heavy noise in communication

channel was discussed in detail:-

Sl No. Name of Sub Station Out from /Remark

01

132KV Morwa S/s

More than one and half Year.

02 132 KV Mungaoli More than one month

03 132 KV Waidhan S/s Very intermittent

04 Bargi HPS Very intermittent

Minutes of 64th OCC of MP 27

Page 30: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

05 Tons HPS Very intermittent

06 220 KV Rewa Very intermittent

07 Bansagar III HPS Very intermittent

08 220 KV Chhindwara Very intermittent

09 220 KV Chhatarpur Very intermittent

10 220 KV Ganjbasoda Very intermittent

11 220 KV Gwalior II Very intermittent

12 220 KV Morena Very intermittent

13 Omkareshwar HPS Very intermittent

14 220 KV Malanpur Very intermittent

15 220 KV Mehgaon Very intermittent

16 220 KV Sirmour Very intermittent

17 220 KV Sidhi Very intermittent

MPERC vide Letter dated 09-08-2017 has directed to submit reason for long outage for RTU & also directed to ensure proper functioning of RTUs. MPPTCL, MPPGCL are requested to sort out rectification of above RTU/data channel on top most priority.

MPPTCL, MPPGCL officials confirmed to look into the matter to sort out/ rectification of above

RTU/data channel. MPPGCL and MPPTCL informed that the action regarding restoration of telemetry of

above sub stations /power stations shall be taken up on top most priority.

9.7. UTILIZATION OF W.B NODE AT BIRSINGHPUR TPS :

SLDC informed that the W.B node at Birsinghpur TPS has already been commissioned in 2016.

However, despite constant pursuance utilization of node is still pending since last two years due to pending

work of laying of cable form W.B node location to PLCC room, Exchange room and RTU.

MPPTCL informed that purchasing of required converter is under tendering process.

Minutes of 64th OCC of MP 28

Page 31: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

9.8 MAINTENANCE OF OPGW WORK OF MPPTCL EHV LINE SECTION:

SLDC informed that break in OPGW was observed on dt. 13/06/2018, between 220 KV Satna to 220

KV Katni EHV line section. Due to this all 15 telemetry routed through 220 KV Satna node was out. SLDC

requested to EHT section Satna & Damoh for early restoration of OPGW and informed that they have no

arrangement related with OPGW related work. As restoration of around fifteen telemetry routed through Satna

along with Satna PGCIL was required on top most priority, M/s PGCIL who is doing the “Master Telecom

Project” deputed their team for rectification of OPGW for the MPPTCL EHV line section. Due to the help of M/s

PGCIL, OPGW communication of Satna section was restored on 23/06/2018.

SLDC further informed that the support for PGCIL was not available for rectification of OPGW on

220KV Satna- 220KV Maiher- 220KV Katni MPPTCL section due to ongoing project works. The same support

may not be available in future. Therefore, it is necessary that MPPTCL may plan the OPGW rectification work

in advance so that the delay in restoration of fault related with OPGW may be avoided.

MPPTCL informed that the matter will be discussed and final decision in the matter regarding issue of

AMC for OPGW directly to its OEM or entering into agreement for AMC of OPG with PGCIL shall be taken

shortly and action shall be initiated accordingly.

9.9 TELEMETRY OF RAILWAY TSS SUB STATIONS: - The matter was not discussed as railways Officials were not available in the meeting.

9.10 INFORMATION REQUIRED FOR PMU ANALYTICS UNDER URTDSM PROJECT:- Under the

“Unified Real Time Dynamic State Measurement” URTDSM Project, the analytics applications has been

installed at SLDC MP for which the relay setting details are required for its configuration from all the sub-

stations where PMU’s are installed and its adjacent sub-stations (list of S/s enclosed as Annexure-9.10.1).

The format for submitting the required details is enclosed as Annexure-9.10.2.

The required data has been received from SGTPS, MPPGCL. MPPTCL is requested to furnish the

data at the earliest.

The matter was discussed in the meeting.

ITEM NO 12 : DATE AND VENUE OF NEXT OCC MEETING :

It is proposed to hold 65th Operation and Coordination Committee meeting of MP on 28-08-2018. The host and venue of the same shall be decided in the meeting.

***********

Minutes of 64th OCC of MP 29

Page 32: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Sr. No.

4

List of participants of 64th OCCM of M.P held at SLDC. MPPTCL, Nayagaon, Jabal pur on 09 th JULY 2018

Name of Participants Des1gnatron Office Telephone No. Sign ;;;

Email Adrress

_,,~ R~ K• 4tC SE:. ~~ C 74LjQv3}~L i{(' ~'~'-~\"Q./c;v.c.~,t ...

~5---l_:5:_- _._C}t:::!......:L-4.:!:::::'!::: ... ~~~·bl~l'!'~r..+~+----e c: ~ 1--~ '-- 9 Lt 2-'<''B03 >-t~ :1 <:~t-JeAAN\. ~ AG S,t.-1>-c_ 541-')16oS'y0 Jlt~ ~~0 -1f..;..J.L~ 6

7 S.\_"\:>c, ~~ ~'-\'"R~~c:Ar:T· ),~'-~~~~~·,~A1 .. Jh~~--o · tro

----8 S.C. G{v52 ~~,.\ -~ ~tf. Cf11..~\~0.5J>"V ~yO el,..,~Pl-J'b)'<2_ )'o..k.o · C:r>"'J

Minutes of 64th OCC of MP 30

low dicpach
Typewritten Text
low dicpach
Typewritten Text
ANNEXURE-1
low dicpach
Typewritten Text
Page 33: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Minutes of 64th OCC of MP 31

low dicpach
Typewritten Text
ANNEXURE-1
low dicpach
Typewritten Text
Page 34: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Minutes of 64th OCC of MP 32

low dicpach
Typewritten Text
ANNEXURE-1
Page 35: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Annexure-2.1

S. No. Particulars

1

1.1 Maximum Frequency 50.08 HzBetween 07.00 hrs & 08.00 Hrs on 09.04.18

50.1 HzBetween 04.00 hrs & 05.00 Hrs on 03.05.18

1.2 Minimum Frequency 49.81 HzBetween 14.00 hrs & 15.00 Hrs on 27.04.18

49.77 HzBetween 19.00 hrs & 20.00 Hrs on 26.05.18

1.3 Average Frequency 49.97 Hz 49.95 Hz

2

2.1 Maximum Frequency 50.2 HzAT 18.02.10 HRS ON 29.04.18

50.2 HzAT 04.03:10 HRS ON 03.05.18

2.2 Minimum Frequency 49.62 HzAT 10.44:50 HRS ON 23.04.18

49.57 HzAT 19.49:10. HRS ON 26.05.18

3 Percentage of time when frequency was :-

%age of time when frequency was Apr-18 May-18

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.00 0

3.6 Between 49.70 Hz and 49.9 Hz 12.80 22.52

3.7 Between 49.9 Hz and 50.05 Hz 79.57 70.06

3.8 Between 50.05 Hz AND 51.5 Hz 7.63 7.42

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

Apr-18 May-18

Minutes of 64th OCC of MP 33

Page 36: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

I

S.No. NAME OF THE TRANSMISSION LINE /

(FINANCED BY)

TYPE OF CIR CUITS

ROUTE LENGTH CIRCUIT

KMS.

MONTH OF COMPLETION

DATE OF COMMI-SSIONING

A. 400 KV TRANSMISSION LINES

B. 220 KV TRANSMISSION LINES

C. 132 KV TRANSMISSION LINES

1132Kv DCDS 2 phase 4wire line from 220Kv s/s Ashoknagar for PS to 132kV RTS Ashoknagar (2x4.726)

DCDS 4.726 9.452 April'2018 11.04.2018

2

132kV DCSS line from 132kV Balwada - water pumping station No.2 of NVDA at village Mukhtyara (1x2.421) (Contribution Supervision Work)

DCSS 2.421 2.421 May'2018 05.05.2018

II.

S. No.

NAME OF SUBSTATION / (DISTRICT) / (FINANCED BY)

VOLTAGE RATIO

(KV)

No.OF X-mer & Cap.(MVA)

EFFECTIVE

CAPACITY MVA

MONTH OF COMPL-ETION

DATE OF COMMI-

SSIONING

A. 400 KV SUBSTATIONS

1Bhopal (Sukhi Sewaniya) 400/220 kv s/s Addl. 315 MVA X-mer (ADB-III)

400/220 1x315 315 April'2018 17.04.2018

B. 220 KV SUBSTATIONS

a. 220 KV NEW SUBSTATIONS

b. 220KV ADDITIONAL TRANSFORMERS

1Betul 220 kv s/s Addl. 160 MVA X-mer (ADB-III)

1x160 160 April'2018 30.04.2018

C. 132 KV SUBSTATIONS

a. 132KV NEW SUBSTATIONS

1Udaipura 132kv s/s with 1x40 MVA (ADB-III)

132/33 1x40 40 April'201827.04.2018

(33kV)

ANNEXURE - 2.2.5.i

M.P POWER TRANSMISSION COMPANY LIMITED TRANSMISSION WORKS COMPLETED DURING 2018-19 (UP TO 31.05.2018)

EHV TRANSMISSION LINES

EHV SUB - STATIONS

Minutes of 64th OCC of MP 34

Page 37: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

S. No. NAME OF THE TRANSMISSION LINEFUNDING AGENCY

PROGRESS IN %

A. 400 KV TRANSMISSION LINES

1400kV DCDS (Quad moose) line from Shri Singaji TPS (stage-II) - Pithampur (2x69.968+ 2x68.626)

UBI 66%

2 400kV DCDS (Quad moose) line from Pithampur - Badnawar (2x70) UBI 58%

3LILO of 400kV Seoni - Bhilai SC line at 400kV S/s Balaghat/Kirnapur (2x3.375)

ADB-III 26%

4LILO of both ckt. Of 400kV Nagda to Rajgarh line at 400kV S/s Badnawar (4x8.163)

ADB-III 43%

5 400 kV DCDS line from Nagda 400 kV S/s to Mandsaur 400 kV S/s GEC 17%

6400 kV DCDS line for LILO of one ckt of Satna(PGCIL) - Bina(PGCIL) 400 kV at Sagar 400 kV S/s

GEC 14%

7 400 kV DCDS line from Ashta 400 kV S/s to Ujjain 400 kV S/s GEC 9%8 400 kV DCDS line from Indore (PGCIL) 765 kV S/s to Ujjain 400 kV S/s GEC 36%9 400 kV DCDS line from Nagda 400 kV S/s to Ujjain 400 kV S/s GEC 14%B. 220 KV TRANSMISSION LINES1 2nd Ckt of 220kv Satna - Chhatarpur line (152) JICA-I 50%

2LILO of both Ckt of Indore-II (jaitpura) - Ujjain 220kV line at Indore (PGCIL) 765 kV S/S (4x6.012)

UBI 36%

3LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) (2x32.782)

ADB-III 3%

4 220Kv DCDS line from Pithampur-Depalpur line (2X31) ADB-III 37%

5220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s Badnawar (2x1+4x8)

ADB-III 19%

6 220Kv DCDS Julwaniya- Kukshi (2X58) ADB-III 16%7 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) ADB-III 16%8 220kV DCDS Khandwa(400 PGCIL) - Chhanera line(2x39.322) ADB-III Saving 52%

9LILO of both ckt of Badod-Kota/Modak 220kV line at 220Kv S/s Suwasara (4x4.382)

ADB-III Saving 100%

10LILO of 2nd ckt Nagda - Neemuch 220kV line at 220Kv S/s Daloda (2x12.2)

ADB-III Saving 72%

11Part (b).LILO of 220kV Sarni - Pandhurna at 220kV S/s Betul (2x38.864) (Note: Betul220 & Betul400 I/C line 3.76 cktkm. charged on 21.07.2017)

ADB-III Saving 37%

12220Kv DCDS Morena(400KV S/s CWRTL Adani Group) - Sabalgarh DCDS line & lilo of Morena 400KV S/s (Adani) to Sabalgarh at Morena 220Kv s/s (2X92 + 2x0.5)

ADB-III Saving 83%

Part (a).Morena 400kV CWRTL Adani Group - Morena 220 (Jarerua) (2x24.685cktkm) charged on 31.03.2018)(b).220Kv DCDS line Morena(400KV S/s CWRTL Adani Group) - Sabalgarh220 (2x69.964)

13 220kV DCDS line from Julwaniya 400kV S/s in Sendhwa 220kV S/s GEC 40%14 220kV DCDS line from Badnawar 220kV S/s - Kanwan 220kV S/s GEC 14%15 220kV DCDS line from Kanwan 220kV S/s - Dhar 220kV S/s GEC 13%

16LILO of both ckt Nagda - Neemuch 220kV line at 400Kv S/s Mandsore(Sitamau) (2x22.427)

GEC 8%

17220kV DCDS line from Mandsaure(Sitamau) 400kV S/s - Maruti Shakti Pool 220kV S/s

GEC 10%

18 220kV DCDS line from Betul 220kV S/s - Gudgaon 220kV S/s GEC 47%19 220kV DCDS line from Neemuch 220kV S/s to Ratangarh 400kV S/s GEC 7%

20220kV interconnector between Sailana 400kV S/s & Ratlam switching 220kV S/s

GEC 47%

ANNEXURE-2.2.5.ii

EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 31.05.2018

Minutes of 64th OCC of MP 35

Page 38: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

21 2nd circuiting of Ratlam switching - Dalod 220kV DCSS line GEC 61%22 LILO of Ratlam - Daloda 220kV line at 220Kv S/s Jaora (2x3.51) GEC 15%

220Kv DCDS line from 220kV Pooling S/s RUMS at Goojarkhedi, Suwasara (For interconnection of Solar PV Plant of RUMS) (2X43.426)

60%

a) 220kV line from 220kV S/s RUMS at Gujarkhedi, Suwasara to tap point (2x8.813)

charged on 23.05.2017

b) Tap point to 400 kV S/s Sitamau (2x34.613) 51%

24220kV DCDS Barsitadesh (220kV Pooling S/s) - 400kV Grid S/s PGCIL line (2X0.917)

RUMS 100%

25220kV DCDS Ramnagar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line (2X2.572)

RUMS 100%

26220kV DCDS Badwar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line) (2X0.917)

RUMS 5%

132 KV TRANSMISSION LINES1 132kv Mugaliya Chaap - Sehore DCSS line (1x24) JICA 60%2 132 kv DCSS Dewas-Barotha line (1x23) JICA 90%3 132kv DCSS Gautampur -Depalpur line (1x19) JICA 56%4 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) JICA 40%

5132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s (1x53.209)

JICA 80%

6LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20)

JICA 54%

7 132 kv DCSS Guna-Eshagarh line (1x72) JICA 32%

8LILO of one circuit of 132 kv Neemuch220 - Ratangarh DCDS line at 132 KV S/s Morwan (2x1)

UBI 0%

9 132 kv Sirmour - Katra DCDS line (2x37.67) UBI 18%

10LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87)

Transco 40%

11 132 kv DCSS Dewas-Agrod line (1x20.76) ADB-III 76%12 132 kv DCSS Khurai- Khimlasa line (1x20.937) ADB-III 20%13 132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv Tower) ADB-III 96%14 132 kv DCSS Panagar - Patan line (1x22.749) ADB-III 7%15 132 kv DCSS Badnagar - Chhayan Line (1x31) ADB-III 43%16 132 kv DCSS Dhar - Teesgaon line (1x15.35) ADB-III 16%17 LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4) ADB-III 5%18 132 kv DCSS Udaipura - Silvani line (1x25.8) ADB-III 38%19 132 kv DCSS Narsinghpur - Devnagar (1x23) ADB-III 18%20 132 kv DCSS Karakbel - Belkheda (1x24.445) ADB-III 23%21 132 kv DCDS Narsinghpur - Karakbel line (2x23) ADB-III 25%

22 LILO of 2ND CIRCUIT OF 132KV Gwalior- Pichhore at 132Kv S/s Dabra (2X0.108) (ADB-III) (balance work) (Note: LILO at Chinour 27.364 cktkm charged on 04.08.2017)

ADB-III 97%

23LILO of one ckt.(Balaghat-Katangi ckt) Of 132 kV Balaghat - Seoni/Katangi line at 132 kV S/s Waraseoni (2x4.7)

ADB-III 35%

24LILO of both ckt. Of 132 kV Balaghat - Bhanegaon line at Balaghat/Kirnapur 400kV S/s.(2x0.774 + 4x1.216)

ADB-III 93%

25 132kV DCSS Sagar - Rehli line (1x40) ADB-III Saving 16%

26LILO of one ckt of 132kv Neemuch - Mandsore line at Budha 132KV Sub-station (2x22.077)

