this page left intentionally blank...0 to 1508), a e the potent.1). the succ ould issue a k, and...

76

Upload: others

Post on 25-Jan-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,
Page 2: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

THIS PAGE LEFT INTENTIONALLY BLANK 

 

   

Page 3: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

   

Page 4: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

 

THIS PAGE INTENTIONALLY LEFT BLANK 

Page 5: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

Table of Co

1.0  Int

 1.1

 1.2

 1.3

 1.4

2.0  Pro

 2.1

2.1.1

Pro

Fli

2.1.2

 2.2

 2.3

3.0  Af

 3.1

3.1.1

3.1.2

3.1.3

3.1.4

 3.2

3.2.1

3.2.2

3.2.3

 3.3

3.3.1

3.3.2

 3.4

 3.5

3.5.1

3.5.2

3.5.3

 3.6

3.6.1

3.6.2

3.6.3

onmental Assess

Experimental P

ontents 

troduction .....

Background ..

Role of the FA

Purpose and N

Public Involve

oposed Action

Proposed Acti

DragonFly R

oposed Operat

ght Profile .....

DragonFly L

No Action Alte

Alternatives C

fected Environ

Air Quality ....

National Am

Hazardous 

Stationary S

Greenhous

Noise and Com

Noise Metr

Noise Crite

Compatible

Department o

Public Park

Significant 

Historical, Arc

Fish, Wildlife, 

Vegetation

Wildlife .....

Special‐Stat

Water Quality

Surface Wa

Groundwat

Wetlands ..

ment 

Permit to Spac

......................

.......................

AA ....................

Need ...............

ment ..............

n and Alternati

ion ..................

RLV .................

tions ...............

.......................

Launch Pad ....

ernative ..........

Considered but

nment ............

.......................

mbient Air Qua

Air Pollutants 

Source Permitt

e Gases ..........

mpatible Land 

rics ..................

ria ..................

e Land Use ......

of Transportati

s, Recreation A

Historic Sites ..

chitectural, Arc

and Plants .....

 ......................

.......................

tus Species .....

y ......................

aters (Non‐wet

ter ..................

.......................

ceX for Operati

TABLE

.....................

.......................

.......................

.......................

.......................

ives ...............

.......................

.......................

.......................

.......................

.......................

.......................

t Not Carried Fo

.....................

.......................

ality Standards

.......................

ting .................

.......................

Use ................

.......................

.......................

.......................

on Act, Section

Areas, and Ref

.......................

chaeological, a

.......................

.......................

.......................

.......................

.......................

tlands Surface 

.......................

.......................

ion of the Drag

i

E OF CONTENT

.....................

.......................

.......................

.......................

.......................

.....................

.......................

.......................

.......................

.......................

.......................

.......................

orward ...........

.....................

.......................

s ......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

n 4(f) ..............

uges ...............

.......................

nd Cultural Re

.......................

.......................

.......................

.......................

.......................

Waters) .........

.......................

.......................

gonFly Vehicle 

TS 

.....................

.......................

.......................

.......................

.......................

.....................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.....................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

sources ..........

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

at the McGreg

......................

........................

........................

........................

........................

......................

........................

........................

........................

........................

........................

........................

........................

......................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

gor Test Site, Te

May

......................

.......................

.......................

.......................

.......................

......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

exas  

y 2014 

.... 1‐1 

.... 1‐1 

.... 1‐4 

.... 1‐4 

.... 1‐5 

.... 2‐1 

.... 2‐1 

.... 2‐2 

.... 2‐4 

.... 2‐5 

.... 2‐6 

.... 2‐6 

.... 2‐7 

.... 3‐1 

.... 3‐1 

.... 3‐2 

.... 3‐3 

.... 3‐4 

.... 3‐4 

.... 3‐4 

.... 3‐5 

.... 3‐5 

.... 3‐7 

.. 3‐12 

.. 3‐12 

.. 3‐12 

.. 3‐13 

.. 3‐16 

.. 3‐16 

.. 3‐16 

.. 3‐16 

.. 3‐18 

.. 3‐19 

.. 3‐19 

.. 3‐21 

Page 6: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

Table of Co

3.6.4

 3.7

 3.8

 3.9

 3.10

3.10.

3.10.

3.10.

3.10.

4.0  En

 4.1

4.1.1

4.1.2

 4.2

4.2.1

Co

4.2.2

 4.3

4.3.1

Pu

Sig

4.3.2

 4.4

4.4.1

4.4.2

 4.5

4.5.1

Ve

W

Sp

4.5.2

 4.6

4.6.1

Su

Gr

W

Flo

4.6.2

 4.7

onmental Assess

Experimental P

ontents 

Floodplains

Natural Resou

Hazardous Ma

Light Emission

Socioeconomi

  Populati1

  Income a2

  Environm3

  Children4

nvironmental C

Air Quality ....

