Three-phase CT/PT Operated Keypad Energy Meter
Operation Manual
Shenzhen INHEMETER Co., Ltd
www.INHEMETER.com
Three-phase CT/PT Operated Keypad Energy Meter
2 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
COTENTS 1 INHEMETER Keypad Prepayment Energy Meter Series ................................................................. 7 2 Introduction ............................................................................................................................................ 10 3 MCU Technical Parameters ................................................................................................................. 20
3.1 energy meter outline diagram: Unit: mm ................................................................................ 26
3.2 energy meter installation diagram: Unit: mm ......................................................................... 27
3.3 Meter Terminals (Unit: mm) ...................................................................................................... 28 3.4 Energy Meter Wiring Diagram ................................................................................................. 29
3.4.1 DTZ1513 (MCT405K4A-CIU) Three Phase Four Wire CT Connected Keypad Energy Meter
Wiring Diagram.................................................................................................................................... 29
3.4.2 DTZ1513 (MCT305K4A-CIU) Three Phase Three Wire PT Connected Keypad Energy Meter
Wiring Diagram.................................................................................................................................... 30
3.4.3 Auxiliary Terminal Wiring Diagram ............................................................................................ 31
3.4.4 External breaker wiring diagram 1 ............................................................................................ 33
3.4.5 External breaker wiring diagram 2 ............................................................................................ 33
3.4.6 External breaker wiring diagram 3 ............................................................................................ 34
3.4.7 External high voltage breaker wiring diagram 4 ........................................................................ 34
3.4.8 External high voltage breaker wiring diagram 5 ........................................................................ 34
3.4.9 External high voltage breaker wiring diagram 6 ........................................................................ 34
3.5 Active/reactive energy measurement...................................................................................... 34 3.6 Meter Characteristics ................................................................................................................ 37
3.6.1 Active(Reactive) impulse indicator (red LED)-marking 11, 12 ............................ 38
3.6.2 Alarm indicator(yellow LED)-marking 13 .............................................. 38
3.6.3 Balance credit indicator(bi-color LED)-marking 14 ..................................... 38
3.6.4 Optical (infrared) port-marking 3 ..................................................... 39
4 Meter measurement function .............................................................................................................. 39 4.1 Meter Principle Diagram ........................................................................................................... 39
4.2 Meter wiring diagram and vector diagram. ............................................................................ 40
4.2.1 DTZ1513(MCT405K4A-CIU)Three phase four wire CT connected energy meter ........ 41
4.2.2 DTZ1513(MCT305K4A-CIU)Three phase three wire CT&PT connected energy meter.... 42
4.3 Four quadrants metering vector diagram for active, reactive and apparent power. ........ 43 4.4 DTZ1513 three phase CT/PT connected energy meter measurement items................... 44 4.5 Energy measurement ................................................................................................................ 47
4.5.1 Total energy and each phase’s energy measurement ................................... 47
Three-phase CT/PT Operated Keypad Energy Meter
3 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
4.5.2 Multi-tariff (TOU) measurement function (32 items) ..................................... 49
4.5.3 Data freeze (historical data of power consumption) ..................................... 49
4.5.3.1 Daily data freeze (daily data within 45 days) ................................................................... 49
4.5.3.2 Monthly data freeze (13 months’ accumulative data at the end of month) ...................... 52
4.5.3.3 Instant freeze (optional) .................................................................................................. 55
4.5.3.4 Appointment freeze (optional) ......................................................................................... 55
4.5.3.5 Monthly data freeze (13 monthly energy data) ................................................................ 56
4.5.4 Energy data display and reading..................................................... 58
4.6 Maximum Demand (MD) Calculation ...................................................................................... 59
4.6.1 Maximum Demand Calculation ...................................................... 59
4.6.2 Max. Demand Reset ............................................................... 60
4.6.3 Max. Demand Calculation Extension (optional) ........................................ 60
4.6.4 13 months’ historical Max. Demand information storage ............................... 60
4.6.5 Max. Demand display and reading ................................................... 61
4.7 Electrical parameters measurement ....................................................................................... 62 4.8 Energy meter harmonic measurement THD .......................................................................... 62
4.9 fundamental wave measurement (optional) .......................................................................... 63 5 Meter TOU measurement function ..................................................................................................... 65
5.1 Daily tariff .................................................................................................................................... 66 5.2 Weekly tariff ................................................................................................................................ 69 5.3 Seasonal tariff ............................................................................................................................. 69 5.4 Holiday Tariff ............................................................................................................................... 70 5.5 Tariff rate table ............................................................................................................................ 71 5.6 Confirmation of valid daily tariff ................................................................................................ 72 5.7 Spare tariff ................................................................................................................................... 73 5.8 Step Tariff Measurement Function (Optional) ........................................................................ 74 5.9 Tariff Data Settings .................................................................................................................... 76
6 Meter LCD .............................................................................................................................................. 76
6.1 OBIS code ................................................................................................................................... 82
6.1.1 Energy accumulation Category (including credit deducted in last month) ................................ 83
6.1.2 Event log category .................................................................................................................... 84
6.1.3 Abstract and General Category ................................................................................................ 84
6.1.4 OBIS code input ................................................................... 85
6.2 Auto scroll display mode ........................................................................................................... 86 6.3 Manual scroll display mode (display mode- Set I) ................................................................ 87 6.4 Manual scroll display mode (display mode- Set II) ............................................................... 88
Three-phase CT/PT Operated Keypad Energy Meter
4 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
6.5 Manual scroll display mode (display mode- Set III) .............................................................. 90 6.6 OBIS code query display mode ............................................................................................... 91
7 Customer Interface Unit (CIU) .......................................................................................................... 138 7.1 Outline dimension .................................................................................................................... 140 7.2 Panel Diagram .......................................................................................................................... 140
7.3 CIU Diagram ............................................................................................................................. 141
7.4 CIU installation diagram .......................................................................................................... 142
7.5 CIU installation instruction ...................................................................................................... 142 7.6 CIU (wire communication) display instruction ..................................................................... 143 7.7 Special display Symbol ........................................................................................................... 144 7.8 CIU keypad instruction ............................................................................................................ 145
7.8.1 Operation by Inputting TOKEN Code via 12-key keypad ............................... 145
7.8.1.1 Complete TOKEN code ................................................................................................. 145
7.8.1.2 Incomplete TOKEN ....................................................................................................... 146
7.8.1.3 Used TOKEN ................................................................................................................ 146
7.8.1.4 Overdue TOKEN code .................................................................................................. 146
7.8.1.5 TOKEN which is complete and correct but rejected due to overflow ............................. 147
7.8.1.6 Incorrect TOKEN code .................................................................................................. 147
7.8.2 Assignment encryption key input operation ........................................... 148
7.8.3 Technical TOKEN ................................................................ 149
7.8.3.1 Tampering clearance TOKEN ........................................................................................ 149
7.8.3.2 Load threshold TOKEN ................................................................................................. 149
7.8.3.3 Credit clearance TOKEN ............................................................................................... 149
7.8.4 Special TOKEN .................................................................. 149
7.8.4.1 Pre-warning threshold TOKEN ...................................................................................... 150
7.8.4.2 Warning threshold TOKEN for low remaining credit ...................................................... 150
7.8.4.3 Processing activation TOKEN after Installation ............................................................. 150
7.8.5 Test TOKEN (Non-specified meter TOKEN) .......................................... 150
7.8.6 Extended function TOKEN .................................................................................................. 151
8 Special functions ................................................................................................................................. 151 8.1 Load cut off function ................................................................................................................ 151 8.2 Zero credit power off ............................................................................................................... 151 8.3 Load control function ............................................................................................................... 152 8.4 Protection against Voltage Abnormity of Grid ...................................................................... 153
8.4.1 Automatic Power Off .............................................................. 153
Three-phase CT/PT Operated Keypad Energy Meter
5 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
8.4.2 Recovery of power supply ......................................................... 154
8.5 Anti-tamper against Cover Opening Counter & Power- off ................................................ 155
8.5.1 Energy meter will instantly power off once the terminal cover or upper cover is opened under
condition of power- on. .................................................................. 155
8.5.2 tripping at terminal cover opening under condition of power-off, this function needs to be
activated. .............................................................................. 155
8.6 Pre-warning & warning against low balance amount ......................................................... 156
8.6.1 Pre-warning function .............................................................. 156
8.6.2 Warning function ................................................................. 157
8.7 Anti-overflow when recharging ............................................................................................... 157 8.8 Anti-tamper for reverse power consumption. ....................................................................... 157 8.9 Overdraft (Option) .................................................................................................................... 158 8.10 Power-off upon load current higher than threshold (Option) ........................................... 158 8.11 Special time or day for friendly none-disconnection power supply ................................ 159 8.12 Shift Between Post-payment and Prepayment( Option) .................................................. 160 8.13 TOU multi-tariff / stepped tariff shift function by credit(money) settlement mode (option) .......................................................................................................................................................... 161
8.14 Monthly basic power consumption amount setting (Option) ........................................... 161 8.15 Settings for relevant processing parameters and prepayment configuration status word .......................................................................................................................................................... 161
8.16 Display negative value for balance amount ....................................................................... 164 8.17 Available Amount ( balance amount) Ladder Diagram Indication .................................. 164 8.18 It’s Not Available to Program or Modify Meter Number(Serial Number) after delivery from factory ..................................................................................................................................... 165 8.19 Load Profile Record .............................................................................................................. 165 8.20 Available Days Indication( Option) ...................................................................................... 166 8.21 Display without Power( Option) ........................................................................................... 167 8.22 Monthly Billing Settlement Day (Billing Date) .................................................................... 167 8.23 Over-temperature Power-off( Option) ................................................................................. 167 8.24 Magnetic Interference Power-off(Option) ........................................................................... 167 8.25 Remote Upgrading ................................................................................................................ 168 8.26 Processing Status Inquiry ..................................................................................................... 168 8.27 Date Display Shift .................................................................................................................. 170 8.28 Automatic Shift with RTC between DST and Winter Time ............................................... 170
9 Special billing Functions for Transformer Loss, Reactive Loss, Installation Capacity .............. 170 9.1 Transformer Loss billing .......................................................................................................... 170 9.2 Reactive Loss billing 1 (Average deduction per hour mode) .......................................... 172 9.3 Reactive Loss billing 2( Real-time Deduction Mode) ..................................................... 173 9.4 billing for Monthly Apparent Maximum Demand ............................................................... 173 9.5 Monthly Installation Capacity(kVA) Charge .......................................................................... 174 9.6 Monthly Fixed Charge( Basic Charge) .............................................................................. 174
Three-phase CT/PT Operated Keypad Energy Meter
6 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
10 Historical Data Transfer & Storage and Event Record ................................................................ 174 10.1 13 Months Monthly Power Consumption Data Storage ................................................... 174 10.2 45 Days Daily Power Consumption Data Storage ......................................................... 175 10.3 Tripping Event Record .......................................................................................................... 175 10.4 Grid Power-off Event Record ............................................................................................... 176 10.5 Special Event Record ............................................................................................................ 176 10.6 Recharging Information ..................................................................................................... 178 10.7 Technique TOKEN Application Information ..................................................................... 180
11 Communication Port ......................................................................................................................... 182 11.1 Optical (infrared) communication port .............................................................................. 182 11.2 RS-485 Communication Port ............................................................................................ 183 11.3 TG4A0-01 Three-phase Meter GPRS/GSM Communication Module ........................... 183 11.4 TPDH0-01 Three Phase Meter PLC Communication Module ........................................ 183 11.5TRGB0-01 Three-phase Meter RF Low Power-consumption Communication Module 184 11.6 TZ0A0-01 Three-phase Meter Zig-bee Communication Module .................................... 184
12 Safety and Security Rule ................................................................................................................. 184 13 Prepayment keypad energy meter malfunction diagnosis .......................................................... 184 14 Meter Installation and Operation Instructions ............................................................................... 185 15 Transportation and storage notice .................................................................................................. 185 16 Warranty ............................................................................................................................................. 185 17 Annex Instructions ............................................................................................................................ 186 18 INHEMETER SMARTtvend management system ....................................................................... 186
20 Instruction for prepayment keypad meter power load threshold presetting & pre-stored electricity at factory ................................................................................................................................ 190
20.1 Rule for load threshold presetting & pre-stored electricity at Factory by INHEMETER massive production ........................................................................................................................ 190 20.2 Pre-stored electricity........................................................................................................... 190 20.3 Load threshold presetting ..................................................................................................... 191
21 Keypad prepayment meter massive production encryption key setting and process ............ 192 21.1 Customized SGC Code Setting ........................................................................................... 192 21.2 INHEMETER default encryption key(SGC:999937)Setting ................................. 192
Three-phase CT/PT Operated Keypad Energy Meter
7 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
1 INHEMETER Keypad Prepayment Energy Meter Series
INHEMETER keypad prepayment energy meter series include:
single & three phase meters; integrated & split type meters; kWh settlement mode & money(amount) settlement mode, TOU (Time of Use) multi-tariff mode & stepped tariff mode; cable, PLC(Power Line Carrier) and low power RF communication method; DLMS certified plug-in communication module single/three meter; ANSI standard compliance split keypad meter, common base type single phase keypad prepayment meter complying with ESKOM
installation requirements(South Africa); three phase measurement device with metering box, single phase keypad prepayment meter complying with PLN D3 009:2010(Indonesia), and three phase CT/PT connected keypad energy meter.
Three-phase CT/PT Operated Keypad Energy Meter
8 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Single/Three Phase Plug-in Module Keypad Prepayment (Direct Connected) Energy Meter Product Series:
Three-phase CT/PT Operated Keypad Energy Meter
9 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Three Phase Plug-in Module Keypad Prepayment (CT/PT Connected) Energy Meter Product Series:
Three Phase Keypad Prepayment Energy (CT/PT Connected)Low Voltage Metering Cabinet
MCU(Metering&Control Unit) installed in
low/high voltage metering control equipment
CIU(Customer Interface Unit) installed
indoors or on metering cabinet surface
Three-phase CT/PT Operated Keypad Energy Meter
10 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
2 Introduction DTZ1513 (CT/PT connected) Plug-in Module Keypad Prepayment Energy Meter is used for 3 phase 4 wire low voltage or 3 phase 3 wire high voltage, civil or commercial power measurement purpose. It complies with STS (Standard Transfer Specification) regulation and can accept 20 digits STS code input. This type of meter shall be used together with corresponding PT, CT, and capable circuit breaker. . The meter complies with DLMS/COSEM and is certified with DLMS certificate. The meter supports active/reactive/apparent energy measurement, and it supports different communication modules. Meter can be switched between prepayment mode and post-payment mode. kWh bill settlement mode, money(amount) bill settlement mode, TOU multi-tariff and step-tariff are all available in the meter. It is ideal to be used in AMI/AMR system together with certain concentrator and centralized meter reading software. It adopts international IEC62053, IEC62055 and IEC62056 standard; its design and production comply with ISO9001 standard.
According to actual requirement and site situation, users can select different communication module, concentrator and centralized meter reading software for configuration of AMI/AMR system, so as to realize centralized meter reading, remote recharging, remote connection/disconnection and etc. DTZ1513 Three phase CT/PT connected keypad prepayment energy meter has the following features ● import active power (kW+), export active power (kW-), combined active power (net active power or absolute active power) ● Four quadrant reactive power, combined reactive power 1 (forward reactive power or inductive
reactive energy), combined reactive energy 2 (programmable options including reactive reverse energy, capacitive reactive energy)
● Apparent energy ●Metering accuracy
Active energy Class 0.5S, complied with IEC62052-22 Reactive energy Class 2, complied with IEC62052-23
● Accurate measurement within range from starting current to maximum current; ● Multi-tariff metering system: power consumption measured according to tariff time shift; ●Tariff shift:
Tariff shift through meter real-time-clock (RTC); Meter saves two tariff solutions and could shift automatically at preset date/time.
Three-phase CT/PT Operated Keypad Energy Meter
11 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
● Large LCD display for data, power direction and prompt symbols; ● Maximum demand calculation: sliding type; ● Measure, record and monitor on real time voltage, current, frequency, active / reactive / apparent power, power factor and other electrical parameters of each phase; ● Load profile record (programmable to record channel number, time shift, data item ) ● Data frozen function: Timing frozen, daily frozen, set frozen, event frozen optional for measurement and value; ● Event record, saving: Detect and record events such as loss phase, power off, by pass, unqualified voltage; ● Summary of voltage qualified rate ● Anti-tamper function: Detect and record unauthorized open terminal cover or communication module cover event and illegal programming events; ● Energy meter shall be able to keep accurate measurement and normal operation in case that certain phase failures or applied to two phase or single phase power grid; ● RWP( reading without power); ● Optical communication port complies with IEC62056-21, functions including
Read meter data through HHU Make programming on site by encryption
● RS-485. RS-485 communication port; ● Plug-in replaceable communication module, able to extend communication ports according to actual requirement. ● Energy meter is able to generate pulse or swift signal to control external alarm or load switch; ● Energy meter is expandable and shall be added with new functions as required; ● Keypad prepayment energy meter complies with STS stipulations and acquires related test certificates; ● Energy meter communication protocol complies with DLMS certificates and acquires related tes certificate; ● Energy meter is able to upgrade software remotely or locally ● Meter supports harmonic metering and harmonic distortion analysis
DTZ1513 Three phase CT/PT connected plug-in communication module keypad prepayment energy meter consists of metering & control unit (MCU), and customer interface unit (CIU) as split type keypad prepayment energy meter. A: MCU: Measurement and Control Unit--Split type keypad prepayment energy meter MCU can be installed in metering box, metering cabinet, or low/high voltage metering chamber, etc; B: CIU: Customer Interface Unit--Split type keypad prepayment energy meter CIU can be installed indoors in customer’s premise to facilitate operation and know about energy meter operation parameter and loaded credit (kWh or money/ amount credit); C: Communication between MCU and CIU is two-wire communication.
Three-phase CT/PT Operated Keypad Energy Meter
12 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
AMI/AMR System Configuration
AMI/AMR system can be configured with the meter, concentrator and SMARTvend/AMR management system. System composition diagram is as below: This system has main functions as below:
Remote meter reading Remote recharging Remote control Remote tariff setting/ load threshold setting Line loss analysis Remote meter software upgrading
Three-phase CT/PT Operated Keypad Energy Meter
13 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Order model Instruction:
S/N Product type
Order model Instruction
1 MCU (Metering&Control Unit)
1.1
DTZ1513(MCT405K4A-CIU)
Three phase four wire plug-in communication module keypad prepayment energy meter (CT connected) MCU
3X220/380V 5(6)A 50Hz active class 0.5S reactive class
2
1.2
DTZ1513(MCT305K4A-CIU)
Three phase three wire plug-in communication module keypad prepayment energy meter (CT/PT connected) MCU
3X100V 5(6)A 50Hz active class 0.5S reactive class 2 2 Plug-in communication module (optional)
2.1
TG4A0-01 Three phase meter GPRS/GSM communication module(Simcom- SIM900,quad-band)
2.2
TPDH0-01 Three phase meter PLC communication module (HT8560 central frequency 125kHz; PLC frequency
Three-phase CT/PT Operated Keypad Energy Meter
14 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
range: 125±2.8kHz; PLC speed 550bps DPSK)
2.3
TRGB0-01
Three phase meter RF wireless communication module (APPCON APC320N; port speed default value: 9600bps; Frequency 470 ~ 510MHz; Transmission power programmable; AMR module APC920)
2.4
TZ0A0-01
Three phase meter Zig-bee communication module (EM250 communication speed: 250kps, modulate method O-QPSK; Concentrator module HD3501-SB/Zig-bee chip EM357)
3 CIU (Optional)
DDZ1513-CIU-CABL
E Two-wire communication CIU
4 Low voltage side data concentrator (optional)
4.1
DJGZ22-INHEMETER20
Low voltage PLC concentrator, remote communication GPRS/GSM, local communication PLC
4.2
DJGJ22-INHEMETER20
Low voltage RF wireless concentrator, remote communication GPRS/GSM, local communication RF
4.3
DJGT22-INHEMETER20
Low voltage Zig-bee concentrator, remote communication GPRS/GSM, local communication Zig-bee
Three-phase CT/PT Operated Keypad Energy Meter
15 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Model No. and ID code instruction for DTZ1513 Three-phase (CT/PT connected) plug in communication module keypad prepayment meter:
DTZ1513 (MCT405K4A-CIU)
DTZ1513: INHEMETER Three phase meter model No.(Registered)
Supplementary code
Meter installation
MBS: Three phase BS direct connected plug-in module energy meter
MCT: Three phase BS CT/PT connected plug-in module energy meter
0BS: Three phase BS direct connected (no plug-in module) energy meter
0CT: Three phase BS CT/PT connected (no plug-in module) energy meter
Meter wiring
3: Three phase three wire energy meter
4: Three phase four wire energy meter
Active measurement accuracy
10: IEC active energy Class 1 or Class B (EU MID)
05: IEC active energy Class 0.5S or Class C (EU MID)
02: IEC active energy Class 0.5S
Meter function
K: STS complied keypad prepayment energy meter
T: Multi-function multi-tariff energy meter
Meter case serial No.
2A: INHEMETER three-phase smart meter case design series II
3A: INHEMETER three-phase smart meter case design series III
4A: INHEMETER three-phase smart meter case design series IV
Customer interface unit
Null: Integrated energy meter without customer interface unit
CIU: With customer interface unit . two-wire communication between CIU and MCU
Three-phase CT/PT Operated Keypad Energy Meter
16 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Remarks: Each low voltage PLC/RF wireless concentrator can read/control 1024pcs (single/three phase) energy meters under one transformer. According to actual requirement, generally, one low voltage transformer is applied for 100 to 600pcs energy meters. INHEMETER energy meter has repeater function, so that the maximum distance between concentrator and energy meter could reach upto 1000 meters. In particular area, additional repeater could be installed so as to increase efficiency of meter reading. For details, please refer to low voltage concentrator operation manual.
It is suggested that DTZ1513 three phase CT/PT connected plug-in module keypad energy meter is better to adopt GPRS/GSM communication module. If there are more than one meter, one of them could be defined as main meter which is built with GPRS/GSM module and connected with other meters by RS485. INHEMETER offers low/high voltage metering cabinet with corresponding CT/PT, circcuit breaking device for high current purpose, as well as meter cabinet blueprint. Meter’s circuit, structure, components and mateirals are designed and selected to adapt greater enviroment tolerance so as to ensure meter’s durablity and stability. Measuring element is protected with shield deivce to prevent disturbance from external AC/DC magnetic field and over-voltage/high frequency electromagnetic field. Perfect EMC performance, durability and stability enable the meter to work accurately through out the whole life period without any calibration. Meter case is made of environment friendly recyclable PC material which is fire retardant and anti-thermal deformation. Meter case is double insulation, its protection grade is IP54 (IEC60529). Meter terminals are made of brass with nickel plated, which is suitable even for tropical climate. Meter is equipped with sealable terminal cover. Keypad prepayment Meter has two deduction modes: energy deduction mode and money (amount) deduction mode.
Energy deduction mode:
Meter calculates consumption based on energy consumed (i.e. kWh). The credit recharged in the meter is also energy (i.e. kWh).
Money (amount) deduction Mode:
Meter should be configured with tariff (flat tariff, TOU tariff or step tariff)first. Credit in the meter is displayed as money amount. Balance amount will be deducted when every 0.01kWh is consumed (i.e. 0.01kWh X tariff rate is the amount to be deducted every time) .
Money (amount) deduction----TOU tariff application instruction: 4 tariff rates and 12 time shifts can be programmed each day. According to electricity using
Three-phase CT/PT Operated Keypad Energy Meter
17 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
situation in one area, utility can adjust electricity price at different time shifts to encourage electricity use at off-peak period and save at peak period.
Tariff Rate Category:
Serial No.
Tariff Rate Tariff Code Comments
1 P0 T1(TOU1) Sharp Consumption Time Period 2 P1 T2(TOU2) Peak Consumption Time Period 3 P2 T3(TOU3) Off-peak Consumption Time Period 4 P3 T4(TOU4) Valley Consumption Time Period
Notes: P0, P1, P2, P3---Tariff Rate (unit: $); minimum unit: 0.0001 T1, T2, T3, T4---Tariff Code
Period Division: Serial No.
Period Start Time (HH:MM) Tariff Rate / Tariff Code Option
TOU1 TOU2 TOU3 TOU4 1 2 3 4 5 6
Three-phase CT/PT Operated Keypad Energy Meter
18 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
7 8 9
10 11 12
Period Setting Example:(as below table) Serial No.
Period Start Time (HH:MM) Tariff Rate / Tariff Code Option
TOU1 TOU2 TOU3 TOU4 1 06:00 √ 2 18:00 √ 3 23:00 √
Money(amount) deduction mode ----Step tariff application instruction: 7 step tariff rates can be programmed in one month. Utility can encourage user to reduce energy consumption through price control.
Note 1:Basic Monthly Consumption can also be preset. Once set, the fixed consumption will be
deducted from the balance amount at 00:00 of the first day of each month.
Note 2:Basic Consumption/kWh can also be preset.Once set, the fixed consumption will be
deducted from the balance amount as per 1 kWh is consumed.
Electricity Saving Policies
Electricity Price
Monthly Energy Consumption
Three-phase CT/PT Operated Keypad Energy Meter
19 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
S/N Monthly Power consumption
Step Tariff Rate Tariff Code Billing Mode
1 0 < Y ≤ E1 P0 T1 Y*P0 2 E1 < Y ≤ E2 P1 T2 E1*P0+(Y-E1)*P1 3 E2 < Y ≤ E3 P2 T3 E1*P1+(E2-E1)*P1+(Y-E2)*P2 4 E3 < Y ≤ E4 P3 T4 … … … 5 E4 < Y ≤ E5 P4 T5 … … … 6 E5 < Y ≤ E6 P5 T6 … … … 7 Y > E6 P6 T7 … … …
Note: Y---Monthly Power Consumption (unit: kWh) E1, E2, E3, E4, E5, E6--- Monthly Power consumption Division (unit: kWh) P0, P1, P2, P3, P4, P5, P6--- Step Tariff Rate (unit: $): minimum unit: 0.0001 T1, T2, T3, T4, T5, T6, T7, T8---Tariff Code
Tariff Setting Meter’s tariff can be programmed through AMI/AMR system and local communication port (optical communication port, RS-485 communication port). Tariff programming is strictly secured with security module and key. Tariff setting comes with tariff version index and tariff activation date/time. Meter is stored with two sets of tariff: when one tariff is in use, the other set of tariff can be programmed and activated at certain date/time to replace the in-use one. After replacement the old tariff will be deleted automatically and get ready to accept new tariff.
This operation manual is edited for three phase CT/PT connected plug-in module keypad prepayment energy meter with money(amount) deduction mode. Special settings: 1. Three phase four wire CT connected plug-in module keypad prepayment energy meter
DTZ1513 (MCT405K4A-CIU) product internal serial No.: TK41-1c13103. MCU has LCD display, without keypad, meter has split CIU display unit.
2. Three phase three wire CT&PT connected plug-in module keypad prepayment energy meter DTZ1513 (MCT-305K4A-CIU) product internal serial No.: TK41-1c13104. MCU has LCD display, without keypad, meter has split CIU display unit.
3. Communication module supports GPRS/GSM or PLC communication modules;
Three-phase CT/PT Operated Keypad Energy Meter
20 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
3 MCU Technical Parameters DTZ1513 Three phase CT/PT keypad prepayment energy meters with plug-in communication module is used to measure 3 phase 4 wire AC active/reactive/apparent energy with 50/60Hz low voltage/high voltage.
DTZ1513 Technical Parameter Chart:
Description specification note Technical Standard IEC 62052-11 2003
IEC 62053-22 2003 IEC 62053-23 2003 IEC 62055-31 2005 IEC 62055-41 2007 IEC 62055-51 2007 IEC62056-21(IEC61107) SANS 1524-1 2005 ESKOM SCSSCAAA9 BS5685-1997/ DIN 43857
Meter Type DTZ1513(MCT405K4A-CIU)
Three phase four wire CT connected keypad prepayment meterPlug-in communication module (GPRS/GSM, PLC) Money (amount) deduction mode (multi-tariff; step tariff as standby) Regular display: balance credit
DTZ1513(MCT305K4A-CIU)
Three phase three wire CT&PT connected keypad prepayment meter Plug-in communication module (GPRS/GSM, PLC) Money(amount) deduction mode (multi-tariff; step tariff as standby) Regular display: balance credit
Active Energy Metering Direction
Forward and reverse energy will be calculated; Combined active energy is programmable (net active energy or total active energy) Total active energy is default at factory(absolute value of forward active energy + absolute value of reverse active energy)
Reactive Energy Metering Direction
Reactive four quadrant metering; Two combined reactive energy available, A: Forward reactive /Reactive inductive energy B: Reverse reactive /Reactive capacitive energy Default setting at factory is reactive forward energy and reactive reverse energy
Anti-tamper mode Meter can record meter cover opening and terminal cover
Three-phase CT/PT Operated Keypad Energy Meter
21 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Description specification note opening events to prevent tampers.