ADB-saving 83%

27LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Bhanpura 220KV S/s (4x14)

ADB-saving 47%

28LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Suwasara 220KV S/s (2x3)

ADB-saving 60%

29 132kv DCSS Mugaliyachhap - Bilkishganj line (1x17.274) ADB-saving 85%30 132kv DCDS Rajgarh - Khujner/Sindaota line (2x26.499+ 4x1.457) ADB-saving 55%31 132kv DCSS Betul-Bisnoor/Masod line (1x35.245) ADB-saving 44%32 LILO of one ckt of Vidisha - Gairatganj line at 132kV Raisen(2x18.221) ADB-saving 100%33 132kv DCDS line Guna-Bhonra (2x21.394) ADB-saving 36%

23 RUMS

Minutes of 64th OCC of MP 36

Page 39: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

34 132kv DCSS line Chhindwara-Saori line (1x31.60) ADB-saving 89%35 132kv DCSS Chichli-Palohabada line (1x25.606) ADB-saving 1%36 132kv DCSS Damoh-Patera line (1x38) ADB-saving 30%37 LILO of 132 kv Satna-Maihar line at Satna-II S/s (2x11.047) ADB-saving 2%

38132kv Birsinghpur -Shahdol DCSS line (1x45) (Revised Estt. Sanc.no.0187dtd.05.09.2016)

ADB-saving 79%

39 132kV MACT (Bhopal) - Mugaliachhap line (2x30.368) REC 95%40 132 KV Gourjhamar - Deori DCSS line (1x27.493) Transco 2%41 133 KV Datiya- Bhitarwar DCSS line (1x35.296) Transco 2%42 132kV DCDS line from Sendhwa 220 kV S/s - Pansemal 132kV line GEC 15%

43132kV interconnector between Kanwan 220 kV S/s & Kanwan 132kV S/s (2x13.115)

GEC 14%

44 132kV DCDS line from Kanwan 220 kV S/s - Teesgaon 132kV line GEC 49%45 2nd ckt of 132kV Rajgarh(Dhar)220 kV S/s - Jhabua 132kV line GEC 69%

46132kV interconnector between Gudgaon 220 kV S/s & Gudgaon 132kV S/s (LILO of 132kV Betul - Gudgaon at 220kV S/s Gudgaon) (2x9.825)

GEC 13%

47 2nd ckt of 132kV Maihar - Amarpatan 132kV line GEC 61%

48132kV DCDS interconnector between Sailana 400kV S/s & Sailana 132kV S/s (2x18.344)

GEC 24%

49 2nd ckt of 132kV Alot - Sitamau 132kV line GEC 45%50 132kV Julwaniya400 - Shahpura DCSS line (2nd ckt-28 + 1x46.866) JICA-II 44%

51132Kv DCSS line from GWSTPP to upcoming Make up Water Pump House river Narmada (Line-II)(1x24.152)

Contrib. 47%

52132Kv DCSS 2 phase 2wire line from 132Kv s/s Shahpura(JBP) for 5MVA PS to RTS Bhitoni (1x5.968)

Contrib. 54%

53 132Kv DCSS line from 400Kv s/s Katni - RTS Patwara (1x19.417) RTS 91%

54132Kv DCSS 2 phase 2wire line from 220Kv s/s Maihar for PS to TSS Bhadanpur(1x13.1)

Contrib. 86%

55132Kv DCSS 2 phase 2wire line from 220Kv s/s KOtar for PS to RTS kaima1x26.938)

Contrib. 58%

56 132kV DCSS Sirmore - RTS Dabhaura line (1x56.1) Contrib. 55%

57132Kv DCDS line from 132Kv s/s Morwa for Power supply of 21.6MVA in phase manner on 132kV for RTS Singroli (1x1.809)

Contrib. 72%

58 132 KV line from Seoni 220 KV S/s - Nainpur 132 KV S/s Contrib. 2%

59132 KV 2 phase 2 wire DCSS line for PS to 132/25 KV 5 MVA RTS at Linga from 220 KV S/s Chhindwara

Contrib. 3%

60132 KV 2 phase 2 wire DCSS line for PS to 132/25 KV 5 MVA RTS at Sausar from 132 KV S/s Boregaon

Contrib. 2%

612nd ckt of 132Kv 2ph 2 wire line from 220Kv s/s Bina - RTS Mungaoli RVNL

Contrib. 99%

62 132Kv 2ph 2 wire DCSS Neemuch - RTS Neemuch line Contrib. 4%63 132Kv 2ph 2 wire DCSS Jaora - RTS Jaora line Contrib. 5%

64132Kv DCSS line from 220kV s/s Rajgarh(Biora) - Birampura Pumping station Distt- Rajgarh of water Resources Department. (1x7.796)

(Supervision only)

100%

Minutes of 64th OCC of MP 37

Page 40: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

S.No.

NAME OF THE SUBSTATIONFUNDING AGENCY

PROGRESS IN %

A. 400 KV SUBSTATIONS

1400 KV sub-station Balaghat/Kirnapur with 2x100MVA 400/220 kv x-MER+ 1X40 MVA X-mer

ADB-III 79%

2 400 KV sub-station Badnawar with 2x315MVA 400/220 KV X-mer ADB-III 80%3 400 KV sub-station Sagar with 2x315MVA 400/220 KV X-mer GEC 8%

B. a 220 KV SUBSTATIONS1 Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA ADB-III 2%2 Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA ADB-III 9%3 Adampur 220/33kv S/s 2x50MVA ADB-III 8%4 Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA ADB-III 11%

5Upgradation of Chhanera 132Kv S/s to 220kv with 2x160MVA +1x50MVA 132KV X-mer

ADB-III Saving 53%

6 220/132kV S/s Suwasara (2x160MVA + 1x50) ADB-III Saving 60%7 220 kV Indore N/Z (Upgradation) with 2x160MVA UBI 26%8 220/132kV S/s Sailana (2x160MVA + 1x63) GEC 12%9 220/132kV S/s Jaora (Upgradation) (2x160MVA + 1x40) GEC 20%

10 220/132kV S/s Sendhwa (Upgradation) (1x160MVA + 1x63) GEC 11%11 220/132kV S/s Kanwan (Upgradation) (1x160MVA + 1x63) GEC 13%12 220/132kV S/s Gudgaon (1x160MVA + 1x63) GEC 5%13 33/220 Kv Pooling Sub-station at Barsitadesh 3x100MVA RUMS-I 75%14 33/220kV Pooling Sub-station at Ramnagar 3x100 RUMS-I 52%C. 132 KV SUBSTATIONS(a) NEW SUBSTATIONS1 Biston 132kv s/s1x40 MVA ADB-III 9%2 Teesgaon 132kv s/s 1x40MVA ADB-III 10%3 Waraseoni 132kv s/s1x40 MVA (Dist- Balaghat) ADB-III 43%4 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) ADB-III 35%5 Belkheda 132kv s/s 1x40 MVA (Dist- Jabalpur) ADB-III 17%6 Khimlasa 132kv s/s 1x40 MVA ADB-III 3%7 Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) ADB-III 17%8 Narsinghgarh 132kv s/s with 1x40 MVA ADB-III 7%9 Silvani 132kv s/s with 1x40 MVA ADB-III 12%

10 Bilkishganj 132kv s/s with 1x50 MVA ADB-III Saving 51%11 Khujner/Sindaota 132kv s/s with 1x50 MVA ADB-III Saving 48%12 Bisnoor/Masod 132kv s/s with 1x50 MVA ADB-III Saving 38%13 Rehli 132kv s/s with 1x50 MVA ADB-III Saving 28%14 Patera 132kv s/s with 1x50 MVA ADB-III Saving 58%15 Budha 132kV S/s with 1x50MVA ADB-III Saving 60%16 Saori 132kV S/s with 1x50MVA ADB-III Saving 10%17 Satna-II 132kV S/s with 2x50MVA ADB-III Saving 55%18 Shahpura 132kv s/s with 1x40 MVA (Barwani) JICA-II 49%19 Pipalpani 132kV S/s with 1x50 MVA UBI 13%

20 IT Park Badwai 132kv s/s with 1x63 MVA (Bhopal) contribution

work16%

Minutes of 64th OCC of MP 38

Page 41: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Annexure-2.3(i)

Apr-18 May-18 Apr-18 May-18

Commissinary HQ 23:56 23:57 23:39 23:30

District HQ 23:52 23:53 23:42 23:39

Tehsil HQ 23:48 23:48 23:35 23:29

Rural -Mixed 23:37 23:39 22:57 22:47

Rural -DLF 23:37 23:39 23:04 22:59

Rural -Irrigation 9:58 9:58 9:38 9:32

Apr-18 May-18 Apr-18 May-18

Commissinary HQ 23:43 23:47 23:47 23:44

District HQ 23:51 23:45 23:49 23:48

Tehsil HQ 23:43 23:40 23:42 23:40

Rural -3Phase 23:47 23:20 23:19 23:16

Rural -1Phase 23:32 23:29 23:25 23:23

Total Rural 9:45 9:42 9:47 9:44

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

West Zone MP

East Zone Central Zone

Minutes of 64th OCC of MP 39

Page 42: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220 KV Anuppur 33KV Jaithari feeder (Mojer bear)

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

33KV AKVN-I 21.06.2016 07.02.2017

33KV AKVN-II 21.06.2016 07.02.2017

132KV Rau 33KV Panther-I 14.03.2014 14.03.2014132KV Raukhedi 33KV Exep.Panther-III 09.07.2015 09.07.2015

132KV Chhegaon-Makhan33KV Khandwa Oil(Previously known as Chichgaon)

-- 18.11.2016

132KV Khandwa 33KV Amalpura 30.01.2011 19.08.201633KV Shri Durga Khandwari 03.04.2017 08.12.2017

33KV Bhargaon 16.11.2017 18.11.2017

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

33KV Mokdi 15.03.2017 18.10.201733KV Kanwas 15.03.2017 16.12.2017

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220 KV Ganjbasoda 33 KV Simcon Solar Power 18.11.2016 --

132KV Pansemal

132KV Khachrod

Annexure-2.3.(ii)

BHOPAL REGION

220KV

UJJAIN REGION

NIL

NIL

NIL

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR

REWA REGION

(For which group to be allocated)

220KV

JABALPUR REGION

INDORE REGION

132KV

SAGAR REGION

NIL

132KV

220KV

220KVNIL

132KVNIL

220KV

132KV

220KV

132KVNIL

400KV

400KV Julwaniya

Minutes of 64th OCC of MP 40

Page 43: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Annexure-2.3.(ii)

132 KV Bareli 33 KV Boras 19.02.2014 --132 KV Gopalpur 33 KV AE, PHE 27.02.2015 --132 KV Amrawad- Khurd 33 KV Katara Hills-II 01.06.2016 --

33 KV Obedullaganj 05.05.2016 02.02.201733 KV AKVN-1 05.05.2016 05.10.201633 KV AKVN-2 05.05.2016 05.10.201633 KV AKVN-1 29.12.2015 02.07.201633 KV AKVN-2 29.12.2015 24.02.201633 KV Aligarh Kotra 28.08.2017 20.12.201733 KV Madankhedi 27.06.2017 05.01.201833 KV Anantpura 15.06.2017 22.05.201833 KV Dewanganj 04.12.2017 04.12.201733 KV Aamkheda 04.12.2014 04.12.2017

132 KV Entkhedi, Bhopal 33 KV Entkhedi 10.01.2018 10.01.201833 KV Incoming 27.04.2018 04.06.201833 KV Thaladigawan 26.04.2018 04.06.201833 KV Boras 04.06.2018 06.06.2018

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220 KV Gwalior-II 33 KV DIG Nayagaon (CRPF) 13.11.2017 13.11.2017

132 KV Datia 33 KV Karapura 17.05.2014 --132 KV Ron 33 KV Mangarh 21.11.2013 --132KV Gohad 33kV Gohad 03.12.2015 11.07.2016132KV Vijaypur 33kV Dord 22.08.2011 29.07.2016

33kV Banbar 05.08.2017 06.08.201733kV Chinor 05.08.2017 06.08.201733kV Karhiya 05.08.2017 06.08.201733kV Gharsondi 05.08.2017 10.08.201733kV Dimani 18.07.2017 18.07.201733kV Khadiyahar 05.08.2017 05.08.201733kV Ajnodha 29.12.2017 29.12.201733kV Bairad 23.12.2017 24.12.201733kV Gazigarh 24.12.2017 15.02.201833kV Govardhan 24.12.2017 12.05.2018

132 KV

132KV Badagaon

132KV Chinor

132 KV Bagroda

132 KV Salamatpur

GWALIOR REGION

132 KV

220 KV

132 KV Lateri

132 KV Udaipura

132KV Bairad

132 KV Tamot

Minutes of 64th OCC of MP 41

Page 44: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Date Time Date Time

1 400315 MVA transformer 1 and 400 Kv BDTCL 1 Tie CB at 400KV S/s Bhopal

02-Jul-18 09:00 16-Jul-18 17:00 Continue1 No.400Kv CB and 6 No.CT replacement under PSDF scheme

2 400315 MVA X-mer-III at 400KV S/s Bina

03-Jul-18 08:00 03-Jul-18 17:00 Daily For NIFPS System Commissioning work

3 400315 MVA X-mer-III at 400KV S/s Bina

04-Jul-18 08:00 04-Jul-18 17:00 Daily For NIFPS System Commissioning work

4 400315 MVA transformer 1 at 400KV S/s Bhopal

13-Jul-18 09:00 13-Jul-18 17:00 Daily For maintenance & Testing work

5 400315 MVA transformer 3 and 400 Kv Itarsi 1 Tie CB at 400KV S/s Bhopal

18-Jul-18 09:00 31-Jul-18 17:00 Continue1 No. 400 Kv CB and 6 No.CT replacement under PSDF scheme

6 400400 KV Main Bus II at 400KV S/s Indore

23-Jul-18 09:00 25-Jul-18 18:00 ContinueFor replacement of 400KV Main bus -II PG Isolator of ICT I

7 400 400KV ICT I at 400KV S/s Indore 23-Jul-18 09:00 25-Jul-18 18:00 Continue 400 KV ICT-I on TBC

8 400315 MVA transformer 3 at 400KV S/s Bhopal

27-Jul-18 09:00 27-Jul-18 17:00 Daily For maintenance & Testing work

9 400315 MVA transformer 1 at 400KV S/s Bhopal

31-Aug-18 09:00 01-Sep-18 18:00 Continue 220Kv CT replacement under PSDF Scheme.