Proposed A

No Action A

Noise and Com

Proposed A

ompatible Land

No Action A

Department o

Proposed A

ublic Parks, Rec

gnificant Histor

No Action A

Historical, Arc

Proposed A

No Action A

Fish, Wildlife, 

Proposed A

egetation ........

ildlife .............

pecial‐Status Sp

No Action A

Water Quality

Proposed A

rface Waters (

roundwater ....

etlands ..........

oodplains .......

No Action A

Natural Resou

ment 

Permit to Spac

s ......................

urces and Energ

aterials, Polluti

ns and Visual Im

ics, Environme

on and Housin

and Employme

mental Justice 

’s Environmen

Consequences 

.......................

Action..............

Alternative .....

mpatible Land 

Action..............

d Use ...............

Alternative .....

of Transportati

Action..............

creation Areas,

ric Sites ..........

Alternative .....

chitectural, Arc

Action..............

Alternative .....

and Plants .....

Action..............

.......................

.......................

pecies .............

Alternative .....

y ......................

Action..............

(Non‐wetlands

.......................

.......................

.......................

Alternative .....

urces and Energ

ceX for Operati

.......................

gy Supply .......

ion Prevention

mpacts ............

ental Justice, Ch

ng ....................

ent ..................

.......................

ntal Health Risk

.....................

.......................

.......................

.......................

Use ................

.......................

.......................

.......................

on: Section 4(f

.......................

, and Refuges .

.......................

.......................

chaeological, a

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

s Surface Wate

.......................

.......................

.......................

.......................

gy Supply .......

ion of the Drag

ii

.......................

.......................

n, and Solid Wa

.......................

hildren’s Envir

.......................

.......................

.......................

ks and Safety R

.....................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

f) ....................

.......................

.......................

.......................

.......................

nd Cultural Re

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

rs) ..................

.......................

.......................

.......................

.......................

.......................

gonFly Vehicle 

.......................

.......................

aste ................

.......................

onmental Hea

.......................

.......................

.......................

Risks ................

.....................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

sources ..........

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

at the McGreg

........................

........................

........................

........................

lth Risks and S

........................

........................

........................

........................

......................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

........................

gor Test Site, Te

May

.......................

.......................

.......................

.......................

Safety Risks .....

.......................

.......................

.......................

.......................

......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

exas  

y 2014 

.. 3‐21 

.. 3‐21 

.. 3‐22 

.. 3‐23 

.. 3‐24 

.. 3‐25 

.. 3‐25 

.. 3‐26 

.. 3‐27 

.... 4‐1 

.... 4‐1 

.... 4‐1 

.... 4‐3 

.... 4‐3 

.... 4‐3 

.... 4‐6 

.... 4‐6 

.... 4‐6 

.... 4‐6 

.... 4‐6 

.... 4‐7 

.... 4‐7 

.... 4‐7 

.... 4‐7 

.... 4‐8 

.... 4‐8 

.... 4‐8 

.... 4‐8 

.... 4‐8 

.... 4‐8 

.... 4‐9 

.... 4‐9 

.... 4‐9 

.... 4‐9 

.. 4‐10 

.. 4‐11 

.. 4‐11 

.. 4‐11 

.. 4‐11 

Page 7: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

Table of Co

4.7.1

4.7.2

 4.8

4.8.1

4.8.2

 4.9

4.9.1

4.9.2

 4.10

4.10.

Po

Inc

En

Ch

4.10.

5.0  Cu

 5.1

 5.2

6.0  Lis

7.0  RE

 

Appendix 

Appendix 

onmental Assess

Experimental P

ontents 

Proposed A

No Action A

Hazardous Ma

Proposed A

No Action A

Light Emission

Proposed A

No Action A

Socioeconomi

  Propose1

opulation and H

come and Emp

nvironmental Ju

hildren’s Enviro

  No Actio2

umulative Impa

Air Quality ....

Noise ............

st of Preparers

EFERENCES .....

A – Noise ....

B – Agency C

ment 

Permit to Spac

Action..............

Alternative .....

aterials, Polluti

Action..............

Alternative .....

ns and Visual Im

Action..............

Alternative .....

ics, Environme

d Action .........

Housing ..........

ployment ........

ustice .............

onmental Healt

on Alternative .

acts ...............

.......................

.......................

s and Contribu

......................

.....................

Coordination 

ceX for Operati

.......................

.......................

ion Prevention

.......................

.......................

mpacts ............

.......................

.......................

ental Justice, Ch

.......................

.......................

.......................

.......................

th and Safety R

.......................

.....................

.......................

.......................

tors ...............

.....................

APPEN

.....................