STS Manufacturer Code 37 STS Test Certificate No. STS-192、STS-194 Rated operating voltage (Un)
DTZ1513(MCT405K4A-CIU)
3X220/380V Three phase four wire CT connected keypad prepayment meter
DTZ1513(MCT305K4A-CIU)
3X100V Three phase three wire PT/CT connected keypad prepayment meter
Working frequency 50Hz±5Hz ; Active measurement accuracy
Class 0.5S
Reactive measurement accuracy
Class 2
Basic current(Ib) 5A Maximum Working Current
6A
Starting Current ≤10mA Threshold Current for Accurate Metering
10A
Short-time Over current 300A Power Consumption Voltage circuit each phase:<1.5W (or <4VA )@220V
Current circuit each phase : < 0.2VA@ Base Reference Current (Ib)
Meter Constant 5000 imp/kWh 5000imp/kVarh
Output of meter pulse LED, optical couplar Working Voltage DTZ1513(MCT405K4A-CIU)
Upper threshold: 264V Low threshold: 150V 68%--120%Un(programmable) Note: meters are able to trip against abnormal voltage (programmable)
Working Voltage DTZ1513(MCT305K4A-CIU)
Upper threshold: 120V Low threshold: 70V 68%--120%Un(programmable) Note: meters are able to trip against abnormal voltage (programmable)
Maximum withstand voltage (48 hours)
500V No damage on meter, accurate metering and normal working can be assured after recover to normal working voltage 3X240/415V.
Three-phase CT/PT Operated Keypad Energy Meter
22 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Description specification note Short-time withstand voltage (1min)
600V AC No damage on meter, accurate metering and normal working can be assured after recover to normal working voltage.
Breaker device (Meter has no integrated breaker)
DTZ1513 Three phase (CT/PT connected) plug-in module keypad prepayment energy meter needs external breaker to realize prepayment control function. Low/high voltage breaker with shunt release device and electric motor is suggested.
Meter output control signal
1. Breaker electric motor connect signal; 2. Breaker electric motor disconnect signal; 3. shunt release signal; 4. Meter operation status signal 1- connect signal; 5. Meter operation status signal 2- alarm signal; 6. Meter operation status signal 3- disconnect signal. Energy meter built-in control relay generates above signals Contact capacity: AC: 220V 5A DC: 24V 5A
Power control output(AC)
In order to ensure breaker and other signals can work efficiently even when meter loses one or more phases, meter is equipped with a control power output terminal which can be powered with individual phase and generate control signals when other phase/phases are lost. AC:220V 10A
DTS1513 Meter MCU has display unit and plug-in communication module but no keypad.
Display /notice interface With large screen, wide angle (≥120º), anti-ultraviolet function, wide temperature range of LCD display mode, Digital display is 8 bits, IEC62056 display code encoding, visualized prompt symbol, remaining credit bar indication, alarm/tip LED indication, LCD screen with backlight instruction, user-friendly.LCD size: 82.0X37.5mm LCD visible display size: 77.0X33.0mm LCD digit size (height X width): 12X4.77mm Two display modes: auto-scroll (defaulted), manual scroll. Display content is programmable. Default regular display item is balance energy. RWP (reading without power) function.
Working Environment: Working Temperature: Storage Temperature: Humidity Requirement:
-40℃~+75℃ -40℃~+80℃ At the maximum temperature of 55℃, the relative humidity
Three-phase CT/PT Operated Keypad Energy Meter
23 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Description specification note Altitude:
range is : 0~95% During the night: 100 % relative humidity (Maximum) During the day: 25 % relative humidity Less than 3500 meters area
Lightning Protection Built-in varistor protection Meters can be used where severe lighting storms prevail.
Communication Port Infrared communication RS-485 communication port
Communication protocol IEC62056-21 Mode C
Communication modules Selection
Please refer to the introduction of communication modules
TG4A0-01 GPRS/GSM communication module; (Simcom- SIM900, quadruple frequency)
TPDH0-01 PLC communication module; (HT8560 center frequency 125kHz;carrier frequency range: 125±2.8kHz;carrier rate:550bps DPSK)
TRGB0-01 RF communication module; (APPCON APC320N; default port rate: 9600bps; frequency: 470~510MHz; emission power is programmable; centralized meter reading module APC920)
TZ0A0-01 Zig bee communication module (EM250 communication rate: 250kps, modulation mode: O-QPSK; concentrator module HD3501-SB/Zig Bee chip EM357)
Real-time Clock Real-time clock Crystal oscillator frequency: 32.768 kHz Clock accuracy (support clock temperature compensation) : ±5ppm Within reference temperature (23℃) and working voltage range: clock accuracy ≤0.5s/d Within working temperature range (-25℃~+75℃) and under AC power supply or back up power supply mode: clock accuracy≤1.0s/d
Real-time clock backup battery
Columnar battery: 3.6 V lithium-ion battery capacity ≥1200mAh During grid power failure, the battery can support clock working more than 10 years.
Insulation performance Class Ⅱ insulation envelope protection instruments, protection grade 2 , double insulation
Pulse voltage AC withstand voltage Current pulse
6KV 4KV Service rating 5kA 8/20μs Withstand rating 30 kA, 4/10μs
IEC60060 1.2/50μs
Three-phase CT/PT Operated Keypad Energy Meter
24 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Description specification note Electromagnetic compatibility
Electrostatic discharge Standard: IEC 61000-4-2 Contact discharge : 8 kV Air discharge: 15kV
Meter works normally.
RF electromagnetic interference resistance test
Standard: IEC 61000-4-3 With current status: 80MHz to 2GHz 10 V/m No current status: 80MHz to 2GHz 30V/m
Meter error meets the requirement. Meter works normally.
Fast transient pulse burst test
Standard: IEC61000-4-4 under basic current work condition For current and voltage circuit: 4KV For auxiliary circuit> 40V: 2KV
Meter error meets the requirement. Meter works normally
RF field induction conduction disturbance test
Standard:IEC61000-4-6 under basic current work condition Voltage level: 10V 150kHz to 80MHz
Meter error meets the requirement. Meter works normally.
Surge immunity test Standard: IEC 61000-4-5 Test voltage levels: For current and voltage circuit: 4KV For auxiliary loop: 1KV
Meter works normally.
Structure requirement Casing and terminal layout
Comply with BS5685/DIN 43857
Casing protection class IP54 IEC60529-4 standard Housing Material Fire retardant, flame resistant, thermal deformation engineering
plastic PC+GF
Inflaming retardant test : pass 960°C glow wire test
(IEC60695-2-1)
Fire resistant test:UL94-V0 rated @1.5mm. No toxic gases emitted: Green Material
Physical dimension(LXWXH) Extended terminal cover
290.0mm X 170.0mm X 85.0mm
Weight About 1200g Terminals: Terminals layout complies with BS5685/ DIN 43857
Main terminal is the pressure-plate type; two screws for a wire.
Three-phase CT/PT Operated Keypad Energy Meter
25 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Description specification note
The material is rust-proof.
Current circuit is connected to terminal:
Hole diameter: 4.6mm; hole depth: 30mm:
Maximum Cable Cross Section: 30 mm2
Voltage circuit is connected to terminal: Hole diameter: 6.3mm; hole depth: 30mm: hole distance: 20mmMaximum Cable Cross Section: 16 mm2
Terminal material Fire retardant, flame resistant, thermal deformation engineering
plastic PC+20%GF
Inflaming retardant test : pass 960°C glow wire test
(IEC60695-2-1)
Fire resistant test:UL94-V0 rated @1.5mm. No toxic gases emitted: Green Material
Sealing Five seals in total:
1)Two manufacturer seals on meter cover;
2)Two terminal cover seals;
3) One seal on communication module cabinet
Three-phase CT/PT Operated Keypad Energy Meter
26 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
3.1 energy meter outline diagram: Unit: mm Extended terminal cover
Three-phase CT/PT Operated Keypad Energy Meter
27 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
3.2 energy meter installation diagram: Unit: mm Extended terminal cover
Pothooks under the base locate on two positions of which the distance is 16mm. The distance is
adjustable.
Three-phase CT/PT Operated Keypad Energy Meter
28 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
3.3 Meter Terminals (Unit: mm)
● Type pressure-plate type terminal ● Hole diameter Current circuit Φ6.3mm Voltage circuit Φ4.6mm ● Recommended cable cross section 4-6 mm2 ● Fastening torque Up to 1.7Nm
Auxiliary terminals
Current/Voltage
terminals
Three-phase CT/PT Operated Keypad Energy Meter
29 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
3.4 Energy Meter Wiring Diagram
3.4.1 DTZ1513 (MCT405K4A-CIU) Three Phase Four Wire
CT Connected Keypad Energy Meter Wiring Diagram
DTZ1513 (MCT405K4A-CIU) Test Terminal (Voltage circuit could be equipped with fuse) Wiring
Diagram
LOAD
Test terminal
Voltage circuit fuse
Three-phase CT/PT Operated Keypad Energy Meter
30 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
3.4.2 DTZ1513 (MCT305K4A-CIU) Three Phase Three Wire
PT Connected Keypad Energy Meter Wiring Diagram
DTZ1513(MCT305K4A-CIU) test terminal wiring diagram
LOAD
Test terminal
PT grounding
Three-phase CT/PT Operated Keypad Energy Meter
31 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
3.4.3 Auxiliary Terminal Wiring Diagram
1.8.0
OBIS编码
2.8.015.8.03.8.04.8.05.8.06.8.07.8.08.8.09.8.010.8.0
总(合相)电能寄存器
正向有功电能
反向有功电能
组合有功电能
第一象限无功电能
第二象限无功电能
第三象限无功电能
第四象限无功电能
组合无功电能1组合无功电能2
正向视在电能
反向视在电能
Three-phase CT/PT Operated Keypad Energy Meter
32 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Meter has 6 sets of control signal output and one set of power control, as below:
S/N Function Terminal No. Instructions
1 Operation status
indication 1---Relay
connect status
13-17 13,17 connect (15-17;16-17 disconnect); it means meter is
under normal operation.
2 Operation status
indication 2---Alarm
status
14-17 14,17 connect, it means meter is alarming.
3 Operation status
indication
1---Disconnect
status
15-17 15,17 connect (13-17 disconnect): it means meter is
disconnected.
4 Shunt release
control signal
16-17 16,17 connect (13-17 disconnect): it means meter sends
shunt release signal and disconnect external low/high voltage
breaker.
5 Electric motor
connect signal
20-21 20, 21 connect (20-22 disconnect,13-17 connect. Meter relay
connect status): electric motor automatically connects.
6 Electric motor
disconnect signal
20-22 20, 22 connect (20-21 disconnect) electric motor
automatically disconnect. Meanwhile 15-17 connect.
7 Control power
output
18-19 To send control signals when one or more phases are lost.
8 Control power
choosing
17 17-18 connect, use meter to output control power; terminal 17
could also choose external control power.
Control power output working
principle under lost phase
condition
X -- power or no power
L1 L2 L3
19 output Power X X
20 output No power Power X
21 output No power No power Power
No output No power No power No power
Three-phase CT/PT Operated Keypad Energy Meter
33 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
S/N Function Terminal
No.
Instructions
1 RS-485 port 23-24 Able to cascaded, or connected with external
communication modules.
2 On-off input 25-26 User for low/high voltage metering cabinet open sensor
3 CIU interface 27-28 None polarity
4 11-12 Reserved
3.4.4 External breaker wiring diagram 1 Good for energy meter to output working mains; and able to support breaker working normally when losing phase.
3.4.5 External breaker wiring diagram 2 Connect with external breaker working mains, work along with middle relay to detect losing phase so as to ensure normal operation in certain conditions when losing phase.
27 2823 24
+ -
25 26
Three-phase CT/PT Operated Keypad Energy Meter
34 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
3.4.6 External breaker wiring diagram 3 External breaker working mains use phase A as control power, which means if phase A loses, control could not be realized.
3.4.7 External high voltage breaker wiring diagram 4 Convenient for energy meter to output working mains, able to support high voltage breaker working normally when losing phase.
3.4.8 External high voltage breaker wiring diagram 5 Connect with external high voltage breaker working mains, along with middle relay to detect losing phase so as to ensure normal operation in certain conditions when losing phase.
3.4.9 External high voltage breaker wiring diagram 6 External breaker working mains use phase A to control power, which means if phase A loses, control could not be realized.
3.5 Active/reactive energy measurement DTZ1513-three phase energy meter active energy measurement (Class 0.5S) percentage error under factory threshold.
Load value Power factorError threshold by percentage
IEC62053-22 standard
INHEMETER standard
0.02In≤I< 0.05 In 1 ±1.0 ±0.6 0.05In≤I≤Imax 1 ±0.5 ±0.2
0.05In≤I< 0.1In 0.5 lag 0.8 lead
±1.3 ±1.3
±0.7 ±0.7
0.1In≤I≤ Imax 0.5 lag 0.8 lead
±0.8 ±0.8
±0.4 ±0.4
Three-phase CT/PT Operated Keypad Energy Meter
35 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
DTZ1513-three phase energy meter reactive energy metering (Class 2) percentage error under factory threshold
Load value Sinφ
(inductive or capacitive)
Error threshold by percentage IEC62053-23
standard INHEMETER standard
0.02In≤I< 0.05 In 1 ±2.5 ±1.0 0.05In≤I≤Imax 1 ±2.0 ±0.8
0.05In≤I< 0.1In 0.5 ±2.5 ±1.0
0.1In≤I≤ Imax 0.5 ±2.0 ±0.8
0.1In≤I< I 0.25 ±7.0 ±2.0
Accuracy compliance with: IEC62052-22 IEC62052-23
Active accuracy: Class 0.5S Reactive accuracy: Class 2 Note: Reactive accuracy typical value is same as that of active accuracy. As IEC62052-23 is the only standard for reactive one, the nameplate labels as class 2.
Typical value distribution diagram for relation between accuracy and load in the
circumstance of balanced load:
DTZ1513 Typical value distribution diagram for relation between accuracy and load in the
circumstance of balanced load
Three-phase CT/PT Operated Keypad Energy Meter
36 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
DTZ1513 Typical value distribution diagram for relation between accuracy and load in the
circumstance of balanced load
Diagram for influence by voltage variation on accuracy: For DTZ1513 three phase CT/PT connected energy meter, working voltage variation has thresholded influence on meter active and reactive measurement accuracy. (Note: voltage range: 0.7 - 1.2XUn ).
Typical distribution diagram for voltage influence on active and reactive accuracy
Diagram for frequency variation influence on accuracy: For DTZ1513 three phase CT/PT connected energy meter, frequency variation has thresholded influence on meter active and reactive measurement accuracy. (Note: Frequency range: 45Hz—65Hz).
Typical distribution diagram for frequency influence on active and reactive accuracy
Three-phase CT/PT Operated Keypad Energy Meter
37 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
3.6 Meter Characteristics DTZ1513 Three Phase CT/PT Connected Plug-in Module Keypad prepayment Energy Meter
1 Energy meter case (cover and base) 2 LCD display 3 Optical communication port 4 Meter cover seals (one on the right
and one left) 5 Display button-Up 6 Display button-Down 7 Plug-in communication module
cover 8 Plug-in communication module
cover seal 9 Terminal cover 10 Terminal cover seals (one on the
right and one left) 11 Active pulse LED(red) 12 Reactive pulse LED(red) 13 Alarm LED(yellow) 14 Credit balance LED (two
colors-red/green)
DTZ1513 Three Phase CT/PT Connected Plug-in Module Keypad prepayment Energy Meter when communication module cover is open.
21 Plug-in communication module
22 Back-up battery for RWP. (with cover,
optional)
23 Maximum demand reset button with seal
24 Module cover seal
Note: Back-up battery is not allocated with the meter unless specified.
Battery specs : Two pieces of CR123A 3.0V battery
Three-phase CT/PT Operated Keypad Energy Meter
38 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
DTZ1513 Three Phase CT/PT Connected Plug-in Module Keypad prepayment Energy Meter when terminal cover is open.
31 Plug-in module antenna 32 Terminal cover open detection button 33 Auxiliary terminals 1 (13-28) 34 Current, voltage terminals 35 Auxiliary terminals 2 (11-12) 36 Energy meter installation hole(one on the left and one on the right)
3.6.1 Active(Reactive) impulse indicator (red LED)-marking
11, 12 Flashing frequency of these two red LED indicators directly indicate instant load of the meter, the higher frequency indicating the higher load. Meanwhile, it can also be used as standard impulse output to measure the accuracy. Active constant 5000imp/kWh means red LED flashes 5000 times for 1kWh. Reactive constant 5000imp/kWh means red LED flashes 5000 times for 1kVarh.
3.6.2 Alarm indicator(yellow LED)-marking 13 The yellow LED indicator is on when: 0 credit; credit at power-off alarm threshold; power off alarm due to improper operation (like tampering).
3.6.3 Balance credit indicator(bi-color LED)-marking 14 When the green LED indicator is on: credit more than alarm threshold When the yellow LED indicator flashes: credit between pre-alarm and alarm, user needs to
31
32
33
34
35
36
Three-phase CT/PT Operated Keypad Energy Meter
39 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
recharge; otherwise power will be off. When the red LED indicator flashes: credit less than alarm threshold, user needs to recharge;otherwise power will be off. When the red indicator is on: 0 credit, power is off under no over-draft permission or non-friendly date/time. recharge needs to be done to connect the electricity.
3.6.4 Optical (infrared) port-marking 3 The optical port can be used to connect meter and portable devices (HHU and laptop) by a optical probe. In such way operator can read and configur meter tariff. The port protocol complies with C mode of IEC62056-21, and has Safety levels and password control.
4 Meter measurement function DTZ1513 Three phase CT/PT connected plug-in communication module keypad prepayment energy meter measures metering data and electrical parameters. Note: DTZ1513(MCT405K4A-CIU)Three phase four wire CT connected plug-in communication module keypad prepayment energy meter is different from DTZ1513(MCT305K4A-CIU)Three phase three wire PT/CT connected plug-in communication module keypad prepayment energy meter in : A: DTZ1513(MCT405K4A-CIU)Three phase four wire CT connected plug-in communication module keypad prepayment energy meter has three metering units; B:DTZ1513(MCT305K4A-CIU)Three phase three wire PT/CT connect plug-in communication module keypad prepayment energy meter has two metering units.
4.1 Meter Principle Diagram
Three-phase CT/PT Operated Keypad Energy Meter
40 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
4.2 Meter wiring diagram and vector diagram.
Three-phase CT/PT Operated Keypad Energy Meter
41 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
4.2.1 DTZ1513(MCT405K4A-CIU)Three phase four wire CT
connected energy meter
DTZ1513(MCT405K4A-CIU)Phasor diagram under correct wiring for three phase four wire CT connected energy meter
● Active power:
P =P1+P2+P3 =UAIA cosφA+ UBIBcosφB+ UCIC cosφC ● Active energy: EP =∫Pdt =∫(UAIA cosφA+ UBIB cosφB+ UCICcosφC)dt
Three-phase CT/PT Operated Keypad Energy Meter
42 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
● Reactive power: Q =Q1+Q2+Q3 =UaIa sinφa+ UbIbsinφb+ UcIc sinφc
● Reactive energy: EQ =∫Qdt =∫(UaIa sinφa+ UbIbsinφb+ UcIc sinφc)dt
4.2.2 DTZ1513(MCT305K4A-CIU)Three phase three wire
CT&PT connected energy meter
DTZ1513(MCT305K4A-CIU) Phasor diagram under correct wiring for three phase three wire CT&PT connected ted energy meter
Three-phase CT/PT Operated Keypad Energy Meter
43 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
● Active power: P =P1+P3
=UabIa cosφa + UcbIc cosφc
● Active energy: EP =∫Pdt
=∫(UabIa cosφa + UcbIc cosφc)dt ● Reactive power:
Q =Q1+Q3
=UabIa sinφa + UcbIc sinφc
● Reactive energy: EQ =∫Qdt
=∫(UabIa sinφa + UcbIc sinφc)dt
4.3 Four quadrants metering vector diagram for active,
reactive and apparent power.
Three-phase CT/PT Operated Keypad Energy Meter
44 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
4.4 DTZ1513 three phase CT/PT connected energy meter
measurement items.
Quadrant 1 quadrant 2 quadrant 3 4 quadrant 4
LCD diagram
Active Direction
Forward Reverse Reverse Forward
Reactive Direction
Forward/inductive
Forward/capacitive
Forward/inductive Forward/capacitive
Apparent Direction
Forward Reverse Reverse 正 Forward
Metering value DTZ1513(MCT405K4A-
CIU)
DSZ1513(MCT305K4A-
CIU)
Notice
Three phase four wire
Three phase three wire
Forward active energy
kWh、mWh Total/Each phase Total
Reverse/forward active energy
kWh、mWh Total /Each phase
Total
combine kWh、MWh Total Total Net active energy /
Quadrant 1 Quadrant 2 Quadrant 3 Quadrant 4Active Direction
Forward Reverse Reverse Forward
Reactive Direction
Forward/inductive Forward/capacitive Forward/inductive Forward/capa
citive Apparent Direction
Forward Reverse Reverse Forward
Three-phase CT/PT Operated Keypad Energy Meter
45 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Quadrant 1 quadrant 2 quadrant 3 4 quadrant 4 dactive energy
total active energy
Reactive energy in quadrant 1
Kvarh/ Mvarh Total Total
Reactive energy in quadrant 2
Kvarh/ mvarh Total Total
Reactive energy in quadrant 3
Kvarh/ Mvarh Total Total
Reactive energy in quadrant 4
Kvarh/ mvarh Total Total
combined reactive energy 1
Kvarh/ mvarh Total /Each phase
Total Forward reactive energy / inductive reactive energy
combined reactive energy 2
kvarh、Mvarh Total/ Each phase
Total Reverse reactive energy / capacitive reactive energy
Forward apparent energy
KVAh/ mVAh Total Total
Reverse apparent energy
KVAh/ mVAh Total Total
Phase voltage
V、kV U1、U2U、U3 U12、U32
Phase current
A、kA I1、I2、I3 I1、I3
Three-phase CT/PT Operated Keypad Energy Meter
46 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Quadrant 1 quadrant 2 quadrant 3 4 quadrant 4 Neutral current
A N/A N/A
Active power
kW、MW Total /Each Total
Reactive power
kvar、Mvar Total /Each Total
Apparent power
kVA、MVA Total / Each Total
Power factor
average value / each phase
average value
Phase angle between voltage and current
ΦU-I each phase Yes
Phase angle between phase voltage
Yes Yes
Frequency
fn Yes Yes
Forward fundamental wave total energy
kWh、MWh Total / Each phase
Total
Reverse fundamental wave total energy
kWh、MWh Total / Each phase
Total
fundamental wave voltage effective
V、kV Each phase Each phase
Three-phase CT/PT Operated Keypad Energy Meter
47 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Quadrant 1 quadrant 2 quadrant 3 4 quadrant 4 value fundamental wave current effective value
A、kA Each phase Each phase
voltage distortion rate
Each phase Each phase
current distortion rate
Each phase Each phase
4.5 Energy measurement
4.5.1 Total energy and each phase’s energy measurement DTZ1513 (MCT405K4A-CIU) three phase four wire CT connected energy meter can measure following total data(data of all phases): forward activ energy, reverse active energy, combined active energy (forward/reverse active algebraic sum up, or absolute sum up); total (all phases) four quadrants’ reactive energy, combined reactive energy 1 (i.e. forward reactive energy or inductive reactive energy), combined reactive energy 2 (i.e. reverse reactive energy or capacitive reactive energy); forward apparent energy, reverse apparent energy. Meter also can measure following individual phase data: Each phase’s forward active energy, reverse active energy, combined reactive energy 1(forward reactive energy), combined reactive energy 2 (reverse reactive energy). Note: default combined active energy is: sum-up of absolute value for forward active energy and reverse active energy.
combined active energy 1: forward reactive energy combined active energy 2: reverse reactive energy Thus, combined reactive energy 1(forward reactive) and combined reactive energy 2(reverse
reactive) will be used in the following description.
OBIS Code L2 phase energy register
41.8.0 Forward active energy
42.8.0 Reverse active energy
43.8.0 combined reactive energy 1
Three-phase CT/PT Operated Keypad Energy Meter
48 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
DTZ1513(MCT305K4A-CIU three phase three wire CT&PT connected energy meter can measure following Items: Total (all phases) forward active energy, reverse active energy, combined active energy (forward and reverse active algebraic value sum up or absolute value sum up) ; Total (all phases) four quadrant reactive energy, combined reactive energy 1 (i.e. forward reactive energy or inductive reactive energy), combined reactive energy 2 (i.e. reverse reactive energy or capacitive reactive energy) ; forward apparent energy, reverse apparent energy. Note: default combined active energy is: sum-up of absolute value for forward active energy and reverse active energy.
combined active energy 1: forward reactive energy combined active energy 2: reverse reactive energy Thus, combined reactive energy 1(forward reactive) and combined reactive energy 2(reverse
reactive) will be used in the following description.
44.8.0 combined reactive energy 2
OBIS
Code
Total((all phases) energy
register
1.8.0 Forward active energy
2.8.0 Reverse active energy
15.8.0 combined active energy
3.8.0 combined reactive energy 1
4.8.0 combined reactive energy 2
5.8.0 Reactive energy in quadrant 1
6.8.0 Reactive energy in quadrant 2
7.8.0 Reactive energy in quadrant 3
8.8.0 Reactive energy in quadrant 4
9.8.0 Forward apparent energy
10.8.0 Reverse apparent energy
OBIS Code L3 phase energy register
61.8.0 Forward active energy
62.8.0 Reverse active energy
63.8.0 combined reactive energy 1
64.8.0 combined reactive energy 2
OBIS Code L1 phase energy register
21.8.0 Forward active energy
22.8.0 Reverse active energy
23.8.0 combined reactive energy 1
24.8.0 combined reactive energy 2
OBIS Code Total (all phases)energy register
1.8.0 Forward active energy
2.8.0 Reverse active energy
15.8.0 combined reactive energy
3.8.0 combined reactive energy 1
4.8.0 combined reactive energy 2
5.8.0 Reactive energy in quadrant 1
6.8.0 Reactive energy in quadrant 2
7.8.0 Reactive energy in quadrant 3
8.8.0 Reactive energy in quadrant 4
9.8.0 Forward apparent energy
10.8.0 Reverse apparent energy
Three-phase CT/PT Operated Keypad Energy Meter
49 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
4.5.2 Multi-tariff (TOU) measurement function (32 items) DTZ1513 three phase CT/PT connected energy meter has TOU measurement function. Meter can measure and store forward/reverse active energy, combined reactive energy 1 and combined reactive energy 2 in different tariff time shifts (maximum 8 tariff time shift in a day).
4.5.3 Data freeze (historical data of power consumption) DTZ1513 three phase CT/PT connected energy meter can freeze total energy data, energy data of each phase and TOU measurement data (history data for power consumption) Freezing modes: regularly (daily or monthly) data freeze, instant data freeze and appointment data freeze.
4.5.3.1 Daily data freeze (daily data within 45 days)
Set fixed time for freezing, and freeze data at 0:00 o’clock each day. It can save recent 45 days
data.
Daily frozen energy’s data sheet is as follow:
The last first day’s daily frozen data (43 items):
OBIS Code Tariff8(T8) energy register
1.8.8 Forward active energy
2.8.8 Reverse active energy
3.8.8 combined reactive energy 1
4.8.8 combined reactive energy 2
OBIS Code Tariff2(T2) energy register
1.8.2 Forward active energy
2.8.2 Reverse active energy
23.8.0 combined reactive energy 1
24.8.0 combined reactive energy 2
OBIS Code Tariff1(T1) energy register
1.8.1 Forward active energy
2.8.1 Reverse active energy
3.8.1 combined reactive energy 1
4.8.1 combined reactive energy 2
OBIS Code Tariff3(T3) energy register
1.8.3 Forward active energy
2.8.3 Reverse active energy
23.8.0 Combined reactive energy 1
24.8.0 Combined reactive energy 2
Three-phase CT/PT Operated Keypad Energy Meter
50 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Three-phase CT/PT Operated Keypad Energy Meter
51 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
The last 45 day’s daily frozen data(43 items):
Three-phase CT/PT Operated Keypad Energy Meter
52 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
The last 45 days frozen data (1935 items)
4.5.3.2 Monthly data freeze (13 months’ accumulative data at the end of month)
Set fixed time for freezing, and freeze accumulative energy data at 0:00 o’clock, the first day of each month. It can save recent 13 monthly accumulative energy data calculated at end of each month. The data is for meter reading. The accumulative monthly energy data calculated at the end of month as follow: The last month’s accumulative energy data at the end of month (43 items):
Three-phase CT/PT Operated Keypad Energy Meter
53 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Three-phase CT/PT Operated Keypad Energy Meter
54 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
The last3th month’s monthly accumulative energy data calculated at the end of month:
Three-phase CT/PT Operated Keypad Energy Meter
55 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
The latest 13 monthly accumulative energy data calculated at end of each month (559 items)
4.5.3.3 Instant freeze (optional)
Under abnormal conditions, it can do instant freezing with instant freezing command. Then the
last three times’ frozen data can be saved.
4.5.3.4 Appointment freeze (optional)
When shift of two sets of tariffs or some special requirement, it can freeze the energy data and
Three-phase CT/PT Operated Keypad Energy Meter
56 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
other important data. The last 2 times’ frozen data can be saved.
4.5.3.5 Monthly data freeze (13 monthly energy data)
Set fixed freeze time, and set the first day of each month’s 0:00 o’clock as the regular time to freeze accumulative data. It can save latest 13 monthly energy data at the end of month. The data is for meter reading. The monthly data are as follow: the last 1st monthly energy data (43 items):
The last 13th monthly energy data (43 items):
Three-phase CT/PT Operated Keypad Energy Meter
57 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
The last 13 months’ monthly energy data(559 items):
Three-phase CT/PT Operated Keypad Energy Meter
58 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
4.5.4 Energy data display and reading LCD can display up to 8 digits. Digits can be programmed as following format: 8 integers; 7 integers + 1 decimal; or 6 integers + 2 decimals. Note: The data displayed on the LCD is the data measured after CT/PT ratio operation. The units of energy data as below: Active energy: kWh 、MWh
Reactive energy:kvarh 、Mvarh
Apparent energy: kVAh 、 MVAh
1
2
34
Three-phase CT/PT Operated Keypad Energy Meter
59 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
LCD display
No. Name Remark 1 Quadrant indication (active, reactive
direction) Quadrant 1
2
Data Unit: Active energy ---kWh、mWh Reactive energy ---kVarh、mVarh Apparent energy ---KVAh、mVAh
kWh
3 Energy value 13731.72kWh 4 OBIS code 1.8.0 current acaccumulative forward
active energy
4.6 Maximum Demand (MD) Calculation Demand: Average power within certain time period. Demand interval: Continuous equal time shift for measuring average power. Maximum Demand: Max. Demand recorded within setting time.