1 400400KV Nagda-Rajgarh-I Line Reactor

04-Jul-18 08:00 04-Jul-18 18:00 Daily For maintenance & Testing work

2 400400/220kv 125 MVAR BHEL REACTOR at 400KV S/s Katni

04-Jul-18 8:00 06-Jul-18 18.00 Continue Attending Oil leakage & Air cell attending work

3 40050 MVAr Line Reactor-I at 400KV S/s Bina

06-Jul-18 08:00 16-Jul-18 17:00 Continue For C.B. replacement work

4 400400KV Nagda-Rajgarh-II Line Reactor

06-Jul-18 08:00 06-Jul-18 18:00 Daily For maintenance & Testing work

5 40050MVAr BUS Reactor at 400KV S/s Bina

20-Jul-18 08:00 28-Jul-18 17:00 Continue For C.B. replacement work

A- 400 KV TRANSFORMERS

B- 400 KV REACTORS

Annexure-3.2

Planned shutdown of transmisison element for the duration 01-07-18 TO 31-08-18

Sr. No

KVLine / Transformer / Reactor

/ Bay

From To Basis(Daily/

Continue)Reason

Minutes of 64th OCC of MP 42

Page 45: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

6 400400KV 50MVAr Bus Reactor at 400KV S/s Nagda

06-Aug-18 08:00 06-Aug-18 18:00 Daily For disc insulator replacement work by EHT

7 400400KV 125MVAR Bus Reactor at 400KV S/s Nagda

7-Aug-18 08:00 7-Aug-18 18:00 Daily For disc insulator replacement work by EHT

1 400400KV Main Bus II at 400KV S/s Katni

02-Jul-18 08:00 03-Jul-18 18:00 Continue For maintenance work

2 400400 KV Main Bus I at 400KV S/s Indore

02-Jul-18 09:00 04-Jul-18 18:00 Continuefor replacement of 400KV Main bus -I PG Isolator of Buscoupler

3 400400 KV Main Bus I at 400KV S/s Indore

05-Jul-18 09:00 07-Jul-18 18:00 Continuefor replacement of 400 KV PG Isolator of Nagda & main bus-I

4 400 400KV Indore-Nagda 05-Jul-18 09:00 07-Jul-18 18:00 Continue 400 KV Nagda on TBC

5 400400KV Main Bus I at 400KV S/s Indore

09-Jul-18 09:00 11-Jul-18 18:00 Continuefor replacement of 400 KV ISP-I PG Isolator of main bus-I

6 400 400KV Indore-ISP I 09-Jul-18 09:00 11-Jul-18 18:00 Continue for 400 KV ISP-I on TBC

7 400 400KV Bhopal-BDTCL-I 16-Jul-18 09:00 16-Jul-18 18:00 Daily For maintenance work

8 400400KV Main Bus I at 400KV S/s Indore

19-Jul-18 09:00 21-Jul-18 18:00 Continuefor replacement of 400KV ISP-I PG Isolator of main bus-I

9 400 400KV Indore-ISP-II 19-Jul-18 09:00 21-Jul-18 18:00 Continue for 400 KV ISP-I on TBC

10 400 400KV Bhopal-Itarsi-I 31-Jul-18 09:00 31-Jul-18 18:00 Daily For maintenance work

11 400400KV BDTCL 1 Main CB at 400KV S/s Bhopal

01-Aug-18 09:00 13-Aug-18 18:00 ContinueReplacement of 400 Kv CB and 3 400 Kv CT under PSDF Scheme. Line will remain charged through Tie CB

12 400400KV Bhopal-I (TIE C.B.) at 400KV S/s Bina

01-Aug-18 08:00 10-Aug-18 17:00 ContinueS/d for TIE CB replacement work (No Interruption occurred during S/d)

13 400400KV Main Bus I at 400KV S/s Indore

01-Aug-18 09:00 02-Aug-18 18:00 Continuefor 2 Nos.CVT Replacement & 400 KV Asoj II will be on TBC

14 400400KV Main bus-I at 400KV S/s Nagda

02-Aug-18 08:00 04-Aug-18 18:00 Continue For disc insulator replacement work

C- 400 KV FEEDER & BAYS OF 400 KV- S/S-

Minutes of 64th OCC of MP 43

Page 46: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

15 400400KV Main Bus II at 400KV S/s Indore

03-Aug-18 09:00 04-Aug-18 18:00 Continue for CVT Replacement & 400 KV Asoj II will be on TBC

16 400400KV Main bus-II at 400KV S/s Nagda

06-Aug-18 08:00 08-Aug-18 18:00 Continue For disc insulator replacement work

17 400 400KV Nagda-Rajgarh-I feeder 06-Aug-18 08:00 07-Aug-18 18:00 Continue For disc insulator replacement work

18 400 400KV Indore-ISP II 06-Aug-18 09:00 07-Aug-18 18:00 Continue for 3 Nos.CVT Replacement

19 400 400KV Nagda-Rajgarh-II feeder 08-Aug-18 08:00 08-Aug-18 18:00 Daily For disc insulator replacement work

20 400400KV Main Bus I at 400KV S/s Indore

08-Aug-18 09:00 10-Aug-18 18:00 Continuefor ICT-I PG Isolator replacement & ICT-I will be on TBC

21 400 400KV Bhopal-BDTCL-I 13-Aug-18 09:00 13-Aug-18 18:00 DailyTesting work after replacement of CB.Line will be under shutdown

22 400400KV Main Bus I at 400KV S/s Indore

16-Aug-18 09:00 18-Aug-18 18:00 Continuefor 400KV Nagda P.G Isolator Replacement & 400 KV Nagda will be on TBC

23 400400KV Itarsi 1 Main CB at 400KV S/s Bhopal

17-Aug-18 09:00 30-Aug-18 18:00 ContinueReplacement of 400 Kv CB and 3no 400 Kv CT under PSDF Scheme. Line will remain charged through Tie CB

24 400400KV Bhopal-I (MAIN C.B.) at 400KV S/s Bina

17-Aug-18 08:00 27-Aug-18 17:00 Continue For MAIN CB replacement work

25 400 400KV Bhopal-Itarsi-I 30-Aug-18 09:00 30-Aug-18 18:00 DailyTesting work after replacement of CB. Line will be under shutdown

Minutes of 64th OCC of MP 44

Page 47: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

1 220 220KV Chhindwara -PGCIL-I 08-Aug-16 11:00 08-Aug-16 16:00 Daily DPR relay testing and Maintenance of Equipment

2 220 220KV Sagar-Damoh(PGCIL)-I 02-Jul-18 09:00 02-Jul-18 17:00 Continue For maintenance work

3 220 220KV Sagar-Damoh(PGCIL)-II 03-Jul-18 09:00 03-Jul-18 17:00 Continue For maintenance work

4 220 220KV Mehgaon-Adani feeder 04-Jul-18 09:00 04-Jul-18 17:00 Daily For maintenance work

5 220 220KV Pandhurna- Kalmeahwar 04-Jul-18 09:00 04-Jul-18 16:00 Daily DPR relay testing and Maintenance of Equipment

6 220 220KV Mehgaon-Auraiya 05-Jul-18 09:00 05-Jul-18 17:00 Daily For maintenance work

7 220 220KV Sagar-Bina-I 06-Jul-18 09:00 06-Jul-18 17:00 Continue For maintenance work

8 220 220KV Sagar-Bina-II 07-Jul-18 09:00 07-Jul-18 17:00 Continue For maintenance work

9 220220KV Main bus-I at 200KV S/s Shivpuri

09-Jul-18 09:00 09-Jul-18 17:00 Daily For maintenance work

10 220 220KV Damoh-Katni 09-Jul-18 09:00 09-Jul-18 17:00 Continue For maintenance work

11 220 220KV Chhindwara -PGCIL-I 10-Jul-18 09:00 10-Jul-18 16:00 Daily For maintenance work

12 220 220KV Mahalgaon - PGCIL-I 11-Jul-18 09:00 11-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

13 220220KV Main bus-II at 200KV S/s Shivpuri

11-Jul-18 09:00 11-Jul-18 17:00 Daily For maintenance work

14 220 220KV Mahalgaon - PGCIL-II 12-Jul-18 09:00 12-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

15 220 220KV MPPTCL Damoh Traction-I 12-Jul-18 09:00 12-Jul-18 17:00 Continue For maintenance work

16 220 220KV Chhindwara -PGCIL-II 12-Jul-18 09:00 12-Jul-18 16:00 Daily For maintenance work

17 220 220KV Malanpur - Auraiya 13-Jul-18 09:00 13-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

18 220 220KV Malanpur - Auraiya 16-Jul-18 09:00 16-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

D- 220 KV FEEDER & BAYS-

Minutes of 64th OCC of MP 45

Page 48: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

19 220 220KV ICT-I (220KV SUKHA) 16-Jul-18 08:00 17-Jul-18 20:00 Continue For C.T, C.B & Isolator Maintnance work.

20 220 220KV Datia- Bina 17-Jul-18 09:00 17-Jul-18 17:00 Daily For maintenance work

21 220 220KV Mahalgaon - Bina 18-Jul-18 09:00 18-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

22 220 220KV Datia- Gwalior 18-Jul-18 09:00 18-Jul-18 17:00 Daily For maintenance work

23 220 220KV Mahalgaon - Bina 19-Jul-18 09:00 19-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

24 220 220KV ICT-II (220KV SUKHA) 19-Jul-18 08:00 20-Jul-18 20:00 Continue For C.T, C.B & Isolator Maintnance work.

25 220 220KV Malanpur - Adani 20-Jul-18 09:00 20-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

26 220 220KV Malanpur - Adani 23-Jul-18 09:00 23-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

27 220 220KV Malanpur - Adani 24-Jul-18 09:00 24-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

28 220 220KV Malanpur - Adani 27-Jul-18 09:00 27-Jul-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

29 220 220KV Mehgaon-Adani feeder 03-Aug-18 09:00 03-Aug-18 17:00 Daily For maintenance work

30 220 220KV Mehgaon-Auraiya 04-Aug-18 09:00 04-Aug-18 17:00 Daily For maintenance work

31 220160MVA X-mer-I At 220KV s/s Mehgaon

07-Aug-18 09:00 07-Aug-18 17:00 Daily For maintenance work

32 220 220KV Seoni -PGCIL-I 07-Aug-18 09:00 07-Aug-18 17:00 Daily For C.T, C.B & Isolator Maintnance work.

33 220 220 KV Mahalgaon- PGCIL Ckt I 08-Aug-18 09:00 08-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

34 220160MVA X-mer-II At 220KV s/s Mehgaon

08-Aug-18 09:00 08-Aug-18 17:00 Daily For maintenance work

35 220 220 KV Mahalgaon- PGCIL Ckt I 09-Aug-18 09:00 09-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

36 220 220KV Seoni -PGCIL-II 09-Aug-18 09:00 09-Aug-18 17:00 Daily For C.T, C.B & Isolator Maintnance work.

Minutes of 64th OCC of MP 46

Page 49: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

37 220 220KV Chhindwara -PGCIL-II 10-Aug-18 11:00 10-Aug-18 16:00 Daily DPR relay testing and Maintenance of Equipment

38 220 220 KV Mahalgaon- PGCIL Ckt II 16-Aug-18 09:00 16-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

39 220 220KV Datia- Bina 16-Aug-18 09:00 16-Aug-18 17:00 Daily For maintenance work

40 220 220 KV Mahalgaon- PGCIL-II 17-Aug-18 09:00 17-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

41 220 220KV Datia- Gwalior 18-Aug-18 09:00 18-Aug-18 17:00 Daily For maintenance work

42 220 220KV ICT-I (220KV SUKHA) 20-Aug-18 08:00 21-Aug-18 20:00 Continue For C.T, C.B & Isolator Maintnance work.

43 220220KV Main Bus I at 400KV S/s Indore

20-Aug-18 09:00 21-Aug-18 18:00 Continue For replacement of TBC Isolator of Bus I

44 220 220KV Indore-Barwaha- II 20-Aug-18 09:00 21-Aug-18 18:00 Continue For replacement of Bus-I Isolator

45 220220KV Tie bus at 220KV S/s Shivpuri

21-Aug-18 10:00 21-Aug-18 17:00 Daily For maintenance work

46 220 220KV Mahalgaon- Bina 23-Aug-18 09:00 23-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

47 220220KV Bus coupler at 220KV S/s Shivpuri

23-Aug-18 10:00 23-Aug-18 17:00 Daily For maintenance work

48 220 220KV ICT-II (220KV SUKHA) 23-Aug-18 08:00 24-Aug-18 20:00 Continue For C.T, C.B & Isolator Maintnance work.

49 220220KV Main Bus I at 400KV S/s Indore

23-Aug-18 09:00 24-Aug-18 18:00 Continue220 KV dewas on TBC & Bus Isolator of dewas to be replace

50 220 220KV Mahalgaon- Bina 24-Aug-18 09:00 24-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

51 220160MVA X-mer-I at 220KV s/s Datia

27-Aug-18 09:00 27-Aug-18 17:00 Daily For maintenance work

52 220160MVA X-mer-II at 220KV s/s Datia

28-Aug-18 09:00 28-Aug-18 17:00 Daily For maintenance work

53 220 220KV Mahalgaon-Datia 29-Aug-18 09:00 29-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

54 220 220KV Mahalgaon-Datia 30-Aug-18 09:00 30-Aug-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

Minutes of 64th OCC of MP 47

Page 50: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

A. ThermalStn. Name UNIT No. Capacity

MW Apr-18 May-185 210 136.01 158.12

PH III 210 136.01 158.12TOT 210 136.01 158.12

6 200 119.11 42.217 210 98.51 41.67

PH II 410 217.62 83.888 210 99.97 96.869 210 0.00 77.78

PH III 420 99.97 174.6410 250 160.68 153.2111 250 144.73 168.65

PH IV 500 305.41 321.86TOT 1330 623.00 580.38

1 210 103.33 132.282 210 127.06 86.20

PH I 420 230.39 218.473 210 112.72 122.534 210 127.33 124.49

PH II 420 240.05 247.015 500 322.82 92.52

PH III 500 322.82 92.52TOT 1340 793.25 558.01

1 600 332.61 170.762 600 207.39 258.06

PH1 1200 540.00 428.82

4080 2092.26 1725.33

B. HydelCapacity

MW Apr-18 May-18115.0 0.88 0.00172.0 0.06 0.2799.0 0.82 1.04

386.0 1.76 1.31193.0 0.88 0.65160.0 6.21 10.35107.0 4.14 6.9090.0 11.03 26.41

315.0 21.99 25.3020.0 0.00 0.0060.0 0.00 0.0030.0 2.82 3.3945.0 0.00 0.0022.5 0.00 0.0020.0 2.46 2.7060.0 0.70 0.00

1186.0 46.96 69.47915.0 46.08 68.16917.5 44.01 65.36

CapacityMW Apr-18 May-18

Indira Sagar Hydel Project 1000 28.84 70.51Omkareshwar Hydel Project 520 12.50 32.62

Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.

TOTAL HYDELMPPGCL HydelMPSEB HYDEL Share

M.P.CHAMBALPENCHM.P.PENCHBARGI

C. NHDC (Ex-Bus)Station Name

B.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHATM.P.RAJGHATB.SGR(JINHA)MADIKHEDA

TONSBIRSINGHPUR

Station NameGANDHISAGARR.P.SAGARJ.SAGARCHAMBAL

Unitwise / Stationwise Genration in MUAnn 4.1

AM

AR

KA

NSA

TPU

RA

SAN

JAY

GA

ND

HI

MPPGCL THERMAL

SSTP

S

Minutes of 64th OCC of MP 48

Page 51: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

S No. Source Apr-18 May-18 TotalA.

1 Thermal 1923.24 1570.02 3493.272 Hydel 43.21 64.48 107.693 Total 1966.45 1634.50 3600.96

B.1 Indira Sagar 26.16 66.30 92.472 Omkareshwar 12.50 32.62 45.123 MPPMCL Schedule from Central Sector of WR 1795.68 1868.24 3663.924 MPPMCL Schedule from Central Sector ER 33.98 30.77 64.755 Total MPPMCL Schedule from Central Sector (WR+ER) 1829.66 1899.01 3728.686 Deviation Energy of (WR+ER) -25.45 -10.48 -35.927 Schedule From DVC ER 0.00 0.00 0.008 Schedule From Sugen 0.54 5.08 5.639 LANCO Amk 162.03 186.79 348.83

10 SASAN 990.18 994.72 1984.9111 ESSAR 0.00 0.00 0.0012 J P Nigri 294.92 335.85 630.7613 MB Power 192.75 208.08 400.8314 JHABUA Power 31.73 31.77 63.5015 Other Open Access Schedule other than MPPMCL Incl. Seci -80.41 -37.99 -118.3916 Himachal Pradesh HYDAL 0.00 0.00 0.0017 BARH 0.00 0.00 0.0018 Schedule from Sardar Sarovar -0.70 -0.76 -1.4619 SCH to Railway from RGPPL_ebid 160.44 165.31 325.7620 Schedule from SEZ 0.00 0.00 0.0021 Schedule from Rihand+Matatila 2.02 5.15 7.17

22 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012

0.00 0.00 0.00

23 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA 0.00 0.00 0.00

24 Additional Power Purchase 4.87 3.27 8.1425 Energy Exchange 0.00 0.00 0.0026 Banking of Energy -441.88 -369.30 -811.1827 Sale of Power -557.64 -167.20 -724.8428 Total MP Schedule (Including Railway) 2588.52 3259.80 5848.3229 Total MP Drawal (Including Railway) 2563.07 3249.32 5812.3930 Wheeled Energy of Tawa HEG 0.00 0.00 0.0031 Wheeled Energy of Wind Farm 15.18 19.45 34.6332 Wheeled Energy of Solar Plant 68.57 61.61 130.1833 Wheeled Energy of Bio-Mass 0.00 0.00 0.0034 Wheeled Energy of Ascent Hydro 1.46 1.41 2.8735 Export to MSEB (Nepa-Dharni) -6.08 -5.89 -11.9636 Deviation Energy of MPPGCL Thermal -0.05 -3.52 -3.5737 Energy Purchased by MP from Wind Farm 437.86 584.49 1022.3538 Energy Purchased by MP from Solar Plant 151.93 162.97 314.90