.....................

ion of the Drag

iii

.......................

.......................

n, and Solid Wa

.......................

.......................

.......................

.......................

.......................

hildren’s Envir

.......................

.......................

.......................

.......................

Risks ...............

.......................

.....................

.......................

.......................

.....................

.....................

DICES 

......................

......................

gonFly Vehicle 

.......................

.......................

aste ................

.......................

.......................

.......................

.......................

.......................

onmental Hea

.......................

.......................

.......................

.......................

.......................

.......................

.....................

.......................

.......................

.....................

.....................

.....................

.....................

at the McGreg

........................

........................

........................

........................

........................

........................

........................

........................

lth Risks and S

........................

........................

........................

........................

........................

........................

......................

........................

........................

......................

......................

.....................

.....................

gor Test Site, Te

May

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

Safety Risks .....

.......................

.......................

.......................

.......................

.......................

.......................

......................

.......................

.......................

......................

......................

......................

......................

exas  

y 2014 

.. 4‐11 

.. 4‐12 

.. 4‐12 

.. 4‐12 

.. 4‐12 

.. 4‐13 

.. 4‐13 

.. 4‐13 

.. 4‐13 

.. 4‐14 

.. 4‐14 

.. 4‐14 

.. 4‐15 

.. 4‐15 

.. 4‐15 

.... 5‐1 

.... 5‐1 

.... 5‐2 

.... 6‐1 

.... 7‐1 

.... A‐1 

.... B‐1 

Page 8: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

Table of Contents  iv  May 2014 

LIST OF EXHIBITS 

Exhibit 1‐1. Regional Location of McGregor, Texas ................................................................................... 1‐2 

Exhibit 1‐2. McGregor Test Site ................................................................................................................. 1‐3 

Exhibit 2‐1. Existing Grasshopper Launch Pad and DragonRider Test Area .............................................. 2‐3 

Exhibit 3.2‐1. A‐Weighted Sound Levels from Typical Sources .................................................................. 3‐6 

Exhibit 3.2‐2. Existing Noise Contours ....................................................................................................... 3‐8 

Exhibit 3.2‐3. Existing Zoning Within and Adjacent to the McGregor Test Site ...................................... 3‐10 

Exhibit 3.4‐1. Historic Resources within the Area of Potential Effects .................................................... 3‐15 

Exhibit 3.6.1. Surface Water in the Vicinity of the McGregor Test Site ................................................... 3‐20 

Exhibit 4.2‐1. No Action Alternative and Proposed Action Noise Contours .............................................. 4‐5 

LIST OF TABLES 

Table 2.1‐1. Proposed Annual Operations of the DragonFly RLV .............................................................. 2‐1 

Table 3.1‐1. National Ambient Air Quality Standards ................................................................................ 3‐2 

Table 3.2‐1. Land Use Compatibility with Annual Day‐Night Average Sound Levels (DNL) ..................... 3‐11 

Table 3.3‐1. Section 4(f) Public Parks, Recreation Areas, and Refuges in the Vicinity of the McGregor Test 

Site ........................................................................................................................................................... 3‐12 

Table 3.4‐1. NRHP‐Listed or ‐Eligible Architectural Resources in the APE ............................................... 3‐14 

Table 3.5‐1. Federally and State‐Listed Threatened and Endangered Species Potentially Occurring within 

McLennan and Coryell Counties .............................................................................................................. 3‐17 

Table 3.7‐1. Utilities Suppliers for McGregor Test Site ............................................................................ 3‐21 

Table 3.10‐1. Current Population and Housing Data in the Region of Influence ..................................... 3‐25 

Table 3.10‐2. Income, Poverty, and Employment Data in the Region of Influence, 2007‐2011 ............. 3‐26 

Table  3.10‐3.  Environmental  Justice  Statistics  for  the  Region  of  Influence,  2012  estimate    (%  of 

population) ............................................................................................................................................... 3‐26 

Table 3.10‐4. Schools Near the McGregor Test Site ................................................................................ 3‐27 

Table 4.1‐1. Estimated Construction Emissions for Launch Pad in Tons ................................................... 4‐1 

Table 4.1‐2. Estimated Annual Operation Emissions in Tons per Year (2014 and 2015) .......................... 4‐2 

Table 4.2‐1. Summary of Total Contours Acreage by Scenario (Proposed Action) ................................... 4‐4 

Table 5.1‐1. Comparison of Proposed Action GHG Emissions to U.S. 2011 GHG Emissions1 .................... 5‐2 