4.6.1 Maximum Demand Calculation ●Within appointed time shift (normally, a month or a certain time period), to measure forward/ reverse active Max. Demand with time stamp. ●It takes sliding method to measure Max. Demand. The demand period and sliding time is programmable. ● Demand period can be selected among 5、10、15、30、60min; Sliding time can be selected among 1、2、3、5min. The Demand period should be five times as much as the sliding time. ●The measurement of Max. Demand should be continuous. Max. Demand measurement in each tariff time shift should be made within complete measurement period in corresponding interval. ●When it comes to the following events: power line is powered on, zero clearance, clock adjustment, time shift shift, Demand period change, power trend direction change, energy meter should measure demand starting from current time according to the Demand period. When the first Demand period finishes, it starts to record the Max Demand in accordance with sliding interval. During incomplete Demand Period, it should not record the Max. Demand.
Three-phase CT/PT Operated Keypad Energy Meter
60 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
4.6.2 Max. Demand Reset ●Automatic reset: at 00:00 of every monthly billing date, energy meter will automatically save the MD happened in this month with time stamp. And the old MD information will be deleted automatically, and meter will start to measure MD for the new month. ●Manual reset: after parameter setting or re-install, operator can reset MD information manually through MD reset button on the meter cover or HHU (HHU MD reset is secured with programming switch and password).
4.6.3 Max. Demand Calculation Extension (optional) MD of combined reactive energy 1, combined reactive energy 2, forward apparent energy and
reverse apparent energy can be an optional extended function.
4.6.4 13 months’ historical Max. Demand information
storage Three phase meter can save the last 13 months’ Max. Demand information.
Three-phase CT/PT Operated Keypad Energy Meter
61 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
4.6.5 Max. Demand display and reading Note: The data displayed on the LCD is the data measured after CT/PT ratio operation. The units
of energy data:
Active energy: kW 、MW
Reactive energy:kvar 、Mvar
Apparent energy: kVA 、 MVA
Forward active Max. Demand display Note: The forward active Max. Demand displayed in this picture is data after ratio operation, the value is 180.245 KW.
Three-phase CT/PT Operated Keypad Energy Meter
62 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Forward active Max. Demand date (YY-MM-DD)
Forward active Max. Demand time (HH-MM)
4.7 Electrical parameters measurement Phase voltage measurement / display: three integers, two decimals, unit V、k, accuracy: ±1% Current measurement / display: three integers, two decimals, unit A、kA, accuracy: ±1% Active power measurement / display: two integers, three decimals, unit kW 、MW, accuracy: ±1% Reactive power measurement / display: two integers, three decimals, unit kvar 、Mvar, accuracy: ±1% Apparent power measurement / display: two integers, three decimals, unit kva 、Mva, accuracy: ±1% Frequency measurement / display: two integers, two decimals, unit Hz, accuracy: ±1% Power factor measurement / display: one integers, three decimals, unit :COSФ, accuracy: ±1% Phase current/voltage angle: two integers, two decimals, unit Ф, accuracy: ±1% Phase voltage angle: two integers, two decimals, unit Ф, accuracy: ±1%
Note:Other parameters’ errors except for energy(active /reactive /apparent) will be calculated through following formula:
Metering error (%) = (measured value-actual value)/ measured fundamental value *100%
Definition of measured fundamental value: Voltage is rated voltage of energy meter; voltage measurement range is 0.6Um--1.2Um。
Current is maximum current of energy meter; current measurement range is 0.05Ib--Imax
4.8 Energy meter harmonic measurement THD DTZ1513 three phase CT/PT connected energy meter’s voltage/current’s sampling speed is 3.2
Three-phase CT/PT Operated Keypad Energy Meter
63 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
kHz (Broadband response characteristics). The sampling data includes 41 times’ harmonic information.
■ Active energy’s harmonic measurement:
P= U1I1 cosφ1 + ∫(UnIncosφn )
n = 2、3、4、…… 41
■ Reactive energy’s harmonic measurement
Q= U1Ia1sinφ1 + ∫(UnInφn sinφn)
n = 2、3、4、…… 41
Result: Active/reactive power include 41 times’ harmonic information. The THD of full wave
energy by active/reactive energy measurement is small.
4.9 fundamental wave measurement (optional) DTZ1513 three phase CT/PT connected energy meter can independently measure (50HZ) fundamental wave active energy and eliminate harmonic wave’s negative effects. It makes measurement fairer and ensures electricity company profit as well. DTZ1513 three phase CT/PT connected energy meter adopts digital signal processor to do digital filtering of ADC sampling data and eliminate harmonic wave. After that, it comes to fundamental wave measurement. The filter’s attenuation to harmonic wave is three time’s harmonic wave-30dB, five time’s harmonic wave-60dB, seven time’s harmonic wave-90dB. The calculation of harmonic wave’s distortion rate is made after getting the fundamental wave data as well as full wave data.
Three-phase CT/PT Operated Keypad Energy Meter
64 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Three-phase CT/PT Operated Keypad Energy Meter
65 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
THD(Total harmonic distortion): Ratio of Root-mean-square values between harmonic content in AC power frequency grid and fundamental wave content
THDu:
U1: fundamental voltage
UH:Harmonic voltage content
THDi:
fundamental voltage
IH: Harmonic voltage content
5 Meter TOU measurement function DTZ1513 three phase CT/PT connected energy meter can measure active/reactive energy with TOU function. Meter supports 8 tariffs and 24 time shifts. Tariff shift is based on a daily tariff table as the basic unit. The meter can prestore up to 16 sets of daily tariff table, and then based on the festival tariff table, seasonal tariff table, and weekly tariff table to select the corresponding tariff table so as to realize tariff swift in different holidays, seasons, and working days in the same week. Tariff consists of the following basic units:
Sr/N Basic unit Number
of bytes
Note
Three-phase CT/PT Operated Keypad Energy Meter
66 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
1 8 tariffs
2 Up to 24 time shifts per
day
Starting time of every shift is accurate to
minute
3 8 tariff rates
Tariff rates can be detailed as:
Forward active electricity rate / reverse
active electricity rate / forward reactive
electricity rate/ reverse reactive electricity
rate
4 16 daily tariff
5 12 weekly tariff
6 12 seasonal tariff
7 50 holiday tariff
8 8 tariff rate tables
Note: For direct connected single /three phase keypad prepayment energy meter, it only has active electricity rate.
5.1 Daily tariff Daily tariff defines in every daily time shift to use with tariff rate code. When a new day comes (at 00:00:00), meter will select a daily tariff according to program of holiday tariff, seasonal tariff and weekly tariff. Meter can store maximum 16 different daily tariffs.
Daily tariff includes the following information:
Daily tariff table code.
It is applied to the status data (1 valid, 0 invalid) for 8 tariff time shifts, and maximum 24 starting time (hh: mm). The information input will be valid from midnight to the specified time at midnight. From 00:00 to 24:00, each time shift will start from the ending time of the last shift. When it is 0 second of every minute, in accordance with the status data of present time shift and tariff time shift in executed daily tariff table, the energy meter can define the tariff which is for current time shift measurement, and calculate forward /reverse active energy measurement from starting time to ending time within this time shift, and save them in the corresponding register so as to realize the function of TOU measurement.
Three-phase CT/PT Operated Keypad Energy Meter
67 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Daily Tariff Table(8 tariffs/24 time shifts)
Daily tariff table: No. 00 Tariff time shift changing table
TOU
1 TO
U2
TOU
3
TOU
4
TOU
5
TOU
6
TOU
7
TOU
8 starting time of time shift (hh:mm)
00:00 Ascending
S.N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
16 Daily Tariff Tables
Three-phase CT/PT Operated Keypad Energy Meter
68 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Sample of Daily Tariff Table design:
Tariff code corresponding relations:
TOU1:00H
TOU2:01H
TOU3:02H
TOU4:03H
TOU5:04H
…
TOU12:0FH
Each daily tariff is 73 bytes. The first byte of daily tariff code: 7XH X is daily tariff table code Range: 1-F Daily tariff values are starting from the second byte. The basic unit of Daily tariff table is of every 3 bytes. The unit of Daily tariff is hh:mm; Tariff code.(72 bytes unit in total) 12 Daily tariff in total is 16X73=1168 bytes. The minimum time shift is 15 minutes, and should be larger than the setting of demand calculation period.
Three-phase CT/PT Operated Keypad Energy Meter
69 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
5.2 Weekly tariff According to working day and weekend day, daily tariff codes for a week can be defined. Weekly tariff defines effective day tariff table types on variety of occasions from Monday to Sunday. The administrative department can store maximum 12 different weekly tariff tables. It can set different daily tariff tables for every day of a week to differentiate each other (such as difference between working day and weekend). It can also set the same daily tariff code to use the same type of tariff.
There are 8 bytes for each weekly tariff. The first byte is the number of weekly tariff , while for the last 7 bytes, each byte is in accordance with the number of daily tariff from Monday to Sunday. 8X12=92 bytes in total.
5.3 Seasonal tariff Based on the cost of electricity generation and the anticipation on the electricity market, different weekly tariff adopted in each season can be defined. Seasonal tariff defines the choices of weekly tariff table in practical use. Energy administration department could define up to 12 seasonal tariffs in different periods and situations. So the administration can work on the seasonal differences of tariff shift. The seasonal tariff table is annually repeatable as the year factor is not taken into consideration. The simplest situation is that there is only one weekly tariff number and the unique tariff number is used from January 1st, (Seasonal tariff is like year time zone. State Grid demands 2 time zones in a year.)
Three-phase CT/PT Operated Keypad Energy Meter
70 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Seasonal tariff table
Starting from Jan.1st, the starting date (Month and Date) of each season is the ending date (Month and Date) of the last season. Sequence in ascending order is MM/DD. 4X12=48 bytes in total.
5.4 Holiday Tariff In public holidays and festivals, the administration can select the particular daily tariff table in special days. So the particular tariff forms holiday tariff. Holiday tariff defines different daily tariff in public holidays and festivals. Meter can store up to 100 special days. For regular holidays (same day for every year, for example Jan 1st ), a special code “A1H” can be set. In the host computer or HHU, MMDD can be set to show this day is valid for every year. For the unfixed holidays (different day in different year, for example Easter Day or Chinese Spring Festival), data should be input each year in the term of YYMMDD. Maximum 50 Festivals can be set in this type of meter as well as there are 50 tables in this meter. Estimated validity period should be arranged and the time shifts of the festival tariff table should be modified in practical use.
Three-phase CT/PT Operated Keypad Energy Meter
71 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
The basic unit is 5 bytes, the first byte is the number of holiday tariff, the second, third and fourth bytes are respectively YY/MM/DD of the holidays. The fifth byte is the number of daily tariff, all 5X50=250 bytes in total.
5.5 Tariff rate table Tariff
Code.
forward active / reverse active / forward reactive/ reverse reactive energy rate in each
tariff shift
TOU1 T1 tariff forward
active energy rate
T1 tariff reverse
active energy rate
T1 tariff forward
reactive energy rate
T1 tariff reverse
reactive energy rate
TOU2 T2 tariff forward
active energy rate
T2 tariff reverse
active energy rate
T2 tariff forward
reactive energy rate
T2 tariff reverse
reactive energy rate
TOU3 T3 tariff forward
active energy rate
T3 tariff reverse
active energy rate
T3 tariff forward
reactive energy rate
T3 tariff reverse
reactive energy rate
TOU4 T4 tariff forward
active energy rate
T4 tariff reverse
active energy rate
T4 tariff forward
reactive energy rate
T4 tariff reverse
reactive energy rate
TOU5 T5 tariff forward
active energy rate
T5 tariff reverse
active energy rate
T5 tariff forward
reactive energy rate
T5 tariff reverse
reactive energy rate
TOU6 T6 tariff forward
active energy rate
T6 tariff reverse
active energy rate
T6 tariff forward
reactive energy rate
T6 tariff reverse
reactive energy rate
Three-phase CT/PT Operated Keypad Energy Meter
72 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
TOU7 T7 tariff forward
active energy rate
T7 tariff reverse
active energy rate
T7 tariff forward
reactive energy rate
T7 tariff reverse
reactive energy rate
TOU8 T8 tariff forward
active energy rate
T8 tariff reverse
active energy rate
T8 tariff forward
reactive energy rate
T8 tariff reverse
reactive energy rate
Every tariff is in correspondence with four tariff rates: forward active / reverse active / forward
reactive/ reverse reactive. There are 8 tariffs, and every tariff is in correspondence with four tariff
rates. Tariff rate consists of tariff code, forward active rate(four bytes) / reverse active rate(four
bytes) / forward reactive rate(four bytes) / reverse reactive rate(four bytes) . 8X(1+4X4)=136
bytes in total.
5.6 Confirmation of valid daily tariff At 00:00:00 each day, the energy meter will select proper daily tariff number from Holiday Tariff table, Seasonal Tariff table and Weekly Tariff table, then the daily tariff table of that day can be selected to RAM from ERROM. (For the energy meter which RAM is relatively small, time Daily tariff table of the present and the next period can be put in). At 0 second each minute, the energy meter will process the period of daily tariff, according to the present daily tariff table, to conduct tariff measurement control. It can be referred as follow:
Three-phase CT/PT Operated Keypad Energy Meter
73 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
5.7 Spare tariff As the changes of resource and the energy supply, as well as electricity generation, transportation and the electricity cost, tariff should be changed accordingly. Due to big quantity of energy meters and the dispersion of locations, it’s impossible to modify the tariff for all meters at the same time. In order to solve this problem, a set of spare tariff which is pre-stored in the meter is applied. Utility can set activation date for the spare tariff. When the spare tairff is activated, meter will start to use new seasonal, weekly, daily and holiday tariff. After activation, the previous tariff will be no
Three-phase CT/PT Operated Keypad Energy Meter
74 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
longer valid. In such way, utility can upload spare tariff to meters and on activation date all meters will excute new tariff.
Spare tariff and its activation date will be saved temporarily in the meter, after activation, the old
tariff information will be deleted and meter will be able to accept another set of spare tariff.
5.8 Step Tariff Measurement Function (Optional) DTZ1513 Three phase CT/PT connected energy meter can define different step tariff rate according to monthly consumption. The step tariff rate consists of units as follow:
S/N. Tariff Basic Unit Byte Remark
1 7 step tariffs
2 8 step tariffs This rate is combined active rate
3 2 step tariff table 2X65=130 Energy:4 bytes; Unit Price: 4bytes; Code
Number: 1 byte
4 2 Seasonal Tariff 2X3=6
Three-phase CT/PT Operated Keypad Energy Meter
75 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
tables
Step tariff table
Stepped electricity rate table: No:0 Step rate
setting
S.N Daily consumption step
division
Step rate
1 0 KWH Rate P0
2 E1 Rate P1
3 E2 Rate P2
4 E3 Rate P3
5 E4 Rate P4
6 E5 Rate P5
7 E6 Rate P6
8 E7 Rate P7
Stepped electricity rate table: No:1 Step rate setting
S.N Daily consumption step
division
Step rate
1 0 KWH Rate P0
2 E1 Rate P1
3 E2 Rate P2
4 E3 Rate P3
5 E4 Rate P4
6 E5 Rate P5
7 E6 Rate P6
8 E7 Rate P7
Three-phase CT/PT Operated Keypad Energy Meter
76 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
There is one set of spare Step Tariff table. It will activate on the appointed date; The activation date and the new step tariff will be stored in the meter temporarily, after activation, the old tariff information will be deleted and meter will be able to accept another set of spare tariff. The new Step Tariff Table’s temporary memory is 136 bytes + the year and month of usage. The step tariff is 272 bytes in total.
5.9 Tariff Data Settings The tariff (holiday tariff, seasonal tariff, weekly tariff, daily tariff and spare tariff) can be programmed by the tariff setting software organized by the R&D Center of INHEMETER. After setting and confirmation, communication data module will be generated in accordance with energy meter’s communication protocol, and data can be loaded to the meter through follows: A. Infrared (HHU or PC) local setting B. RS-485 communication port (HHU or PC) local settings C. Remote batch setting
When it is not factory settings (such as on site modification or user preference): A: To modify tariff and electricity rate by local communication, operator needs to turn on the programming switch (with seal protection), which needs password authentication. B: To modify tariff and electricity rate by remote communication, operator must go through authorization and password authentication via data management center, it can also go through all or selected meter type/meter No. to modify the tariff and electricity rate in batch mode. Meanwhile meter must be allowed in remote programming mode.
6 Meter LCD Meter adopts LCD display with large screen, wide visual angle(≥120º),anti -UV function and wide temperature range; LCD can display up to 8 digits. Digits can be programmed as following format: 8 integers;
Seasonal tariff table
Seasonal tariff table no. Step electricity rate table’s
starting time for transition
(MM-DD)
Step electricity rate table
00 MM-DD
01 MM-DD
Three-phase CT/PT Operated Keypad Energy Meter
77 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
7 integers + 1 decimal; or 6 integers + 2 decimals. Meter adops IEC62056 display code, visualized prompt symbol, bar indicator of available electricity credit (balance energy/ amount) and LED indicator of alarm/ prompt. LCD has backlight. Character size(height*width): 12X4.77mm.
LCD visual icon
S/N Example Instruction
1
Active Direction、reactive direction, current
measurement quadrant indication
1.1
First quadrant measurement.
active forward, reactive forward(inductive
reactive )
1.2 Second quadrant measurement; active reverse, reactive forward(capacitive reactive ))
1 2 3 4
5
6
9
8
7
Three-phase CT/PT Operated Keypad Energy Meter
78 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
S/N Example Instruction
1.3
Third quadrant measurement
active reverse, reactive reverse(inductive
reactive )
1.4
Forth quadrant measurement
active forward, reactive reverse(capacitive
reactive )
2
Bar indicator for balance
credit(energy/amount) or active power
3
LCD display mode indication
3.1 Automatic scroll display
3.2 Manual display 1
3.3 Manual display 2
3.4 Manual display 3
4
Processing status-10 marks
4.1
Warning: by-pass tamper, neutral line
failure
4.2
4.2.1 No GPRS/GSM function, or no GPRS/GSM
communication signal
4.2.2
GPRS/GSM weak signal
4.2.3
GPRS/GSM strong signal
4.3
Local or remote communication status. This
mark means the communication is working
4.4
Prepayment control status
4.4.1 Relay connected. Power supply is normal
Three-phase CT/PT Operated Keypad Energy Meter
79 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
S/N Example Instruction
4.4.2
Relay disconnected. Power supply is off
4.5
Meter is allowed to be programmed now
4.6
Prepayment mark
4.6.1 Smile: Normal
4.6.2 Sad: Abnormal
4.7
4.7.1 Empty: battery voltage is normal
4.7.2 Battery is not enough, needs to be replaced
4.7.3
Battery is low, will affect meter’s normal
working
4.8
ON- terminal cover was opened before; this event has not been solved.
Flash- terminal cover is still open.
4.9
ON- meter cover was opened before; this event has not been solved.
Flash- upper meter cover is still open.
4.10 RTC malfunction
5
unit / dimension in main display area
5.1 power factor dimension
5.2 Frequency unit
5.3 Temperature unit
5.4
Currency icon: money deduction mode
5.5 measurement dimension voltage -----V、 kV 、MV current -----A、 kA 、MA
Three-phase CT/PT Operated Keypad Energy Meter
80 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
S/N Example Instruction
active power ---- kW 、MW reactive power ---- kvar 、Mvar apparent power---- kVA 、 MVA
active energy---- kWh 、MWh
reactive energy----kvarh 、Mvarh apparent energy----kVA 、 MVA active demand/max. demand---- kW 、MWreactive demand/max. demand---- kvar 、Mvar
apparent demand/max. demand---- kVA 、
MVA
6 Data display area: 8 digits maximum, place
of decimal is programmable
7
Arrows: auxiliary indications of tariff, test
mode, etc. It is matching with printed
content on the nameplate
8
OBIS code area: Display 6 digits code, define data display area
Data code, or Character symbols
9 Phase voltage, phase current status
9.1
three phases meter phase voltage indication 1: Phase mark disappears when corresponding phase is lost
2: If three phase voltage marks flash
together, it means phase voltage sequence
error.
9.2
Three phase meter phase current indication1: Do not display--phase current is smaller than starting current, or is not detected. 2. Display--corresponding phase current is bigger than starting current
3. Flash--corresponding phase current
reverses
Three-phase CT/PT Operated Keypad Energy Meter
81 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Energy meter will automatically start self-checking status when power on, LCD shows full display
at this time (as picture). After 2 seconds, energy meter enters into display mode of balance
amount.
Normal working display explanation (balance amount): energy meter with built-in relay, display
electricity credit, it means balance amount.
1 2 3 4 5
6
79
8
Three-phase CT/PT Operated Keypad Energy Meter
82 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Mark No. Name Remark
1 Test quadrant indication The first quadrant. Forward active energy, forward
reactive energy
2 Bar indicator Balance credit
3 GPRS/GSM、or RF communication
strength signal
strong wireless signal
4 Relay status Relay connect
5 Meter status smile: normal working
6 Quantity unit / currency unit
7 Main area display data Balance credit: 12107.6
8 Tariff code T1 means tariff shift 2 or step tariff rate 2. Pls refer to
multi tariff function introduction
9 Phase voltage/current status Phase voltage/ current are normal, no phase lost, no
current reverse
6.1 OBIS code In DLMS protocol, OBIS has 6 bytes: A、B、C、D、E、F. Only four bytes C、D、E、F are displayed in LCD.
C: Defines items with abstract or specific physical meanings, such as active power, reactive power, current, voltage, power factor, and a certain kind of item.
D: defines different kinds of items or the methods to calculate this value, such as acaccumulative value through time points, average value within a period, instantaneous value etc.
E: For items with specific physical meanings like energy, it defines different tariff code. For abstract items or items that have nothing to do with tariff but with specific physical meanings, it means some user-defined meanings
F: It means billing data in last Nth times. If there is no billing data, the value of this item is 255.
Because of the limit of display digits, some data are displayed by letter according to OBIS
regulation. The below numbers in C and D bytes which are related to below table, are replaced by
letter.
Three-phase CT/PT Operated Keypad Energy Meter
83 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Display code replacement(value group C)
OBIS code Display code 96 C 97 F
124 T 128 E
Display code replacement(value group D) OBIS code Display code
99 P
98 L
For data items which is required to display with two digits, for the sake of conciseness, the digit in high-order will be hided if the value is smaller than 10.
6.1.1 Energy accumulation Category (including credit
deducted in last month) Data in Energy Category defined by DLMS committee can’t fulfill all requirements like combined reactive; these items need to be user-defined according to extension rules. A: or standard OBIS: XX. X. X. XX Display form
XX. X. X. XX
Example: Total accumulative forward active energy: 1.8.0 Accumulative forward active electricity rate energy 1:1.8.1 The last month’s total accumulative forward active energy: 1.8.1. The last month’s total forward active energy: 1.9.1.1
B: For user-defined OBIS: X. XX. X. XX Display form:
Value
group C
codes
A=1
Processing of
measuremen
t values
Tariff rate Billing
period
Three-phase CT/PT Operated Keypad Energy Meter
84 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
X. XX. X. XX
Example: Total combined reactive energy 1 :E.0.0 Combined reactive electricity rate energy 1: E.0.1 The last month’s total combined reactive energy 1 : E.0.0.1 Note: E is the equivalence of 128 in display For current data display (F=255), hide billing period
6.1.2 Event log category In the protocol, it is categorized into curve category, so OBIS in all display items are user- defined
items.
For standard OBIS: X. X. XX. XX
Display form
X. X. X X. XX
Example: The first screen for last recharge event:C.L.31.1 The third screen for the last 2nd recharge events:C.L.33.2
6.1.3 Abstract and General Category Since this category’s F is 255, only C.D.E three bytes can be displayed.
OBIS: XX. XX. XX
Display form:
128 Value group
D codes
Manufacturer
specific codes
Tariff rate
0:total
Billing
period
C=96D=98 or 99 Even type:
0‐9
Billing
period:
0‐99
Screens:
0‐9
Three-phase CT/PT Operated Keypad Energy Meter
85 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
XX. XX. XX
Example: Reactive consumption tariff rate:C.71.10 Forward active total power:1.7.0
6.1.4 OBIS code input DTZ1513 three phase CT/PT connected keypad prepayment energy meter, the CIU has 12 digits keypad. OBIS code can be input through the keypad.
The measurement data can be checked through following methods:
■ Automatic scroll display: automatic display as programmed. You can also check the data
though up, down button.
■ Display mode: Set I
Under automatic scroll display, you can enter SETI display mode through long pressing on
Up button (more than 3 seconds). Then you can check pre-set items through Up/Down button.
Set1 mode is mainly for energy measurement data.
■ Set II Display mode: Set II
Value
group C
codes
Value
group D
codes
Value
group E
codes
Three-phase CT/PT Operated Keypad Energy Meter
86 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Under Set I display mode, you can enter SETII display mode through long pressing on Up
button (more than 3 seconds). Then you can check pre-set items through Up/Down button.
Set II mode is mainly for measurement parameters, running status flags.
■ Display mode: Set III
Under Set II display mode, you can enter SETIII display mode through long pressing on Up
button (more than 3 seconds). Then you can check pre-set items through Up/Down button.
Set III mode is mainly for operation settings.
Under display mode Set I, Set II, or Set III, within pre-defined time(automatic scroll display time,
default setting is 10 seconds), if there is no operation (Up/Down button operation), energy meter
will go back to automatic scroll display mode automatically.
■ Input OBIS code to check information through keypad.
6.2 Auto scroll display mode According to preset data item of auto scroll display, display sequence and display time, LCD can automatically switch display data in order. Display time can be programmed from 3 secondes to 99 seconds. It can be programmed with up to 20 items for auto scroll display data item (programmable through meter software). For this project, there are following 7 default auto scroll display items. At the same time, tariff code will be displayed as well.
Three-phase CT/PT Operated Keypad Energy Meter
87 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS
code
Content Display mode Unit/meaning
C.50.1 Balance credit
When displaying balance
credit, OBIS code will not
be displayed
1.8.0 total accumulative forward active energy
2.8.0 total accumulative reverse active energy
3.8.0 total accumulative combined reactive energy
1.