39 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP

60.47 38.27 98.75

40Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW

24.49 7.73 32.22

41 Deviation Energy of ISP 2.68 4.21 6.8842 Schedule Energy of BLA Power against LTOA 0.00 2.16 2.1643 Schedule Energy of JP BINA Power against LTOA 165.38 155.48 320.8644 Import from bargi Left Bank Canal Power House + ISP NVDA 0.01 0.01 0.0145 Chambal Complex Excess / less Overshare by MP -1.15 -1.72 -2.8746 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.02 -0.07 -0.0947 State Supply (Ex-Power st. Bus) 5488.91 6009.35 11498.2748 AVERAGE DAILY (Ex-Bus) 182.96 193.85 188.5049 MINIMUM DAILY (MP Periphery) 163.56 163.85 163.5650 MAXIMUM DAILY (MP Periphery) 185.36 197.05 197.0551 State Supply (Ex-Power st. Bus):- YEAR : 2017-18 5494.33 5544.84 11039.1752 Year ((18-19)-(17-18))*100/Year (17-18) -0.10 8.38 4.1653 Unshedule L/S : Year-2018-19 0.00 0.00 0.0054 Frequency Correction 5.16 8.76 13.9255 Restricted Requirement : Year-2018-19 5494.07 6018.11 11512.1856 Shedule L/S : Year-2018-19 0.00 0.00 0.0057 Un-Restricted Requirement : Year-2018-19 5494.07 6018.11 11512.18

ENERGY BALANCE SHEETYear : 2018 - 19

All figures in Million Unit

M.P. Availability

Exchange with other States / Systems

Minutes of 64th OCC of MP 49

Page 52: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

S.NO. Apr-18 May-18 Yr 18-19

C.1 DEMAND MET 8511 8641 86412 LOAD RELIEF 0 0 03 LOAD SHEDDING 0 0 0D.1 DEMAND MET 7908 8306 83062 LOAD RELIEF 0 0 03 LOAD SHEDDING 0 0 0F. REGISTERED MAXIMUM 8621 8916 8916G. COMPUTED MAXIMUM DEMAND 8624 8916 8916H. UNRESTRICTED MAXIMUM DEMAND 8624 8916 8916I.1. Div. Head Quarters 23:47 23:44 23:452. District Head Quarters 23:49 23:48 23:483. Tahsil Head Quarters 23:42 23:40 23:414. Rural -Mixed 23:19 23:16 23:185. Rural -DLF 23:25 23:23 23:246. Rural -Irrigation 9:47 9:44 9:46J LOAD FACTOR % 88.43 90.59 89.51

S.N PARTICULARS Apr-18 May-18 Yr 18-19

A. INTGRATED FREQUENCY1 MAXIMUM 50.08 50.10 50.102 MINIMUM 49.81 49.77 49.77

B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.20 50.20 50.202 MINIMUM 49.62 49.57 49.57

C. AVG FREQUENCY 49.97 49.95 49.96D. % TIME WHEN FREQUENCY WAS

1 ABOVE 51.5 Hz 0.00 0.00 0.002 50.05 TO 51.5 Hz 7.63 7.42 7.523 49.9 TO 50.05 Hz 79.57 70.06 74.744 49.7 TO 49.9 Hz 12.80 22.52 17.745 49.5 TO 49.7 Hz 0.00 0.00 0.006 49.2 TO 49.5 Hz 0.00 0.00 0.007 48.8 TO 49.2 Hz 0.00 0.00 0.008 48.5 TO 48.8 Hz 0.00 0.00 0.009 BELOW 48.5 Hz 0.00 0.00 0.00

ENERGY BALANCE SHEET : Demand & Sypply HoursYear : 2018 - 19

MORNING PEAK (MAX)

EVENING PEAK (MAX)

Average Power Supply per day to

FREQUENCY ANALYSIS YEAR 2018-19

Minutes of 64th OCC of MP 50

Page 53: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs

Injection

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur

Total MTO

Aat

MP

STOA

Rihand+Matatila-Rajghat

Total SCHUN

SCH TOTAL

1:00 49.96 2909 2687 40 19 8 297 877 3928 2566 0 0 219 1310 3 397 249 43 0 206 0 -651 -401 0 0 -6 3 3938 7865 3893 -44 -7 7814 0 0 0 7824 7824

2:00 49.97 2880 2660 24 15 2 295 866 3862 2455 0 0 217 1313 2 397 233 40 0 207 0 -651 -502 0 0 -24 3 3691 7554 3566 -126 -7 7421 0 0 0 7428 7428

3:00 49.98 2878 2658 15 7 0 299 831 3811 2534 0 0 219 1322 2 396 244 43 0 206 0 -609 -656 0 0 -131 3 3574 7385 3534 -39 -7 7339 0 0 0 7345 7345

4:00 49.99 2875 2655 10 4 2 299 799 3769 2498 0 0 214 1324 1 394 244 48 0 207 0 -605 -629 0 0 -131 3 3569 7338 3501 -68 -7 7263 0 0 0 7266 7266

5:00 49.94 2888 2668 12 22 15 301 782 3799 2553 0 0 214 1331 2 395 263 48 0 207 0 -605 -774 0 0 -131 3 3504 7304 3463 -42 -7 7255 0 0 0 7267 7267

6:00 49.97 2916 2694 36 48 21 299 754 3853 2481 0 0 217 1331 2 386 264 34 0 208 0 -605 -673 0 0 -53 3 3594 7447 3536 -59 -8 7380 0 0 0 7387 7387

7:00 50.03 2926 2703 58 59 30 299 785 3934 2635 0 0 222 1358 2 385 261 43 0 208 0 -605 -315 0 0 -11 3 4186 8120 4146 -41 -9 8071 0 0 0 8071 8071

8:00 50.03 2902 2680 91 70 33 297 833 4004 2563 0 0 217 1327 1 385 266 49 0 209 0 -605 -279 10 0 -41 3 4104 8107 4040 -63 -9 8035 0 0 0 8036 8036

9:00 49.99 2896 2674 113 66 29 296 994 4172 2518 0 0 218 1329 1 385 262 37 0 209 0 -605 -318 0 0 -77 3 3961 8133 3797 -164 -9 7960 0 0 0 7965 7965

10:00 49.99 2868 2649 94 48 27 296 1192 4305 2532 0 0 217 1335 1 385 281 35 0 209 0 -605 -613 0 0 -109 3 3669 7975 3431 -238 -8 7728 0 0 0 7733 7733

11:00 49.96 2852 2634 93 44 25 299 1252 4348 2421 0 0 213 1320 1 382 233 22 0 202 0 -605 -841 0 0 -162 3 3189 7536 3152 -36 -8 7492 0 0 0 7502 7502

12:00 49.98 2844 2626 87 44 19 302 1258 4336 2382 0 0 213 1321 1 382 228 18 0 205 0 -605 -1209 0 0 -192 3 2746 7082 2611 -135 -7 6940 0 0 0 6946 6946

13:00 49.99 2894 2673 57 22 10 305 1228 4296 2496 0 0 213 1323 1 384 259 29 0 200 0 -595 -1318 0 0 -190 3 2804 7100 2842 38 -7 7130 0 0 0 7135 7135

14:00 49.96 2905 2683 46 34 19 308 1166 4255 2486 0 0 212 1324 0 390 248 28 0 200 0 -595 -1239 0 0 -180 3 2876 7130 2831 -45 -7 7079 0 0 0 7089 7089

15:00 49.93 2932 2708 58 41 19 312 1083 4222 2607 0 0 220 1350 3 390 268 47 0 204 0 -623 -1411 7 0 -163 3 2902 7124 2886 -17 -7 7101 0 0 0 7116 7116

16:00 49.95 2966 2740 53 29 17 326 926 4091 2594 0 0 217 1348 4 395 275 56 0 207 0 -623 -1365 7 0 -148 3 2968 7059 2998 30 -8 7082 0 0 0 7092 7092

17:00 49.97 2950 2726 60 29 17 324 755 3912 2656 0 0 217 1330 5 398 284 59 0 208 0 -623 -1375 7 0 -113 3 3054 6965 3042 -12 -9 6945 0 0 0 6953 6953

18:00 50.02 2906 2684 84 52 27 318 595 3759 2468 0 0 213 1313 3 402 271 55 0 209 0 -623 -1364 7 0 -114 3 2844 6603 2764 -80 -9 6514 0 0 0 6515 6515

19:00 49.97 2929 2705 94 41 19 355 589 3804 2536 0 2 212 1310 1 407 258 55 0 210 0 -592 -1115 9 0 -96 3 3199 7003 3222 23 -9 7017 0 0 0 7024 7024

20:00 49.99 2890 2670 107 55 23 360 691 3906 2431 0 2 210 1323 1 408 264 48 0 208 0 -606 -559 15 0 -132 3 3615 7521 3539 -76 -9 7436 0 0 0 7441 7441

21:00 49.97 2841 2623 62 22 10 349 801 3867 2423 0 5 213 1306 1 407 239 32 0 207 0 -606 -575 16 0 -132 3 3539 7406 3411 -129 -8 7269 0 0 0 7277 7277

22:00 49.97 2856 2637 42 41 23 342 889 3974 2382 0 2 213 1310 1 407 210 33 0 202 0 -601 -611 16 0 -132 3 3436 7411 3363 -74 -9 7328 0 0 0 7335 7335

23:00 49.94 2905 2683 88 66 31 336 913 4118 2623 0 2 220 1310 4 408 262 57 0 200 0 -619 -323 21 0 -132 3 4037 8154 4004 -32 -9 8114 0 0 0 8130 8130

24:00 49.97 2908 2686 59 67 29 308 892 4041 2517 0 2 220 1309 3 407 259 53 0 200 0 -642 -328 0 0 -37 3 3966 8007 3923 -43 -8 7956 0 0 0 7964 7964

Avg. 49.98 2896 2675 62 39 19 313 906 4015 2515 0 1 216 1324 2 395 255 42 0 206 0 -613 -783 5 0 -110 3 3457 7472 3396 -61 -8 7403 0 0 0 7410 7410

00 TO 06 HRS.

49.97 2891 2670 23 19 8 299 818 3837 2515 0 0 217 1322 2 394 250 43 0 207 0 -621 -606 0 0 -79 3 3645 7482 3582 -63 -7 7412 0 0 0 7420 7420

06 TO 12 HRS.

49.99 2881 2661 89 55 27 298 1053 4183 2508 0 0 217 1332 1 384 255 34 0 207 0 -605 -596 2 0 -99 3 3642 7826 3529 -113 -8 7704 0 0 0 7709 7709

12 TO 18 HRS.

49.97 2926 2703 60 35 18 315 959 4089 2551 0 0 215 1331 3 393 267 46 0 205 0 -614 -1346 4 0 -151 3 2908 6997 2894 -14 -8 6975 0 0 0 6983 6983

06TO 18 HRS.

49.98 2903 2682 74 45 23 307 1006 4136 2530 0 0 216 1332 2 388 261 40 0 206 0 -610 -971 3 0 -125 3 3275 7411 3212 -64 -8 7340 0 0 0 7346 7346

18 TO 24 HRS.

49.97 2888 2667 75 49 23 342 796 3952 2485 0 3 215 1311 2 407 249 46 0 205 0 -611 -585 13 0 -110 3 3632 7584 3577 -55 -9 7520 0 0 0 7528 7528

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- April 2018

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl Deviation

Intra State STO

A

DEMAND MET

Load Shedding

Minutes of 64th OCC of MP 51

Page 54: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs

Injection

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur

Total MTO

Aat

MP

STOA

Rihand+Matatila-Rajghat

Total SCHUN

SCH TOTAL

1:00 49.96 2333 2147 82 84 36 252 1162 3762 2521 0 12 248 1271 7 442 290 41 0 193 0 -542 -103 0 0 27 7 4413 8176 4439 26 0 8184 0 0 0 8196 8196

2:00 49.98 2326 2141 38 38 10 250 1170 3647 2441 0 5 248 1271 5 440 276 33 0 192 0 -542 -105 0 0 26 7 4295 7942 4164 -132 0 7793 0 0 0 7801 7801

3:00 49.97 2321 2137 22 14 2 251 1121 3547 2395 0 2 248 1277 4 440 272 27 0 191 0 -493 -106 0 0 1 7 4264 7811 4256 -9 0 7787 0 0 0 7796 7796

4:00 50.00 2309 2126 22 14 0 254 1098 3514 2416 0 0 246 1276 4 435 253 35 0 190 0 -493 -132 0 0 -14 7 4222 7736 4209 -13 0 7707 0 0 0 7712 7712

5:00 49.96 2316 2132 25 46 22 256 1022 3504 2414 0 0 251 1282 4 435 252 37 0 193 0 -484 -155 0 0 -14 7 4223 7726 4247 25 0 7735 0 0 0 7746 7746

6:00 49.98 2326 2141 67 95 38 259 938 3537 2420 0 5 239 1282 5 434 235 36 0 191 0 -484 -126 0 0 4 7 4248 7785 4155 -93 0 7676 0 0 0 7683 7683

7:00 50.02 2332 2146 91 105 52 259 924 3576 2538 0 14 242 1275 5 431 284 49 0 192 0 -486 -99 0 0 -8 7 4445 8020 4516 72 0 8076 0 0 0 8077 8077

8:00 50.02 2338 2151 110 140 70 258 958 3688 2505 0 5 242 1284 4 431 302 42 0 192 0 -486 -81 0 0 -29 7 4417 8105 4327 -90 0 7997 0 0 0 7998 7998

9:00 49.98 2335 2149 79 81 42 257 1111 3720 2501 0 2 242 1288 3 431 280 42 0 192 0 -485 -74 0 0 -71 7 4359 8079 4201 -158 0 7905 0 0 0 7911 7911

10:00 49.97 2319 2134 85 53 38 257 1255 3822 2467 0 0 242 1291 2 431 263 50 0 192 0 -489 -210 0 0 -96 7 4152 7974 3977 -175 0 7782 0 0 0 7789 7789

11:00 49.94 2301 2118 88 74 40 256 1296 3872 2420 0 0 239 1294 1 429 226 45 0 192 0 -489 -344 0 0 -123 7 3898 7769 3895 -2 0 7749 0 0 0 7763 7763

12:00 49.95 2297 2115 91 92 42 255 1307 3900 2356 0 0 241 1298 1 428 207 36 0 192 0 -495 -496 0 0 -127 7 3648 7548 3551 -97 0 7434 0 0 0 7446 7446

13:00 49.93 2308 2125 81 92 42 259 1292 3891 2444 0 9 239 1297 2 427 242 40 0 191 0 -495 -369 0 0 -126 7 3910 7800 3977 67 0 7851 0 0 0 7868 7868

14:00 49.92 2297 2114 92 112 53 263 1241 3876 2461 0 12 235 1295 3 421 277 43 0 190 0 -495 -339 0 0 -117 7 3992 7868 4020 28 0 7880 0 0 0 7899 7899

15:00 49.89 2314 2130 114 158 76 264 1144 3886 2497 0 12 236 1303 7 423 291 50 0 191 0 -545 -366 0 0 -106 7 3999 7886 4114 114 0 7984 0 0 0 8010 8010

16:00 49.92 2321 2136 128 168 84 266 998 3780 2544 0 12 233 1302 7 423 292 51 0 192 0 -547 -338 0 0 -87 7 4091 7872 4071 -21 0 7835 0 0 0 7855 7855

17:00 49.94 2310 2126 119 129 61 264 849 3547 2517 0 9 239 1307 7 438 292 45 0 192 0 -539 -327 0 0 -50 7 4137 7684 4096 -41 0 7626 0 0 0 7642 7642

18:00 50.00 2285 2104 121 98 47 262 724 3357 2339 0 0 235 1305 2 435 248 36 0 191 0 -539 -495 0 0 -50 7 3715 7071 3572 -142 0 6912 0 0 0 6915 6915

19:00 49.97 2284 2102 76 36 26 262 716 3219 2333 0 0 232 1309 0 440 226 34 0 192 0 -445 -450 0 0 7 7 3885 7104 3876 -8 0 7078 0 0 0 7086 7086

20:00 49.93 2306 2123 134 120 56 281 831 3544 2477 0 12 239 1296 6 444 256 41 0 191 0 -442 -156 0 0 -2 7 4369 7913 4331 -38 0 7857 0 0 0 7874 7874

21:00 49.94 2303 2120 102 60 32 280 1001 3595 2464 0 0 239 1301 6 445 272 39 0 191 0 -441 -218 0 0 -2 7 4301 7896 4163 -138 0 7740 0 0 0 7754 7754

22:00 49.95 2313 2129 94 82 40 269 1073 3686 2386 0 5 239 1291 5 445 253 33 0 190 0 -441 -237 0 0 -1 7 4175 7862 4118 -57 0 7788 0 0 0 7801 7801

23:00 49.91 2333 2147 132 201 83 269 1096 3927 2555 0 21 245 1277 8 446 305 49 0 188 0 -441 -129 0 0 -1 7 4531 8459 4568 36 0 8478 0 0 0 8502 8502

24:00 49.97 2322 2137 127 202 90 256 1110 3923 2535 0 14 245 1261 7 446 310 46 0 191 0 -543 -128 0 0 21 7 4413 8335 4456 44 0 8362 0 0 0 8373 8373

Avg. 49.96 2315 2130 88 95 45 261 1060 3680 2456 0 6 241 1289 4 435 267 41 0 191 0 -495 -233 0 0 -39 7 4171 7851 4138 -33 0 7801 0 0 0 7812 7812

00 TO 06 HRS.

49.97 2322 2137 42 48 18 254 1085 3585 2435 0 4 247 1277 5 438 263 35 0 192 0 -507 -121 0 0 5 7 4278 7863 4245 -33 0 7814 0 0 0 7822 7822

06 TO 12 HRS.

49.98 2320 2136 91 91 47 257 1142 3763 2465 0 4 242 1288 3 430 261 44 0 192 0 -488 -217 0 0 -76 7 4153 7916 4078 -75 0 7824 0 0 0 7831 7831

12 TO 18 HRS.

49.93 2306 2123 109 126 60 263 1041 3723 2467 0 9 236 1302 5 428 274 44 0 191 0 -526 -372 0 0 -89 7 3974 7697 3975 1 0 7681 0 0 0 7698 7698

06TO 18 HRS.