Page 9: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

Acronyms and Abbreviations  v  May 2014 

ACRONYMS AND ABBREVIATIONS 

AGL  above ground level APE  Area of Potential Effects AST  Office of Commercial Space Transportation BMPs  Best Management Practices CAA  Clean Air Act CEQ  Council on Environmental Quality CERCLA  Comprehensive Environmental Response,   Compensation, and Liability Act CFR  Code of Federal Regulations CO  carbon monoxide CTYRA  Central Texas Youth Rodeo Association CWA  Clean Water Act dB  decibel dBA  A‐weighted decibels DNL  day‐night average noise level DOT  Department of Transportation EA  Environmental Assessment EO  Executive Order EPA  U.S. Environmental Protection Agency ESA  Endangered Species Act F9R  Falcon 9R FAA  Federal Aviation Administration FEMA  Federal Emergency Management Agency ft  feet ft2  square feet HAPs  Hazardous Air Pollutants ISD  Independent School District GAO  Government Accountability Office GCD  Groundwater Conservation Districts GHG  greenhouse gases kW‐hr  kilowatt‐hour lb  pound lbf  pounds force Lmax  maximum sound level LOX  liquid oxygen MEDC  McGregor Economic Development    Corporation mg/m3  milligrams per cubic meter  µg/m3   micrograms per cubic meter  

MMH  monomethylhydrazine MSATs   Mobile Source Air Toxics NAAQS  National Ambient Air Quality Standards NAVFAC  Naval Facilities Engineering Command NEPA  National Environmental Policy Act NESHAP  National Emission Standards for   Hazardous Air Pollutants NHPA  National Historic Preservation Act NRHP  National Register of Historic Places NSR  New Source Review NTO  nitrogen tetroxide NWI  National Wetlands Inventory  NWIRP  Naval Weapons Industrial Reserve Plant  O3  ozone ppb  parts per billion ppm  parts per million PSD  Prevention of Significant Deterioration RCRA  Resource Conservation and Recovery Act RLV  Reusable Launch Vehicle ROI  Region of Influence RP‐1  refined petroleum SARA  Superfund Amendments and     Reauthorization Act  SEL  Sound Exposure Level SHPO  State Historic Preservation Officer TAC  Texas Administrative Code TCEQ  Texas Commission on Environmental Quality THC  Texas Historical Commission TPDES  Texas Pollutant Discharge    Elimination System TPWD  Texas Parks and Wildlife Department TSD  treatment, storage and disposal U.S.   United States U.S.C.  United States Code USCB  United States Census Bureau USFWS  U.S. Fish and Wildlife Service VOCs  Volatile Organic Compounds  

Page 10: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

Acronyms and Abbreviations  vi  May 2014 

THIS PAGE INTENTIONALLY LEFT BLANK

Page 11: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

1.0 Introdu

1.0 INTRO

Space Exp

the Drago

Coryell Co

experime

Transport

Commerc

Issuing an

under the

FAA  has 

Environm

Parts 150

to evaluat

Section 2

the FAA w

safety,  ris

analyses w

environm

Backg1.1

Since 200

leased are

depicted 

support b

of proper

was the s

surrounde

Areas L a

informatio

experime

the McGr

and  addit

Grasshop

Permit to 

Since obta

launches 

the Grass

onmental Assess

Experimental P

uction 

ODUCTION 

ploration Tech

onFly reusabl

ounties  (Exhi

ntal  permit 

tation  as  des

cial Space Lau

n experiment

e National En

prepared  th

ental  Quality

0 to 1508), a

te the potent

.1). The succ

would  issue a

sk,  and  finan

would be req

ental docume

ground 

03, SpaceX ha

ea has grown

in  Exhibit  1‐

buildings, as w

ty (approxim

site of a Nava

ed by agricult

nd M  to  test

on on SpaceX

ntal permit t

regor test site

tional  suppo

per operation

SpaceX for O

aining the ex

and  landings

hopper RLV t

ment 

Permit to Spac

hnologies Co

e  launch veh

bits 1‐1  and 

from  the  Fe

scribed  in  51

nch Act of 20

tal permit  is 

vironmental 

is  Draft  Envi

y  (CEQ)  NEPA

nd FAA Orde

tial environm

essful compl

an experimen

ncial  responsi

uired for futu

entation. 

as  leased an 

n from appro

‐2,  SpaceX  le

well as stands

ately 9,700 a

al Weapons  I

tural land (Ag

t engines  tha

X’s existing ac

o SpaceX to 

e. To support

rt  infrastruct

ns was analyz

Operation of t

perimental p

s of the Grass

est program 

ceX for Operati

rp. (SpaceX) p

hicle (RLV) at 

1‐2).  To  con

ederal  Aviati

1  United  Sta

011. 