4.8.0 total accumulative combined reactive energy
2
0.9.1 Real time
0.9.2 Real date
6.3 Manual scroll display mode (display mode- Set I) According to preset data items, display sequence and display time, LCD can display appointed data item. Display time can be programmed from 3 secondes to 99 seconds. If there is no operation (Up/Down button operation) after display time, energy meter will go back to auto scroll display mode. For this project, Set I includes following items (programmable, 4tariffs)
OBIS
code
Content Display mode Unit/meaning
15.8.0 accumulative combined active energy
1.8.0 accumulative forward active energy
1.8.1 Tariff 1(T1) accumulative forward active energy/step 0
accumulative forward active energy
1.8.2 Tariff 2(T2) accumulative forward active energy/step1
accumulative forward active energy
1.8.3 Tariff 3(T3) accumulative forward active energy/step 2
accumulative forward active energy
1.8.4 Tariff 4(T4) accumulative forward active energy/step 3
accumulative forward active energy
2.8.0 accumulative reverse active energy
2.8.1 Tariff 1(T1) accumulative reverse active energy
2.8.2 Tariff 2(T2) accumulative reverse active energy
2.8.3 Tariff 3(T3) accumulative reverse active energy
2.8.4 Tariff 4(T4) accumulative reverse active energy
3.8.0 Total accumulative combined reactive energy 1
3.8.1 Tariff1(T1) accumulative combined reactive energy 1
Three-phase CT/PT Operated Keypad Energy Meter
88 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS
code
Content Display mode Unit/meaning
3.8.2 Tariff2(T2) accumulative combined reactive energy 1
3.8.3 Tariff3(T3) accumulative combined reactive energy 1
3.8.4 Tariff4(T4) accumulative combined reactive energy 1
4.8.0 Total accumulative combined reactive total energy 2
4.8.1 Tariff1(T1) accumulative combined reactive energy 2
4.8.2 Tariff2(T2) accumulative combined reactive energy 2
4.8.3 Tariff3(T3) accumulative combined reactive energy 2
4.8.4 Tariff4(T4) accumulative combined reactive energy 2
5.8.0 Total accumulative reactive energy in the first quadrant
6.8.0 Total accumulative reactive energy in the second quadrant
7.8.0 Total accumulative reactive to energy in the third quadrant
8.8.0 Total accumulative reactive energy in the forth quadrant
9.8.0 accumulative forward apparent energy
10.8.0 accumulative reverse apparent energy
0.4.2 Meter Serial No.
6.4 Manual scroll display mode (display mode- Set II) According to preset data items, display sequence and display time, LCD can display appointed data item. Display time can be programmed from 3 secondes to 99 seconds. If there is no operation (Up/Down button operation) after display time, energy meter will go back to auto scroll display mode. For this project, Set II includes following items (programmable)
OBIS
code
Content Display mode Unit/meaning
31.7.0 L1 phase current
32.7.0 L1 phase voltage
33.7.0 L1 phase power factor
21.7.0 L1 phase active power
21.8.0 L1 phase forward active accumulative energy
22.8.0 L1 phase reverse active accumulative energy
23.7.0 L1 phase reactive power
23.8.0 L1 phase combined reactive accumulative energy 1
24.8.0 L1 phase combined reactive accumulative energy 2
29.7.0 L1 phase apparent power
Three-phase CT/PT Operated Keypad Energy Meter
89 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS
code
Content Display mode Unit/meaning
51.7.0 L2 phase current
52.7.0 L2 phase voltage
53.7.0 L2 phase power factor
41.7.0 L2 phase active power
41.8.0 L2 phase forward active accumulative energy
42.8.0 L2 phase reverse active accumulative energy
43.7.0 L2 phase reactive power
43.8.0 L2 phase combined reactive accumulative energy 1
44.8.0 L2 phase combined reactive accumulative energy 2
49.7.0 L2 phase apparent power
71.7.0 L3 phase current
72.7.0 L3 phase voltage
73.7.0 L3 phase power factor
61.7.0 L3 phase active power
61.8.0 L3 phase forward active accumulative energy
62.8.0 L3phase reverse active accumulative energy
63.7.0 L3 phase reactive power
63.8.0 L3 phase combined reactive accumulative energy 1
64.8.0 L3 phase combined reactive accumulative energy 2
69.7.0 L3 phase apparent power
1.7.0 all phases active power
3.7.0 all phases reactive power
9.7.0 all phases apparent power
13.7.0 all phases power factor
14.7.0 Frequency
81.7.4 L1 phase angle between current and voltage 81.7.15 L2 phase angle between current and voltage 81.7.26 L3 phase angle between current and voltage 81.7.1 Voltage angle between L1/L2 81.7.12 Voltage angle between L2/L3 81.7.2 Voltage angle between L3/L1 91.7.0 Three phase four wire meter N line current C.51.9 available remaining days 1.1.0 total billings
Three-phase CT/PT Operated Keypad Energy Meter
90 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS
code
Content Display mode Unit/meaning
C.72.1 over load tripping times C.5.1 meter status word 1 C.5.2 meter status word 2(malfunction events) C.5.3 meter status word 3(cover open events) C.5.4 meter status word4 (grid events 1) C.5.5 meter status word 5(grid events 2) C.5.6 )meter status word 6(grid events 3) C.7.0 Grid power failure(power off) event accumulative times C.15.6 Tripping event accumulative times C.72.7 Special event accumulative times
6.5 Manual scroll display mode (display mode- Set III) According to preset data items, display sequence and display time, LCD can display appointed data item. Display time can be programmed from 3 secondes to 99 seconds. If there is no operation (Up/Down button operation) after display time, energy meter will go back to auto scroll display mode. Set III is mainly for setting parameters For this project, Set III includes following items (programmable)
OBIS code Content Display mode Unit/meaning
11.35.0 Over current tripping current threshold
12.31.0 low voltage triping voltage threshold
12.35.0 Over voltage tripping voltage threshold
21.35.0 Load threshold
C.50.4 balance credit pre-warning threshold
C.50.5 balance credit pre-warning threshold
C.50.9 billing date
C.51.0 buzzer alarm interval
C.51.1 recovery time when over load tripping
C.51.3 allowable over-load tripping times
C,51.4 Min. power supply load threshold
C.51.5 unbalanced phase power tripping threshold
C.51.6 temperature threshold for over temperature tripping
C.51.7 (6.25% 12.5%) warning threshold for by-pass tamper
C.51.11 pre-warning threshold for remaining credit
C.51.12 Warning threshold for remaining credit
Three-phase CT/PT Operated Keypad Energy Meter
91 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code Content Display mode Unit/meaning
C.50.70 Prepayment configuration status word 1
C.50.71 Prepayment configuration status word 2
C.72.0 combined active, combined reactive 1, combined
reactive 1 definition character
C.72.4 CT ratio
C.72.5 PT ratio
C.72.6 total ratio
C.70.9 user installation transformer capacity
C.70.2 combined active, combined reactive, combined reactive
definition character 2
6.6 OBIS code query display mode Through meter keypad, input OBIS code and press blue enter button, appointed items can be queried. For OBIS code with letters, you can refer to the 12 keys’ corresponding letters and decimal point. The operation is the same as cell phone’s operation. OBIS code display item is defined as below:
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
15.8.0 accumulative combined active total energy 1.8.0 accumulative forward active total energy
1.8.1 Tariff 1 (T1) accumulative forward active energy// Step 0 accumulative active energy
1.8.2 Tariff 2 (T2) accumulative forward active energy// Step 1 accumulative active energy
1.8.3 Tariff 3 (T3) accumulative forward active energy// Step 2 accumulative active energy
1.8.4 Tariff 4 (T4) accumulative forward active energy// Step 3 accumulative active energy
1.8.5 Tariff 5 (T5) accumulative forward active energy// Step 4 accumulative active energy
1.8.6 Tariff 6 (T6) accumulative forward active energy// Step 5 accumulative active energy
1.8.7 Tariff 7 (T7) accumulative forward active energy// Step 6 accumulative active energy
1.8.8 Tariff 8 (T8) accumulative forward active energy// Step 7 accumulative active energy
Three-phase CT/PT Operated Keypad Energy Meter
92 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
2.8.0 accumulative reverse active total energy 2.8.1 Tariff 1 (T1) accumulative reverse active energy 2.8.2 Tariff 2 (T2) accumulative reverse active energy 2.8.3 Tariff 3 (T3) accumulative reverse active energy 2.8.4 Tariff 4 (T4) accumulative reverse active energy 2.8.5 Tariff 5 (T5) accumulative reverse active energy 2.8.6 Tariff 6 (T6) accumulative reverse active energy 2.8.7 Tariff 7 (T7) accumulative reverse active energy 2.8.8 accumulative reverse active energy 3.8.0 accumulative combined reactive energy 1
3.8.1 Tariff 1 (T1) accumulative combined reactive energy 1
3.8.2 Tariff 2 (T2) accumulative combined reactive energy 1
3.8.3 Tariff 3 (T3) accumulative combined reactive energy 1
3.8.4 Tariff 4 (T4) accumulative combined reactive energy 1
3.8.5 Tariff 5 (T5) accumulative combined reactive energy 1
3.8.6 Tariff 6 (T6) accumulative combined reactive energy 1
3.8.7 Tariff 7 (T7) accumulative combined reactive energy 1
3.8.8 Tariff 8 (T8) accumulative combined reactive energy 1
4.8.0 accumulative combined reactive energy 2
4.8.1 Tariff 1 (T1) accumulative combined reactive energy 2
4.8.2 Tariff 2 (T2) accumulative combined reactive energy 2
4.8.3 Tariff 3 (T3) accumulative combined reactive energy 2
4.8.4 Tariff 4 (T4) accumulative combined reactive energy 2
4.8.5 Tariff 5 (T5) accumulative combined reactive energy 2
4.8.6 Tariff 6 (T6) accumulative combined reactive
Three-phase CT/PT Operated Keypad Energy Meter
93 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
energy 2
4.8.7 Tariff 7 (T7) accumulative combined reactive energy 2
4.8.8 Tariff 8 (T8) accumulative combined reactive energy 2
5.8.0 accumulative reactive total energy for 1st quadrant
6.8.0 accumulative reactive total energy for 2nd quadrant
7.8.0 accumulative reactive total energy for 3rd quadrant
8.8.0 accumulative reactive total energy for 4th quadrant
9.8.0 accumulative forward apparent energy 10.8.0 accumulative reverse apparent energy 31.7.0 L2 phase current 32.7.0 L2 phase voltage 33.7.0 L2 phase power factor 21.7.0 L2 phase active power 21.8.0 L2 phase forward active accumulative energy 22.8.0 L2 phase reverse active accumulative energy 23.7.0 L2 phase reactive power
23.8.0 L2 phase combined reactive 1 accumulative energy
24.8.0 L2 phase combined reactive 2accumulative energy
29.7.0 L2 phase apparent power 51.7.0 L2 phase current 52.7.0 L2 phase voltage 53.7.0 L2 phase power factor 41.7.0 L2 phase active power 41.8.0 L2 phase forward active accumulative energy 42.8.0 L2 phase reverse active accumulative energy 43.7.0 L2 phase reactive power
43.8.0 L2 phase combined reactive accumulative energy 1
44.8.0 L2 phase combined reactive accumulative
Three-phase CT/PT Operated Keypad Energy Meter
94 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
energy 2 49.7.0 L2 phase apparent power 71.7.0 L3 phase current 72.7.0 L3 phase voltage 73.7.0 L3 phase power factor 61.7.0 L3 phase active power 61.8.0 L3 phase forward active accumulative energy 62.8.0 L3 phase reverse active accumulative energy 63.7.0 L3 phase reactive power
63.8.0 L3 phase combined reactive accumulative energy 1
64.8.0 L3 phase combined reactive accumulative energy 2
69.7.0 L3 phase apparent power
1.7.0 Total all phases active power 3.7.0 Total all phases reactive power 9.7.0 Total all phases accumulative power 13.7.0 Total conjunction phase power factor 14.7.0 Frequency 81.7.4 L2 phase current voltage angle 81.7.15 L2 phase current voltage angle 81.7.26 L3 phase current voltage angle 81.7.1 L2L2 voltage angle 81.7.12 L2L3 voltage angle 81.7.2 L3L2 voltage angle
E.2.0 Current day combined active energy E.3.0 Current day forward active total energy
Current day forward active total deducted credit amount
E.3.1 Current day tariff 1 (T1) forward active energy//Step 0 active energy
E.3.2 Current day tariff 2 (T2) forward active energy E.3.3 Current day tariff 3 (T3) forward active energy E.3.4 Current day tariff 4 (T4) forward active energy
Three-phase CT/PT Operated Keypad Energy Meter
95 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
E.3.5 Current day tariff 5 (T5) forward active energy E.3.6 Current day tariff 6 (T6) forward active energy E.3.7 Current day tariff 7 (T7) forward active energy E.3.8 Current day tariff 8 (T8) forward active energy E.4.0 Current day reverse active total energy
Current day reverse active total deducted credit amount
E.4.1 Current day tariff 1 (T1) reverse active energy E.4.2 Current day tariff 2 (T2) reverse active energy E.4.3 Current day tariff 3 (T3) reverse active energy E.4.4 Current day tariff 4 (T4) reverse active energy E.4.5 Current day tariff 5 (T5) reverse active energy E.4.6 Current day tariff 6 (T6) reverse active energy E.4.7 Current day tariff 7 (T7) reverse active energy E.4.8 Current day tariff 8 (T8) reverse active energy E.5.0 Current day combined reactive energy 1
Current day deducted credit combined reactive energy 1
Current day combined reactive energy 1 deducted credit amount
E.5.1 Current day Tariff 1 (T1) combined reactive energy 1
Current day tariff 1 (T1) deducted credit combined reactive energy 1
E.5.2 Current day Tariff 2 (T2) combined reactive energy 1
Current day tariff 2 (T2) deducted credit combined reactive energy 1
E.5.3 Current day Tariff 3 (T3) combined reactive energy 1
Current day tariff 3 (T3) deducted credit combined reactive energy 1
E.5.4 Current day Tariff 4 (T4) combined reactive energy 1
Current day tariff 4 (T4) deducted credit combined reactive energy 1
E.5.5 Current day Tariff 5 (T5) combined reactive energy 1
Three-phase CT/PT Operated Keypad Energy Meter
96 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
Current day tariff 5 (T5) deducted credit combined reactive energy 1
E.5.6 Current day Tariff 6 (T6) combined reactive energy 1
Current day tariff 6 (T6) deducted credit combined reactive energy 1
E.5.7 Current day Tariff 7 (T7) combined reactive energy 1
Current day tariff 7 (T7) deducted credit combined reactive energy 1
E.5.8 Current day Tariff 8 (T8) combined reactive energy 1
Current day tariff 8 (T8) deducted credit combined reactive energy 1
E.6.0 Current day combined reactive energy 2
Current day deducted credit combined reactive energy 2
Current day combined reactive 2 deducted credit amount
E.6.1 Current day Tariff 1 (T1) combined reactive energy 2
Current day tariff 1 (T1) deducted credit combined reactive energy 2
E.6.2 Current day Tariff 2 (T2) combined reactive energy 2
Current day tariff 2 (T2) deducted credit combined reactive energy 2
E.6.3 Current day Tariff 3 (T3) combined reactive energy 2
Current day tariff 3 (T3) deducted credit combined reactive energy 2
E.6.4 Current day Tariff 4 (T4) combined reactive energy 1
Current day tariff 4 (T4) deducted credit combined reactive energy 2
E.6.5 Current day Tariff 5 (T5) combined reactive energy 1
Current day tariff 5 (T5) deducted credit combined reactive energy 1
Three-phase CT/PT Operated Keypad Energy Meter
97 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
E.6.6 Current day Tariff 6 (T6) combined reactive energy 1
Current day tariff 6 (T6) deducted credit combined reactive energy 2
E.6.7 Current day Tariff 7 (T7) combined reactive energy 1
Current day tariff 7 (T7) deducted credit combined reactive energy 2
E.6.8 Current day Tariff 8 (T8) combined reactive energy 1
Current day tariff 8 (T8) deducted credit combined reactive energy 2
E.7.0 Current day accumulative reactive total energy for 1st quadrant
E.8.0 Current day accumulative reactive total energy for 2nd quadrant
E.9.0 Current day accumulative reactive total energy for 3rd quadrant
E.10.0 Current day accumulative reactive total energy for 4th quadrant
C.71.1 combined active consumption for the last hour
C.71.2 combined reactive consumption for the last hour
C.71.3 Transformer loss for the last hour
Transformer loss deducted credit amount for the last hour
C.71.4 Reactive loss for the last hour
Reactive loss deducted credit amount for the last hour
C.71.5 Current day transformer loss energy
Current day transformer loss energy deducted credit amount
C.71.6 Current day reactive loss energy
Current day reactive loss energy deducted credit amount
15.9.0 Current month combined active energy
Three-phase CT/PT Operated Keypad Energy Meter
98 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
1.9.0 Current month forward active energy
Current month forward active deducted credit amount
1.9.1 Current month tariff 1 (T1) forward active energy 1.9.2 Current month tariff 2 (T2) forward active energy 1.9.3 Current month tariff 3 (T3) forward active energy 1.9.4 Current month tariff 4 (T4) forward active energy 1.9.5 Current month tariff 5 (T5) forward active energy 1.9.6 Current month tariff 6 (T6) forward active energy 1.9.7 Current month tariff 7 (T7) forward active energy 1.9.8 Current month tariff 8 (T8) forward active energy 2.9.0 Current month reverse active energy
Current month reverse active deducted credit amount
2.9.1 Current month tariff 1 (T1) reverse active energy 2.9.2 Current month tariff 2 (T2) reverse active energy 2.9.3 Current month tariff 3 (T3) reverse active energy 2.9.4 Current month tariff 4 (T4) reverse active energy 2.9.5 Current month tariff 5 (T5) reverse active energy 2.9.6 Current month tariff 6 (T6) reverse active energy 2.9.7 Current month tariff 7 (T7) reverse active energy 2.9.8 Current month tariff 8 (T8) reverse active energy 1.6.0 Current month forward active max demand
Current month forward active max demand occurrence date
Current month forward active max demand occurrence time
2.6.0 Current month reverse active max demand
Current month reverse active max demand occurrence date
Current month reverse active max demand occurrence time
3.9.0 Current month combined reactive energy 1
Current month deducted credit combined reactive energy 1
Current month combined reactive deducted credit amount 1
Three-phase CT/PT Operated Keypad Energy Meter
99 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
3.9.1 Current month tariff 1 (T1) combined reactive energy 1
Current month tariff 1 (T1) deducted credit combined reactive energy 1
3.9.2 Current month tariff 2 (T2) combined reactive energy 1
Current month tariff 2 (T2) deducted credit combined reactive energy 1
3.9.3 Current month tariff 3 (T3) combined reactive energy 1
Current month tariff 3 (T3) deducted credit combined reactive energy 1
3.9.4 Current month tariff 4 (T4) combined reactive energy 1
Current month tariff 4 (T4) deducted credit combined reactive energy 1
3.9.5 Current month tariff 5 (T5) combined reactive energy 1
Current month tariff 5 (T5) deducted credit combined reactive energy 1
3.9.6 Current month tariff 6 (T6) combined reactive energy 1
Current month tariff 6 (T6) deducted credit combined reactive energy 1
3.9.7 Current month tariff 7 (T7) combined reactive energy 1
Current month tariff 7 (T7) deducted credit combined reactive energy 1
3.9.8 Current month tariff 8 (T8) combined reactive energy 1
Current month tariff 8 (T8) deducted credit combined reactive energy 1
4.9.0 Current month total accumulative combined reactive energy 2
Current month deducted credit combined reactive energy 2
Current month combined reactive energy 2 deducted credit amount
4.9.1 Current month tariff 1 (T1) combined reactive
Three-phase CT/PT Operated Keypad Energy Meter
100 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
energy 2
Current month tariff 1 (T1) deducted credit combined reactive energy 2
4.9.2 Current month tariff 2 (T2) combined reactive energy 2
Current month tariff 2 (T2) deducted credit combined reactive energy 2
4.9.3 Current month tariff 3 (T3) combined reactive energy 2
Current month tariff 3 (T3) deducted credit combined reactive energy 2
4.9.4 Current month tariff 4 (T4) combined reactive energy 2
Current month tariff 4 (T4) deducted credit combined reactive energy 2
4.9.5 Current month tariff 5 (T5) combined reactive energy 2
Current month tariff 5 (T5) deducted credit combined reactive energy 2
4.9.6 Current month tariff 6 (T6) combined reactive energy 2
Current month tariff 6 (T6) deducted credit combined reactive energy 2
4.9.7 Current month tariff 7 (T7) combined reactive energy 2
Current month tariff 7 (T7) deducted credit combined reactive energy 2
4.9.8 Current month tariff 8 (T8) combined reactive energy 2
Current month tariff 8 (T8) deducted credit combined reactive energy 2
5.9.0 Current month total accumulative reactive energy for 1st quadrant
6.9.0 Current month total accumulative reactive energy for 2nd quadrant
7.9.0 Current month total accumulative reactive energy for 3rd quadrant
8.9.0 Current month total accumulative reactive energy for 4th quadrant
Three-phase CT/PT Operated Keypad Energy Meter
101 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
3.6.0 Current month combined reactive 1 max demand
Current month combined reactive energy 1 max demand occurrence date
Current month combined reactive energy 1 max demand occurrence time
4.6.0 Current month combined reactive energy 2 max demand
Current month combined reactive energy 2 max demand occurrence date
Current month combined reactive energy 2 max demand occurrence time
9.9.0 Current month forward apparent energy 10.9.0 Current month reverse apparent energy 9.6.0 Current month forward apparent max demand
Current month forward apparent max demand occurrence date
Current month forward apparent max demand occurrence time
10.6.0 Current month reverse apparent max demand
Current month reverse apparent max demand occurrence date
Current month reverse apparent max demand occurrence time
C.71.7 Current month transformer loss energy
Current month transformer loss deducted credit amount
C.71.8 Current month reactive loss energy
Current month reactive loss deducted credit amount
C.50.1 Remaining credit C.50.51 accumulative recharging amount C.50.52 accumulative deducted credit amount
C.50.53 accumulative active energy deducted credit amount
Three-phase CT/PT Operated Keypad Energy Meter
102 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
C.50.54 accumulative reactive energy deducted credit amount
C.50.55 accumulative apparent max demand deducted credit amount
C.50.56 accumulative transformer loss deducted credit amount
C.50.57 accumulative reactive loss deducted credit amount
11.35.0 Current threshold of over current power off 12.31.0 Voltage threshold value of low voltage power off
12.35.0 Voltage threshold value of over voltage power off
21.35.0 Power load control threshold 11.35.0 Current threshold of over current power off 12.31.0 Voltage threshold value of low voltage power off
12.35.0 Voltage threshold value of over voltage power off
21.35.0 load control threshold C.50.4 overflow credit threshold C.50.5 Overdraft credit threshold C.50.9 Billing date C.51.0 Buzzer alarm internal C.51.1 Recovery time from over load power off C.51.3 Allowable power off times for over load C,51.4 Min. insurance load threshold C.51.5 Phase power unbalance power off threshold
C.51.6 Power off temperature threshold for over temperature
C.51.7 Bypass tamper warning threshold ( 6.25% 12.5%)
C.51.11 Pre-warning threshold for remaining credit C.51.12 Warning threshold for remain credit C.50.70 prepayment configuration status word 1 C.50.71 prepayment configuration status word 2 C.72.0 combined active, combined reactive energy1,
Three-phase CT/PT Operated Keypad Energy Meter
103 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
combined reactive energy 2 definition character.C.72.4 CT ratio C.72.5 PT ratio C.72.6 Total ratio C.70.9 User installation transformer capacity
C.70.2 combined active, combined reactive energy 1, combined reactive energy 2 definition character.
