THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”. EXISTING TML COMPLEX. RFP called for an ASSESSMENT OF THE EXISTING LIBRARY. Multiple assessments were conducted: Functional Architectural Engineering Peer Comparisons Public Input. ASSESSMENT. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/1.jpg)
THOMAS MEMORIAL LIBRARYA NEW VISION FOR THE“LIGHTHOUSE OF KNOWLEDGE”
![Page 2: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/2.jpg)
EXISTING TML COMPLEX
![Page 3: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/3.jpg)
ASSESSMENT
RFP called for an ASSESSMENT OF THE EXISTING LIBRARY
Multiple assessments were conducted:• Functional• Architectural• Engineering• Peer Comparisons• Public Input
![Page 4: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/4.jpg)
ASSESSMENT
MORE THAN 100 DEFICIENCIESWERE IDENTIFIED
Some of the shortcomings are serious:• Exceeding Floor-Loading Capacity• Potential Mold/Air Quality Problems• ADA/Accessibility Problems• Inefficient/Obsolete HVAC Systems• Highly Inefficient Layout for Staff
![Page 5: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/5.jpg)
ASSESSMENT
PEER ASSESSMENT
TML can offer only an average level of service in a community with exceptionallygood demographics for library use. The existing facility severely limits the abilityof the Library to serve the public with high-quality 21st century services.
![Page 6: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/6.jpg)
ASSESSMENT
PUBLIC INPUT
Input from approximately 1,000 residents:• Focus Groups• Interviews• Surveys• Design Charrette
![Page 7: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/7.jpg)
ASSESSMENT
PUBLIC INPUT
Public wants a Library that is:• Fully accessible to all• Energy efficient• Uses staff resources wisely• Serves as a center of community life• Offers exceptional services to all• Located in the town center
![Page 8: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/8.jpg)
RECOMMENDATION
A building of approximately 22,500 GSF would meet the long-term (20 – 30 year) needs of the Cape Elizabeth Library and of the Cape Elizabeth Historical Preservation Society.
Constructing a facility of this size on the existing site (including necessary parking)would be challenging, but possible.
![Page 9: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/9.jpg)
OPTIONS
Four Options Were Considered
• Do Nothing• Reprogram Existing Space• Addition to Existing Structure(s)• New Facility (Clean Slate)
![Page 10: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/10.jpg)
OPTIONS
Doing Nothing is not an option Deficiencies are serious and wasteful
Reprogramming existing space is a poor option Very expensive with little or no gain in functionality
![Page 11: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/11.jpg)
OPTIONS
Both the addition option and the new facility option were examined in detail.
No fewer than seven scenarios were formulated and critiqued bythe Study Committee.
![Page 12: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/12.jpg)
OPTIONS
One “Addition” scenario and one “Clean Slate” scenario
were explored in greater detail and
cost estimates were developed for each approach.
![Page 13: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/13.jpg)
COSTS
Costs for both approaches werecomparable (in 2009 dollars)
Addition Scenario $ 5 million - $ 7.5 million
Clean Slate Scenario $ 5.1 million - $ 7.8 million
![Page 14: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/14.jpg)
RECOMMENDATION
The pros and cons of both approaches were considered at great length, and the Library Study Committee voted to recommend the Clean Slate approach.
However, the consultants were instructed to retain historical elements of the old Spurwink School, and design elements of the old Pond Cove School.
![Page 15: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/15.jpg)
RECOMMENDATION
Advantages of Clean Slate• Site allows for design creativity• Flexibility to repurpose space• One level eliminates elevators/stairs• Better sightlines & supervision• Lowers operating costs over time• Costs comparable to “addition” approach
![Page 16: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/16.jpg)
RECOMMENDATION
The consultants and architects were directed to develop a
conceptual plan and drawings based on the Clean Slate
approach.
![Page 17: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/17.jpg)
Conceptual Exterior View
![Page 18: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/18.jpg)
![Page 19: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/19.jpg)
Conceptual View – Adult Area
![Page 20: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/20.jpg)
Conceptual View–Children’s Area
![Page 21: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/21.jpg)
FUNDING
FUNDING STRATEGIES• Library is a municipal service• Mix of both public & private funds• Determine the requirements of each• Private funding target unknowable without fundraising “capacity” study
• Need several large leadership gifts• New library will have several exciting
“naming” opportunities
![Page 22: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/22.jpg)
NEXT STEPS
NEXT STEPS
• Development of an initial design andelevation drawings
• Ongoing discussions with communityand potential donors
• Identification of a leadership team• Conduct a fundraising “capacity”
study
![Page 23: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/23.jpg)
Final Report is the culmination of 20-months of work by the Thomas Memorial Library Study Committee . . . But the beginning of the dialogue for a 21st century library for the citizens of Cape Elizabeth.
![Page 24: THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”](https://reader037.vdocuments.us/reader037/viewer/2022110102/5681409c550346895dac4202/html5/thumbnails/24.jpg)
QUESTIONS?