considered a

Policy Act of

ironmental  A

A  implement

r 1050.1E, En

ental impacts

etion of  the 

ntal permit  to

ibility  require

ure SpaceX‐p

engine test s

ximately 250

eases  Areas 

s to conduct 

cres) that wa

ndustrial Res

g 1, Ag 2, and

at are used  in

ctivities at the

conduct subo

t Grasshoppe

ture.  The  ac

zed in the Fin

the Grasshopp

ermit from th

shopper RLV 

was renewed

ion of the Drag

1‐1

proposes to c

the McGrego

nduct  this ex

on  Administ

tes  Code  (U

a major Fede

f 1969, as am

Assessment  (

ting  regulatio

nvironmental 

s of activities 

environment

o SpaceX. Th

ements  per  1

roposed activ

site  in McGre

0 acres  in 200

L  and M,  w

engine testin

as previously 

serve Plant  (N

d Ag 3) as dep

n SpaceX  laun

e McGregor te

orbital  launch

r operations,

tion  of  issui

al Environme

per Vehicle a

he FAA, Space

at the McGr

d by the FAA i

gonFly Vehicle 

conduct subo

or, Texas test

perimental  te

tration  (FAA)

.S.C.)  Subtitl

eral action  su

mended (NEPA

EA)  in  accor

ons  (40  Code

Impacts: Pol

associated w

tal  review pr

he Proposed 

14  CFR  Part 

vities not add

egor, Texas  fr

03 to approxi

which  include

ng. The test s

owned by th

NWIRP)  from

picted in Exh

nch vehicles 

est site). In O

hes and  landi

, SpaceX cons

ng  an  exper

ental Assessm

at the McGreg

eX has condu

regor test site

in September

at the McGreg

orbital launch

t site  located

esting,  Space

)  Office  of  C

e  V,  ch.  509

ubject  to env

A; 42 U.S.C. 4

rdance  with 

e  of  Federal 

licies and Pro

with FAA’s Pro

ocess does n

Action also m

400. Additio

dressed in thi

rom the City 

mately 1,000

s  administra

site is a portio

e United Stat

m 1966  to 199

ibit 1‐2. Curr

(see Section 

October 2012,

ings of the G

structed a co

rimental  perm

ment for Issuin

gor Test Site, 

ucted nine su

e. The experi

r 2013. 

gor Test Site, Te

May

hes and landin

d  in McLenna

eX must obta

Commercial  S

9,  §  50906  o

ironmental  re

4321, et seq.

NEPA,  Counc

Regulations 

ocedures, Cha

oposed Action

not guarantee

must meet al

nal  environm

s EA or in pre

of McGregor

0 acres  in 201

tive,  storage

on of a larger

tes (U.S.) Nav

95. The test s

ently, SpaceX

2.2  for addi

, the FAA issu

rasshopper R

oncrete launc

mit  to  Space

ng an Experim

Texas (FAA 2

ccessful subo

imental perm

exas  

y 2014 

ngs of 

n and 

ain  an 

Space 

of  the 

eview 

). The 

cil  on 

[CFR] 

ange 1 

n (see 

e  that 

ll FAA 

mental 

evious 

r. The 

13. As 

e,  and 

r area 

vy and 

site  is 

X uses 

tional 

ued an 

RLV at 

h pad 

eX  for 

mental 

2011). 

orbital 

mit for 

Page 12: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

1.0 Introdu

onmental Assess

Experimental P

uction 

ment 

Permit to Spac

Exhibit 1

ceX for Operati

1‐1. Regional

ion of the Drag

1‐2

 Location of M

gonFly Vehicle 

McGregor, Te

at the McGreg

exas

gor Test Site, Te

May

exas  

y 2014 

 

Page 13: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

D

1

Draft Environmental 

Issuing an Experim

1.0 Introduction 

Assessment 

ental Permit to SpaaceX for Operation of the DragonFly V

Exhibit 1‐2

Vehicle at the McG

1‐3

2. McGregor Test

Gregor Test Site, Tex

t Site

exas  

May 2014 

 