C.51.10 Friendly time (Power off is not allowed) Start HHMM
C.51.13 Friendly time (Power off is not allowed) End HHMM
C.51.14 Friendly weekend(code of week and date on which power off is not allowed)
C.51.15 (date on which power off is not allowed)1st friendly holiday (date on which power off is not allowed—YYMMDD)
C.51.16 (date on which power off is not allowed)2nd friendly holiday (Date of power off not allowed—YYMMDD)
C.51.17 (date on which power off is not allowed)3rd friendly holiday (date on which power off is not allowed—YYMMDD)
C.51.18 (date on which power off is not allowed)4th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.19 (date on which power off is not allowed)5th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.20 (date on which power off is not allowed)6th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.21 (date on which power off is not allowed)7th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.22 (date on which power off is not allowed)8th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.23 (date on which power off is not allowed)9th friendly holiday (Date of power off not
Three-phase CT/PT Operated Keypad Energy Meter
104 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
allowed—YYMMDD)
C.51.24 (date on which power off is not allowed)10th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.25 (date on which power off is not allowed)11th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.26 (date on which power off is not allowed)12th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.27 (date on which power off is not allowed)13th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.28 (date on which power off is not allowed)14th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.29 (date on which power off is not allowed)15th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.30 (date on which power off is not allowed)16th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.31 (date on which power off is not allowed)17th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.32 (date on which power off is not allowed)18th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.33 (date on which power off is not allowed)19th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.34 (date on which power off is not allowed)20th friendly holiday (Date of power off not allowed—YYMMDD)
C.51.9 available days for Remaining energy 1.1.0 Total billings C.72.1 Over load power off times C.5.1 Meter status word 1 C.5.2 Meter status word 2
Three-phase CT/PT Operated Keypad Energy Meter
105 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
C.5.3 Meter status word 3 (Cover open event) C.5.4 Meter status word 4 (Network event 1) C.5.5 Meter status word 5 (Network event 2) C.5.6 Meter status word 6 (Network event 3) C.15.6 Meter tripping times C.L.11.1 Lastst meter tripping date/time C.L.12.1 Lastst meter power recovery date/time C.L.13.1 Lastst meter tripping cause word 1 C.L.14.1 Lastst meter tripping cause word 2 C.L.11.2 Last 2nd tripping date/time C.L.12.2 Last 2nd meter power recovery date/time C.L.13.2 Last 2nd meter tripping cause word 1 C.L.14.2 Last 2nd meter tripping cause word 2 C.L.11.3 Last 3rd meter tripping date/time C.L.12.3 Last 3rd meter power recovery C.L.13.3 Last 3rd tripping cause word 1 C.L.14.3 Last 3rd tripping cause word 2 C.L.11.4 Last 4th meter tripping date/time C.L.12.4 Last 4th meter power recovery C.L.13.4 Last 4th meter tripping cause word 1 C.L.14.4 Last 4th meter tripping cause word 2 C.L.11.5 Last 5th meter tripping date/time C.L.12.5 Last 5th meter power recovery C.L.13.5 1 Last 5th meter tripping cause word 1 C.L.14.5 2 Last 5th meter tripping cause word 2 C.L.11.6 Last 6th meter tripping date/time C.L.12.6 Last 6th meter power recovery C.L.13.6 Last 6th meter tripping cause word 1 C.L.14.6 2 Last 6th meter tripping cause word 2 C.L.11.7 Last 7th meter tripping date/time C.L.12.7 Last 7th meter power recovery C.L.13.7 1 Last 7th meter tripping cause word 1 C.L.14.7 2 Last 7th meter tripping cause word 2 C.L.11.8 Last 8th meter tripping date/time C.L.12.8 Last 8th meter power recovery C.L.13.8 1 Last 8th meter tripping cause word 1 C.L.14.8 2 Last 8th meter tripping cause word 2 C.L.11.9 Last 9th meter tripping date/time C.L.12.9 Last 9th meter power recovery
Three-phase CT/PT Operated Keypad Energy Meter
106 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
C.L.13.9 Last 9th meter tripping cause word 1 C.L.14.9 Last 9th meter tripping cause word 2 C.L.11.10
Last0th meter tripping date/time
C.L.12.10
Last0th meter power recovery
C.L.13.10
Last0th meter tripping cause word 1
C.L.14.10
Last0th meter tripping cause word 2
C.8.0 grid power off accumulative times C.L.21.1 Lastst network power off occurrence date/time C.L.22.1 Lastst grid power recovery date/time C.L.21.2 Last 2nd grid power off occurrence date/time C.L.22.2 Last 2nd grid power recovery date/time C.L.21.3 Last 3rd grid power off occurrence date/time C.L.22.3 Last 3rd network power recovery date/time C.L.21.4 Last 4th network power off occurrence
date/time
C.L.22.4 Last 4th network power recovery date/time C.L.21.5 Last 5th grid power off occurrence date/time C.L.22.5 Last 5th grid power recovery date/time C.L.21.6 Last 6th grid power off occurrence date/time C.L.22.6 Last 6th grid power recovery date/time C.L.21.8 Last 7th grid power off occurrence date/time C.L.22.8 Last 7th grid power recovery date/time C.L.21.8 Last 8th grid power off occurrence date/time C.L.22.8 Last 8th grid power recovery date/time C.L.21.9 Last 9th grid power off occurrence date/time C.L.22.9 Last 9th grid power recovery date/time C.L.21.10
Last0th grid power off occurrence date/time
C.L.22.10
Last0th grid power recovery date/time
C.82.8 Special event accumulative times C.L.31.1 Lastst event occurrence date/time C.L.32.1 Lastst event recovery date/time C.L.33.1 Lastst event status word 1 (malfunction event)
Three-phase CT/PT Operated Keypad Energy Meter
107 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
C.L.34.1 Lastst event status word 2 (meter cover open event)
C.L.35.1 Lastst event status word 3 (grid event 1) C.L.36.1 Lastst event status word 4 (grid event 2) C.L.38.1 Lastst event status word 5 (grid event 3) C.L.31.2 Last 2nd event occurrence date/time C.L.32.2 Last 2nd event recovery date/time C.L.33.2 Last 2nd event status word 1 (malfunction
event)
C.L.34.2 Last 2nd event status word 2 (meter cover open event)
C.L.35.2 Last 2nd event status word 3 (grid event 1) C.L.36.1 Last 2nd event status word 4 (grid event 2) C.L.38.2 Last 2nd event status word 5 (grid event 3) C.L.31.3 Last 3rd event occurrence date/time C.L.32.3 Last 3rd event recovery date/time C.L.33.3 Last 3rd event status word 1 (malfunction event) C.L.34.3 Last 3rd event status word 2 (meter cover open
event)
C.L.35.3 Last 3rd event status word 3 (grid event 1) C.L.36.3 Last 3rd event status word 4 (grid event 2) C.L.38.3 Last 3rd event status word 5 (grid event 3) C.L.31.4 Last 4th event occurrence date/time C.L.32.4 Last 4th event recovery date/time C.L.33.4 Last 4th event status word 1 (malfunction event) C.L.34.4 Last 4th event status word 2 (meter cover open
event)
C.L.35.4 Last 4th event status word 3 (grid event 1) C.L.36.4 Last 4th event status word 4 (grid event 2) C.L.38.4 Last 4th event status word 5 (grid event 3) C.L.31.5 Last 5th event occurrence date/time C.L.32.5 Last 5th event recovery date/time C.L.33.5 Last 5th event status word 1 (malfunction event) C.L.34.5 Last 5th event status word 2 (meter cover open
event)
C.L.35.5 Last 5th event status word 3 (grid event 1) C.L.36.5 Last 5th event status word 4 (grid event 2) C.L.38.5 Last 5th event status word 5 (grid event 3) C.L.31.6 Last 6th event occurrence date/time C.L.32.6 Last 6th event recovery date/time
Three-phase CT/PT Operated Keypad Energy Meter
108 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
C.L.33.6 Last 6th event status word 1 (malfunction event) C.L.34.6 Last 6th event status word 2 (meter cover open
event)
C.L.35.6 Last 6th event status word 3 (grid event 1) C.L.36.6 Last 6th event status word 4 (grid event 2) C.L.38.6 Last 6th event status word 5 (grid event 3) C.L.31.8 Last 8th event occurrence date/time C.L.32.8 Last 8th event recovery date/time C.L.33.8 Last 8th event status word 1 (malfunction event) C.L.34.8 Last 8th event status word 2 (meter cover open
event)
C.L.35.8 Last 8th event status word 3 (grid event 1) C.L.36.8 Last 8th event status word 4 (grid event 2) C.L.38.8 Last 8th event status word 5 (grid event 3) C.L.31.8 Last 8th event occurrence date/time C.L.32.8 Last 8th event recovery date/time C.L.33.8 Last 8th event status word 1 (malfunction event) C.L.34.8 Last 8th event status word 2 (meter cover open
event)
C.L.35.8 Last 8th event status word 3 (grid event 1) C.L.36.8 Last 8th event status word 4 (grid event 2) C.L.38.8 Last 8th event status word 5 (grid event 3) C.L.31.9 Last 9th event occurrence date/time C.L.32.9 Last 9th event recovery date/time C.L.33.9 Last 9th event status word 1 (malfunction event) C.L.34.9 Last 9th event status word 2 (meter cover open
event)
C.L.35.9 Last 9th event status word 3 (grid event 1) C.L.36.9 Last 9th event status word 4 (grid event 2) C.L.38.9 Last 9th event status word 5 (grid event 3) C.L.31.10
Last0th event occurrence date/time
C.L.32.10
Last0th event recovery date/time
C.L.33.10
Last0th event status word 1 (malfunction event)
C.L.34.10
Last0th event status word 2 (meter cover open event)
C.L.35.10
)Last0th event status word 3 (grid event 1)
Three-phase CT/PT Operated Keypad Energy Meter
109 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
C.L.36.10
Last0th event status word 4 (grid event 2)
C.L.38.10
Last0th event status word 5 (grid event 3)
Last3 monthly Power consumption data and deducted credit amount data (The meter displays monthly data for every month, and the reading data is for the frozen data at end of each month)
15.9.0.1 combined active energy for last month 1.9.0.1 combined forward active energy for last month
Forward active deducted credit amount for last month
1.9.1.1 Last month tariff 1 (T1) forward active energy 1.9.2.1 Last month tariff 2 (T2) forward active energy 1.9.3.1 Last month tariff 3 (T3) forward active energy 1.9.4.1 Last month tariff 4 (T4) forward active energy 1.9.5.1 Last month tariff 5 (T5) forward active energy 1.9.6.1 Last month tariff 6 (T6) forward active energy 1.9.8.1 Last month tariff 8(T8) forward active energy 1.9.8.1 Last month tariff 8 (T8) forward active energy
2.9.0.1 Total combined reverse active energy for last month
Reverse active energy deducted credit amount for last month
2.9.1.1 Last month tariff 1 (T1) reverse active energy 2.9.2.1 Last month tariff 2 (T2) reverse active energy 2.9.3.1 Last month tariff 3 (T3) reverse active energy 2.9.4.1 Last month tariff 4 (T4) reverse active energy 2.9.5.1 Last month tariff 5 (T5) reverse active energy 2.9.6.1 Last month tariff 6 (T6) reverse active energy 2.9.8.1 Last month tariff 8(T8) reverse active energy 2.9.8.1 Last month tariff 8 (T8) reverse active energy 1.6.0.1 Last month forward active max demand
Last month forward active max demand occurrence date
Last month forward active max demand
Three-phase CT/PT Operated Keypad Energy Meter
110 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
occurrence time 2.6.0.1 Last month reverse active max demand
Last month reverse active max demand occurrence date
Last month reverse active max demand occurrence time
3.9.0.1 Last month combined reactive energy 1
Last month deducted credit combined reactive energy 1
Last month combined reactive 1 deducted credit
3.9.1.1 Last month Tariff 1 (T1) combined reactive energy 1
Last month tariff 1 (T1) deducted credit combined reactive energy 1
3.9.2.1 Last month Tariff 2 (T2) combined reactive energy 1
Last month tariff 2 (T2) deducted credit combined reactive energy 1
3.9.3.1 Last month Tariff 3 (T3) combined reactive energy 1
Last month tariff 3 (T3) deducted credit combined reactive energy 1
3.9.4.1 Last month Tariff 4 (T4) combined reactive energy 1
Last month tariff 4 (T4) deducted credit combined reactive energy 1
3.9.5.1 Last month Tariff 5 (T5) combined reactive energy 1
Last month tariff 5 (T5) deducted credit combined reactive energy 1
3.9.6.1 Last month Tariff 6 (T6) combined reactive energy 1
Last month tariff 6 (T6) deducted credit combined reactive energy 1
3.9.8.1 Last month Tariff 7 (T7) combined reactive energy 1
Last month tariff 7 (T7) deducted credit combined reactive energy 1
3.9.8.1 Last month Tariff 8 (T8) combined reactive
Three-phase CT/PT Operated Keypad Energy Meter
111 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
energy 1
Last month tariff 8 (T8) deducted credit combined reactive energy 1
4.9.0.1 Last month combined reactive energy 2
Last month deducted credit combined reactive energy 2
Last month combined reactive 2 deducted credit
4.9.1.1 Last month Tariff 1 (T1) combined reactive energy 2
Last month tariff 1 (T1) deducted credit combined reactive energy 2
4.9.2.1 Last month Tariff 2 (T2) combined reactive energy 2
Last month tariff 2 (T2) deducted credit combined reactive energy 2
4.9.3.1 Last month Tariff 3 (T3) combined reactive energy 2
Last month tariff 3 (T3) deducted credit combined reactive energy 2
4.9.4.1 Last month Tariff 4 (T4) combined reactive energy 2
Last month tariff 4 (T4) deducted credit combined reactive energy 2
4.9.5.1 Last month Tariff 5 (T5) combined reactive energy 2
Last month tariff 5 (T5) deducted credit combined reactive energy 2
4.9.6.1 Last month Tariff 6 (T6) combined reactive energy 2
Last month tariff 6 (T6) deducted credit combined reactive energy 2
4.9.8.1 Last month Tariff 7 (T7) combined reactive energy 2
Last month tariff 7 (T7) deducted credit combined reactive energy 2
4.9.8.1 Last month Tariff 8 (T8) combined reactive energy 2
Last month tariff 8 (T8) deducted credit combined reactive energy 2
Three-phase CT/PT Operated Keypad Energy Meter
112 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
5.9.0.1 Last month accumulative reactive total energy for 1st quadrant
6.9.0.1 Last month accumulative reactive total energy for 2nd quadrant
8.9.0.1 Last month accumulative reactive total energy for 3rd quadrant
8.9.0.1 Last month accumulative reactive total energy for 4th quadrant
3.6.0.1 Last month combined reactive 1 (forward reactive) max demand
Last month combined reactive 1 (forward reactive) max demand occurrence date
Last month combined reactive 1 (forward reactive) max demand occurrence time
4.6.0.1 Last month combined reactive 2 (reverse reactive) max demand
Last month combined reactive 2 (reverse reactive) max demand occurrence date
Last month combined reactive 2 (reverse reactive) max demand occurrence time
9.9.0.1 Last month forward apparent energy 10.9.0.1 Last month reverse apparent energy 9.6.0.1 Last month forward apparent max demand
Last month forward apparent max demand occurrence date
Last month forward apparent max demand occurrence time
10.6.0.1 Last month reverse apparent max demand
Last month reverse apparent max demand occurrence date
Last month reverse apparent max demand occurrence time
E.35.0.1 Last month apparent max demand deducted credit
E.36.0.1 Last month transformer loss energy
Three-phase CT/PT Operated Keypad Energy Meter
113 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
E.38.0.1 Last month transformer loss energy deducted credit
E.38.0.1 Last month reactive loss energy E.39.0.1 Last month reactive loss energy deducted credit E.40.0.1 Last month total deducted credit 15.9.0.2 combined active energy for last 2 months
1.9.0.2 Total combined forward active energy for last 2 months
Forward active deducted credit for last 2 months 1.9.1.2 Last 2 months tariff 1 (T1) forward active energy 1.9.2.2 Last 2 months tariff 2 (T2) forward active energy 1.9.3.2 Last 2 months tariff 3 (T3) forward active energy 1.9.4.2 Last 2 months tariff 4 (T4) forward active energy 1.9.5.2 Last 2 months tariff 5 (T5) forward active energy 1.9.6.2 Last 2 months tariff 6 (T6) forward active energy 1.9.8.2 Last 2 months tariff 8(T8) forward active energy 1.9.8.2 Last 2 months tariff 8 (T8) forward active energy
2.9.0.2 Total combined reverse active energy for last 2 months
Reverse active deducted credit for last 2 months 2.9.1.2 Last 2 months tariff 1 (T1) reverse active energy 2.9.2.2 Last 2 months tariff 2 (T2) reverse active energy 2.9.3.2 Last 2 months tariff 3 (T3) reverse active energy 2.9.4.2 Last 2 months tariff 4 (T4) reverse active energy 2.9.5.2 Last 2 months tariff 5 (T5) reverse active energy 2.9.6.2 Last 2 months tariff 6 (T6) reverse active energy 2.9.8.2 Last 2 months tariff 8(T8) reverse active energy 2.9.8.2 Last 2 months tariff 8 (T8) reverse active energy 1.6.0.2 Last 2 months forward active max demand
Last 2 months forward active max demand occurrence date
Last 2 months forward active max demand occurrence time
2.6.0.2 Last 2 months reverse active max demand
Last 2 months reverse active max demand occurrence date
Three-phase CT/PT Operated Keypad Energy Meter
114 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
Last 2 months reverse active max demand occurrence time
3.9.0.2 Last 2 months combined reactive energy 1
Last 2 months deducted credit combined reactive energy 1
Last 2 months combined reactive 1 deducted credit
3.9.1.2 Last 2 months Tariff 1 (T1) combined reactive energy 1
Last 2 months tariff 1 (T1) deducted credit combined reactive energy 1
3.9.2.2 Last 2 months Tariff 2 (T2) combined reactive energy 1
Last 2 months tariff 2 (T2) deducted credit combined reactive energy 1
3.9.3.2 Last 2 months Tariff 3 (T3) combined reactive energy 1
Last 2 months tariff 3 (T3) deducted credit combined reactive energy 1
3.9.4.2 Last 2 months Tariff 4 (T4) combined reactive energy 1
Last 2 months tariff 4 (T4) deducted credit combined reactive energy 1
3.9.5.2 Last 2 months Tariff 5 (T5) combined reactive energy 1
Last 2 months tariff 5 (T5) deducted credit combined reactive energy 1
3.9.6.2 Last 2 months Tariff 6 (T6) combined reactive energy 1
Last 2 months tariff 6 (T6) deducted credit combined reactive energy 1
3.9.8.2 Last 2 months Tariff 7 (T7) combined reactive energy 1
Last 2 months tariff 7 (T7) deducted credit combined reactive energy 1
3.9.8.2 Last 2 months Tariff 8 (T8) combined reactive energy 1
Last 2 months tariff 8 (T8) deducted credit combined reactive energy 1
Three-phase CT/PT Operated Keypad Energy Meter
115 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
4.9.0.2 Last 2 months combined reactive energy 2
Last 2 months deducted credit combined reactive energy 2
Last 2 months combined reactive 2 deducted credit
4.9.1.2 Last 2 months Tariff 1 (T1) combined reactive energy 2
Last 2 months tariff 1 (T1) deducted credit combined reactive energy 2
4.9.2.2 Last 2 months Tariff 2 (T2) combined reactive energy 2
Last 2 months tariff 2 (T2) deducted credit combined reactive energy 2
4.9.3.2 Last 2 months Tariff 3 (T3) combined reactive energy 2
Last 2 months tariff 3 (T3) deducted credit combined reactive energy 2
4.9.4.2 Last 2 months Tariff 4 (T4) combined reactive energy 2
Last 2 months tariff 4 (T4) deducted credit combined reactive energy 2
4.9.5.2 Last 2 months Tariff 5 (T5) combined reactive energy 2
Last 2 months tariff 5 (T5) deducted credit combined reactive energy 2
4.9.6.2 Last 2 months Tariff 6 (T6) combined reactive energy 2
Last 2 months tariff 6 (T6) deducted credit combined reactive energy 2
4.9.8.2 Last 2 months Tariff 7 (T7) combined reactive energy 2
Last 2 months tariff 7 (T7) deducted credit combined reactive energy 2
4.9.8.2 Last 2 months Tariff 8 (T8) combined reactive energy 2
Last 2 months tariff 8 (T8) deducted credit combined reactive energy 2
5.9.0.2 Last 2 months accumulative reactive total
Three-phase CT/PT Operated Keypad Energy Meter
116 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
energy for 1st quadrant
6.9.0.2 Last 2 months accumulative reactive total energy for 2nd quadrant
8.9.0.2 Last 2 months accumulative reactive total energy for 3rd quadrant
8.9.0.2 Last 2 months accumulative reactive total energy for 4th quadrant
3.6.0.2 Last 2 months combined reactive 1 (forward reactive) max demand
Last 2 months combined reactive 1 (forward reactive) max demand occurrence date
Last 2 months combined reactive 1 (forward reactive) max demand occurrence time
4.6.0.2 Last 2 months combined reactive 2 (reverse reactive) max demand
Last 2 months combined reactive 2 (reverse reactive) max demand occurrence date
Last 2 months combined reactive 2 (reverse reactive) max demand occurrence time
9.9.0.2 Last 2 months forward apparent energy 10.9.0.2 Last 2 months reverse apparent energy 9.6.0.2 Last 2 months forward apparent max demand
Last 2 months forward apparent max demand occurrence date
Last 2 months forward apparent max demand occurrence time
10.6.0.2 Last 2 months reverse apparent max demand
Last 2 months reverse apparent max demand occurrence date
Last 2 months reverse apparent max demand occurrence time
E.35.0.2 Last 2 months apparent max demand deducted credit
E.36.0.2 Last 2 months transformer loss energy
E.38.0.2 Last 2 months transformer loss energy deducted credit
Three-phase CT/PT Operated Keypad Energy Meter
117 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
E.38.0.2 Last 2 months reactive loss energy
E.39.0.2 Last 2 months reactive loss energy deducted credit
E.40.0.2 Last 2 months deducted credit ● ● ● ● ●
15.9.0.13 combined active energy for last3 months
1.9.0.13 Total combined forward active energy for last3 months
Forward active deducted credit for last3 months 1.9.1.13 Last3 months tariff 1 (T1) forward active energy 1.9.2.13 Last3 months tariff 2 (T2) forward active energy 1.9.3.13 Last3 months tariff 3 (T3) forward active energy 1.9.4.13 Last3 months tariff 4 (T4) forward active energy 1.9.5.13 Last3 months tariff 5 (T5) forward active energy 1.9.6.13 Last3 months tariff 6 (T6) forward active energy 1.9.8.13 Last3 months tariff 8(T8) forward active energy 1.9.8.13 Last3 months tariff 8 (T8) forward active energy
2.9.0.13 Total combined reverse active energy for last3 months
Reverse active deducted credit for last3 months 2.9.1.13 Last3 months tariff 1 (T1) reverse active energy 2.9.2.13 Last3 months tariff 2 (T2) reverse active energy 2.9.3.13 Last3 months tariff 3 (T3) reverse active energy 2.9.4.13 Last3 months tariff 4 (T4) reverse active energy 2.9.5.13 Last3 months tariff 5 (T5) reverse active energy 2.9.6.13 Last3 months tariff 6 (T6) reverse active energy 2.9.8.13 Last3 months tariff 8(T8) reverse active energy 2.9.8.13 Last3 months tariff 8 (T8) reverse active energy 1.6.0.13 Last3 months forward active max demand
Three-phase CT/PT Operated Keypad Energy Meter
118 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
Last3 months forward active max demand occurrence date
Last3 months forward active max demand occurrence time
2.6.0.13 Last3 months reverse active max demand
Last3 months reverse active max demand occurrence date
Last3 months reverse active max demand occurrence time
3.9.0.13 Last3 months combined reactive energy 1
Last3 months deducted credit combined reactive energy 1
Last3 months combined reactive 1 deducted credit
3.9.1.13 Last3 months Tariff 1 (T1) combined reactive energy 1
Last3 months tariff 1 (T1) deducted credit combined reactive energy 1
3.9.2.13 Last3 months Tariff 2 (T2) combined reactive energy 1
Last3 months tariff 2 (T2) deducted credit combined reactive energy 1
3.9.3.13 Last3 months Tariff 3 (T3) combined reactive energy 1
Last3 months tariff 3 (T3) deducted credit combined reactive energy 1
3.9.4.13 Last3 months Tariff 4 (T4) combined reactive energy 1
Last3 months tariff 4 (T4) deducted credit combined reactive energy 1
3.9.5.13 Last3 months Tariff 5 (T5) combined reactive energy 1
Last3 months tariff 5 (T5) deducted credit combined reactive energy 1
3.9.6.13 Last3 months Tariff 6 (T6) combined reactive energy 1
Last3 months tariff 6 (T6) deducted credit combined reactive energy 1
3.9.8.13 Last3 months Tariff 7 (T7) combined reactive
Three-phase CT/PT Operated Keypad Energy Meter
119 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
energy 1
Last3 months tariff 7 (T7) deducted credit combined reactive energy 1
3.9.8.13 Last3 months Tariff 8 (T8) combined reactive energy 1
Last3 months tariff 8 (T8) deducted credit combined reactive energy 1
4.9.0.13 Last3 months combined reactive energy 2
Last3 months deducted credit combined reactive energy 2
Last3 months combined reactive 2 deducted credit
4.9.1.13 Last3 months Tariff 1 (T1) combined reactive energy 2
Last3 months tariff 1 (T1) deducted credit combined reactive energy 2
4.9.2.13 Last3 months Tariff 2 (T2) combined reactive energy 2
Last3 months tariff 2 (T2) deducted credit combined reactive energy 2
4.9.3.13 Last3 months Tariff 3 (T3) combined reactive energy 2
Last3 months tariff 3 (T3) deducted credit combined reactive energy 2
4.9.4.13 Last3 months Tariff 4 (T4) combined reactive energy 2
Last3 months tariff 4 (T4) deducted credit combined reactive energy 2
4.9.5.13 Last3 months Tariff 5 (T5) combined reactive energy 2
Last3 months tariff 5 (T5) deducted credit combined reactive energy 2
4.9.6.13 Last3 months Tariff 6 (T6) combined reactive energy 2
Last3 months tariff 6 (T6) deducted credit combined reactive energy 2
4.9.8.13 Last3 months Tariff 7 (T7) combined reactive energy 2
Last3 months tariff 7 (T7) deducted credit
Three-phase CT/PT Operated Keypad Energy Meter
120 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
combined reactive energy 2
4.9.8.13 Last3 months Tariff 8 (T8) combined reactive energy 2
Last3 months tariff 8 (T8) deducted credit combined reactive energy 2
5.9.0.13 Last3 months accumulative reactive total energy for 1st quadrant
6.9.0.13 Last3 months accumulative reactive total energy for 2nd quadrant
8.9.0.13 Last3 months accumulative reactive total energy for 3rd quadrant
8.9.0.13 Last3 months accumulative reactive total energy for 4th quadrant
3.6.0.13 Last3 months combined reactive 1 (forward reactive) max demand
Last3 months combined reactive 1 (forward reactive) max demand occurrence date
Last3 months combined reactive 1 (forward reactive) max demand occurrence time
4.6.0.13 Last3 months combined reactive 2 (reverse reactive) max demand
Last3 months combined reactive 2 (reverse reactive) max demand occurrence date
Last3 months combined reactive 2 (reverse reactive) max demand occurrence time
9.9.0.13 Last3 months forward apparent energy 10.9.0.13 Last3 months reverse apparent energy 9.6.0.13 Last3 months forward apparent max demand
Last3 months forward apparent max demand occurrence date
Last3 months forward apparent max demand occurrence time
10.6.0.13 Last3 months reverse apparent max demand
Last3 months reverse apparent max demand occurrence date
Last3 months reverse apparent max demand
Three-phase CT/PT Operated Keypad Energy Meter
121 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
occurrence time
E.35.0.13 Last3 months apparent max demand deducted credit
E.36.0.13 Last3 months transformer loss energy
E.38.0.13 Last3 months transformer loss energy deducted credit
E.38.0.13 Last3 months reactive loss energy
E.39.0.13 Last3 months reactive loss energy deducted credit
E.40.0.13 Last3 months total deducted credit
Daily power consumption data and deducted credit data for last 45 days (The meter displays daily data for every day, and the reading data is for the daily frozen data)
E.2.0.1 combined active energy for lastday E.3.0.1 combined forward active energy for last day Forward active deducted credit for last day E.3.1.1 Last day tariff 1 (T1) forward active energy E.3.2.1 Last day tariff 2 (T2) forward active energy E.3.3.1 Last day tariff 3 (T3) forward active energy E.3.4.1 Last day tariff 4 (T4) forward active energy E.3.5.1 Last day tariff 5 (T5) forward active energy E.3.6.1 Last day tariff 6 (T6) forward active energy E.3.8.1 Last day tariff 8(T8) forward active energy E.3.8.1 Last day tariff 8 (T8) forward active energy E.4.0.1 combined reverse active energy for last day Reverse active deducted credit for last day E.4.1.1 Last day tariff 1 (T1) reverse active energy E.4.2.1 Last day tariff 2 (T2) reverse active energy E.4.3.1 Last day tariff 3 (T3) reverse active energy E.4.4.1 Last day tariff 4 (T4) reverse active energy E.4.5.1 Last day tariff 5 (T5) reverse active energy E.4.6.1 Last day tariff 6 (T6) reverse active energy E.4.8.1 Last day tariff 8(T8) reverse active energy E.4.8.1 Last day tariff 8 (T8) reverse active energy E.5.0.1 Last day combined reactive energy 1
Three-phase CT/PT Operated Keypad Energy Meter
122 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
Last day deducted credit combined reactive energy 1
Last day combined reactive 1 deducted credit
E.5.1.1 Last day Tariff 1 (T1) combined reactive energy 1
Last day tariff 1 (T1) deducted credit combined reactive energy 1
E.5.2.1 Last day Tariff 2 (T2) combined reactive energy 1
Last day tariff 2 (T2) deducted credit combined reactive energy 1
E.5.3.1 Last day Tariff 3 (T3) combined reactive energy 1
Last day tariff 3 (T3) deducted credit combined reactive energy 1
E.5.4.1 Last day Tariff 4 (T4) combined reactive energy 1
Last day tariff 4 (T4) deducted credit combined reactive energy 1
E.5.5.1 Last day Tariff 5 (T5) combined reactive energy 1
Last day tariff 5 (T5) deducted credit combined reactive energy 1
E.5.6.1 Last day Tariff 6 (T6) combined reactive energy 1
Last day tariff 6 (T6) deducted credit combined reactive energy 1
E.5.8.1 Last day Tariff 7 (T7) combined reactive energy 1
Last day tariff 7 (T7) deducted credit combined reactive energy 1
E.5.8.1 Last day Tariff 8 (T8) combined reactive energy 1
Last day tariff 8 (T8) deducted credit combined reactive energy 1
E.6.0.1 Last day combined reactive energy 2
Last day deducted credit combined reactive energy 2
Last day combined reactive 2 deducted credit
Three-phase CT/PT Operated Keypad Energy Meter
123 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
E.6.1.1 Last day Tariff 1 (T1) combined reactive energy 2
Last day tariff 1 (T1) deducted credit combined reactive energy 2
E.6.2.1 Last day Tariff 2 (T2) combined reactive energy 1
Last day tariff 2 (T2) deducted credit combined reactive energy 2
E.6.3.1 Last day Tariff 3 (T3) combined reactive energy 1
Last day tariff 3 (T3) deducted credit combined reactive energy 2
E.6.4.1 Last day Tariff 4 (T4) combined reactive energy 1
Last day tariff 4 (T4) deducted credit combined reactive energy 2
E.6.5.1 Last day Tariff 5 (T5) combined reactive energy 1
Last day tariff 5 (T5) deducted credit combined reactive energy 2
E.6.6.1 Last day Tariff 6 (T6) combined reactive energy 1
Last day tariff 6 (T6) deducted credit combined reactive energy 2
E.6.8.1 Last day Tariff 7 (T7) combined reactive energy 1
Last day tariff 7 (T7) deducted credit combined reactive energy 2
E.6.8.1 Last day Tariff 8 (T8) combined reactive energy 1
Last day tariff 8 (T8) deducted credit combined reactive energy 2
E.8.0.1 Last day accumulative reactive total energy for 1st quadrant
E.8.0.1 Last day accumulative reactive total energy for 2nd quadrant
E.9.0.1 Last day accumulative reactive total energy for 3rd quadrant
Three-phase CT/PT Operated Keypad Energy Meter
124 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
E.10.0.1 Last day accumulative reactive total energy for 4th quadrant
E.41.0.1 Last day transformer loss energy
E.42.0.1 Last day transformer loss energy deducted credit
E.43.0.1 Last day reactive loss energy E.44.0.1 Last day reactive loss energy deducted credit E.45.0.1 Last day deducted credit
E.2.0.2 combined active energy for last 2 days E.3.0.2 combined forward active energy for last 2 days Forward active deducted credit for last 2 days E.3.1.2 Last 2 days tariff 1 (T1) forward active energy E.3.2.2 Last 2 days tariff 2 (T2) forward active energy E.3.3.2 Last 2 days tariff 3 (T3) forward active energy E.3.4.2 Last 2 days tariff 4 (T4) forward active energy E.3.5.2 Last 2 days tariff 5 (T5) forward active energy E.3.6.2 Last 2 days tariff 6 (T6) forward active energy E.3.7.2 Last 2 days tariff 7(T7) forward active energy E.3.8.2 Last 2 days tariff 8 (T8) forward active energy
E.4.0.2 Total combined reverse active energy for last 2 days
Reverse active deducted credit for last 2 days E.4.1.2 Last 2 days tariff 1 (T1) reverse active energy E.4.2.2 Last 2 days tariff 2 (T2) reverse active energy E.4.3.2 Last 2 days tariff 3 (T3) reverse active energy E.4.4.2 Last 2 days tariff 4 (T4) reverse active energy E.4.5.2 Last 2 days tariff 5 (T5) reverse active energy E.4.6.2 Last 2 days tariff 6 (T6) reverse active energy E.4.7.2 Last 2 days tariff 7(T7) reverse active energy E.4.8.2 Last 2 days tariff 8 (T8) reverse active energy E.5.0.2 Last 2 days combined reactive energy 1
Last 2 days deducted credit combined reactive energy 1
Last 2 days combined reactive 1 deducted credit
Three-phase CT/PT Operated Keypad Energy Meter
125 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
E.5.1.2 Last 2 days Tariff 1 (T1) combined reactive energy 1
Last 2 days tariff 1 (T1) deducted credit combined reactive energy 1
E.5.2.2 Last 2 days Tariff 2 (T2) combined reactive energy 1
Last 2 days tariff 2 (T2) deducted credit combined reactive energy 1
E.5.3.2 Last 2 days Tariff 3 (T3) combined reactive energy 1
Last 2 days tariff 3 (T3) deducted credit combined reactive energy 1
E.5.4.2 Last 2 days Tariff 4 (T4) combined reactive energy 1
Last 2 days tariff 4 (T4) deducted credit combined reactive energy 1
E.5.5.2 Last 2 days Tariff 5 (T5) combined reactive energy 1
Last 2 days tariff 5 (T5) deducted credit combined reactive energy 1
E.5.6.2 Last 2 days Tariff 6 (T6) combined reactive energy 1
Last 2 days tariff 6 (T6) deducted credit combined reactive energy 1
Last 2 days Tariff 7 (T7) combined reactive energy 1
E.5.8.2 Last 2 days tariff 7 (T7) deducted credit combined reactive energy 1
Last 2 days Tariff 8 (T8) combined reactive energy 1
E.5.8.2 Last 2 days tariff 8 (T8) deducted credit combined reactive energy 1
Last 2 days combined reactive energy 2
E.6.0.2 Last 2 days deducted credit combined reactive energy 2
Last 2 days combined reactive 2 deducted credit amount
Last 2 days Tariff 1 (T1) combined reactive energy 2
Three-phase CT/PT Operated Keypad Energy Meter
126 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
E.6.1.2 Last 2 days tariff 1 (T1) deducted credit combined reactive energy 2
Last 2 days Tariff 2 (T2) combined reactive energy 1
E.6.2.2 Last 2 days tariff 2 (T2) deducted credit combined reactive energy 2
Last 2 days Tariff 3 (T3) combined reactive energy 1
E.6.3.2 Last 2 days tariff 3 (T3) deducted credit combined reactive energy 2
Last 2 days Tariff 4 (T4) combined reactive energy 1
E.6.4.2 Last 2 days tariff 4 (T4) deducted credit combined reactive energy 2
Last 2 days Tariff 5 (T5) combined reactive energy 1
E.6.5.2 Last 2 days tariff 5 (T5) deducted credit combined reactive energy 2
Last 2 days Tariff 6 (T6) combined reactive energy 1
E.6.6.2 Last 2 days tariff 6 (T6) deducted credit combined reactive energy 2
Last 2 days Tariff 7 (T7) combined reactive energy 1
E.6.8.2 Last 2 days tariff 7 (T7) deducted credit combined reactive energy 2
Last 2 days Tariff 8 (T8) combined reactive energy 1
E.6.8.2 Last 2 days tariff 8 (T8) deducted credit combined reactive energy 2
E.8.0.2 Last 2 days accumulative reactive total energy for 1st quadrant
E.8.0.2 Last 2 days accumulative reactive total energy for 2nd quadrant
E.9.0.2 Last 2 days accumulative reactive total energy for 3rd quadrant
E.10.0.2 Last 2 days accumulative reactive total energy for 4th quadrant
Three-phase CT/PT Operated Keypad Energy Meter
127 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
E.41.0.2 Last 2 days transformer loss energy
E.42.0.2 Last 2 days transformer loss energy deducted credit amount
E.43.0.2 Last 2 days reactive loss energy
E.44.0.2 Last 2 days reactive loss energy deducted credit amount
E.45.0.2 Last 2 days deducted credit amount ● ● ● ● ●
E.2.0.45 combined active energy for last 45 days E.3.0.45 combined forward active energy for last 45 days Forward active deducted credit for last 45 days E.3.1.45 Last 45 days tariff 1 (T1) forward active energy E.3.2.45 Last 45 days tariff 2 (T2) forward active energy E.3.3.45 Last 45 days tariff 3 (T3) forward active energy E.3.4.45 Last 45 days tariff 4 (T4) forward active energy E.3.5.45 Last 45 days tariff 5 (T5) forward active energy E.3.6.45 Last 45 days tariff 6 (T6) forward active energy E.3.8.45 Last 45 days tariff 8(T8) forward active energy E.3.8.45 Last 45 days tariff 8 (T8) forward active energy
E.4.0.45 Total combined reverse active energy for last 45 days
Reverse active deducted credit for last 45 days E.4.1.45 Last 45 days tariff 1 (T1) reverse active energy E.4.2.45 Last 45 days tariff 2 (T2) reverse active energy E.4.3.45 Last 45 days tariff 3 (T3) reverse active energy E.4.4.45 Last 45 days tariff 4 (T4) reverse active energy E.4.5.45 Last 45 days tariff 5 (T5) reverse active energy E.4.6.45 Last 45 days tariff 6 (T6) reverse active energy E.4.8.45 Last 45 days tariff 8(T8) reverse active energy E.4.8.5 Last 45 days tariff 8 (T8) reverse active energy
Three-phase CT/PT Operated Keypad Energy Meter
128 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
E.5.0.45 Last 45 days combined reactive energy 1
Last 45 days deducted credit combined reactive energy 1
Last 45 days combined reactive 1 deducted credit
E.5.1.45 Last 45 days Tariff 1 (T1) combined reactive energy 1
Last 45 days tariff 1 (T1) deducted credit combined reactive energy 1
E.5.2.45 Last 45 days Tariff 2 (T2) combined reactive energy 1
Last 45 days tariff 2 (T2) deducted credit combined reactive energy 1
E.5.3.45 Last 45 days Tariff 3 (T3) combined reactive energy 1
Last 45 days tariff 3 (T3) deducted credit combined reactive energy 1
E.5.4.45 Last 45 days Tariff 4 (T4) combined reactive energy 1
Last 45 days tariff 4 (T4) deducted credit combined reactive energy 1
E.5.5.45 Last 45 days Tariff 5 (T5) combined reactive energy 1
Last 45 days tariff 5 (T5) deducted credit combined reactive energy 1
E.5.6.45 Last 45 days Tariff 6 (T6) combined reactive energy 1
Last 45 days tariff 6 (T6) deducted credit combined reactive energy 1
E.5.8.45 Last 45 days Tariff 7 (T7) combined reactive energy 1
Last 45 days tariff 7 (T7) deducted credit combined reactive energy 1
E.5.8.45 Last 45 days Tariff 8 (T8) combined reactive energy 1
Last 45 days tariff 8 (T8) deducted credit combined reactive energy 1
E.6.0.45 Last 45 days combined reactive energy 2
Three-phase CT/PT Operated Keypad Energy Meter
129 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
Last 45 days deducted credit combined reactive energy 2
Last 45 days combined reactive 2 deducted credit
E.6.1.45 Last 45 days Tariff 1 (T1) combined reactive energy 2
Last 45 days tariff 1 (T1) deducted credit combined reactive energy 2
E.6.2.45 Last 45 days Tariff 2 (T2) combined reactive energy 1
Last 45 days tariff 2 (T2) deducted credit combined reactive energy 2
E.6.3.45 Last 45 days Tariff 3 (T3) combined reactive energy 1
Last 45 days tariff 3 (T3) deducted credit combined reactive energy 2
E.6.4.45 Last 45 days Tariff 4 (T4) combined reactive energy 1
Last 45 days tariff 4 (T4) deducted credit combined reactive energy 2
E.6.5.45 Last 45 days Tariff 5 (T5) combined reactive energy 1
Last 45 days tariff 5 (T5) deducted credit combined reactive energy 2
E.6.6.45 Last 45 days Tariff 6 (T6) combined reactive energy 1
Last 45 days tariff 6 (T6) deducted credit combined reactive energy 2
E.6.8.45 Last 45 days Tariff 7 (T7) combined reactive energy 1
Last 45 days tariff 7 (T7) deducted credit combined reactive energy 2
E.6.8.45 Last 45 days Tariff 8 (T8) combined reactive energy 1
Last 45 days tariff 8 (T8) deducted credit combined reactive energy 2
E.8.0.45
E.8.0.45 Last 45 days accumulative 1st quadrant reactive total energy
Three-phase CT/PT Operated Keypad Energy Meter
130 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
E.9.0.45 Last 45 days accumulative 2nd quadrant reactive total energy
E.10.0.45 Last 45 days accumulative 3rd quadrant reactive total energy
Last 45 days accumulative 4th quadrant reactive total energy
E.41.0.45 E.42.0.45 Last 45 days transformer loss energy
E.43.0.45 Last 45 days transformer loss energy deducted credit amount
E.44.0.45 上 45 天无功损耗电量 Last 45 days reactive loss energy
E.45.0.45 Last 45 days reactive loss energy deducted credit
Recharging information
C.15.0 Recharge times C.L.40.1 Last time Recharge (Recharge credit, TOKEN,
TID code, Recharge date/time)
C.L.40.2 Last 2 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
C.L.40.3 Last 3 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
C.L.40.4 Last 4 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
C.L.40.5 Last 5 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
C.L.40.6 Last 6 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
C.L.40.8 Last 7 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
C.L.40.8 Last 8 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
C.L.40.9 Last 9 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
C.L.40.10
Last0 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
C.L.40.11
Last1 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
Three-phase CT/PT Operated Keypad Energy Meter
131 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
C.L.40.12
Last2 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
C.L.40.13
Last3 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
C.L.40.14
Last4 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
C.L.40.15
Last5 times Recharge (Recharge credit, TOKEN, TID code, Recharge date/time)
C.15.1 Technical TOKEN input times C.L.50.1 Last 1st time input technical TOKEN info C.L.50.2 Last 2nd input technical TOKEN info C.L.50.3 Last 3rd input technical TOKEN info C.L.50.4 Last 4th input technical TOKEN info C.L.50.5 Last 5th input technical TOKEN info C.L.50.6 Last 6th input technical TOKEN info C.L.50.8 Last 7th input technical TOKEN info C.L.50.8 Last 8th input technical TOKEN info C.L.50.9 Last 9th input technical TOKEN info
C.84.1 Current tariff version No. (Multi tariff T
No.//Stepped electricity rate P No.)