49.96 2313 2129 100 108 54 260 1092 3743 2466 0 6 239 1295 4 429 267 44 0 192 0 -507 -295 0 0 -83 7 4063 7806 4026 -37 0 7753 0 0 0 7764 7764

18 TO 24 HRS.

49.94 2310 2126 111 117 54 270 971 3649 2458 0 9 240 1289 5 444 270 40 0 191 0 -459 -220 0 0 4 7 4279 7928 4252 -27 0 7884 0 0 0 7899 7899

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- May 2018

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl Deviation

Intra State STO

A

DEMAND MET

Load Shedding

Minutes of 64th OCC of MP 52

Page 55: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 49.96 2510 2535 25 0 0 2538 2538 2567 2543 -24 0 0 2546 2546 2625 2522 -102 0 0 2526 2526 206 214

2:00 49.97 2424 2359 -65 0 0 2362 2362 2498 2442 -56 0 0 2445 2445 2498 2403 -95 0 0 2405 2405 207 217

3:00 49.98 2334 2357 24 0 0 2359 2359 2413 2379 -34 0 0 2381 2381 2477 2386 -91 0 0 2388 2388 206 217

4:00 49.99 2314 2324 10 0 0 2325 2325 2391 2349 -42 0 0 2350 2350 2459 2373 -86 0 0 2374 2374 207 217

5:00 49.94 2257 2306 49 0 0 2310 2310 2333 2326 -8 0 0 2330 2330 2436 2410 -26 0 0 2414 2414 207 213

6:00 49.97 2274 2221 -53 0 0 2223 2223 2370 2383 13 0 0 2385 2385 2588 2557 -30 0 0 2560 2560 208 219

7:00 50.03 2399 2353 -46 0 0 2353 2353 2544 2539 -6 0 0 2539 2539 3011 2956 -56 0 0 2956 2956 208 223

8:00 50.03 2327 2261 -66 0 0 2261 2261 2562 2522 -40 0 0 2522 2522 3018 3025 7 0 0 3025 3025 209 228

9:00 49.99 2305 2235 -69 0 0 2237 2237 2545 2505 -41 0 0 2506 2506 3077 3003 -74 0 0 3005 3005 209 217

10:00 49.99 2305 2228 -77 0 0 2229 2229 2478 2398 -80 0 0 2399 2399 2975 2880 -95 0 0 2882 2882 209 223

11:00 49.96 2223 2217 -5 0 0 2220 2220 2323 2294 -28 0 0 2297 2297 2801 2776 -25 0 0 2779 2779 202 205

12:00 49.98 2129 2011 -119 0 0 2012 2012 2174 2118 -55 0 0 2120 2120 2582 2598 16 0 0 2600 2600 205 213

13:00 49.99 2067 2079 12 0 0 2081 2081 2068 2086 17 0 0 2087 2087 2704 2760 56 0 0 2762 2762 200 205

14:00 49.96 2039 2009 -30 0 0 2012 2012 2109 2082 -26 0 0 2085 2085 2721 2781 60 0 0 2785 2785 200 206

15:00 49.93 2007 2013 6 0 0 2017 2017 2077 2062 -15 0 0 2066 2066 2712 2815 103 0 0 2821 2821 204 211

16:00 49.95 2004 1992 -12 0 0 1995 1995 2073 2069 -4 0 0 2072 2072 2701 2805 104 0 0 2809 2809 207 216

17:00 49.97 1975 1935 -40 0 0 1937 1937 2085 2059 -27 0 0 2061 2061 2681 2736 55 0 0 2739 2739 208 216

18:00 50.02 1981 1861 -119 0 0 1861 1861 2099 2023 -76 0 0 2023 2023 2470 2417 -53 0 0 2417 2417 209 213

19:00 49.97 2195 2260 66 0 0 2263 2263 2149 2252 103 0 0 2255 2255 2389 2284 -105 0 0 2286 2286 210 220

20:00 49.99 2406 2432 26 0 0 2434 2434 2433 2471 38 0 0 2473 2473 2425 2316 -109 0 0 2317 2317 208 217

21:00 49.97 2402 2418 16 0 0 2421 2421 2403 2384 -18 0 0 2387 2387 2326 2254 -72 0 0 2256 2256 207 213

22:00 49.97 2364 2375 11 0 0 2377 2377 2373 2380 7 0 0 2382 2382 2388 2368 -21 0 0 2370 2370 202 205

23:00 49.94 2594 2626 32 0 0 2632 2632 2598 2634 36 0 0 2639 2639 2678 2653 -25 0 0 2658 2658 200 201

24:00 49.97 2571 2583 12 0 0 2586 2586 2586 2587 1 0 0 2589 2589 2614 2585 -29 0 0 2588 2588 200 201

Avg. 49.98 2267 2250 -17 0 0 2252 2252 2344 2329 -15 0 0 2331 2331 2640 2611 -29 0 0 2613 2613 206 214

00 TO 06 HRS. 49.97 2352 2350 -2 0 0 2353 2353 2429 2403 -25 0 0 2406 2406 2514 2442 -72 0 0 2445 2445 207 216

06 TO 12 HRS. 49.99 2281 2218 -64 0 0 2219 2219 2438 2396 -42 0 0 2397 2397 2911 2873 -38 0 0 2874 2874 207 218

12 TO 18 HRS. 49.97 2012 1982 -31 0 0 1984 1984 2085 2063 -22 0 0 2066 2066 2665 2719 54 0 0 2722 2722 205 211

06TO 18 HRS. 49.98 2147 2100 -47 0 0 2101 2101 2261 2230 -32 0 0 2232 2232 2788 2796 8 0 0 2798 2798 206 215

18 TO 24 HRS. 49.97 2422 2449 27 0 0 2452 2452 2424 2451 28 0 0 2454 2454 2470 2410 -60 0 0 2413 2413 205 210

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- April 2018

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Minutes of 64th OCC of MP 53

Page 56: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 49.96 2648 2719 71 0 0 2723 2723 2694 2734 40 0 0 2738 2738 2588 2509 -79 0 0 2512 2512 193 223

2:00 49.98 2572 2522 -50 0 0 2525 2525 2629 2642 13 0 0 2645 2645 2493 2413 -80 0 0 2415 2415 192 217

3:00 49.97 2518 2531 13 0 0 2534 2534 2571 2591 20 0 0 2594 2594 2500 2449 -51 0 0 2452 2452 191 216

4:00 50.00 2473 2501 28 0 0 2503 2503 2526 2562 36 0 0 2564 2564 2464 2431 -33 0 0 2433 2433 190 213

5:00 49.96 2448 2493 45 0 0 2496 2496 2497 2551 55 0 0 2555 2555 2495 2475 -20 0 0 2478 2478 193 216

6:00 49.98 2416 2323 -93 0 0 2325 2325 2511 2543 32 0 0 2545 2545 2603 2593 -9 0 0 2596 2596 191 217

7:00 50.02 2404 2376 -28 0 0 2376 2376 2544 2616 72 0 0 2616 2616 2803 2861 58 0 0 2861 2861 192 223

8:00 50.02 2376 2309 -67 0 0 2309 2309 2633 2624 -10 0 0 2624 2624 2854 2836 -18 0 0 2836 2836 192 228

9:00 49.98 2354 2275 -80 0 0 2276 2276 2640 2619 -20 0 0 2621 2621 2829 2792 -37 0 0 2794 2794 192 219

10:00 49.97 2352 2293 -59 0 0 2296 2296 2566 2537 -28 0 0 2540 2540 2788 2737 -51 0 0 2739 2739 192 214

11:00 49.94 2338 2337 -2 0 0 2341 2341 2463 2466 3 0 0 2470 2470 2755 2733 -23 0 0 2738 2738 192 214

12:00 49.95 2297 2190 -107 0 0 2194 2194 2375 2369 -6 0 0 2372 2372 2651 2655 3 0 0 2659 2659 192 220

13:00 49.93 2322 2342 20 0 0 2347 2347 2362 2395 33 0 0 2400 2400 2877 2912 35 0 0 2918 2918 191 202

14:00 49.92 2328 2322 -5 0 0 2328 2328 2405 2430 25 0 0 2436 2436 2912 2925 13 0 0 2933 2933 190 202

15:00 49.89 2329 2341 12 0 0 2348 2348 2388 2438 50 0 0 2446 2446 2945 2994 50 0 0 3004 3004 191 211

16:00 49.92 2300 2300 0 0 0 2306 2306 2391 2412 21 0 0 2419 2419 2877 2908 31 0 0 2916 2916 192 214

17:00 49.94 2219 2184 -35 0 0 2189 2189 2371 2370 -1 0 0 2375 2375 2811 2855 43 0 0 2861 2861 192 217

18:00 50.00 2088 1979 -109 0 0 1980 1980 2268 2256 -11 0 0 2257 2257 2486 2458 -28 0 0 2459 2459 191 219

19:00 49.97 2177 2258 80 0 0 2260 2260 2252 2305 53 0 0 2307 2307 2391 2291 -100 0 0 2294 2294 192 225

20:00 49.93 2522 2580 57 0 0 2585 2585 2575 2655 80 0 0 2661 2661 2567 2403 -164 0 0 2408 2408 191 219

21:00 49.94 2530 2595 64 0 0 2599 2599 2607 2644 37 0 0 2649 2649 2458 2285 -173 0 0 2289 2289 191 217

22:00 49.95 2527 2558 31 0 0 2563 2563 2597 2627 30 0 0 2632 2632 2514 2389 -125 0 0 2393 2393 190 213

23:00 49.91 2703 2818 115 0 0 2826 2826 2750 2855 105 0 0 2863 2863 2721 2603 -118 0 0 2610 2610 188 202

24:00 49.97 2693 2790 97 0 0 2793 2793 2749 2804 55 0 0 2807 2807 2679 2568 -111 0 0 2571 2571 191 201

Avg. 49.96 2414 2414 0 0 0 2418 2418 2515 2544 28 0 0 2547 2547 2669 2628 -41 0 0 2632 2632 191 215

00 TO 06 HRS. 49.97 2512 2515 2 0 0 2518 2518 2571 2604 33 0 0 2607 2607 2524 2478 -45 0 0 2481 2481 192 217

06 TO 12 HRS. 49.98 2354 2297 -57 0 0 2299 2299 2537 2538 2 0 0 2541 2541 2780 2769 -11 0 0 2771 2771 192 220

12 TO 18 HRS. 49.93 2264 2245 -19 0 0 2250 2250 2364 2384 19 0 0 2389 2389 2818 2842 24 0 0 2848 2848 191 211

06TO 18 HRS. 49.96 2309 2271 -38 0 0 2274 2274 2450 2461 11 0 0 2465 2465 2799 2806 6 0 0 2810 2810 192 215

18 TO 24 HRS. 49.94 2526 2600 74 0 0 2605 2605 2588 2648 60 0 0 2653 2653 2555 2423 -132 0 0 2428 2428 191 213

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- May 2018

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Minutes of 64th OCC of MP 54

Page 57: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

ANNEXURE-5 System Disturbance / System Incidence

1. System Disturbance on 12.04.2018 in Tons HPS area: On dated 12.04.2018 at around

00.30 Hrs. M.P system was normal, Weather at Rewa-Tons area was Cloudy and Stormyand frequency of National Grid was 49.96 Hz. At 00.40 Hrs, Bus-Bar protection of Main Bus-II operated at Tons HPS, resulting in the tripping of following feeders only from Tons area as given below. 220kv Tons HPS-Rewackt-II 220kv Tons HPS-Kotarckt-II 20 MVA X-mer at Tons HPS 220kv Bus Tie at Tons HPS

There was No generationand load loss Supply to Tons HPS remain managedDG set

available as informed by Tons HPS. Later 20 MVA X-mer charged at 00.56 Hrs along with this otherelements restored gradually.

2. System Disturbance on 19.04.2018 in Ratlam area: On dated 19.04.2018 at around

08.00 Hrs. M.P system was normal and frequency of National Grid was 50.07 Hz. At 08.05 Hrs,220kv Bus Bar Protection maloperated due to 220kv bus tie master relay contact got shorted , this instance happened during opening of 132kv side of 160 MVA X-Mer-I for taking shutdown,resulting into tripping of following X-mers/ckts-

160 MVA , 220kv/132kv X-mer-II 160 MVA , 220kv/132kv X-mer-III 220kv Ratlam-Badnagarckt-I 220kv Ratlam-Badnagarckt-II 220kv Ratlam-Nagrackt-I 220kv Ratlam-Nagrackt-II 220kv Ratlam-Dalodackt 220kv Bus tie 220kv Bus coupler

This caused the No interruption in 220kv s/s Ratlam as supply was managed through 132kv network. Also there was no generation loss. Later the elements restored gradually.

Minutes of 64th OCC of MP 55

Page 58: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

3. System Disturbance on 30.04.2018 in Tons HPS area: On dated 30.04.2018at around

09.40 Hrs. M.P system was normal and frequency of National Grid was 49.82 Hz, Thunderstorm was occurring at Tons Area. At 09.45 Hrs, Bus-Bar protection of Main Bus-II operated at Tons HPS, resulting in the tripping of following feeders only from Tons area as given below. 220kv Tons HPS-Rewackt-II 220kv Tons HPS-Kotarckt-II 20 MVA X-mer at Tons HPS 220kv Bus Tie at Tons HPS

There was No generation and load loss Supply to Tons HPS remain managed DG

set available as informed by Tons HPS. Later 20 MVA X-mer charged at 10.35 Hrs along with this other elements restored gradually.

4. System Disturbance on 03.05.2018 in Barwaha area: On dated 03.05.2018 at around 17:15 Hrs. M.P system was normal, Weather was Clear, frequency of National Grid was 50.06 Hz. At 17:21 Hrs,132kv B-ph CT of 132kv Barwaha-Sanawad-ckt burst at 220kv s./s Barwaha,resulting in the tripping of followingelementsas given below. 220kv/132kv 160MVA X-mer 220kv/132kv 3*40 MVA X-mer 132kv/33kv 63MVA , 40 MVA I & II X-mer 132kvBarwaha-Sanawadckt 132 kvBarwaha-ChhotiKhargoneckt 132 kvBarwaha-Kishangarhckt 132 kvBarwaha-Balwadackt 132 kvBarwaha-OSP Canalckt 132 kvBarwaha–Chhegaonckt 132 kvBarwaha-Simrolckt 132 kvBarwaha-Bhaklaickt

Interruption occurred at 220kv S/S Barwaha,132kv S/S Kishangarh, 132kv S/S Bhaklai. There was No generation and load loss was 55MW . 220kv/132kv 3*40 MVA X-mer charged at 17:30 hrs , later other elements got restored.

5. System Disturbance on 12.05.2018 in Sidhiarea: On dated 12.05.2018 at around

12:30 Hrs. M.P system was normal and frequency of National Grid was 49.85 Hz. At 12:36 Hrs, at loc no 134 B-ph jumper opened of 220kv Sidhi-Amarkantakckt, resulting into tripping of following X-mers/ckts-

220kv Rewa-Tons-ckt-I, 220KV Rewa-Birsinghpur, 220kv Sidhi-Amarkantakckt

Minutes of 64th OCC of MP 56

Page 59: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

During the tripping 220kv Rewa-Tons-ckt-II was under shutdown, this caused theinterruption in 220kv Rewa s/s, 220 KV Sidhi S/S ,220kv Sirmour S/S, 132 KV Rewa S/S, 132 KV Sidhi S/S ,132 KV Deosar S/S, 132 KV Pahadiya S/S , 132 KV Mauganj S/S , 132 KV Mangawan S/S, 132 KV Katra S/S.There was no generation loss and load loss of 188MW.220kv Rewa-Tons ckt I charged at 13:00 hrs, 220KV Rewa-Birsinghpurckt charged at 13.09 hrs,later other elements restored gradually. 220kv Sidhi-Amarkantakckt restored after petrolling.