Page 14: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

1.0 Introdu

In  additio

Grasshop

and  the F

Therefore

do not inc

Role o1.2

The  FAA 

operation

Commerc

U.S.C. Sub

the  safety

during  co

facilitate, 

The FAA h

• P

fo

• En

se

• En

co

th

se

• Fa

in

d

th

The decis

under NE

permittin

Purpo1.3

SpaceX’s 

of the Dra

to  conduc

reused. O

capsule w

onmental Assess

Experimental P

uction 

on,  SpaceX  re

per vehicle. T

F9R  test prog

e, the baselin

clude the Gra

of the FAA 

licenses  and

n  of  non‐Fed

cial Expendab

btitle V, ch. 5

y  of  property

ommercial  la

and promote

has the respo

romote econ

or peaceful pu

ncourage  the

ervices by 

o simplif

o facilita

nsure that th

ommercial  la

hose operatio

ecurity and fo

acilitate  the 

ncluding  the 

evelopment 

he full range o

ion for the FA

PA. The FAA 

g commercia

ose and Need

purpose of re

agonFly RLV t

ct  tests  to  fu

One of SpaceX

would help me

ment 

Permit to Spac

eceived  an  ex

The F9R test 

grams would 

e conditions 

sshopper RLV

d  regulates  U

deral  launch 

ble  Launch Ve

509, §§ 50901

y while  prote

unch  and  re

e commercial

nsibility, und

omic growth

urposes 

e U.S. private

fying and exp

ating and enc

he Secretary o

unch and  ree

ons,  and prot

oreign policy 

strengthenin

enhanceme

of  reentry  sit

of U.S. space‐

AA to issue an

is responsibl

l launch vehic

equesting an 

o execute pre

urther  develo

X’s goals  is to

eet this goal b

ceX for Operati

xperimental 

program con

be complete

(refer to Sect

V and F9R tes

U.S.  commer

and  reentry

ehicle Activiti

1‐50923). The

ecting  the  na

eentry  opera

 space launch

er the Comm

 and entrepr

e  sector  to pr

pediting the is

ouraging the 

of Transporta

entry operati

tects  the pub

interests of th

ng  and  expa

ent  of  U.S. 

tes, with Fed

‐related activ

n experiment

le for analyzi

cles. 

experimenta

ecision landin

op  the  capab

o reduce the 

by eliminating

ion of the Drag

1‐4

permit  for  th

nsists of 10  la

ed prior  to  th

tion 2.2, No A

st program op

cial  space  la

sites,  as  au

ies,  and  the 

e FAA’s missio

ational  secur

tions.  In  add

hes and reent

mercial Space 

reneurial acti

rovide  launch

ssuance and t

use of gover

ation provide

ions,  issue an

blic health  a

he U.S. 

nsion  of  the

launch  sites

deral, State, a

ities. 

tal permit to S

ng the poten

l permit from

ngs on land. S

bility  for  the 

cost of acces

g the costs as

gonFly Vehicle 

he  Falcon  9R

aunches at M

he  implemen

Action Alterna

perations.  

aunch  and  re

uthorized  by 

Commercial 

on is to ensu

ity  and  forei

dition,  the  F

tries.  

Launch Act, t

ivity through 

h vehicles,  re

transfer of co

nment‐devel

es oversight a

nd  transfer co

nd  safety,  sa

e  U.S.  space 

s  and  launc

and private  s

SpaceX is con

ntial environm

m the FAA is f

SpaceX’s need

Dragon  caps

ss to space. B

ssociated with

at the McGreg

R  (F9R), whic

McGregor. The

tation of  the

ative) for the

eentry  activit

Executive  O

Space  Launc

re public hea

gn  policy  int

FAA  is  direct

to do the follo

use of the s

eentry vehicle

ommercial lice

oped space t

and coordinat

ommercial  lic

afety of prop

transportati

ch‐site  suppo

sector  involve

nsidered a ma

mental  impac

for SpaceX to 

d for the expe

sule  to  land, 

Being able to

h building ano

gor Test Site, Te

May

h  is  similar  t

e Grasshoppe

e Proposed A

 analysis in th

ty,  as  well  a

Order  (EO)  1

ch Act of 201

alth and safet

terests  of  the

ted  to  encou

owing:  

pace environ

es, and assoc

enses, and 

echnology 

tes the condu

censes autho

perty,  and na

ion  infrastru

ort  facilities,

ement,  to  su

ajor Federal a

cts associated

test the capa

erimental per

so  that  it  ca

o reuse the D

other capsule

exas  

y 2014 

to  the 

er RLV 

Action. 

his EA 

as  the 

12465, 

11  (51 

ty and 

e U.S. 

urage, 

nment 

ciated 

uct of 

orizing 

tional 

cture, 

,  and 

upport 

action 

d with 

ability 

rmit is 

an  be 

ragon 

e.  

Page 15: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

1.0 Introdu

The  purp

permit is 

Ch. 509, §

consisten

The need 

Congress 

property, 

promote c

space  tra

permit fro

FAA must

Public1.4

In accord

Order 105

review an

environm

the  date 

electronic

http://ww

The FAA  i

to submit

in  prepar

comment

addressed

The follow

the prepa

• Th

• Th

• Th

• Th

onmental Assess

Experimental P

uction 

ose  of  the  F

to fulfill the 

§§ 50901‐509

t with the ob

for the FAA 

under  the  C

and nationa

commercial s

nsportation 

om SpaceX to

t review the a

c Involvemen

ance with NE

50.1E, Environ

nd  comment 

ental  issues 

of  publicatio

c version of th

ww.faa.gov/a

invites  intere

t comments o

ing  a  Final  E

ts be as specif

d in this Draft

wing agencies

aration of this

he State Histo

he Texas Park

he Comanche

he Tonkawa T

ment 

Permit to Spac

AA’s  Propose

FAA responsi

923, for overs

jectives of th

action of issu

Commercial  S

l security and

space launch 

infrastructur

o conduct  lau

application an

nt  

EPA, CEQ NE

nmental Impa

period  for  th

and concerns

on  of  the  No

he Draft EA is

bout/office_o

ested agencie

on all aspects

EA.  To  facilita

fic as possible

t EA. 