C.80.10 P0 Current tariff 1 (T1) forward active electricity rate//Stepped electricity rate P0
C.80.11 P1 Current tariff 2 (T2) forward active electricity rate//Stepped electricity rate P1
C.80.12 P2 Current tariff 3 (T3) forward active electricity rate//Stepped electricity rate P2
C.80.13 P3 Current tariff 4 (T4) forward active electricity rate//Stepped electricity rate P3
C.80.14 Current tariff 5 (T6) forward active electricity rate//Stepped electricity rate P4
C.80.15 P5 Current tariff 6 (T6) forward active electricity rate//Stepped electricity rate P5
C.80.16 P6 Current tariff 8 (T8) forward active electricity rate//Stepped electricity rate P6
C.80.18 P8 Current tariff 8 (T8) forward active electricity rate//Stepped electricity rate P8
C.80.20 Current tariff 1 (T1) forward active electricity rate
Three-phase CT/PT Operated Keypad Energy Meter
132 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
C.80.21 Current tariff 2 (T2) forward active electricity rate C.80.22 Current tariff 3 (T3) forward active electricity rate C.80.23 Current tariff 4 (T4) forward active electricity rate C.80.24 Current tariff 5 (T5) forward active electricity rate C.80.25 Current tariff 6 (T6) forward active electricity rate C.88.26 Current tariff 7 (T7) forward active electricity rate C.80.28 Current tariff 8 (T8) forward active electricity rate C.80.6 Current reactive deducted credit power factor
(upper threshold)
C.80.50 Current tariff 1 (T1) combined reactive 1
electricity rate
C.80.51 Current tariff 2 (T2) combined reactive 1 electricity rate
C.80.52 Current tariff 3 (T3) combined reactive 1 electricity rate
C.80.53 Current tariff 4 (T4) combined reactive 1 electricity rate
C.80.54 Current tariff 5 (T5) combined reactive 1 electricity rate
C.80.55 Current tariff 6 (T6) combined reactive 1 electricity rate
C.80.56 Current tariff 7 (T7) combined reactive 1 electricity rate
C.80.58 Current tariff 8 (T8) combined reactive 1 electricity rate
C.80.60 Current tariff 1 (T1) combined reactive 2
electricity rate
C.80.61 Current tariff 2 (T2) combined reactive 2 electricity rate
C.80.62 Current tariff 3 (T3) combined reactive 2 electricity rate
C.80.63 Current tariff 4 (T4) combined reactive 2 electricity rate
C.80.64 Current tariff 5 (T5) combined reactive 2 electricity rate
C.80.65 Current tariff 6 (T6) combined reactive 2 electricity rate
Three-phase CT/PT Operated Keypad Energy Meter
133 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
C.80.66 Current tariff 7 (T7) combined reactive 2 electricity rate
C.80.68 Current tariff 8 (T8) combined reactive 2 electricity rate
C.82.11 Current day tariff time shift 1 start HHMM tariff
code//monthly stepped energy E1
C.82.12 Current day tariff time shift 2 start HHMM tariff code//monthly stepped energy E2
C.82.13 Current day tariff time shift 3 start HHMM tariff code//monthly stepped energy E3
C.82.14 Current day tariff time shift 4 start HHMM tariff code//monthly stepped energy E4
C.82.15 Current day tariff time shift 5 start HHMM tariff code//monthly stepped energy E5
C.82.16 Current day tariff time shift 6 start HHMM tariff code//monthly stepped energy E6
C.82.18 Current day tariff time shift 8 start HHMM tariff code//monthly stepped energy E8
C.82.18 当日费率时段 8 开始时时分分费率代码//下一个
阶梯电价转换的月份 Current day tariff time shift 8 start HHMM tariff code//the month for next Stepped electricity rate shift
C.82.19 Current day tariff time shift 9 start HHMM tariff code//next backup monthly stepped electricity rate energy E1
C.82.20 Current day tariff time shift 10 start HHMM tariff code//next backup monthly stepped electricity rate energy E2
C.82.21 Current day tariff time shift 11 start HHMM tariff code//next backup monthly stepped electricity rate energy E3
C.82.22 Current day tariff time shift 12 start HHMM tariff code//next backup monthly stepped electricity rate energy E4
C.82.23 Current day tariff time shift 13 start HHMM tariff code//next backup monthly stepped electricity rate energy E5
Three-phase CT/PT Operated Keypad Energy Meter
134 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
C.82.24 Current day tariff time shift 14 start HHMM tariff code//next backup monthly stepped electricity rate energy E6
C.82.25 Current day tariff time shift 15 start HHMM tariff code//next backup monthly stepped electricity rate energy E8
C.82.26 Current day tariff time shift 16 start HHMM tariff code
C.82.28 Current day tariff time shift 18 start HHMM tariff code
C.82.28 Current day tariff time shift 18 start HHMM tariff code
C.82.29 Current day tariff time shift 19 start HHMM tariff code
C.82.30 Current day tariff time shift 20 start HHMM tariff code
C.82.31 Current day tariff time shift 21 start HHMM tariff code
C.82.32 Current day tariff time shift 22 start HHMM tariff code
C.82.33 Current day tariff time shift 23 start HHMM tariff code
C.82.34 Current day tariff time shift 24 start HHMM tariff code
C.81.10 Reactive loss energy tariff C.80.3 Apparent max demand active electricity rate for
every month
C.80.4 The unit price based on installation capacity for every month (KVA)
C.80.5 Fixed cost for every month (basic cost) C.88.44 Electricity rate of transformer loss energy C.82.35 Next tariff shift date C.82.36 Next tariff shift time C.82.38 Next tariff version No. (multi tariff T number//
Stepped electricity rate P code)
0.4.2 Meter number (meter address) 0.3.0 Meter pulse constant 0.4.5 Meter embedded software version number
Three-phase CT/PT Operated Keypad Energy Meter
135 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
C.9.0 Temperature measurement value inside meter C.82.8 Encryption Key type C.82.9 Encryption Key version C.82.10 Tariff number C.60.5 Organization code (SGC code) C.60.6 STS software version C.84.3 Meter installation position info (longitude) C.84.4 Meter installation position info (latitude) C.84.5 Meter installation position info (altitude) C.84.6 Replaceable communication module type,
version
C.84.9 GPRS/GSM module type info C.84.8 Signal quality (GPRS) C.84.8 Connection status (GPRS) C.82.38 PLC module info C.82.39 Module type info (RF) C.84.40 (Zigbee)Module type info (Zigbee)
C.82.41 LCD full screen display inspection
Harmonic info E.19.1 all phases forward active accumulative
fundamental wave energy
E.20.1 all phases reverse active accumulative fundamental wave energy
E.21.1 L2 phase forward active accumulative fundamental wave energy
E.22.1 L2 phase reverse active accumulative fundamental wave energy
E.23.1 L2 phase forward active accumulative
Three-phase CT/PT Operated Keypad Energy Meter
136 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
fundamental wave energy E.24.1 L2 phase reverse active accumulative
fundamental wave energy
E.25.1 L3 phase forward active accumulative fundamental wave energy
E.26.1 L3 phase reverse active accumulative fundamental wave energy
15.8.1 all phases forward fundamental wave active power
16.8.1 all phases reverse fundamental wave active power
35.8.1 L2 phase forward fundamental wave active power
36.8.1 L2 phase reverse fundamental wave active power
55.8.1 L2 phase forward fundamental wave active power
56.8.1 L2 phase reverse fundamental wave active power
85.8.1 L3 phase forward fundamental wave active power
86.8.1 L L3 phase reverse fundamental wave active power
32.8.1 L2 phase fundamental wave voltage effective value
52.8.1 L2 phase fundamental wave voltage effective value
82.8.1 L3 phase fundamental wave voltage effective value
31.8.1 L2 phase fundamental wave current effective value
51.8.1 L2 phase fundamental wave current effective value
81.8.1 L3 phase fundamental wave current effective value
32.8.T L2 phase voltage harmonic distortion rate (THD) 31.8.T L2 phase current harmonic distortion rate (THD) 52.8.T L2 phase voltage harmonic distortion rate (THD) 51.8.T LL2 phase current harmonic distortion rate
(THD)
Three-phase CT/PT Operated Keypad Energy Meter
137 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
82.8.T L3 phase voltage harmonic distortion rate (THD) 81.8.T L3 phase current harmonic distortion rate (THD)
E.19.1.1 Last month all phases forward active
fundamental wave frozen energy
E.20.1.1 Last month all phases reverse active fundamental wave frozen energy
E.21.1.1 Last month L2 phase forward active fundamental wave frozen energy
E.22.1.1 Last month L2 phase reverse active fundamental wave frozen energy
E.23.1.1 Last month L2 phase forward active fundamental wave frozen energy
E.24.1.1 Last month L2 phase reverse active fundamental wave frozen energy
E.25.1.1 Last month L3 phase forward active fundamental wave frozen energy
E.26.1.1 Last month L3 phase reverse active fundamental wave frozen energy
● ● ● ● ● E.19.1.13 Last 3 months all phases forward active
fundamental wave frozen energy
E.20.1.13 Last 3 months all phases reverse active fundamental wave frozen energy
E.21.1.13 Last 3 months L2 phase forward active fundamental wave frozen energy
E.22.1.13 Last 3 months L2 phase reverse active fundamental wave frozen energy
E.23.1.13 Last 3 months L2 phase forward active fundamental wave frozen energy
E.24.1.13 Last 3 months L2 phase reverse active fundamental wave frozen energy
E.25.1.13 Last 3 months L3 phase forward active fundamental wave frozen energy
Three-phase CT/PT Operated Keypad Energy Meter
138 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code
Data Item Content Display Method
(example)
Data Item Unit/Meaning
E.26.1.13 Last 3 months L3 phase reverse active fundamental wave frozen energy
7 Customer Interface Unit (CIU) DTZ1513 three phase plug-in prepayment keypad energy meter is configured with CIU which communicates with meter through wire. User can recharge meter or check consumption data through CIU. CIU technical specifications is as follows:
Technical Category Technical Parameter Value Remark
Electrical spec.
Communication type
Power supply method
Two core communication cable, insulation, none-polarity,
half-duplex
12DC (obtain from MCU)≤30mA
130m (maximum linear resistance40 ohm),
Environmental
requirements
Normal working
temperature range:
working temperature limit:
Storage & transporting
temperature limit
Humidity
-10℃~+55℃
-20℃~+55℃
-25℃~+80℃
Relative humidity range is 0 ~ 95% at
55℃
Three-phase CT/PT Operated Keypad Energy Meter
139 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Technical Category Technical Parameter Value Remark
Human interface
Display and indication port
Keypad
With large screen, wide angle, and wide temperature range of
LCD display mode. Digital display is 8 bits, IEC62056 display
code encoding, visualized prompt symbol, trapezoid bar
indication for balance energy, alarm/prompt LED indication,
battery prompt symbol, status indication of communication with
MCU, LCD screen with backlight indication, user-friendly
operation.
LCD screen size:60.0X31.0mm
LCD window size:55.4X22.0mm
LCD character size:12.0X4.5mm;
Display can be manual scroll display and automatic scroll
display; Display contents is programmable. Data item by
default auto scroll display is balance energy.
12-key keypad, keypad prompt sound, indication of keypad
inputting error., with Braille signs
Structure
Case and terminal layout Installed on wall indoors where is easy to operate and observe
as well as replace battery.
AC power plug is available; keep AC power connected during
working.
Protection grade: IP51
Case material PC+10%GF Fire retardant, Flame retardant, thermal
deformation retardant engineering plastics
Flame retardant test: in accordance with 960° glow-wire test
requirement(IEC60695-2-1)
Fir retardant test:UL94-V0 rated @1.5mm. No toxic gases
emitted: „Green Material
Outline dimension 160mm(L) ×88.6mm(W) ×41.2mm(H)
Weight Approximate 160g
Three-phase CT/PT Operated Keypad Energy Meter
140 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
7.1 Outline dimension
160
87.6
41.2
7.2 Panel Diagram
Three-phase CT/PT Operated Keypad Energy Meter
141 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
7.3 CIU Diagram
CIU unit 1. LCD 2. Pulse indicator
3. Alarm indicator 4. Corresponding unique MCU Serial number
5. 12-key keypad
Notice: When CIU and MCU are communicating with each other (dynamic change and
instantaneous display), the LCD of CIU is in status shown in the picture above. When operating
on MCU’s keypad (if MCU is equipped with a keypad), the CIU’s keypad will be locked until the
MCU one is finished operation (“finished operation” means pressing enter(blue) button or
backspace (red ) button, or finishing input short code or TOKEN)
Three-phase CT/PT Operated Keypad Energy Meter
142 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
7.4 CIU installation diagram
7.5 CIU installation instruction CIU consists of CIU base and CIU cover (As below)
CIU installation instruction:
1. Separate the cover and base of CIU before installation 2. Insert the two-wire communication cable through cable hole on CIU base, fix the cable
on CIU base with related cable buckles, then fix CIU base on the right position with 2 screws.
3. Stick the bar code (ID) at bar code place. 4. Connect the communication wire. 5. Lock up CIU cover to CIU base.
Three-phase CT/PT Operated Keypad Energy Meter
143 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
6. Power on and check if meter and CIU work properly. If communication fails, re-check from step 1.
CIU opening method diagram To open CIU cover, push the middle position on right side to loose the cover lock. It is suggested that CIU should be installed on the wall; or on the table or platform where it is easy to operate. After fixing CIU, before connecting communication wire, user should check if MCU is installed correctly, if MCU works properly, if the CIU serial number is matching with MCU. When all is checked and correct, communication wire can be connected and CIU can be enabled.
7.6 CIU (wire communication) display instruction When CIU is powered on it starts self-checking procedure to check communication with MCU, the LCD on CIU will first display communication mode (please refer to picture 1).
Three-phase CT/PT Operated Keypad Energy Meter
144 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
If the communication is normal, LCD on CIU will display balance energy/credit (please refer to picture 2), integrated relay indication is on connected position.
If communication is abnormal the LCD will not work, following are the solutions:
A:Check again if the communication wire is connected properly on CIU and MCU. B:Check if
MCU is powered on and working well. C:Repair and maintenance.
MCU data can be checked on CIU by following methods:
A:Manual scroll display mode: push the enter (blue) button on keypad, and manually ckeck data
items one by one.
B:Short code mode: input short code and push enter (blue) button, appointed item can be
displayed. Notice: the display time of each item is 10 seconds (during whitch CIU locks up communication and no response to inquiry in this period), only when display returns to default item (balance credit), next short code can be input.
7.7 Special display Symbol
Display method (example) Item description
CIU is communicating with MCU, please wait.
Display:no_USEd It means the item you are checking is not used.
Display:NULL The data you are checking is empty.
Three-phase CT/PT Operated Keypad Energy Meter
145 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
7.8 CIU keypad instruction CIU is equipped with 12-key keypad through which user can input code and TOKEN. Numbers input will be displayed on LCD, total quantity of numbers will be showed on top left corner on LCD. For clearer view, every 4 numbers will be devided by a “-”. Input will be accompanied with key tone. (Take the following picture for example, 10 numbers have been input)
0-9 number keys are for TOKEN and short codes input. Red backspace key : press this key to delete wrong digits one by one by rom right to
left.
Blue enter key : press this key to confirm your input. If there is no number input, press
this button user can ckeck manual scroll display items.
7.8.1 Operation by Inputting TOKEN Code via 12-key
keypad 7.8.1.1 Complete TOKEN code
After enter 20 digits TOKEN and confirm, LCD will indicate “Accept” if this TOKEN is correct and accepted by the meter.
keypad is locked up for 5 seconds for processing TOKEN.
Meter sound indication.
Display:OUEr_UoL Power supply is disconnected due to over voltage. This page and real voltage value will be displayed alternatively. When voltage becomes normal, meter can be re-connected automatically or manually.
Display:Lo_UoL Power supply is disconnected due to too low voltage. This page and real voltage value will be displayed alternatively. When voltage becomes normal, meter can be re-connected automatically or manually.
Three-phase CT/PT Operated Keypad Energy Meter
146 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Smile face.
Display total credit (balance KWh) after 5 seconds .
S/N Example Instruction
1
Display:Connect It means communicating with MCU via PLC, please wait.
2
Display:Accept TOKEN has been accepted. Recharge succeeded.
3
Display:12108.60$ After recharge, total balance credit is 12108.60$.
7.8.1.2 Incomplete TOKEN
If no number is input continuously within 30 seconds while inputting TOKEN code, it will be regarded as overtime.
· TOKEN code will disappear from LCD. · Display balance KWh/credit
7.8.1.3 Used TOKEN
Once a TOKEN is accepted and processed by the meter, it will be rejected if input again. Meter LCD will indicate “Used”.
Keypad is locked up for 5 seconds and display “Used”
Meter sound alarm
Sad face
7.8.1.4 Overdue TOKEN code
If the TOKEN is older than the oldest TOKEN that logged in meter record, it will be regarded as “overdue” and rejected by the meter. Meter LCD will indicate “Old”.
Keypad is locked up for 5 seconds and indicating “Old”
Meter sound alarm
Sad face
Three-phase CT/PT Operated Keypad Energy Meter
147 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
7.8.1.5 TOKEN which is complete and correct but rejected due to overflow
Please refer to section 6.8 for anti-overflow function while recharge. The effective TOKEN code will be rejected if total balance credit register capacity is more than preset value. LCD display will indicate “Over- Crd”
Keypad is locked up for 5 seconds and indicating “Over Crd”
Meter sound alarm
Sad face
7.8.1.6 Incorrect TOKEN code
The TOKEN will be rejected by meter if number inputting is wrong, meter No. is inconsistent, meter encryption key is incorrect, or random numbers are input for the purpose of tempering. LCD display will indicate “Reject-1”.
Display “Reject-1” on LCD.
Meter sound alarm.
Sad face.
rejected TOKEN types instruction:
S/N. Example Instruction
1
Meter TOKEN decoding verification error TOKEN for recharge, load threshold modification, encryption key shift are incorrect; or TOKEN is inconsistent to meter number or meter encryption key.
2
Meter does not support TOKEN, cannot decode.
3 Meter encryption key type is DDTK, and does not support recharge TOKEN.
4
TOKEN data is out of range and it is abnormal data after decoding
5
Encryption replacement is illegal (error occurs when other encryption key type is transfer to unique encryption key.)
Three-phase CT/PT Operated Keypad Energy Meter
148 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
6 Used TOKEN
8
Overdue TOKEN
8
TOKEN which is complete and correct but rejected due to overflow
7.8.2 Assignment encryption key input operation Meter assignment key need to be replaced when install & re-install meter, or meter use area and power supply are changed, or prepayment management system vending encryption is refreshed, or security target un-periodically change encryption. These secuirty measures need to be changed by inputting meter assignment encryption key. At the same time, vending system and meter require assignment encryption key separately generated by the same vending encryption key. Otherwise TOKEN from vending system will not be accepted by the meter.
Assignment encryption key has two groups of TOKEN(This first group of change encryption key TOKEN and the second group of change encryption key TOKEN). Settings for the first group and the second group will not be by sequence, user can input the first group or the second group at first. But two groups of TOKEN must be input within 5 minutes together, otherwise, user has to restart the input operation. .
After inputting one group of TOKEN (accepted by meter correctly), the meter will indicate as followings:
The 2nd group of change encryption key TOKEN is input and accepted, please input the 1st group now.
The 1st group of change encryption key TOKEN is input and
accepted, please input the 2nd group now.
Three-phase CT/PT Operated Keypad Energy Meter
149 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
7.8.3 Technical TOKEN
There are several TOKEN codes with special functions for keypad prepayment energy meter- technical Token, which can be applied for power off recovery due to tampering, record clearance, meter load threshold setting, etc. These special TOKEN codes are generated dispersedly according to each energy meter by vending Management System.
7.8.3.1 Tampering clearance TOKEN
If the power is cut off by opening of terminal cover, the user must go to vending Management Center to apply for
tamper clearance TOKEN code to have power supply recovery. After inputting temper clearance TOKEN code, the meter will be recovery from tamper power failure to supply power.
7.8.3.2 Load threshold TOKEN
Load threshold can be changed by inputting load threshold TOKEN. If preset load threshold is low as user load demand increases, which brings about frequent overload consumption or overload power off, the user needs to go to Power Supply Management Department or Vending Department to apply for additional requirement of power load, and a new load threshold TOKEN code will be provided after the application is permitted by Vending Department. Meter load threshold setting will be revised by inputting new load threshold TOKEN code.
7.8.3.3 Credit clearance TOKEN
If energy meter needs to be changed or maintained or user is changed, after confirming related data, the user can input a KWh clearance TOKEN to reset remaining energy/credit. Built-in relay will be disconnected to cut off power supply.
7.8.4 Special TOKEN
The following special TOKEN codes are special extended functions for keypad prepayment energy meter made by INHEMETER.
Three-phase CT/PT Operated Keypad Energy Meter
150 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
7.8.4.1 Pre-warning threshold TOKEN
Remaining KWh pre-warning threshold value and function can be set by inputting code: 4547
8xxx, the value which can be set as 0kWh~999kWh.
7.8.4.2 Warning threshold TOKEN for low remaining credit
Remaining KWh warning threshold value and function can be set by inputting code: 4547 9xxx,
the value which can be set as 0kWh~999kWh.
Details refer to 6.8 pre-warning, warning function for low remaining credit
7.8.4.3 Processing activation TOKEN after Installation
Meter relay is on disconnection status since delivery from factory. After completion of installation, 20-digit special TOKEN code should be input on the keypad to activate meter working( relay is connected ). Meter relay is always on disconnection status before activation no mater preset at factory, user recharging, or if there is remaining credit. Processing activation TOKEN can be used only for one time as per one meter. Once meter is activated, it will not be restricted. Activation TOKEN will be issued by INHEMETER.
Activation TOKEN: 1285-4194-1448-6450-5980
7.8.5 Test TOKEN (Non-specified meter TOKEN) There are some non-specified TOKEN codes for prepayment keypad meter which are used for
meter function test. Once the meter accept these TOKEN, the meter will practice corresponding
tests.
Function TOKEN Activate the built-in relay ( relay switch status shift) 0000 0000 0001 5099 7584
HMI test, including turning on all the LED’s, displaying all
segments on the LCD, and activating the buzzer 0000 0000 0001 6777 4880
Display the total accumulative active energy 0000 0000 0002 0132 8896
Display the encryption key revision number and
encryption key type 1844 6744 0738 4377 2416
Display the tariff index 3689 3488 1475 5332 2496
Display load threshold 0000 0000 0012 0797 4400
Display tamper state 0000 0000 0022 8172 8512
Display the instantaneous active power 0000 0000 0044 2920 8064
Three-phase CT/PT Operated Keypad Energy Meter
151 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Display the software version number 0000 0000 0087 2419 5840
Test all above functions(tests by sequence) 5649 3153 7254 5031 3471
Every test (all test by sequence) will last for 2.5 seconds. If one test item operates independently ,
it will last 5 seconds. After test, meter returns to normal working mode.
7.8.6 Extended function TOKEN The setting data of overdraw threshold and Minimum guarantee power consumption can be
transformed to TOKEN via vending system.