6. System Disturbance on 13.05.2018 in Binaarea: On dated 13.05.2018at around 21:00

Hrs. M.P system was normal and frequency of National Grid was 50.07 Hz, Stormy weather with heavy winds and rains was reported at Bina area. At 21.09 Hrs, 400kv JP Bina-Bina( PG) ckt tripped on B-Ph –E/F along with the following ckts 400kv JP Bina-Bina( MP) ckt 400kv Bina-Bhopal ckt -II Unit # 1 , Unit # 2 of JPBTPP BINA

There was generation Loss of 309 MW as both the units of JP Bina got tripped due to

no evacuation lines available and no load lossreported .400kv JP Bina-Bina( PG) cktcharged at 22.05 hrs and through this supply extended to JP BINA, later other lines got restored.

7. System Disturbance on 26.05.2018 in OSParea: On dated 26.05.2018 at around 17:45 Hrs. M.P system was normal and frequency of National Grid was 49.85 Hz. At 17.49 Hrs,while desynchronization of Unit # 2, the LBB protection of CB of unit # 2 got operated at OSP leading to the Bus Bar protection operation, due to this further following elements got tripped:- 220kv OSP-Khandwa(PG)ckt 220kv OSP-Chhegaonckt 220kv OSP-Barwaha Tap Nimranickt 220kv OSP-Julwaniyackt 220kv OSP-Barwahackt Three units of OSP i.eUnit # 2 , Unit #3, Unit #6

Minutes of 64th OCC of MP 57

Page 60: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

There was generation loss of 174 MW and no load lossoccured. 220kv OSP-Barwahackt charged at 18.23 hrs, later other elements restored gradually

*********

Minutes of 64th OCC of MP 58

Page 61: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Minutes of 64th OCC of MP 59

Page 62: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Annexure-6.12A

Schemes of Western Region funded under PSDF

State I UT Sr. Details of the Scheme Nos. of Grant Date of Funds %age of

No. Schemes Sanctioned Sanction released fund

(in Rs (in Rs Crores) Disbursed

Crores) as on against

30.11.2016 Grant

sanctioned

Madhya 1. Implementation of 2 3.6 17/03/2016 0 0%

Pradesh Integrated system for

availability based

tariff. 92.7

2. Renovation and 17/03/2016 0 0%

Upgradation of

protection system of

substations of

MPPTCL

Madhya 3. Renovation and 2 47.11 5/9/2016 0 0%

Pradesh Upgradation of

protection system of

substations MPPGCL

4. Installation of 5.59 0 0%

125MVARBus

Reactor at SSTPP

Khandwaand

50MVARLine

Reactor at SGSTPS

Birsinghpur

substation of

MPPGCL.

Chhattisgarh 5. Renovation and 1 61.67 5/9/2016 0 0%

Upgradation of

protection system of

substations 1.50

Gujarat 6. Automatic Demand 3 11105/2015 1.35 89.82%

Management Scheme 3.70

17/03/2015

7. Load Forecasting 04/08/2015 0 0%

Scheme

8. Wind generation 1.62 17/03/2015 0 0%

forecasting project

for State of Gujarat.

TOTAL 8 217.49

Minutes of 64th OCC of MP 60

Page 63: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Annexure-6.12 (B) Reporting Format to the PSDF Project Monitoring Group

1. Name of the Scheme

1.1 Name of the substation and its Location

1.2 Executing Agency

1.3 State/Region

2. Date of Sanction Order

2.1 Date of Agreement of Entity with State Govt. / NLDC

2.2 Total Approved Cost of Scheme

2.3 Approved Grant by Monitoring Committee (Rs. In Lakhs)

2.4 Date of Requisition by the Entity

2.4 a) Date and Reference of LOA

2.4 b) Amount of LOA

2.5 Date of Disbursement and amount

2.5.1 Ist Installment

2.5.2 IInd Installment

2.5.3 IIIrd Installment

2.6 Date of Scheduled completion of work

2.7 Date of Handling over of Site to entity ( In case of Turn key project)

Report for the Month of JANUARY 2017

Quantity CUMMULATIVE

PROGRESS till date

Qty. AS PER Received during

No. Supply Discription LOA Month Sch. Act. Balance Remark

1 Item Details (As per Annexure-II)

1.1

1.2

Erection Discription works as per Progress During CUMMULATIVE

Balance

LOA Month PROGRESS till date

2 Work Details

2.1

2.2

3 Others

Signature With Seal of The Nodal Officer

Minutes of 64th OCC of MP 61

Page 64: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

ANNEXURE-6.14

YES/NOIF NOT COMMISSIONED THEN REASON

FOR NOT COMMISSIONINGYES/NO

IF NOT WORKING CONDITION THEN REASON FOR NOT

WORKINGYES/NO

IF NOT IN SERVICE CONDITION THEN REASON FOR NOT IN

SERVICE

RGMO COMMISSIONED WORKING CONDITION IN SERVICE

S.NO.NAME OF ELIGIBLE

UNITS

INSTALLED CAPACITY

IN MW

Minutes of 64th OCC of MP 62

Page 65: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Vol

tage

(kV

)R Y B Phase Voltage2018-06-14 15:25:00.000 - 2018-06-14 15:30:00.000

VRM SubstationId: BINA__MPDeviceId: 400BUS1______

VYM SubstationId: BINA__MPDeviceId: 400BUS1______

VBMSubstationId: BINA__MPDeviceId: 400BUS1______

15:25:00 15:25:30 15:26:00 15:26:30 15:27:00 15:27:30 15:28:00 15:28:30 15:29:00 15:29:30 15:30:00

234

236

232

238

Minutes of 64th OCC of MP 63

low dicpach
Typewritten Text
Annexure-6.15
low dicpach
Typewritten Text
low dicpach
Typewritten Text
low dicpach
Typewritten Text
low dicpach
Typewritten Text
Page 66: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Vol

tage

(kV

)R Y B Phase Voltage2018-06-14 15:25:00.000 - 2018-06-14 15:30:00.000

VRM SubstationId: BINA__MPDeviceId: 400BUS2______

VYM SubstationId: BINA__MPDeviceId: 400BUS2______

VBMSubstationId: BINA__MPDeviceId: 400BUS2______

15:25:00 15:25:30 15:26:00 15:26:30 15:27:00 15:27:30 15:28:00 15:28:30 15:29:00 15:29:30 15:30:00

235

230

232.5

237.5

Minutes of 64th OCC of MP 64

Page 67: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Vol

tage

(kV

)R Y B Phase Voltage2018-06-14 15:25:00.000 - 2018-06-14 15:30:00.000

VRM SubstationId: BINA__MPDeviceId: 400BINA_BPSCL1

VYM SubstationId: BINA__MPDeviceId: 400BINA_BPSCL1

VBMSubstationId: BINA__MPDeviceId: 400BINA_BPSCL1

15:25:00 15:25:30 15:26:00 15:26:30 15:27:00 15:27:30 15:28:00 15:28:30 15:29:00 15:29:30 15:30:00

0

2

4

Minutes of 64th OCC of MP 65

Page 68: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Annexure-8.1.i

SNO Meter No Location Feeder Name T & C Circle T & C Division Data Not Available Dates1 Y0515484 132KV S/S MANAWAR 132KV ULTRATECH FEEDER 400KV Indore Testing Division - II Indore 01/05/2018 to 31/05/2018

2 MPE51793 132KV S/S PITHAMPUR MVA 132/33KV X'MER-I BHEL S.NO. 20097 400KV Indore Testing Division - II Indore 01/05/2018 to 31/05/2018

3 MPE51761 132KV S/S AYODHYANAGAR BHOPAL 40MVA MAKE TELK SN 120459-16 BHOPAL 400 KV Testing Division Bhopal 01/05/2018 to 31/05/2018

4 MPE51976 132KV S/S BIORA 40MVA MAKE ABB SN 12020-014 BHOPAL Testing Division -I Bhopal-S/s DN Beora 01/05/2018 to 31/05/2018

5 XB577396 132KV S/S SHAMSHABAD 20MVA MAKE NGEF BHOPAL Testing Division -II Bhopal 01/05/2018 to 31/05/2018

6 MPE51945 132KV S/S MOTIZEEL 40 MVA MAKE BBL SN 4910/5 GWALIOR Testing Division -I Gwalior 03/05/2018 to 31/05/2018

7 MPE51950 132KV S/S TIGHRA 40 MVA MAKE BBL SN 4732/2 GWALIOR Testing Division -I Gwalior 01/05/2018 to 31/05/2018

8 APMB5072 220KV S/S MALANPUR SRF LIMITED GWALIOR Testing Division -II Gwalior 01/05/2018 to 31/05/2018

9 MPP28501 132KV S/S ALIRAJPUR 63MVA 132/33KV XMER BBL S.NO.5329/08 INDORE Testing Division - Rajgarh 01/05/2018 to 31/05/2018

10 MPE51649 132KV S/S KYMORE 40MVA MAKE EMCO SN 1864/13199 JABALPUR Testing Division -Katni 01/05/2018 to 31/05/2018

11 MPP28796 132KV S/S MUNGAOLI Tr. 132 KV TRACT.MUNGAOLI RAILWAY 400 KV Testing Division Bina 01/05/2018 to 31/05/2018

12 MPE51722 132KV S/S BIJAWAR 40MVA MAKE NGEF SN 5076/12 SAGAR Testing Division -II Sagar 01/05/2018 to 31/05/2018

13 MPP28381 132KV S/S PRITHVIPUR 63 MVA MAKE BBL SAGAR Testing Division -II Sagar 01/05/2018 to 31/05/2018

14 MPE51750 132KV S/S REWA 132 KV SATNA (for JP BELA Cement ) SATNA Testing Division - Rewa 01/05/2018 to 31/05/2018

15 Y0221275 132KV S/S BEOHARI 50 MVA X-mer SN 204292 SATNA Testing Division - Satna- S/S DN Shahdol 01/05/2018 to 31/05/2018

16 MPP28390 132KV S/S KOTMA 20 MVA NGEF MAKE SN 280016834 SATNA Testing Division - Satna- S/S DN Shahdol 01/05/2018 to 31/05/2018

17 MPE51662 132KV S/S BAIHAR BIRSA FEEDER/HCL MALAJKHAND SEONI Testing Division -II Chindwara 01/05/2018 to 31/05/2018

18 MPC58840 132KV S/S PANWADI 50MVA MAKE BBL SN 5406/02 UJJAIN Testing Division - Dewas 01/05/2018 to 31/05/2018

19 Y0221555 132KV S/S GAROTH 20MVA MAKE TELK SN 120255-1(R) UJJAIN Testing Division - Ratlam 01/05/2018 to 31/05/2018

20 MPE51892 132KV S/S MANASA 40MVA MAKE TELK S.NO.120271/3 UJJAIN Testing Division - Ratlam-S/S DN Neemuch 03/05/2018 to 31/05/2018

21 MPE51874 132KV S/S NEEMUCH 40MVA MAKE GEC SN B-27790 UJJAIN Testing Division - Ratlam-S/S DN Neemuch 01/05/2018 to 31/05/2018

22 MPP28660 132KV S/S INGORIYA 20MVA MAKE BHEL SN 6004701 UJJAIN Testing Division - Ujjain 01/05/2018 to 31/05/2018

23 MPP28661 132KV S/S INGORIYA 20MVA MAKE APEX SN 891B/010 UJJAIN Testing Division - Ujjain 01/05/2018 to 31/05/2018

24 MPE51895 132KV S/S TARANA 63MVA MAKE BBL TRANSFORMER UJJAIN Testing Division - Ujjain 01/05/2018 to 31/05/2018

25 Y0221427 220KV S/S UJJAIN 40MVA MAKE CROMPTON SN T-8362/3 UJJAIN Testing Division - Ujjain 01/05/2018 to 31/05/2018

26 MPE51809 220KV S/S S/Z, INDORE 0 MVA 132/33 KV XMAR-III CGL S.NO. 2479 400KV Indore 440 KV Testing Division, Indore 07/05/2018 to 31/05/201827 XC582184 132KV S/S BARWANI 40MVA 132/33KV XMER BBL S.NO.3072/1 400KV Indore Testing Division - II Indore 01/05/2018 to 10/05/201828 MPB98765 132KV S/S BETMA 40MVA 132/33KV X'MER BBL S.NO. 5033/27 400KV Indore Testing Division - II Indore 17/05/2018 to 31/05/201829 GEC08847 132KV S/S DEPALPUR 0 MVA CROMPTION MAKE SR .NO T8362/ INDORE Testing Division - I Indore 17/05/2018 to 31/05/201830 KA904776 132KV S/S GANJBASODA Tr.TRACTION BARETH-I RAILWAY Testing Division -II Bhopal 01/05/2018 to 06/05/201831 MPP28374 220KV S/S DAMOH IAMOND CEMENT FEEDER NARSINGGAR SAGAR Testing Division -II Sagar 26/05/2018 to 31/05/201832 MPP28355 132KV S/S KATRA 40MVA ECE MAKE XMER SATNA Testing Division - Rewa 17/05/2018 to 31/05/201833 MPE51863 132KV S/S KHATEGAON 40MVA BHEL X-mer S.NO. 2018175 UJJAIN Testing Division - Dewas 17/05/2018 to 31/05/2018