s and federal

s EA: 

oric Preservat

ks and Wildlif

e Nation of O

Tribe of Oklah

ceX for Operati

ed Action  in 

bilities under

sight of exper

e Commercia

uing an exper

Space  Launch

d foreign pol

activities by t

e.  The  FAA 

unch operatio

nd determine 

PA  implemen

acts: Policies 

his Draft EA. 

s, preferably 

otice  of  Avai

s available on 

org/headquar

s, organizatio

 of this Draft 

ate  FAA  cons

e and clearly s

ly‐recognized

tion Officer (S

fe Departmen

klahoma 

homa 

ion of the Drag

1‐5

connection w

r the Comme

rimental perm

al Space Laun

imental perm

 Act  to  prot

icy  interest o

the private se

expects  to  r

ons of the Dr

whether to is

nting  regulati

and Procedur

Interested p

in writing, on

ilability  in  th

the FAA web

rters_offices/

ons, Native A

EA. The FAA

sideration  an

state concern

d Native Ame

SHPO) ‐ Texas

nt (TPWD) 

gonFly Vehicle 

with  SpaceX’

ercial Space La

mit activities.

ch Act.  

mit results fro

ect  the  publ

of the U.S. an

ector in order

eceive  an  ap

ragonFly RLV 

ssue the expe

ions  (40 CFR 

res, Change 1

parties are  in

n or before J

he  Federal  Re

bsite: 

/ast/environm

American trib

A will consider

d  response  t

ns or recomm

erican Tribes 

s Historical Co

at the McGreg

’s  request  fo

aunch Act, 51

The Propose

om the statut

ic  health  and

nd to encoura

r to strengthe

pplication  for

at the McGr

erimental per

Parts 1500  t

1, the FAA ha

nvited  to  sub

June 16, 2014

egister,  whic

mental/review

es, and mem

r all commen

to  comments

mendations re

have been co

ommission (T

gor Test Site, Te

May

r  an  experim

1 U.S.C. Subt

ed Action wou

tory direction

d  safety,  safe

age, facilitate

en and expan

r  an  experim

egor test site

rmit. 

to 1508), and

as initiated a p

bmit  commen

4, or 30 days

hever  is  late

w/permits  

mbers of the p

nts on this Dra

s,  it  is  critica

elated to the i

ontacted rega

THC) 

exas  

y 2014 

mental 

itle V, 

uld be 

n from 

ety  of 

e, and 

d U.S. 

mental 

e. The 

d FAA 

public 

nts on 

s from 

er.  An 

public 

aft EA 

l  that 

issues 

arding 

Page 16: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

1.0 Introduction  1‐6  May 2014 

THIS PAGE INTENTIONALLY LEFT BLANK

Page 17: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

2.0 Propos

2.0 PROP

Propo2.1

The Propo

which wo

the  McG

experime

Action an

permit (i.e

Under  th

experime

suborbita

be valid f

experime

SpaceX an

2015). Th

Although 

estimate 

coordinat

conducted

maximum

operation

multiple  l

of 7:00 a.

SpaceX  is

McGregor

onmental Assess

Experimental P

sed Action and

POSED ACTIO

osed Action 

osed Action  (

ould authorize

regor  test  s

ntal permit, S

nalyzed  in  thi

e., the operat

e  FAA  exper

ntal  permits 

l rockets on s

or one year a

ntal  permit  i

nticipates  tha

erefore, the P

an  experime

the  number 

tion with  Spa

d  under  any 

m of 30 annua

n  types  (see 

aunches per 

m. and 10:00

Ta

Operatio

Propulsive As

Full Propulsiv

Propulsive AsHopping 

Full Propulsiv

s  currently  c

r  test site:  th

ment 

Permit to Spac

Alternatives 

N AND ALTER

(preferred alt

e SpaceX to c

ite  in  McGr

SpaceX would

s Draft EA  in

tion of the lau

rimental  per

to  commerc

suborbital tra

and would au

if  requested,

at  the Dragon

Proposed Act

ental  permit 

of  launches

aceX  has  assu

one  experim

al operations 

Table  2.1‐1)

day and pote

0 p.m. 