8 Special functions 8.1 Load cut off function There is built-in relay for DTZ1513 CT/PT connected prepayment keypad meter. According to user’s credit (balance amount), tamper status, load control status and power supply, it can output control signal and control outside HV/LV breaker, and realize load power control. Relay status indication on LCD
“ ” It means built-in relay is connected, and power load is available.
“ ” It means built-in relay is disconnected, and power load is not available.
Notice: If the relay status indication on LCD does not match the real status, it maybe malfunction,
and user should inform electricity management department to check.
8.2 Zero credit power off When remaining credit in the meter is zero (except overdraw, friendly data/time), the built-in relay will output control signal immediately and control outside HV/LV breaker to disconnect, and realize power off. After user recharging, meter will output automatic power supply recovery information and control outside HV/LV breaker to connect, realize power recovery.
Three-phase CT/PT Operated Keypad Energy Meter
152 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
8.3 Load control function DTZ1513 CT/PT connected prepayment keypad meter has load control function. The load control function of DTZ1513 CT connected prepayment keypad meter complies with the load control algorithm method specially mentioned in SCSSCAAA9 item 7.7.2 of Eskom.
Notice: Meter load control function cannot be used to protect load security protection. It is
normally used to control the users average load upper thresholdin a associated area. (mainly
concerned with grid security, cable loss reduction and power supply cable load limit). Load
connected to CT/PT means primary winding load (Transformation ration algorithm)
Automatic delay recovery mode after over load power off. A. If one phase load is beyond load threshold value 132.000kWh (OBIS code 21.35.0 data
item), the alarm will sound and LED indicator will flash, and LCD on MCU/CIU will display overload information, and switch to display on real time present overload phase power.
Above 2 LCD display by shift, which means it is in overload status and current load is 140.80kW. B. If the consumption load is beyond load threshold for more than 45 seconds, the built-in relay will cut off power at 45th second. After 150 seconds, the relay will connect automatically (power supply will not work during the 150 seconds). And LCD on MCU/CIU will display remaining time for power recovery (unit: second; it means remaining lock time. The remaining lock time will reduce by a second interval).
If the user does not low down the consumption load, which is beyond threshold value, above process will repeat (Power off- Delay recovery- Power off).
C. Within 30 minutes, if tripping occur for 5 times, meter will cut off power supply and last for 30
Three-phase CT/PT Operated Keypad Energy Meter
153 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
minutes. And power supply will automatically recover after 30 minutes. LCD will display remaining lock time, it will reduce by one second interval. And LCD will display power at the last power off. The recovery time after 5 tripping within 30 minutes can be programmable. Min. time period is 5minutes. It is default 30minutes at factory for this project.
Load control threshold for this project
Three phase four wire CT connected meter (LV): 1.320kWh X CT Transformation ratio.
Three phase three wire CT/PT connected meter (HV): 1.320kWh X PT Transformation ratio
X CT Transformation ratio.
Notice: When overload tripping occurs constantly, the user should check the power consumption
load , and contact electricity company to modify load threshold.
D. If times of overload power-off are more than allowed threshold value which preset (check
OBIS F.L.3), the meter cannot recover power supply automatically after overload power-off. The
user should inform electricity company and apply for load threshold change TOKEN or tamper
record clearance TOKEN, and meter can recover power supply after TOKEN inputting.
Optional function: ① Overload is judged based on active power or apparent power which is
decided by meter prepayment status word. The default is active power at factory.
② Options for power supply recovery after overload power off: automatic
delay recovery or key-press immediate recovery.
③ Please check prepayment configuration instruction for more information.
8.4 Protection against Voltage Abnormity of Grid Keypad prepayment meter is designed for protection against voltage abnormity of grid so as to reduce possibility of electronic appliance damage when voltage abnormity of grid occurs.
8.4.1 Automatic Power Off Energy meter will automatically power off (cut off subscriber circuit), and indicate power-off status and display corresponding phase voltage value when grid phase voltage is lower than < threshold value of voltage under condition of low voltage power-off, OBIS code 12.31.0 >, and keeps the
Three-phase CT/PT Operated Keypad Energy Meter
154 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
situation for 30 seconds; or grid phase voltage is higher than < threshold value of voltage under condition of overvoltage power-off, OBIS code 12.35.0 >, and keeps the situation for 3 seconds.
Lo_UoL: 108.00V :
It means power-off at low voltage It means voltage value before power-off
OUEr_UoL: 306.70V :
It means power-off at hight voltage It means voltage value before power-off
Note: It’s programmable to set threshold value of grid phase voltage abnormity, and it’s available
to check threshold value by OBIS code.
OBIS code12.35.0: threshold value of voltage under condition of overvoltage power-off
OBIS code12.31.0: threshold value of voltage under condition of low voltage power-off
8.4.2 Recovery of power supply A: Automatic recovery of power supply
Energy meter will automatically recover power supply when grid phase voltage recovers between <threshold value under condition of low voltage power-off OBIS code12.31.0 > and <threshold value under condition of overvoltage power-off OBIS code 12.35.0 >, and last 5 minutes.
B:Manul recovery of power supply
Energy meter can manually recover power supply by keypad before automatic recovery when grid phase voltage recovers between < threshold value under condition of low voltage power off
Three-phase CT/PT Operated Keypad Energy Meter
155 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
OBIS code 12.31.0 > and < threshold value under condition of overvoltage power off OBIS code 12.35.0 >. Note: There will exist not more than ±3V error value in meter for above voltage range determination due to such serious voltage deviation.
Energy meter will cancel protection against low voltage power-off if threshold value under condition of low voltage power-off set as zero; Energy meter will cancel protection against high voltage power-off if threshold value under condition of high voltage power-off set higher.
8.5 Anti-tamper against Cover Opening Counter & Power-
off Energy meter has activated anti-tamper against cover opening counter(terminal cover or upper
meter cover) & power- off after delivery from factory.
8.5.1 Energy meter will instantly power off once the
terminal cover or upper cover is opened under condition of
power- on. Energy meter shall recover power supply after upper cover and terminal cover are taken to original position, and input corresponding TOKEN while meter still remains balance amount and other problem is free.
8.5.2 tripping at terminal cover opening under condition of
power-off, this function needs to be activated. Activation method: Meter keeps continuous power supply for more than 2 hours after delivery from factory; or acaccumulative power consumption with more than 1okWh.
Activation status: Terminal cover opening under condition of power-off, and tripping at recovery of power supply. Meter will recover power supply only after subscriber takes back terminal cover to original position, and input corresponding TOKEN while meter remains balance amount and other problem is free.
Inactivation status: If terminal cover opening under condition of power-off, and meter will not
Three-phase CT/PT Operated Keypad Energy Meter
156 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
power off when power supply recovery ( terminal cover has been closed). Such activation will not be applied when delivery from factory as it’s more convenient for electricity company to test and install meters.
Cover opening indication icon:
① continuous lighting: there used to be cover opening event, and terminal cover has been closed and built-in relay tripping.
② flashing: there used to be cover opening event, and terminal cover is still open. Note: It’s decided by meter’s prepayment configuration word to allow cover opening detection under condition of power-off or power-on.
8.6 Pre-warning & warning against low balance amount
This function is applied to prompt subscriber that the balance amount is not sufficient, and recharge is necessary; otherwise, meter will cut off power supply once balance amount uses up soon later, and will bring subscriber inconvenience. Furthermore, this function provides subscriber choices for settings. One hand, subscriber can reset threshold value of balance amount for pre-warning/ warning according to actual situation; another hand, subscriber can reset audible warning or not.
8.6.1 Pre-warning function When balance amount is lower than threshold value for pre-warning(OBIS code C.51.12), meter
will sound warning and yellow LED indicator will flash, and icons 、 will alternatively flash
on LCD screen display to prompt subscriber to purchase electricity. It’s programmable to set threshold value for pre-warning and its relevant function by inputting code: 4547 8xxx, available value is from 1-999$. CIU screen will display “Accept” ,and indicate successful settings.
Pre-warning threshold value for This project: 30.00$
Warning indication details:
Red warning indicator keeps continuous lighting ----- it means balance amount is lower
than 30$;
Red warning indicator flashes ----- It means balance amount is lower than 20$;
Red warning indicator flashes and sounds warning ----- It means balance amount is
lower than10$;
Three-phase CT/PT Operated Keypad Energy Meter
157 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
8.6.2 Warning function When balance amount is equal or lower than threshold value (OBIS code C.51.11), meter sounds warning, yellow LED indicator keeps continuous lighting, and meter’s internal replay disconnects
to cut off power supply. Icons 、 will alternatively flash and icon will display on
LCD screen. subscriber has to press blue key on meter keypad for recovery of power supply if any inquiry. It’s programmable to set threshold value for warning by inputting code: 4547 9xxx, available value is from 0-999$. CIU screen will display “Accept” ,and indicate successful settings.
Warning threshold value for this project : 0.00$
Note: Threshold value for warning must be lower than threshold value for pre-warning; there will
no corresponding warning or pre-warning if threshold value for warning or pre-warning is set as
zero. It’s very convenient for subscriber to programme the settings and relevant function.
8.7 Anti-overflow when recharging It’s allowed to set upper limit for subscriber maximum consumption amount( OBIS code C.50.4). If TOKEN is valid, but balance amount will be higher than upper limit after recharging, then meter will reject the TOKEN. It can be available to have normal operation only when balance amount( after recharging) is equal to or lower than upper limit.
Threshold for Maximum recharging amount 999999.99$
8.8 Anti-tamper for reverse power consumption. Meter will cut off power supply circuit when it detects reverse power consumption. L line and N line are reverse in terminal connection. Meter will detect this event, and will automatically cut off power supply if reversing event keeps over 60 seconds. Meter will automatically recover power supply 5 minutes later when grid resumes work in proper way; or press keypad to recover power supply within 5 minutes when grid resumes work in proper way ( it will be invalid to press in the first minute, and valid since the second minute). Note: It’s selected by prepayment configuration word to cut off power supply or not when reverse
Three-phase CT/PT Operated Keypad Energy Meter
158 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
power consumption event occurs. Default setting at factory for this project: meter will cut off power supply circuit when reverse power consumption event occurs.
8.9 Overdraft (Option) Overdraft( default settings at factory will not allow overdraft): Meter will support overdraft. Metering administration department or electricity utility can apply such function to subscribers who have higher credit rating. Overdraft will be allowed when threshold is not zero(OBIS code C.50.5). Overdraft amount is equal to threshold value( OBIS code C.50.5). Threshold value consists of six integers and two decimals. When overdraft is allowed(threshold setting - OBIS code C.50.5), and balance amount is lower than threshold for pre-warning or balance amount is zero which results in power-off, subscriber can input short code 8989 8686 to activate overdraft function so as to continue power supply until available overdraft amount become zero. Note: Overdraft function is temporary measure for subscriber when it’s not convenient to purchase electricity. subscriber should go to purchase electricity ASAP when overdraft is working. Default setting at factory for this project: without overdraft function
8.10 Power-off upon load current higher than threshold
(Option) When one- phase current is over threshold( check OBIS code 11.35.0), LCD screen will sound warning and yellow LED indicator will flash; meanwhile, LCD will display overload current information, and timely shift to display present real-time current.
(( display shift)
If current value keeps higher than threshold within 45 seconds, meter built-in relay will cut off power supply at the 45th second, and power-off will The last 150 seconds; then built-in relay will automatically recover power supply(subscriber can not manually recover power supply within 150 seconds). Meanwhile, LCD will display remaining time information for recovery(unit: second; it means locked remaining time. Remaining time will descend by interval of 1 second based on the locking state). And LCD will timely shift the display for overload real-time current before power-off.
Three-phase CT/PT Operated Keypad Energy Meter
159 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
(display shift)
If subscriber doesn’t low down consuming current, and continue to allow current over threshold, the process will repeat. Meter will automatically recover power supply after 30 minutes delaying provided that overload current results in 5 times successive tripping within 30 minutes. subscriber can not manually recover power supply during 30 minutes delaying. In the locking time, LCD will display locked remaining time which will descend by interval of 1 minute; meanwhile, LCD will display the current at the last time power- off . It’s programmable to set delaying time for recovery after 5 times successive tripping; Minimum setting value: 5 minutes; default value at factory: 30 minutes. Current threshold for this project: OA don’t ask for this requirement!
Note: when meter suffers from successive tripping with overload current, subscriber should check
the current, and contact electricity company to modify threshold so as to keep subscriber’s
normal power consumption.
8.11 Special time or day for friendly none-disconnection
power supply
Energy meter has function of special time or day for friendly none-disconnection power supply.
Evening (or programmed time period) with none-disconnection power supply(option): DTZ1513 Three phase CT connected keypad prepayment energy meter supports this function. Metering administration department or electricity utility can apply this function to some specified subscribers for social responsibility and people’s basic power consumption guarantee. Special holiday/weekend with none-disconnection power supply(option): DTZ1513 Three phase CT/PT connected keypad prepayment energy meter supports this function. Metering administration department or electricity utility can apply this function to some specified subscribers for social responsibility and subscriber’s basic power consumption guarantee.
Time period with none-disconnection power supply:
OBIS code C.51.10 starting time
OBIS code C.51.13 ending time
Three-phase CT/PT Operated Keypad Energy Meter
160 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Weekend with none-disconnection power supply:
OBIS code C.51.14 refer to weekend with none-disconnection power supply each
week
Holidays with none-disconnection power supply:
OBIS code C.51.15 ---- C.51.35 20 specified holidays with none-disconnection power
supply.
8.12 Shift Between Post-payment and Prepayment( Option)
DTZ1513 Three phase CT connected keypad prepayment energy meter has function of shift
between post-payment and prepayment. The shift is realized by prepayment configuration word.
Prepayment configuration word -item 230 can be programmed through optic commutation
port, RS-485 or AMI system to realize the shift after it’s allowed and authorized.
Prepayment metering(or shift from post-payment to prepayment); acaccumulative power
consumption keep the same, but built-in relay will disconnect circuit when balance amount is
zero.
Post-payment metering- billing settlement mode(or shift from prepayment to post-payment);
acaccumulative power consumption keep the same, but built-in relay will not disconnect circuit
when balance amount is zero.
DTZ1513 Three phase CT connected keypad prepayment energy meter has function of Shift
between Multi-tariff solution with Amount of Money Settlement Mode and Stepped Solution;The
shift is realized by prepayment configuration word.
Prepayment configuration word -item 230 can be programmed through optic commutation port,
RS-485 or AMI system to realize the shift after it’s allowed and authorized.
Three-phase CT/PT Operated Keypad Energy Meter
161 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
8.13 TOU multi-tariff / stepped tariff shift function by
credit(money) settlement mode (option) DTZ1513 three phase CT/PT-connected prepayment keypad meter is allowed to shift between TOU Multi-tariff and stepped tariff in credit settlement mode. Such shift will be realized through setting prepayment status word. After permission as well as authorization, you can set the prepayment configuration status word 230 to realize such shift through optical communication port, RS485 communication port or AMI system.
8.14 Monthly basic power consumption amount setting
(Option) It’s programmable to set amount for Monthly Basic Power Consumption. If amount for actual monthly power consumption is less than amount for Monthly Basic Power Consumption, meter will automatically count electricity charge as amount for Monthly Basic Power Consumption(but D-value between two kinds of amount will not be calculated to amount for actual monthly power consumption. If amount for Monthly Basic Power Consumption is set as zero, this function doesn’t work.
8.15 Settings for relevant processing parameters and
prepayment configuration status word DTZ1513 Three phase CT connected keypad prepayment energy meter can be programmable for Relevant Processing Parameters and Prepayment Configuration word so as to reach to normal processing state. Available settings for Rocket Project three phase CT connected keypad prepayment energy meter is as below,
Display Item
Code Content
Default at
factory Unit/ Meaning
11.35.0 Current threshold for over-current power-off 12.31.0 Voltage threshold for low-voltage power-off 12.35.0 Voltage threshold for over-voltage power-off 21.35.0 Threshold for load control C.50.4 Threshold for overflow C.50.5 Threshold for overdraft C.50.9 Billing date C.51.0 buzzer warning interval
Three-phase CT/PT Operated Keypad Energy Meter
162 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
C.51.1 Recovery time for overload power-off C.51.3 Available times for overload power-off C,51.4 Threshold for minimum load guarantee
C.51.5 Power-off threshold for unbalanced phase
power
C.51.6 Threshold for over-temperature power-off
C.51.7 Warning threshold for by-pass tamper(6.25%
12.5%)
C.51.11 Pre-warning threshold for balance amount C.51.12 Warning threshold for balance amount C.50.70 1 Prepayment configuration word 1 C.50.71 2 Prepayment configuration word 2
C.72.0 Definition word for combined active, combined
reactive 1, combined reactive 2.
C.72.4 Ratio of CT C.72.5 Ratio of PT C.72.6 Total ratio
C.70.9 subscriber installation demand transformer
capacity
C.70.2 Definition word for combined active, combined
reactive 1, combined reactive 2.
CT/PT connected keypad prepayment meter configuration word for this project as below:
prepayment configuration word 1:display item C.50.70
prepayment configuration word 1:display item S/N Displays Function Instruction
0 - - - - - - - 1
Cover opening counter
detection under condition
of power off
1:Allowed(it needs activation) 0:not allowed
1 - - - - - - 1 - Power supply recovery
after overload mode
1:key-press instant recovery 0:automatic delay
recovery
2 - - - - - 1 - - Power off 1:Power off with relay disconnection 0:power off with
relay connection
3 - - - - 1 - - - Payment mode 1:Post-payment mode 0:prepayment mode
4 - - - 1 - - - - Overload diagnosis mode 1:Apparent power 0:Active power
5 - - 1 - - - - - Money settlement mode 1:Stepped tariff 0:Multi-tariff
Three-phase CT/PT Operated Keypad Energy Meter
163 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
6 - 1- - - - - -
If it’s allowed to power off
under condition of
reverse power
consumption
1:Allowed 0:not allowed
7 1- - - - - - - Reservation
Prepayment configuration word 1 default at factory for this project: 1100 0000
Prepayment configuration word 2 details: Display Item C.50.71
Prepayment configuration word 2 details: Display Item C.50.71
Serial
No.
Displays Function Instruction
1 - - - - - - - 1 Phase loss power off 1:allowed; 0:not allowed
2 - - - - - - 1 -Reverse phase sequence
power off
1: allowed ; 0:not allowed
3 - - - - - 1 - -Payment deduction for
reactive energy
1: average payment deduction per hour; 0: real
time payment deduction
4 - - - - 1 - - -Magnetic interference power
off
1:allowed; 0:not allowed
5 - - - 1 - - - -
Power off for
over-temperature inside
meter
1:allowed; 0:not allowed
6 - - 1 - - - - - Reservation
7 - 1 - - - - - - Date display mode 1:DD MM YY 0:Y Y M M D D
8 - - - - - - - - Reservation
prepayment configuration word 2 default at factory for this project: 0000 0001
Pre-combined active, reactive 1, and reactive 2 definition words: display item C.72.0
Pre-combined active, reactive 1, and reactive 2 definition words: display item C.72.01S/N. Displays Function Details
1 - - - - - - - 1 combined active definition
1:net active ( algebraic value of forward active +
algebraic value of reverse active)
0: total active (absolute value of forward active +
absolute value of reverse active)
2 - - - - - - 1 -combined reactive 1
definition
1:Inductive reactive( quadrant1+ quadrant 4)
0:forward reactive( quadrant 1+ quadrant 2)
3 - - - - - 1 - - combined reactive 2 1:capacitive reactive (quadrant 2+ quadrant 3)
Three-phase CT/PT Operated Keypad Energy Meter
164 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
definition 0: reverse reactive(quadrant 3+ quadrant 4)
4 - - - - 1 - - - If it’s allowed remote
programming or not
1: allowed 0: not allowed
5 - - - - - - - -
6 - - - - - - - -
7 - - - - - - - -
8 - - - - - - - -
Pre-combined active, reactive 1, and reactive 2 definition words default at factory: display item 0000 0000
8.16 Display negative value for balance amount
If balance amount is zero, and built-in relay suffers from breakdown, and still keeps connected( subscriber continue to consume power); meter still makes normal measurement. Under this situation, meter will display negative value for balance amount.
(display shift)
8.17 Available Amount ( balance amount) Ladder Diagram
Indication LCD screen will directly display available amount ( balance amount) Ladder diagram Indication
① ② ③ ④ ⑤
Three-phase CT/PT Operated Keypad Energy Meter
165 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Four bars are
lighting
Three bars are
lighting Two bars are lighting
One bar is
lighting
No bar is lighting,
framework of ladder
diagram is lighting/
flashing
Available amount( balance amount) indication according to pre-warning / warning threshold( default at factory)
1 Four bars are lighting when available amount is more than pre-warning threshold, refer to diagram① 2 Three bars are lighting when available amount is less than pre-warning threshold, but more than
warning threshold +(pre-warning threshold - warning threshold )/2, it prompts subscriber to purchase
electricity; refer to diagram ② 3 Two bars are lighting when available amount is less than warning threshold + (pre-warning threshold -
warning threshold / 2), but more than warning threshold, it prompts subscriber to purchase electricity;
refer to diagram③. 4 One bar is lighting when available amount is less than warning threshold, but more than 1/2 of warning
threshold, it prompts subscriber to purchase electricity; refer to diagram ④. 5 None bar is lighting and framework of ladder digram is lighting when available amount is
less than 1/2 of waring threshold but not zero; it prompts subscriber to purchase electricity, otherwise it will be power-off; refer to diagram ⑤.
6 None bar is lighting and framework of ladder digram is flashing when available amount is zero, it means internal replay is disconnected and stops power supply(exceptions for overdraft, minimum load power supply, evening/holidays power-on); refer to diagram⑤.
8.18 It’s Not Available to Program or Modify Meter
Number(Serial Number) after delivery from factory
Meter cannot be programmed or modified when it’s on processing status after delivery from
factory.
8.19 Load Profile Record DTZ1513 Three phase CT connected keypad prepayment energy meter has load profile record: record 8 channels, 1920 measurement values with time scale per channel. It’s convenient for electricity company to check power consumption situation. Time unit: hh: mm Minimum time shift: 15minutes(00:15) Max time shift: 1 day(24:00)
Three-phase CT/PT Operated Keypad Energy Meter
166 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Record saving space details: Channel1 Channel 2 Channel 4 Channel 8
15minutes 80days 40days 20days 10days
30minutes 160days 80days 40days 20days
60minutes(1hour) 320days 160days 80days 40days
120minutes(2hours) 640days 320days 160days 80days
Eight channels definitions as below,
S/N. Parameter Remark
1 all phases/separate phase forward active power
consumption(time shift)
2 all phases/separate phase reverse active power
consumption( time shift)
3 all phases/separate phase forward reactive power
consumption(time shift)
4 all phases/separate phase reverse reactive power
consumption(interval)
5 all phases forward apparent power
consumption(time shift)
6 all phases reverse apparent power
consumption(time shift)
7 all phases/separate phase active power
8 all phases/separate phase reactive power
9 all phases/separate phase apparent power
10 all phases average power factor/ separate phase
power factor
11 Phase voltage value
12 Phase current value
Load profile data can be read through meter communication port.
8.20 Available Days Indication( Option) Meter can estimate available days for purchased electricity according to average load of subscriber’s power consumption. It will display in available time item(display code 300), display unit is dd:hh, Max indication time is 99 days 24 hours. It adopts calculation based on balance amount and Maximum Demand. It adopts calculation by last month MD when current month MD is zero; it adopts calculation by load threshold when last month MD is zero.
Three-phase CT/PT Operated Keypad Energy Meter
167 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
8.21 Display without Power( Option) DTZ1513 Three phase CT connected keypad prepayment energy meter has function of display without power. Meter can display power consumption information(balance amount) without power.
8.22 Monthly Billing Settlement Day (Billing Date) Meter can be programmed for monthly settlement day according to electricity company requirement. Default setting is the last day of each month.
8.23 Over-temperature Power-off( Option) When meter detects internal temperature over threshold (OBIS code C.51.6:default setting: 95℃), will diagnose it as over temperature, and buzzer will sound warning. If this status keeps over 30seconds, meter will automatically cut off power supply; meter will automatically resume to power on 5 minutes later or manually press keypad to resume power supply within 5 minutes if internal temperature recovers as usual( lower than threshold). Root for over temperature: overload or terminal connection trouble.
8.24 Magnetic Interference Power-off(Option) When meter detects magnetic interference, it will display symbols below and buzzer will sound warning; and meter will power off after it detects continuous magnetic interference for 10 seconds, and will resume to power on 5 minutes later after magnetic interference ends up, and record it as event.
Three-phase CT/PT Operated Keypad Energy Meter
168 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
8.25 Remote Upgrading DTZ1513 Three phase CT connected keypad prepayment energy meter will upgrade software on line by local or remote control to realize function improvement.
8.26 Processing Status Inquiry DTZ1513 Three phase CT/PT connected keypad prepayment energy meter can be checked for processing status by keypad, local communication port, or remote communication mode.
Processing Status word 1(OBIS code C.5.1)
S/N. Status word definition Remark 0 No balance amount (balance amount is zero) 1 Warning status 2 Pre-warning status 3 Relay status 4 No balance amount (balance amount is
negative value)
5 If meter allows remote communication programming or not.
6 7
Meter Processing status word 2( meter breakdown event OBIS code C.5.2)
S/N. Status word definition Remark 0 breakdown of meter control circuit 1 clock battery low voltage 2 internal register breakdown 3 Internal clock breakdown 4 Overdraft situation 5 meter software upgrading 6 clock timing 7
Processing status word 3(cover-opening event OBIS code C.5.3)
S/N. Status word definition Remark
Three-phase CT/PT Operated Keypad Energy Meter
169 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
0 Open terminal cover 1 Open meter upper cover 2 Open modular cover 3 4 5 6 7
Processing status word 4( grid event 1 OBIS code C.5.4)
S/N. Status word definition Remark 0 Active power reverse 1 serious unbalance of current (more than
6.5%)
2 3 4 5 6 7
Processing status word 5( grid event 2 OBIS code C.5.5 )
S/N. Status word definition Remark 0 Voltage loss 1 Under voltage 2 Over voltage 3 Flow Loss 4 Over current 5 Phase failure 6 Cutout 7 Neutral loss
Processing Status word 6(grid event 3 OBIS code C.5.6)
S/N. Status word definition Remark 0 Voltage reverse phase sequence 1 Current reverse phase sequence 2 Three-phase voltage unbalance 3 Three-phase current unbalance
Three-phase CT/PT Operated Keypad Energy Meter
170 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
4 Maximum Demand over threshold 5 Power factor under lower limit 6 separate phase active power
reverse
7
8.27 Date Display Shift DTZ1513 Three phase CT connected keypad prepayment energy meter has function of date display shift. It’s realized by programming of prepayment configuration status word, default display at factory is yy mm dd. It’s available to modify prepayment configuration status word(OBIS code C.50.71) and shift date display as dd mm yy through optic communication port, RS-485 communication port or AMI system if these actions are allowed and authorized.
8.28 Automatic Shift with RTC between DST and Winter
Time
DTZ1513 Three phase CT connected keypad prepayment energy meter has function of automatic shift with RTC( real time clock) between DST( daylight saving time) and winter time. It’s realized by prepayment settings through optic communication port, RS-485 communication port or AMI system if these actions are allowed and authorized.
9 Special billing Functions for Transformer Loss, Reactive Loss, Installation Capacity DTZ1513 Three phase CT connected keypad prepayment energy meter supports special billing functions for transformer loss, reactive loss, maximum apparent demand, and installation capacity which are practiced by large power consumption subscriber.
9.1 Transformer Loss billing
Electricity company needs to take special charge for transformer loss from high-voltage supply& low-voltage measuring subscriber
Three-phase CT/PT Operated Keypad Energy Meter
171 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Transformer loss consists of no -load loss( fixed loss), load loss(variable loss). There are two calculations: A. One by one calculation B. Transformer loss check-list calculation; Rocket Project adopts calculation B as below, Meter has function of transformer loss billing. Meter will calculate transformer loss each hour according to programmed transformer capacity and active power consumption for current hour, and deduct amount for transformer loss from balance amount.
W: power consumption S: transformer capacity
Transformer loss calculation Formular:
Thereinto:
Transformer loss W power consumption: Active power consumption kWh for current hour S transformer capacity: Transformer capacity KVA( Selected from transformer loss coefficient list)
12
43
5
6
7
8
9
1 0
1 11 21 31 4
: Average power factor for current
hour( calculation as below) W active power consumption for current hour
W active power consumption for current hour2 + Q reactive power consumption for current hour2
W transformer loss: transformer loss kWh for current hour in grid
t: Settlement time, default as one hour. K1、K2、K3: transformer loss coefficient are available from transformer loss coefficient check list P loss: loss charge AZN/kWh (programmable)
Transformer loss coefficient check list:
Transformer Transformer loss coefficient
tW
x××
=2cosS ϕ变压器容量
用电量
720K
720K
720K 3221 +×+×=Δ xxW变压器损耗
222QW
cos该小时无功用电量该小时有功用电量
该小时有功用电量
+=
Wϕ
Three-phase CT/PT Operated Keypad Energy Meter
172 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
capacity
(KVA) K1 K2 K3
0 0 0 0
25 422.7700 9.8407 87.9420
40 633.6200 -1.7463 130.0300
63 916.2800 5.1886 188.9400
100 1487.1000 -81.6260 273.9700
160 1914.1000 -7.2981 390.6300
180 2264.7000 309.4100 544.9900
250 2675.1000 -16.6390 568.1800
320 3490.5000 1.9562 971.8900
400 3961.6000 -1.8026 776.2300
560 5165.1000 -494.6300 1446.7000
630 5476.2000 -3.9875 1209.8000
750 8581.4000 -13.0010 2953.5000
1000 8935.0000 -125.2500 1769.7000
1600 13013.0000 -68.7290 2386.8000
2500 17958.0000 45.0210 3108.8000
Electricity company can programme transformer capacity according to subscriber actual situation,
the function doesn’t work when transformer capacity is programmed as zero.