Minutes of 64th OCC of MP 66

Page 69: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Annexure-8.1.iiSNO Meter No Location Feeder Name T & C Circle T & C Division1 MP924834 132KV S/S KHURAI 40 MVA BHEL 400KV BINA 400 KV Testing Division Bina2 MPC58874 132KV S/S CHANDERI 20MVA EMCO SN 1023/10789 400KV BINA Testing Division Guna3 MPP28723 220 KV BINA DISCOM_33KV VIDISHA FEEDER ( EZ TO CZ) 400KV BINA 400KV Testing Division -BINA4 MPC57149 132KV S/S ANJAD 40MVA XMER BHEL S.NO. 2037088 400KV Indore Testing Division - II Indore5 MPE51799 132KV S/S DHAR 40MVA BHEL 400KV Indore Testing Division - II Indore6 GEC88970 220KV S/S HOSANGABAD SPM M/S SPM BHOPAL Testing Division Hoshangabad7 XB577467 132KV S/S BANKHEDI 40MVA MAKE IMP BHOPAL Testing Division Hoshangabad8 XB577430 132KV S/S SEMRI HARCHAND 40 MVA IMP PT6722 BHOPAL Testing Division Hoshangabad9 XB577404 220KV S/S PIPARIA 12.5MVA BHEL MAKE 6001776 BHOPAL Testing Division - Itarsi10 XB577379 132KV LATERI 40MVA IMP SN PT-7282 BHOPAL Testing Division -II Bhopal11 XB577712 132KV HASTINAPUR 40MVA BHEL SN 2037087 GWALIOR Testing Division -I GWL12 XB569562 132KV S/S BARODA 40MVA ABB GWALIOR Testing Division Guna-S/S Dn Shivpuri13 XB577730 220KV S/S DATIA 40MVA GWALIOR Testing Division -II Gwalior14 Y0221431 132KV S/S KARERA 20MVA BHEL MAKE SN 6004351 GWALIOR Testing Division Guna-S/S Dn Shivpuri15 XB577385 132KV S/S BADAGAON 40MVA IMP GWALIOR Testing Division -I Gwalior16 MSP56852 132KV S/S BANMORE 132 kv AMBA SHAKTI GWALIOR Testing Division -I Gwalior17 XB583341 132KV GOHAD 63 MVA MAKE IMP SN PT7479 GWALIOR Testing Division -II Gwalior18 MPP28712 132KV KOLARAS 20MVA CGL GWALIOR Testing Division -GUNA S/S Shivpuri19 MPE51942 132KV S/S MORAR 63 MVA MAKE BBL Sno. 5308/9 GWALIOR Testing Division -I Gwalior20 GEC88916 132KV S/S SENDHWA 20MVA CGL SN 24400 INDORE Testing Division - II Barwaha21 MPE51805 132KV S/S CHHANERA 20MVA MAKE CGL SN 24641 INDORE Testing Division - Khandwa22 MPC59861 132KV S/S ALIRAJPUR 20MVA BBL 1991/3 INDORE Testing Division - Rajgarh23 MPC57146 132KV S/S ANJOD CH GANJ 40 MAVA BHEL INDORE Testing Division - I Indore24 MPC58410 132KV S/S BICHHUA 40MVA BHEL XMER JABALPUR Testing Division -II Chindwara25 MP925055 220KV S/S PANAGAR 220KV PANAGAR JABALPUR Testing Division - JABALPUR26 MPP28518 220KV S/S CHHINDWARA 50MVA XMER JABALPUR Testing Division -II Chindwara27 XB577406 132KV S/S BADGAON 40MVA BBL 5423/5 KHANDWA Testing Division - Khandwa28 MPE22595 132KV S/S JEERAPUR 20MVA NGEF RAJGARH Testing Division -I Bhopal-S/s DN Beora29 XB549199 132KV S/S DONGARITAL 20 MVA EMCO SN 1058 B/10930 REWA Testing Division - Rewa30 XB552535 132KV S/S SIRMOUR 40MVA IMP REWA Testing Division - Rewa31 MPC60964 132KV S/S DIGODA 20MVA SAGAR Testing Division -II Sagar32 MPC57148 132KV BUDERA 40MVA SAGAR Testing Division -II Sagar33 XB583338 132KV MUNGAOLI 63MVA SAGAR Testing Division -II SAGAR34 GEC88948 132KV S/S MAIHAR 132 KV RELIANCE FEEDER SATNA Testing Division - Satna35 MP924832 132KV S/S RAMPUR NAIKIN 40 MVA X-mer (33 kv side) SATNA Testing Division - Satna36 KA907077 220KV S/S ANUPUR 132KV MOSERBEAR SATNA Testing Division - Satna- S/S DN Shahdol37 MPC58838 220KV S/S SIDHI 220KV S/S SIDHI SATNA Testing Division - Rewa38 KA904800 220KV S/S ANUPUR 132KV OPM SATNA Testing Division - Satna- S/S DN Shahdol39 XB577419 132KV S/S UMARIYA 20 MVA NGEF SATNA Testing Division - Rewa40 MPP28662 132KV S/S TARANA 20MVA MAKE GEC TRANSFORMER UJJAIN Testing Division - Ujjain41 MPC58871 132KV S/S MAXI 40MVA MAKE UJJAIN Testing Division - Dewas42 XB580676 132KV S/S BHERUGARH 63MVA MAKE IMP UJJAIN UJJAIN43 MP924841 220KV S/S SHANKARGARH 40MVA MAKE BHEL UJJAIN Testing Division - Dewas44 MP924848 132KV S/S BAROTHA 40MVA MAKE BHEL SN 2037 UJJAIN Testing Division - Dewas45 MPC58406 132KV SATWAS 40MVA MAKE BHEL SN 2037078 UJJAIN Testing Division - Dewas46 MPC58408 132KV SHAJAPUR 40MVA BHEL S.N. 2037089 UJJAIN Testing Division - Dewas47 XB593845 132KV NALKHEDA 40MVA ALSTOM S.N. B-30818 UJJAIN Testing Division - UJJAIN48 XB583619 132KV KALAPIPAL 40MVA TOSHIBA SN 90153 UJJAIN Testing Division - Shujalpur49 MPC58866 132KV PORSA 12.5MVA MAKE EMCO SN 969B/10463 GWALIOR Testing Division -I Gwalior, S/S DN Morena50 XB577443 132KV S/S BHERUGARH 40MVA MAKE BBL SN-4732/4 UJJAIN Testing Division - Ujjain51 MPC72357 132KV S/S SHIVANI 40 MVA XMER ALSTOM 400KV Indore Testing Division - II Indore52 BENEGAON_NEW 132KV BENEGAON 12.5MVA JABALPUR Testing Division -II Chindwara53 MPC74042 132KV TAMOT 40MVA MAKE CGL SN 24788 BPL Testing Division -II Bhopal54 XB577473 132KV S/S MAKSUDANGARH 63MVA MAKE BBL SN 5442/07 GWALIOR Testing Division Guna55 MPP08529 220KV S/S CHHEGAON MAKHA 63MVA 132/33KV BBL S.No. 5442/11 IND Testing Division - Khandwa56 XB577425 132KV S/S SLEEMANABAD 12.5MVA NGEF SN2800022226 JBP Testing Division -Katni57 XC530817 132KV S/S LALBARRA 40MVA IMP JBP Testing Division -II Chindwara58 XC548595 132KV S/S UMRETH 40MVA BBL XMER JBP Testing Division -II Chindwara59 KA909252 132KV S/S LAUNDI 40MVA IMP SGR Testing Division -II Sagar60 MPP28606 132KV S/S RATLAM 50MVA X-mer BBL SN 5406/10 UJJ Testing Division - Ratlam61 XB577773 220KV S/S GWALIOR-II 40 MVA MAKE GWALIOR Testing Division -I Gwalior

List of newly commissioned substations / recently connected HT Consumers required to be included in supplementary list.

Minutes of 64th OCC of MP 67

Page 70: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

62 XB577474 132KV AMARWARA 50MVA BHEL JABALPUR Testing Division -Chhindwara63 MPC58407 220KV S/S JULWANIYA 40MVA BHEL SN 2037620 INDORE Testing Division - II Barwaha64 XB560307 220KV S/S MUNGALIYA CHHAP 40MVA BHEL SN 2037622 BHOPAL Testing Division - I Bhopal65 XB577435 132KV S/S KATNI 50MVA MAKE BHEL JABALPUR Testing Division - Katni66 XB577453 220KV S/S SEONI 50MVA BHEL JABALPUR Testing Division - Seoni67 MPP28396 132KV S/S KATRA 50MVA BHEL MAKE XMER SATNA Testing Division - Rewa68 XB577438 132KV S/S NAGOD 40 MVA X-mer SATNA Testing Division - Satna69 XC573291 132 KV ANDHAD 40MVA INDORE Testing Division - II Indore70 ESAGARH_NEW 132KV S/S ESAGARH_NEW 40MVA GWALIOR Testing Division Guna71 XB583342 132KV S/S KOTHIYA 20MVA GWALIOR Testing Division Guna72 XC573290 132KV S/S TAL 40MVA MAKE IMP UJJAIN Testing Division - Ratlam73 XB583343 132KV PRATAPURA 40MVA GWALIOR Testing Division -II Gwalior74 JHABUA_NEW 132KV JHABUA 40 MVA MAKE NGEF INDORE Testing Division - II Indore75 XB577383 132KV S/S GUDGAON 50MVA BHEL SN 2042484 BHOPAL Testing Division Itarsi76 MPP28696 132KV S/S SHIVPURI 40MVA,BBLSN 5033/1 GWALIOR Testing Division Guna-S/S Dn Shivpuri77 XB577374 132KV S/S BOREGAON 50MVA BHEL SN.2042482 JBP Testing Division -II Chindwara78 MPC73878 132KV PANDHANA 63MVA IMP INDORE Testing Division KHANDWA79 XB577378 132KV S/S KASRAWAD 20MVA INDORE Testing Division - I Indore80 XB577371 220KV BHANPURA 50MVA BHEL SN 2042485 UJJAIN Testing Division - Neemuch81 XB577434 132KV S/S REWA-II 50MVA BHEL SATNA Testing Division - Rewa82 XB577412 132KV S/S NARSINGPUR 50MVA BHEL SN2042481 JABALPUR Testing Division -II Jabalpur83 Y0221147 220KV S/S CHICHLI 50MVA XMER MAKE BHEL SR. 2042480 JABALPUR Testing Division -II Jabalpur84 Y0221433 132KV S/S BARODA 40MVA NGEF GWALIOR Testing Division Guna-S/S Dn Shivpuri85 ICHHAWAR_NEW 132KV S/S ICHHAWAR 40MVA BBL SN 1448/3 BHOPAL Testing Division - I Bhopal86 SATWAS_NEW 132KV S/S SATWAS 20MVA NGEF SN 280002-2214 UJJAIN Testing Division - Dewas87 XB577472 220 KV S/S KOTAR 50MVA BHEL SATNA Testing Division - Satna88 XB569347 220KV S/S ANUPUR 50MVA BHEL SATNA Testing Division - Satna- S/S DN Shahdol89 MPC73830 132KV S/S TALAKPURA 40 MVA INDORE Testing Division - Barwaha90 Y0062910 132KV S/S GADARWARA 132KV TC_NTPC JABALPUR Testing Division -II Jabalpur91 Y0221471 220KV S/S NEEMUCH 50MVA BHEL UJJAIN Testing Division - Neemuch92 MPC73877 132KV S/S SINGHANA 40 MVA IMP INDORE Testing Division - II Indore93 XB552537 132KV S/S Kishangarh 40 MVA IMP INDORE Testing Division - Dewas94 XC559777 220KV MORENA 63MVA GWALIOR Testing Division Morena95 XB583344 132KV BHANDER 63MVA GWALIOR Testing Division DATIA96 MPM06716 220KV S/S RAJGARH BIAORA 20MVA BHOPAL Testing Division -I Bhopal-S/s DN Beora97 XC530820 132KV BAGRODA 40MVA BHOPAL Testing Division -I Bhopal98 MPC57144 132KV S/S RUNAHA 63MVA MAKE BBL SN 5308/10 BHOPAL Testing Division -II Bhopal99 MPC59988 220KV S/S BARNAGAR 40MVA MAKE BBL SN 3661/2 UJJAIN Testing Division - Ujjain100 XC559792 132KV S/S MORENA 40 MVA MAKE BBL SN 4910/7 GWALIOR Testing Division -I Gwalior, S/S DN Morena101 MPP28683 220KV S/S BINA 132KV BINA-BORL CKT-I 400KV BINA 400 KV Testing Division Bina102 MPP28684 220KV S/S BINA 132KV BINA-BORL CKT-II 400KV BINA 400 KV Testing Division Bina103 MPP28697 132KV S/S DABRA 63MVA MAKE BHEL SN 2042500 GWALIOR Testing Division -II Gwalior104 MPC58835 132KV S/S POLAIKALAN 20 MVA EMCO UJJAIN Testing Division - Shujalpur105 Y0221529 220KV S/S UJJAIN 63MVA MAKE BBL SN 5442/9 UJJAIN Testing Division - Ujjain106 MPM08323 132KV S/S SHIVPURI 40MVA,BBLSN 5033/1 GWALIOR Testing Division Guna107 MPC58403 132KV S/S PANSEMAL 40MVA BBL MAKE SN 5076/10 INDORE Testing Division - II Barwaha108 ABB06601 132KV S/S BALWADA 63MVA INDORE Testing Division - II Barwaha109 MPC75135 220KV S/S DHAR 132 KV VACMAT UJJAINI INDORE Testing Division - II Indore110 XC582192 132KV S/S SUSNER 50MVA BBL MAKE SN 5406/1 UJJAIN Testing Division - Ujjain111 Y0280030 132KV S/S AMLA Tr.132KV RLY. TR. BORDAHI_AMLA BHOPAL Testing Division - I Bhopal112 XB577712 132 KV S/s Hastinapur 40 MVA MAKE BHEL SN 2037087 GWALIOR Testing Division -I Gwalior113 XB583340 132KV S/S CHINNOR 50MVA MAAKE BBL SN 5406/04 GWALIOR Testing Division -II Gwalior114 Y0221830 132KV S/S Makdone 40 MVA BHEL UJJAIN Testing Division - Ujjain115 KAILARAS_NEW 132KV S/S KAILARAS 40 MVA GWALIOR Testing Division -I Gwalior116 RAHATGARH_NEW132KV S/S RAHTGARH 40 MVA SAGAR Testing Division -II SAGAR117 Y0221711 132KV S/S SALAMATPUR 40MVA IMP BHOPAL Testing Division -I Bhopal-S/s DN Beora118 MPC74039 220KV S/S PITHAMPUR 63MVA SEZ_II 400KV Indore Testing Division - II Indore119 X0209252 132KV S/S UMRETH 132KV Rly Trac.Umreth RAILWAY Testing Division -II Chindwara120 XC530820 132KV S/S BAGRODA 40MVA BHOPAL Testing Division -II Bhopal121 XB577480 220KV S/S GUNA 63MVA BBL SN 5442/10 400KV BINA Testing Division Guna122 BAROD_NEW 132KV S/S BAROD 40MVA BBL S.NO 5564/05 UJJAIN Testing Division - Ratlam123 Y0221711 132KV S/S SALAMATPUR 40MVA IMP BHOPAL Testing Division -II Bhopal124 PAWAI_NEW 132KV S/S PAWAI 40MVA BBL SAGAR Testing Division - Satna

Minutes of 64th OCC of MP 68

Page 71: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

125 X0209247 220KV S/S NARSINGHPUR Tr.TRACTION-NARSINGHPUR RAILWAY Testing Division -Katni126 MPP28790 132KV S/S BANKHEDI 132KV RLY TRAC BANKHEDI RAILWAY Testing Division Itarsi127 MPC73855 132KV S/S ENTKHEDI 63 MVA BHOPAL Testing Division -II Bhopal128 MP925355 132KV S/S BARHI 40 MVA IMP JABALPUR Testing Division Katni129 Y0221370 132KV S/S INDERGARH 50 MVA BHEL GWALIOR Testing Division -II Gwalior130 BAIRAD_NEW 132KV S/S BAIRAD 40MVA BHOPAL Testing Division Guna-S/S Dn Shivpuri131 MADA_NEW 132KV S/S MADA 50MVA GWALIOR Testing Division Guna-S/S Dn Shivpuri132 BANDA_NEW 132KV S/S BANDA 50MVA BHEL SGR Testing Division -II Sagar133 KARPGAON_NEW 132KV S/S KARPGAON 50MVA BHEL JABALPUR Testing Division -II Jabalpur134 DEPALPUR__NEW 132KV S/S DEPALPUR 40MVA INDORE Testing Division - II Indore135 MP924845 220KV S/S MANGLIYA 63MVA INDORE Testing Division - I Indore136 X0363187 132KV KAPSI 63MVA GWL Testing Division - Guna137 UNHEL_NEW 132KV UNHEL 50MVA BBL UJJ Testing Division - Nagda138 JOBAT_NEW 132KV JOBAT 40MVA INDORE Testing Division RAJGARH

139 DEPALPUR_NEW 132KV S/S DEPALPUR 40 MVA BHEL INDORE Testing Division - I Indore140 ELECTRONIC COM 132KV S/S ELECTRONIC COMP63 MVA MAKE BHEL INDORE Testing Division - I Indore141 XD512310 220KV S/S BARWAHA 132KV OSP CANAL FEEDER IND Testing Division - II Barwaha142 SINGOT_NEW 132KV SINGOT 40MVA IND Testing Division - Khandwa143 RAJGARH_NEW 132KV S/S RAJGARH 40MVA 132/33KV X'MER IMP SN PT-7562 IND Testing Division - Rajgarh144 HATTA_NEW 132KV S/S HATTA 20MVA 132/33KV X'MER NGEF SN 2800034786 IND Testing Division - Rajgarh145 Y0221822 132KV S/S BIORA 40MVA BPL Testing Division -I Bhopal-S/s DN Beora

Minutes of 64th OCC of MP 69

Page 72: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Annexure-8.1.iii

132KV 466190.00 468345.00 4.00 0.00 8620.00 17.00 17.00 4.00 0.0033 KV 452973.00 457359.00 2.00 0.00 8772.00 701.00 701.00 0.67 0.00 0.00132 KV 340202.00 342884.00 1.00 0.00 2682.00 215.00 215.00 1.00 0.0033 KV 1435473.00 1446811.00 0.24 0.00 2721.12 485.00 485.00 1.33 0.00132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV

33 KV

132KV33 KV

132 KV

33KV

132KV33 KV132KV33 KV132KV33 KV132KV33 KV

21 40MVA 132/33K Xmer I

20

13

40MVA 132/33K Xmer-II

18Ichhawar

Khilchipur

Sehore

50MVA 132/33K Xmer-II

20MVA 132/33K Xmer-I

16

63MVA 132/33K Xmer-II

63MVA 132/33K Xmer-I

20MVA 132/33K Xmer-I

14

15

Ashta

12.5MVA 132/33K Xmer

Sarangpur

Pachore

50MVA 132/33K Xmer-I

20MVA 132/33K Xmer

3

40MVA 132/33K Xmer-II

40MVA 132/33K Xmer II

4

IMPORT

CONSUMPTION (MWH)

63MVA 132/33K Xmer-I

Bhopal Lalghati 63MVA 132/33K Xmer-II

40MVA 132/33K Xmer-I

40MVA 132/33K Xmer-III

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) May-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