9.2 Reactive Loss billing 1 (Average deduction per hour
mode) Meter has function of reactive loss billing. Meter will calculate reactive loss each hour according to programmed power factor billing threshold and active& reactive power consumption; meter will deduct reactive loss amount from balance amount.
Reactive loss calculation formula:
3 1
3 2
3 3
3 4
3 5
3 6
Reactive loss Power consumption There into: W 用电量:W power consumption: Active power consumption kWh
1cosϕ : Power factor billing threshold (Programmable 0.00-1.00) 1
2
34
: Average power factor for current hour( calculation as below)
Three-phase CT/PT Operated Keypad Energy Meter
173 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
W active power consumption for current hour2 + reactive power consumption2
W reactive loss: reactive loss kWh for current hour in grid (negative value will be treated as zero) P electricity charge: loss charge AZN/kWh (programmable)
Electricity company can program (power factor billing threshold) according to actual
situation; this function doesn’t work when 各费率时段下正向有功、反向有功、正向无功、反向无功电价
TOU1TOU2TOU3
TOU5TOU6
费率编号
TOU4
TOU7TOU8
T1费率正向有功电价
T3费率正向有功电价
T2费率正向有功电价
T4费率正向有功电价
T5费率正向有功电价
T6费率正向有功电价
T7费率正向有功电价
T8费率正向有功电价
T1费率正向无功电价
T3费率正向无功电价
T2费率正向无功电价
T4费率正向无功电价
T5费率正向无功电价
T6费率正向无功电价
T7费率正向无功电价
T8费率正向无功电价
T1费率反向有功电价
T3费率反向有功电价
T2费率反向有功电价
T4费率反向有功电价
T5费率反向有功电价
T6费率反向有功电价
T7费率反向有功电价
T8费率反向有功电价
T1费率反向无功电价
T3费率反向无功电价
T2费率反向无功电价
T4费率反向无功电价
T5费率反向无功电价
T6费率反向无功电价
T7费率反向无功电价
T8费率反向无功电价
is programmed as 0.00.
Meter will record reactive loss for The last hour/ each settlement day/ each settlement month and
total reactive loss.
9.3 Reactive Loss billing 2( Real-time Deduction Mode) Reactive power consumption charge is deducted by real time. When meter detects power factor is continuously lower than threshold of reactive power consumption deduction(0.95 for example) for 1 minute, and will deduct reactive power consumption charge; it’s real-time deduction according to reactive power consumption and corresponding tariff. Deduction will be The lasting until meter detects power factor rises over threshold( it means deduction will be stopped once meter detects power factor is more than programmed threshold 0.95)
Note: Reactive loss billing mode is selected by prepayment configuration status word 2.
9.4 billing for Monthly Apparent Maximum Demand
It’s deducted at end of each month( it means 00 hour 00 minute, 1st of the next month) by current
monthly apparent maximum demand value calculated by maximum demand list X corresponding
tariff .
For example:
Current monthly apparent MD(Max. Demand) counting value : 1000kVA
Tariff: 0.7200 $/kVA
Current monthly apparent MD charge: 720$
222QW
cos该小时无功用电量该小时有功用电量
该小时有功用电量
+=
Wϕ
Three-phase CT/PT Operated Keypad Energy Meter
174 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Note: if monthly apparent MD tariff is zero, MD charge will be free.
9.5 Monthly Installation Capacity(kVA) Charge Monthly installation capacity charge will be deducted at beginning of each month( it means 00 hour 00 minute, 1st of each month) or when MD list is used for the first time( it’s valid by inputting activation code) according to programmed user installation capacity(kVA) X tariff.
For example: User installation capacity(kVA): 1000kVA
Monthly installation capacity(kVA) tariff: 0.2800 $/kVA
Monthly installation capacity(kVA) charge: 280$
Note: if monthly installation capacity tariff is zero, the charge will be free.
9.6 Monthly Fixed Charge( Basic Charge) The charge will be deducted at beginning of each month( it means 00 hour 00 minute, 1st of each month) or when MD list is used for the first time( it’s valid by inputting activation code) according to programmed monthly fixed charge( basic charge).
10 Historical Data Transfer & Storage and Event Record 10.1 13 Months Monthly Power Consumption Data Storage DTZ1513 Three phase CT connected keypad prepayment energy meter will save The last 13 months monthly historical metering data,and it’s programmable for monthly(billing) settlement date& time (freezing time). Default at factory for freezing time is 24:00 hour, end of each month.
Settlement(monthly) for power consumption at billing period; power consumption at
different tariff period. Settlement(monthly) for amount at billing period; amount at different tariff period. Settlement(monthly) for MD and it’s date & time . Inquiry for 13 months monthly power consumption data and amount data by inputting
short code.
Three-phase CT/PT Operated Keypad Energy Meter
175 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
10.2 45 Days Daily Power Consumption Data Storage DTZ1513 Three phase CT connected keypad prepayment energy meter can save 45 days daily power consumption data. Default settlement time is 00:00.
Daily power consumption; power consumption at different tariff time period Amount for each day; amount at different tariff time period Inquiry for 45 days daily power consumption data and amount data by inputting short
code
10.3 Tripping Event Record DTZ1513 Three phase CT connected keypad prepayment energy meter will record The last 20 times power-off events, and it’s available to check The last 10 times power-off events by inputting short-code.
Record Content as below, 1 Acaccumulative times for power-off 2 Date and time for power-off 3 Recovery date and time after each power-off 4 Power-off root word 1
S/N. Status word definition Remark 0 Power-off when balance amount is zero
1 Power-off when it’s warning
2 Power-off when it’s overload
3 Power-off when it’s over current
4 Power-off when it’s inactivated
5 Power-off by remote control
6 Power-off when there is mistake by
self-check
7 Power-off when there is the neutral line
failure
5 Power-off Root Word 2
S/N Status word definition Remark 0 Power-off when it’s over voltage 1 Power-off when it’s low voltage 2 Power-off when it’s reverse
power-consumption
3 Power-off when the terminal cover is
Three-phase CT/PT Operated Keypad Energy Meter
176 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
opened
4 Power-off when meter upper cover is
opened
5 Power-off when there is bypass tamper 6 Power-off when there is phase loss 7 Power-off when there is reverse phase
sequence
10.4 Grid Power-off Event Record DTZ1513 Three phase CT connected keypad prepayment energy meter can record The last 20 times grid power-off events. It’s available to check The last times grid power-off event.
Record content as below, 6 Acaccumulative times for grid power-off 7 Date and time for grid power-off 8 Recovery date and time after each grid power-off
10.5 Special Event Record DTZ1513 Three phase CT connected keypad prepayment energy meter will record The last 50 times special events, and it’s available to check The last 10 times special events.
Record content as below, 9 Acaccumulative times for special event 10 Date and time for special event 11 Ending date and time for special event S/N. Status word definition Remark
0 Control circuit breakdown 1 Clock battery low voltage 2 Internal register malfunction 3 Internal clock malfunction 4 Overdraft 5 Meter software upgrading 6 Clock timing 7
12 Special event status word 2(cover-opening event) which can distinguish event types
S/N. Status word definition Remark 0 terminal cover opening 1 meter upper cover opening 2 modular cover opening
Three-phase CT/PT Operated Keypad Energy Meter
177 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
3 MD resetting 4 5 6 7
13 Special event status word 3(grid event 1) which can distinguish event types
S/N. Status word definition Remark 0 Reverse active power 1 Serious unbalance of current(more than
6.5%)
2 3 4 5 6 7
14 Special event status word 4(grid event 2) which can distinguish event types
S/N. Status word definition Remark 0 Voltage loss 1 Under voltage 2 Over voltage 3 Flow loss 4 Over current 5 Phase failure 6 Cutout 7 Neutral loss
15 Special Event Status Word 5(grid event 3) which can distinguish event types
S/N. Status word definition Remark 0 Voltage reverse phase sequence 1 Current reverse phase sequence 2 Three-phase voltage unbalance 3 Three-phase current unbalance 4 MD over limit 5 power factor under lower limit 6 Separate phase active power
reverse
7
Three-phase CT/PT Operated Keypad Energy Meter
178 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
10.6 Recharging Information DTZ1513 Three phase CT connected keypad prepayment energy meter can record/check The last 15 times recharging information, and it’s available to check The last 15 times recharging events. Record content as below,
16 Total recharging times 17 Recharging amount 18 TOKEN value 19 Corresponding TID code for TOKEN 20 Recharging date and time It’s available to check The last 15 times recharging events. Check items as below,
Display item code
Content Display method
Unit/ meaning
C.15.0 Acaccumulative
recharging times XXXX Four digits, Max record times of 9999
C.L.40.1 The last time
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
C.L.40.2 The last 2 times
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
C.L.40.3 The last 3 times
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
C.L.40.4 The last 4 times
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
C.L.40.5 The last 5 times
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
C.L.40.6 The last 6 times
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
C.L.40.7 The last 7 times
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
C.L.40.8 The last 8 times
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
C.L.40.9 The last 9 times
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
C.L.40.10 The last 10 times
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
C.L.40.11 The last 11 times 7 divi-screens Recharging amount, TOKEN value, TID code,
Three-phase CT/PT Operated Keypad Energy Meter
179 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Display item code
Content Display method
Unit/ meaning
recharging event display Date/time
C.L.40.12 The last 12 times
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
C.L.40.13 The last 13 times
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
C.L.40.14 The last 14 times
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
C.L.40.15 The last 15 times
recharging event
7 divi-screens
display
Recharging amount, TOKEN value, TID code,
Date/time
For example( check The last time recharging event):( Need to shift screen)
Display Serial No.
Display Content Instruction
1
The first screen: To display recharging amount for this time;(it shows 40.00kWh)
2
The second screen: To display the first seven digits of recharging TOKEN (TOKEN is 1162 4313 9811 8735 7405)
3
The third screen: To display the middle six digits of recharging TOKEN(TOKEN is 1162 4313 9811 8735 7405)
4
The fourth screen To display the The last seven digits of recharging TOKEN(TOKEN is 1162 4313 9811 8735 7405)
5 The fifth screen Corresponding TID code (09968569)
6 The sixth screen Recharging date: 2011(Y).12(M).15(D)
Three-phase CT/PT Operated Keypad Energy Meter
180 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Display Serial No.
Display Content Instruction
7 The seventh screen Recharging time: 16:20
10.7 Technique TOKEN Application Information DTZ1513 Three phase CT connected keypad prepayment energy meter can record/check The last 10 times technique TOKEN application information, and it’s available to check 10 times TOKEN application events by inputting short code. Record content as below,
21 Total application times of technical TOKEN 22 Technical TOKEN type 23 Technical TOKEN type 24 Application time and date of technical TOKEN It’s available to check the last 9 times technical TOKEN treatment.
Check items as below,
Display
Item
Code
Content Display
method Data unit/ meaning
C.15.1 Application times of Technical TOKEN
XXXX Four digits, maximum record times of 9999
C.L.50.1 The last time technical TOKEN event
6 divi-screens
display
Technical TOKEN type, TOKEN value, date and time of TOKEN inputting
C.L.50.2 The last 2 times technical TOKEN event
6 divi-screens
display
Technical TOKEN type, TOKEN value, date and time of TOKEN inputting
C.L.50.3 The last 3 times technical TOKEN event
6 divi-screens
display
Technical TOKEN type, TOKEN value, date and time of TOKEN inputting
C.L.50.4 The last 4 times technical TOKEN event
6 divi-screens
display
Technical TOKEN type, TOKEN value, date and time of TOKEN inputting
C.L.50.5 The last 5 times technical TOKEN event
6 divi-screens
display
Technical TOKEN type, TOKEN value, date and time of TOKEN inputting
C.L.50.6 The last 6 times technical TOKEN event
6 divi-screens
display
Technical TOKEN type, TOKEN value, date and time of TOKEN inputting
C.L.50.7 The last 7 times technical TOKEN event
6 divi-screens
display
Technical TOKEN type, TOKEN value, date and time of TOKEN inputting
C.L.50.8 The last 8 times technical TOKEN event
6 divi-screens
display
Technical TOKEN type, TOKEN value, date and time of TOKEN inputting
C.L.50.9 The last 9 times technical TOKEN event
6 divi-screens
display
Technical TOKEN type, TOKEN value, date and time of TOKEN inputting
Three-phase CT/PT Operated Keypad Energy Meter
181 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Technique TOKEN type:
Serial S/N. Technique OTKEN type Definition
1 00 Set Maximum Load
2 01 Clear Credit
3 02 Set Tariff Rate
4 03 Set encryption Key
5 05 Tamper Clearance
6 06 Phase unbalance
For example( to check the last time technique TOKEN event)( need to shift screen)
S/N. Example Statement
1 The first screen: Technique TOKEN type;( 01 means clear credit)
2 The second screen the first 7 digits of technical TOKEN( Technique TOKEN 2531 3886 8909 4070 5121)
3
The third screen The middle 6 digits of technical TOKEN( Technique TOKEN 2531 3886 8909 4070 5121)
4
The fourth screen The last 7 digits of technical TOKEN( Technique TOKEN 2531 3886 8909 4070 5121)
5 The fifth screen Date of technical TOKEN inputting( 2011(Y) 12(M) 15(D)
6
The sixth screen Time of technical TOKEN inputting( 16:20)
Three-phase CT/PT Operated Keypad Energy Meter
182 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
11 Communication Port DTZ1513 Three phase CT/PT connected keypad prepayment energy meter consists of optical (infrared) communication interface, RS-485 interface; PLC module, RF module, GPRS/GSM module and Zig-bee module are optional. Main control unit and customer interface unit can make up a split prepayment energy meter; or it can be configurable with concentrator and AMR software as AMI/AMR system.
11.1 Optical (infrared) communication port Meter optical (infrared) communication port works as the diagram shows below, it can read the subscriber’s billing data, such as: total active (reactive/apparent) power consumption, max demand, the historical monthly power consumption data of last 13 months, the daily power consumption data of last 45 days and event record. It can also be used to program meter processing parameters; for example, meter processing parameters and multi tariff/ Stepped solutions can be set via code administration when it’s allowed. According to the different requirements of customers, presetting at factory can be done or done by Electricity Company. It can also be used to upgrade the meter embedded software.
Notice: Presetting at factory should be done before delivery according to customer’s requirement.
Three-phase CT/PT Operated Keypad Energy Meter
183 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Accessories are optional as below,
S/N.
Item Instruction Document attached
1
Photoelectric
communication
cable
Communication cable between Photoelectric
port and HHU/computer.
English user manual of optic
communication cable V1.3
2
HHU: C5000W
Photoelectric meter-reading palm reader
attached with charger(multi-holder);
communication cable between palm reader
and PC, related operation system software .
User manual of C5000W mobile
data terminal
Introduction of C5000W mobile
data terminal
3 SMARTview INHEMETER smart meter management
system software
11.2 RS-485 Communication Port RS-485 can be used to read the subscriber’s billing data, such as: acaccumulative active (reactive/apparent) power consumption, max demand, the historical total power consumption data of last 13 months, the daily power consumption data of last 45 days and event record. It can also be used to program processing parameters; for example, meter processing parameters and multi tariff/ Stepped solutions can be set via code administration when it’s allowed. According to the different requirements of customers, presetting at factory can be done or done by Electricity Company. It can also be used to upgrade the meter embedded software.AMI/AMR network can be configurable via RS-485 port.
11.3 TG4A0-01 Three-phase Meter GPRS/GSM
Communication Module Please refer to attachment 1《SG4A0(TG4A0) Data sheet GPRS Single Phase(Three Phase)Meter Replaceable Communication Module》
11.4 TPDH0-01 Three Phase Meter PLC Communication
Module Please refer to attachment 2《SPDH0(TPDH0) Data sheet PLC Single Phase(Three Phase)Meter Replaceable Communication Module》
Three-phase CT/PT Operated Keypad Energy Meter
184 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
11.5TRGB0-01 Three-phase Meter RF Low
Power-consumption Communication Module Please refer to attachment 3《SRGB0(TRGB0) Data sheet RF Low Power-consumption Wireless Single Phase(Three Phase)Meter Replaceable Communication Module》
11.6 TZ0A0-01 Three-phase Meter Zig-bee Communication
Module Please refer to attachment 4《SZ0A0(TZ0A0) Data sheet RF Low Power-consumption Wireless Single Phase(Three Phase)Meter Replaceable Communication Module》
12 Safety and Security Rule Prepayment keypad energy meter can be installed outdoor, indoor and in switch board, but user should pay more attention to wiring security and operation conveniences. Energy meter is strengthened insulation-protection product, and button, panel, LCD and cover are safe in normal use, and comply with safety and security rule. The safety protection is needed in installation and operation. Naked conduct and interface is not permitted.
13 Prepayment keypad energy meter malfunction diagnosis Prepayment keypad energy meter has self-diagnosis function, and long life and adaptability have
been considered in design and manufacture. malfunction may occur in some conditions because
of incorrect operation. Please deal with the faults in following table.
Sr.No. Appearance Error Description Reason or dealing method
1 Data memory error. Please contact electricity company for maintenance.
2 In LCD full screen, some character is not complete or power indictor flashes, but no display in LCD.
It means LCD is broken; manufacturer or agent should replace the LCD.
3 LCD cannot display, power indictor and pulse indictor do not flash.
① Power off or check following items when power on ②Check wiring
Three-phase CT/PT Operated Keypad Energy Meter
185 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
③Check voltage
4 LCD and power indicator can work; pulse indictor does not flash in power using.
①Check wiring. ②Current is less than 0.1%Ib.
5 LCD works and battery bar flashes. Change battery.
14 Meter Installation and Operation Instructions
1) Before installation, meter appearance, manufacturer mark, power company inspection mark and seal should be checked. The energy meter can be installed inside the meter box after confirmation.
2) Before wiring, please check the diagram on the meter terminal cover, and confirm input and output cables are correspondence with the diagram on the cover. Copper cable or copper joint is preferred.
3) In meter wiring, screw on every terminal should be unlocked first, and insert the cable; the screw should be locked tightly and confirmed be touched well.
4) After confirm wiring is correct, meter cover should be fixed and special seal from Power Company should be installed.
5) Pulling cable is not permitted when arranging cables, to avoid affecting fix on joint. Fix the cable till it cannot move. Dust and water is not permitted to enter meter.
6) Supply power to meter and check its work condition. If it works well, record the data; if it doesn’t work please check the installation, wiring and voltage.
7) Be careful to meter installation process and avoid dropping or shocking. 8) In meter installation and operation, be careful about safety and avoid accident.
15 Transportation and storage notice The product shall be transported and stored according to the related rules. No intense impact to the product is allowable during transportation and unpacking. The product shall be stored in original packing, the ambient temperature is -35℃~80℃, and the relative humidity is not more than 100%, and no corrosive gas or harmful material is present. Natural ventilation is good. The product shall be stored on shelf in a warehouse and the stacking height shall not be more than 8 layers.
16 Warranty
Three-phase CT/PT Operated Keypad Energy Meter
186 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
If the meter does not meet the requirements of technical specifications according to the purchase contract after leaving factory, and the user follows the manual instruction and manufacturer’s sealing is in good condition, we furnish free maintenance or replace the defective meter within 24 months from delivery at factory.
17 Annex Instructions There are related accessories attached (For each single meter packing) when meter delivery at factory
S/N. Description Qty Remark 1 Prepayment Keypad Meter MCU Unit 1 2 Prepayment Keypad Meter CIU Unit 1 3 User Operation Manual 1 4 Prepayment keypad meter identification
magnetic card pcs
5 MCU Unit Serial No. Bar Code sticker 3pcs 6 Installation screw 1 unit Not included 7 Sealing wire and sealing 1 unit Not included 8 9
18 INHEMETER SMARTtvend management system SMARTvend: INHEMETER smart network power vending management system (Smart Vending Anywhere) is introduced after years’ of experience of developing IC prepayment energy meter, keypad prepayment energy meter, SMS prepayment energy meter power vending Management system and after-payment power vending management mode. It uses B/S and C/S mixing network construction and network data is under centralized management. Value added service, various power vending, 7*24 power vending anywhere can be realized by co-operation with the bank, the network companies, etc. It is mainly used to manage energy charge collection of utilities, companies, schools and etc, and plays important role in automatic collection of energy charges and load control. Smart Vending Anywhere System (SVAS) brings convenience, efficiency and security for users and thus simplifies the complexity of management, reduces cost and improves revenue collection. It can be used in prepayment / post-payment smart vending system of energy meters, water meters, and gas meters.
Three-phase CT/PT Operated Keypad Energy Meter
187 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
SMARTvend System Features
Network- based system structure and operation mode;
Multi-method Billing and compatible with various billing solutions;
Various power vending methods available, i.e. vending through internet, vending point,
agent, POS, ATM, SMS and scratch card;
Multi-station or single station management for vending points; Vending points can be
centralized for control and vending authorization.
Support many kinds of prepayment energy meter including IC card prepayment energy
meter and all STS certified keypad prepayment energy meter, SMS message prepayment
energy meter etc.
Abundant graphic statistics and analysis report forms;
Multi-level management mode and digital certified authentication system to ensure system
security.
Users are given rights according to position that can be done to each control point of each
module.
Built-in third party data exchange port and can communicate with exterior system like
marketing system, AMR system closely.
Desktop user-defined.
SMARTvend Structure
SMARTvend includes server application as following:
Database Server: used for storage of business data.
Web Server: used for providing HTTP service to connect vending points of utility company
and connection for bank payment collection, internet power vending, vending agency,
internet vending etc.
Data Exchange Server: maintaining multi-layer system data exchange and data exchange
with different suppliers;
Affair Handling Server: for affair handling, TOKEN generation and data encryption,
decryption etc;
Management Terminal: for system comprehensive maintenance and report analysis of client
side PC;
Notice: Above-mentioned server application can be grouped according to customer demand and
development condition; all service function operated in one server is supported as well.
Three-phase CT/PT Operated Keypad Energy Meter
188 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Provide corresponding port for other systems:
Power marketing system, power deployment automation EMS system, distribution
automation DMS system, superior measurement system, and other system.
Telecommunication port: payment collection port provided by bank for ATM automatic and
internet power vending;
Other System port: payment collection through agents like network company,
telecommunication company or scratch car
System Compatibility and Extensibility SMARTvend adopts unified power vending and revenue collection method,
Three-phase CT/PT Operated Keypad Energy Meter
189 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
compatible with IC prepayment energy meter, STS keypad prepayment energy meter, SMS prepayment energy meter researched by INHEMETER, as well as STS keypad energy meter made by different manufacturers. Meanwhile, it makes SMARTvend compatible with prepayment energy meter with different types and different protocols, prepayment water meter, prepayment hot water meter and gas meter by system’s third party extended interface base.
Diversified Power Vending Module
SMARTvend SVAS provides various vending modes in order to bring convenience and efficiency
to users and reduce workload of vending personnel.
ATM: Users purchase electricity from ATM self-help equipment. Recharge will be made by
connecting with bank system after safety certificate. ATM will read the card and print digit
code.
PC recharge: Users enter online network vending website to purchase electricity(IC card
reader is needed for operation for IC prepayment energy meter). After paying and confirming
the payment on internet, vending management center will make safety authentication and
give vending instruction for printing digit code.
POS, PDA recharge: Users enter network vending website by internet with handhold
computer for recharge (It can not recharge for IC prepayment energy meter).
Agent vending: Banks or other agent vendors authorized by the utility provide vending
business for users.
Recharge hall: Integrated petty charges recharge hall provide electricity vending business.
Vending hall: Power supply system provides internal vending network.
Scratch card: Telecom companies use their value added service to transfer the recharge
payment and give recharge instruction (It can not recharge for IC prepayment energy meter).
SMS: Telecom companies use their value added service to transfer the recharge payment,
and after successful recharge transferring, recharge can be made by SMS. It is applicable for
SMS prepayment energy meter and STS keypad prepayment energy meter (It can not
recharge for IC prepayment energy meter).
SMARTvend Functions SMARTvend has three versions: standard version, professional version and enterprise version. Different version system contains different functions and supports different meter type. Customers can choose according to their actual business requirement. SMARTvend SVAS has following function modules: 1) Daily business processing module
Three-phase CT/PT Operated Keypad Energy Meter
190 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Customer data maintenance, power consumption contact signing and canceling, petty charge collection, power vending, meter exchange, card complement, card data maintenance, and complementally bill printing. 2) Power vending network management module: Contact signing or canceling of vending network, vending terminal management, vending network reconciliation, vending network permission, commission payment, etc 3) Tempering module Customer power off/power recovery, tempering charge collection, handling charge collection of power off made by customers, etc 4) Charge collection module Petty charge collection, capacitance increase charge collection, meter freezing charge collection 5) Reports outputting module
Account opening integrated report, vending integrated report, consumption integrated report, tempering integrated report, vending network integrated report, charges integrated report, etc daily report outputting, consumption and vending and other analyses report outputting 6) System management module Company information management, department management, role permission management, user management, electricity price management, system operation data management, data management, data maintenance, data exchange management, etc, 7) Assistance module: Online assistance display
20 Instruction for prepayment keypad meter power load threshold presetting & pre-stored electricity at factory 20.1 Rule for load threshold presetting & pre-stored
electricity at Factory by INHEMETER massive production DTZ1513 three phase CT/PT connected keypad prepayment energy meter:
Pre-stored electricity:30.00kWh
Load threshold :22.000kW
Preset pre-warning alarm threshold:30.00kWh
Preset alarm threshold:0.00kWh
20.2 Pre-stored electricity It aims to test before installation, check the circulation status after installation. There several modes regarding pre-stored electricity. Detailed operation will refer to local practice.
Three-phase CT/PT Operated Keypad Energy Meter
191 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
A: After finishing the test before installation, installation operation and circulation status check after installation, the pre-stored electricity can be reset to zero by installation worker before officially handing over to users. Carry-out ways: In the stage of installation, while registering user and meter information in the power vending system, the system will generate the TOKEN code specialized in clearing up power consumption credit. After finishing the circulation check status and before officially handing over to users, installation workers will input this TOKEN code into keypad prepayment energy meter to clear up power consumption credit (clear up pre-stored electricity). B: After completing measurement meter testing, installation and inspection of electricity circulation status after the installation, energy meter can be formally delivered to users in the prior record by a meter installer residual value of the stored power to submit the sale of electricity management system. Specific carrying out ways: After completing measurement meter testing, installation and inspection of power after the installation, energy meter can be formally delivered to users in the prior by a meter installer record residual value of the stored charge and get the user to confirm it; installer will record the pre-stored electricity meter to log on to the remaining value of the stored power management system for the sale of electricity from the sale of electricity management system in the user when the first purchase deducted. C: Give the pre-stored power to users for free. Since the quantity of pre-stored electricity is not very big, then it can be given to users for free use after energy meter test, installation and circulation statuses check. D: The pre-stored power will be deducted with one time by power vending management system. According to pre-stored power in the energy meter before delivery, power vending management system will deduct it while users open an account and purchase the power.
20.3 Load threshold presetting The purpose of pre-set load threshold is to facilitate measurement test before installation of energy meter. According to the user information and load threshold permitted by utilities, the special load threshold TOKEN code will be generated by the power vending management system, and then users input it into related energy meter to finish load threshold setting. In the process of using the meter, if the actual load of users changes, then they can apply for load threshold change anytime. If the application is authorized, the specific TOKEN code used for load threshold will be generated by power vending management system, then users input this TOKEN to the related meter and finish load threshold changes.
Three-phase CT/PT Operated Keypad Energy Meter
192 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
21 Keypad prepayment meter massive production encryption key setting and process 21.1 Customized SGC Code Setting
Encryption Key for this project: SGC 600434,01,1
Encryption key type: DDTK
Energy meters are set according to the client’s requirement for SGC. A series of operation like
installation, power vending, recharging, etc. can be processed once the client receives the
products.
When leaving factory, INHEMETER keypad prepayment energy meter’s meter number, factory setting and other information are given together with the whole batch. It’s convenient to import all the information to customer vending management system.
21.2 INHEMETER default encryption key(SGC:999937)
Setting Set with the default factory encryption key (SGC: 999937)-key type is DDTK.
Three-phase CT/PT Operated Keypad Energy Meter
193 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Encryption key will be replaced as follows: 1. INHEMETER provides a authorization table with the SGC code: 999937 and manufacturer’s information of INHEMETER as table 1. 2. Customer fill in the vending security module number, customer information (as table 2), submit the table to the Key Management Center(KMC)and apply for a key file of the keypad prepayment energy meters of INHEMETER, then update their security module. 3. Energy meters will be set with the SGC: 999937 of INHEMETER, and can be supplied to all customers who have this requirement, key on the back plate is as the follow diagram.
4. After customer receive energy meters from INHEMETER, they should generate 2 groups of
replace TOKEN codes as per new security modules, input them into the energy meters, so as to change the default keys(DDTK)to unique keys (DUTK), the back plate has to be replaced too.
SGC: 999937, 01, 1 CREDIT: 30.00kWh POWER LIMIT: 15.180kW METER NUMBER:
37 99000089 7 TYPE:
DDZ1513 1Phase 2 Wire MFG. 2013
Three-phase CT/PT Operated Keypad Energy Meter
194 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Form 1
Three-phase CT/PT Operated Keypad Energy Meter
195 Shenzhen Inhemeter Co., Ltd www: inhemeter.com
Form 2