5

6

11

10

9

12

7

8

1

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

50MVA 132/33KV Xmer IBairagarh Bhopal 220

2

EXPORT

PREVIOUS READING WITH TIME & DATE

17

22

19

40MVA 132/33K Xmer

PREVIOUS READING

WITH TIME & DATE

T&C CIRCLE BHOPAL :-

20MVA 132/33KV Xmer II

40MVA 132/33K Xmer-I

Kurawar

Biaora

40MVA 132/33K Xmer-II

40MVA 132/33K Xmer-II

REMARKS

Minutes of 64th OCC of MP 70

Page 73: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) May-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV

Mandideep 220

2520MVA 132/33K Xmer

24

23 40MVA 132/33K XmerShyampur

Rajgarh

24

40MVA 132/33K Xmer

20MVA 132/33K Xmer

40MVA 132/33K XmerJeerapur

Mugaliyachaap 40MVA 132/33K Xmer

40MVA 132/33K Xmer

26

26

20MVA 132/33K Xmer

Minutes of 64th OCC of MP 71

Page 74: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) May-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

132KV33 KV132KV33 KV

132KV

33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV

132KV

33 KV

132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV

40 MVA 132/33KV Xmer-II

Bhopal MACT 40MVA 132/33K Xmer-II

30

28

38

27

Vidisha63MVA 132/33K Xmer 2

63 MVA 132/33K Xmer 1

37

31

29

32

34

40 40MVA(TELK) 132/33K Xmer

35

Beresia

Bareli

Raisen

42

36

39

41

43

44

45

Sironj

46Nasrullaganj

47

33

40MVA 132/33K Xmer II

GanjBasoda20MVA 132/33K Xmer

Mandideep 13240MVA 132/33K Xmer-II

Runha

20MVA 132/33K Xmer-I

63MVA 132/33K Xmer

20MVA 132/33K Xmer I

40 MVA 132/33K Xmer II

16MVA 132/33K Xmer-III

40MVA 132/33K Xmer I

20 MVA 132/33K Xmer-I

63 MVA 132/33K Xmer-III

40MVA 132/33K Xmer

40MVA(EMCO)132/33K Xmer 2

40MVA 132/33K Xmer

40MVA 132/33K Xmer-I

50MVA 132/33K Xmer 1

20MVA 132/33K Xmer-II

63MVA 132/33K Xmer-I

Minutes of 64th OCC of MP 72

Page 75: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) May-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

33 KV132KV33 KV132KV33 KV

132KV

33 KV132KV33 KV

132KV

33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV

Shamshabad

47

48

52

51

51

50

50

Gopalpur

49

40MVA 132/33K Xmer II

63MVA 132/33K Xmer

49

Gairatganj

Lateri

20MVA 132/33K Xmer-II

20MVA 132/33K Xmer

40MVA 132/33K Xmer-I

40MVA 132/33K Xmer

40MVA 132/33K Xmer

40MVA 132/33K Xmer

40MVA 132/33K Xmer

40MVA 132/33K Xmer

Sarni 220

Itarsi 220

Minutes of 64th OCC of MP 73

Page 76: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) May-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

132KV33 KV132KV33 KV

132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33KV

132KV

33KV

132KV

33KV

132KV

33KV

132KV

58

53

54

61

63

56

57

64

67

55

69

70

40MVA 132/33KV X-MER

40MVA 132/33K Xmer-II

40MVA 132/33K Xmer

40MVA 132/33K Xmer

20MVA 132/33K Xmer

50 MVA 132/33K Xmer

40MVA 132/33K Xmer

60

62

59

63

40MVA 132/33K Xmer-II

40MVA 132/33K Xmer-I

40MVA 132/33K Xmer-IIBetul

63 MVA 132/33K Xmer-II

40MVA 132/33K Xmer-I

40MVA 132/33K Xmer-I

Multai

40MVA 132/33K Xmer

40MVA 132/33K Xmer-II

50MVA 132/33K XmerGudgaon

Hoshangabad

20MVA 132/33K Xmer

63MVA 132/33K Xmer-I

40MVA 132/33K Xmer-I

Amla 132 40MVA 132/33KV X-MER

Seoni Malwa

Pipariya 132

Chicholi 132

Pipariya 220

40MVA 132/33KV X-MER

Bankhedi 132

63MVA 132/33KV X-MER

69

66

65

Harda

Sultanpur 132 40MVA 132/33KV X-MER

67

68

Betul 220

Minutes of 64th OCC of MP 74

Page 77: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) May-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

33KV

132KV

33KV

72 132KV

33KV

132KV

33KV

70 63MVA 132/33K Xmer 132KV33 KV

71 40MVA 132/33K Xmer 132KV

33 KV72 63MVA 132/33K Xmer-I 132KV

33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV

51 Entekhedi 63MVA 132/33K Xmer

72

74

73

73

70

71

40MVA 132/33KV X-MER

20MVA 132/33K Xmer

40MVA 132/33KV X-MER

Khirkiya 132 40MVA 132/33KV X-MER

40MVA 132/33K Xmer

Bhopal Chambal

40MVA 132/33K Xmer

20MVA 132/33K Xmer

Ayodhya

40MVA 132/33K Xmer

63MVA 132/33K XmerAmarawat Khurd Bhopal

Semriharchand 132

76

81

82

Bagroda

Shahganj

SHAMSHABAD

40MVA 132/33K Xmer

75

20MVA 132/33K Xmer

78 Saharwasa 40MVA 132/33K Xmer

50 Salamatpur

Tamot

40MVA 132/33K Xmer

77

Sultanpur 132 40MVA 132/33KV X MER

Minutes of 64th OCC of MP 75

Page 78: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

THESE THREE S/S TELEMETRY IS OUT SINCE LONG TIME1 MORWA 132 KV

1 ALL T.M. DATA CB ,MW,MVAR N/A2 132/33 KV(50MVA) XMER CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED

1 220 KV INTERCONNECTOR 2 CB FAULTY CLOSE2 220 KV TRACTION 1 CB FAULTY CLOSE

1 132 KV ANUPPUR 2 CB /MW/MVAR FAULTY PROCESSES CONNECTION REQUIRED2 132 KV ANUPPUR 1 CB FAULTY

KOTMA 132 KV S/S

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

SATNA CIRCLE

BIRSINGHPUR 220 KV S/S

BEOHARI 132KV S/S

Minutes of 64th OCC of MP 76

Page 79: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

Sr.no. DESCRIPTION Status Telemetry value at SLDC Actual value at site

1 132/33 KV XMER 2 MW/MVAR N/A2 220 KV PGCIL 1 & 2 MW/MVAR N/A 70/15

SEONI CIRCLE

SEONI 220 KV S/S

Minutes of 64th OCC of MP 77

Page 80: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 220/132 KV 160 MVA XMER(HV) CB FAULTY CLOSE

1 220 KV BUS TIE CB FAULTY CLOSE2 132/33KV 20 MVA XMER MW/MVAR NON CURRENT

1 400 KV & 220 KV BUS FREQUENCY WRONG VALUES2 315MVA X-MER-1 MW/MVAR WRONG VALUES3 400 KV BUS COUPLER CB FAULTY

1 33 KV ICHAWAR 1 CB FAULTY

1 220 KV MANDIDEEP CB FAULTY CLOSE

1 132 CHANERA(RLY.TRAC.-2) CB FAULTY CLOSE2 132 KHIRKIYARLY.TRAC.-1 CB FAULTY CLOSE

HARDA 132 KV S/S

21-06-2018SARNI 220 KV S/S

RAJGARH 220 KV S/S

ASHTA 400 KV S/S

ICHAWAR 132 KV S/S

HOSANGABAD 220 KV S/S

Minutes of 64th OCC of MP 78

Page 81: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 400KV BINA-2 CB OPEN CLOSE2 80 MVAR REACTOR-1 CB FAULTY CLOSE3 220KV BHOPAL-2 CB NON CURRENT CLOSE4 315MVA X-MER -4 TIE CB FAULTY5 80 MVAR REACTOR-1 TIE CB CB FAULTY CLOSE6 80 MVAR REACTOR-2 CB FAULTY OPEN7 315MVA X-MER -4 HV & LV CB FAULTY CLOSE

22-06-2018BHOPAL 4000 KV S/S

Minutes of 64th OCC of MP 79

Page 82: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 132 KV BUS COUPLER-1 MW/MVAR NON CURRENT2 132 KV BUS COUPLER-1 CB FAULTY OPEN

1 132 KV BUS VOLTAGE WRONG VALUES2 132 KB BASAI-1 & 2 CB FAULTY CLOSE

1 132 KV BUS COUPLER MW/MVAR NON CURRENT

1 132 KV BARODA MW/MVAR WRONG VALUES

23-06-2018

MALANPUR 220 KV S/S

PICHORE 132 KV S/S

SHIVPURI 220 KV S/S

SHOEPURKALAN 132 KV S/S

Minutes of 64th OCC of MP 80

Page 83: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

1 220/132 160 MVA X-Mer-I CB Faulty Close2 220/132 160 MVA X-Mer-II CB Open Close3 220 Kv Ujjain -II CKT CB Faulty Close4 220/132 160 MVA X-Mer-II CB Open Close5 132 Kv RLY Traction-II CB Open Close6 132 kv Bus coupler CB faulty Close7 132 Depalpur Ckt-II CB Open Close8 132 kv Sanwer Ckt CB Open Close9 132 kv Ujjain Ckt CB Close Open

1 132 KV INTC-I CB FAULTY CLOSE

1 220/132kV 160MVA TRF-1(SEC SIDE) CB FAULTY CLOSE

1 220/132 TR4(SECONDARY SIDE) CB FAULTY2 132KV BUS COUPLER CB FAULTY CLOSE3 132KV BUS COUPLER CB FAULTY CLOSE

1 220/132 160 MVA XMER-2 CB OPEN CIOSE2 33 Kv Bus coupler CB Faulty open3 132/33 KV 50 MVA XMER 33 SIDE MW,MVAR NOT COMING

220KV S/s DHAR2 132KVRAJGHARH CB Faulty CLOSE3 132/33KV TRF -1 LV side CB Faulty CLOSE4 132/33KV TRF -4 LV Side CB Faulty CLOSE5 33 KV AAHU CKT CB Faulty CLOSE6 33KV Tees gaon CB Faulty OPEN7 33KV Berchha CB Faulty CLOSE

1 132/33KV 40MVA TRF-I CB Faulty CLOSE

132 KV S/S CHHEGAONSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNIMRANI 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDINDORE SZ 220KV S/S

SOE Data are coming.NEPANAGAR 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

PITAMPUR 220 KV S/S-II

INDORE NZ (JETPURA) 220KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDPITAMPUR 220 KV S/S Sector-III

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Minutes of 64th OCC of MP 81

Page 84: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

1 132kV Shajapur CB faulty closeMAKSI 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

132 KV S/S JAORASOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

132 KV S/S SAILANASOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

GHOSLA 132 KV S/SSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Minutes of 64th OCC of MP 82

Page 85: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

2 132KV RAILWAY TRAC 2 MW,MVAR NOT COMINGSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

3 132/33KV 63MVA TRF-2 CB FOULTY CLOSE

132 KV S/S CHHEGAONSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

132 KV S/S BAHADURPUR

NIMRANI 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Minutes of 64th OCC of MP 83

Page 86: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

1 220/132 KV X-mer -IV CB Open CLOSE2 400/220KV 315MVA TRF-4 CB OPEN CLOSE

1 132kV Khachrod MW,MVAR Not coming2 33KV Unhel MW,MVAR Not coming2 132kV INTCC MW,MVAR Not coming

1

1 220 Kv Nagda Ckt -II CB Faulty Close

1 33 KV Bus Coupler CB Faulty open

1 132KV BUS -2 FREQ N/C

2 132KV CHAYAN CB FAULTY OPEN3 132KV SARJAN CB OPEN CLOSE4 220KV BUS-2 KV HZ5 33KV DISCOM-II CB FAULTY OPEN6 33KV BADNAWER CB OPEN CLOSE7 33KV CAP. BANK II CB FAULTY OPEN8 12+5 MVAR CAP. BANK CB FAULTY OPEN

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S JAORA

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S SAILANA

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED220 KV S/S BADNAGAR

N/C

220 Kv S/S NAGRA

NAGDA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNAGDA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S KACHROD

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S Polykalan

All Lines and X-mers data jump 6 times to orignal dataSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

220 KV S/S RATLAMSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Minutes of 64th OCC of MP 84

Page 87: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

9 6MVAR CAP. BANK CB FAULTY OPEN10 33KV BUS COUPLER CB FAULTY OPEN

1 33KV CAP BANK CB FAULTY CLOSE2 33KV DELIGENTIA-1 CB FAULTY CLOSE3 132KV BUS COUPLER CB FAULTY OPEN4

1 33KV UJAAS-2 CB OPEN CLOSE2 33KV DEEPAKHEDA CB OPEN CLOSE

1 132kV Buscoupler CB Faulty Close2 33KV CAP BANK-2 CB Faulty Close3 33KV BUS CUPLER CB Faulty Close

1 33KV CAP BANK-2 CB Faulty OPEN

1 33KV SARANGPUR CB FAULTY CLOSED2 132/33KVTRF-1 SEC. CB FAULTY CLOSED3 33KV BAHARWAL CB FAULTY CLOSED4 33KV BUS COUPLER CB FAULTY CLOSED5 33KV INDUSTRIAL-2 CB FAULTY CLOSED

1 132KV SHAJAPUR CB FAULTY CLOSED

MAKDONE 132KV SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

132 KV S/S AGAR

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDGHOSLA 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SHUJALPURR132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDMAKSI 132 KV S/S

132 KV S/S SITAMAU

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S RATANGARH

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Minutes of 64th OCC of MP 85

Page 88: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

12 33KV CAP BANK-2 CB FAULTY FAULTY

1 132/33KV 50MVATRF CB CLOSED OPEN

132KV ALOT

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132KV BAHADARPUR

Minutes of 64th OCC of MP 86

Page 89: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

1 ISP-INDORE 400KV 1 & 2 MVAR 200 202 ISP-NAGDA 400 KV MVAR 583 58

ISP H P S

Minutes of 64th OCC of MP 87

Page 90: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Name at SLDC end at site end

1 GEN 6 GT MW/MVAR 0 155 /102 GEN 7 GT MW/MVAR 0 160/103 GEN 6 GT CB FAULTY OPEN4 GEN 7 GT CB FAULTY OPEN5 220 KV TRB CB FAULTY CLOSE6 220 KV ITARSI 2 MW/MVAR 165/1 32/07 220 KV SARNI 1 MW/MVAR 6/2 60/108 ALL 220 KV FEEDER CB FAULTY

1 STATION XMER 5A & 5B CB N/A2 132/33 AUTO XMER CB N/A

1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C

1 400/220 KV ICT P & S (BOTH SIDE) CB FAULTY CLOSE2 400 KV STN TRANSFORMER A & B CB NA CLOSE3 STN TR 1 ,2 (220 KV ) CB NA CLOSE4 220 KV BUS TIE CB NA CLOSE

5 220 /33 KV TR CB/MW/MVAR NA

6 GEN 1 CB FAULTY CLOSE7 400 KV BUS 1 FREQ 49.79 49.988 220 KV BUS 2 VOLTAGE 264 2309 220 KV PANAGAR CB FAULTY CLOSE

10 220 KV ATPS 2 CB FAULTY CLOSE11 220 KV SHAHDOL CB FAULTY CLOSE

1 GEN 4 CB FAULTY CLOSE

1 GEN 3 CB OPEN CLOSERAJGHAT H P S

SATPURA T P S

AMARKANTAK TPS

SINGHA JI S T P S

S G T P S

GANDHI SAGAR H P S

Minutes of 64th OCC of MP 88

Page 91: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

ANNEXURE-9.10.iS.NO. NAME OF SUB-STATION VOLTAGE LEVEL

1 BINA 4002 BHOPAL 4003 KATNI 4004 INDORE 4005 NAGDA 4006 SGTPS 400 & 2207 ISP 4008 JP BINA 4009 BINA-PG 400

10 ITARSI-PG 40011 DAMOH-PG 40012 KSTPS 40013 SHUJALPUR-PG 40014 DEHGAM 40015 ASOJ 40016 RAJGARH-PG 40017 INDORE-PG 40018 BHOPAL-BDTCL 400

Minutes of 64th OCC of MP 89

Page 92: thThe Minutes of 64 meeting of the Operation and ... of 64th OCCM of MP.pdfThe Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Bina- -Agasod, Post

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Forward(ZF) Reverse(ZR)

Positive sequence

impedance

Substation Name

Line Name / X'mer

CT/CVT Ratio

PT Ratioline length in

Km

Zone-I

Zone-2

Zone-3

Zone-4 Power Swing Blocking

Annexure-9.10.II

Negative sequence

impedance

Zero sequence

impedance Relay Type

Voltage Level

Minutes of 64th OCC of MP 90