able 2.1‐1. Pr

on Type 

ssist 

ve Landing 

ssist 

ve Hopping 

onsidering  tw

he existing Gr

ceX for Operati

RNATIVES  

ternative)  is  f

conduct subo

egor,  Texas.

d construct a 

ncludes  the a

unch vehicle)

mit  program

cial  launch  o

jectories. Un

uthorize an u

  in writing,  b

nFly RLV pro

tion considers

would  autho

s  in  order  to

umed  a  certa

mental  perm

are proposed

).  This  estim

ential  launch

oposed Annu

Drop the RLV f10,000 ft, depSuperDraco enseconds 

Drop the RLV f10,000 ft and (no parachute

RLV takes off fparachutes; en

RLV takes off fpropulsive (no25 seconds 

wo  locations

rasshopper  la

ion of the Drag

2‐1

for the FAA t

orbital  launch

  To  support

40 foot (ft) b

activities  that

 as well as th

m  (implement

operators  for 

der the Propo

unlimited num

by  SpaceX  at

gram would 

s one new pe

orize  an  unli

  analyze  pot

ain  number  o

it  for  the  Dr

d in each year

mation  is  a  m

 failures. All 

ual Operation

Descripti

from a helicoploy parachutesngines; engine

from a helicopland only withe); engines wou

from launch pangines would f

from launch pao parachute); e

s  for  the  Dra

aunch pad an

gonFly Vehicle 

to  issue an e

hes and  landi

t  the  Dragon

by 40 ft launc

t would be a

e constructio

ted  by  14  C

the  operatio

osed Action, 

mber of  launc

t  least  60  da

require up  to

rmit and one

mited  numb

tential  enviro

of  annual  lau

ragonFly  RLV

r of operation

maximum  nu

operations w

ns of the Drag

ion 

pter from up tos and land withs would fire fo

pter from up to SuperDraco euld fire for 5 se

ad and lands wfire for 25 seco

ad, hovers, andengines would 

Total Ope

agonFly  RLV 

nd  the Drago

at the McGreg

experimental 

ngs of the Dr

nFly  RLV  act

h pad. Theref

uthorized by

on of the laun

CFR  Part  437

on  of  develo

the experime

ches. The FAA

ays  before  th

o 2 years  to 

e potential pe

ber  of  launch

onmental  im

unch  operati

V  at  the McG

n, distributed

mber  and  co

would occur b

gonFly RLV A

Ope

o h or 5 

o engines econds 

with onds  

d lands fire for 

erations 

launch  oper

onRider  test a

gor Test Site, Te

May

permit to Sp

ragonFly RLV

tivities  unde

fore, the Prop

y  the experim

nch pad.  

7),  the  FAA  i

opmental  reu

ental permit w

A could renew

he  permit  ex

complete  (2

ermit renewal

hes,  the  FAA 

pacts.  The  F

ons  that  cou

Gregor  test  s

d between the

onsiders  pot

between the 

Annual erations 

18 

30 

rations  withi

area.  If opera

exas  

y 2014 

paceX, 

V from 

er  the 

posed 

mental 

issues 

usable 

would 

w the 

xpires. 

014 – 

l.  

must 

AA  in 

uld  be 

ite.  A 

e four 

tential 

hours 

n  the 

ations 

Page 18: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

2.0 Propos

would occ

(see Exhib

depicted 

2.1.1

The Drago

during a D

consists  o

thermal  p

structures

tanks, pre

self‐conta

SuperDra

It  is also d

with fast s

The Drago

base widt

aluminum

The prop

monomet

amount o

discussed

The  Drag

load of a

loads wo

Section 2

test type)

The parac

mortars. 

order to p

parachute

compone

main para

main para

onmental Assess

Experimental P

sed Action and

cur at the Dra

bit 2‐1). The 

in Exhibit 1‐2

DragonFly R

onFly RLV  is t

DragonFly op

of  a  welded 

protection  sy

s including ei

essurant tank

ained  quadra

co engine use

designed to s

shut‐off and l

onFly RLV we

th of 13 ft. Ea

m bracket. Thi

ulsion  system

thylhydrazine

of propellant f

  further  in  S

onFly  RLV  ha

pproximately

uld  be  differ

.1.1.1 for fur

.  

chute  system

A drogue  is a

pull a larger p

e. Each of  th

nts  except  th

achutes fill th

achutes has a

ment 

Permit to Spac

Alternatives 

agonRider tes

proposed op

.  

LV 

the Dragon c

peration) and

aluminum  p

ystem  suppo

ght SuperDra

ks, parachute 

ants  with  ind

es a fuel‐cent

seal off both 

limited prope

eighs approx

ach pair of Su

s bracket is c

m uses a nitr

e  (MMH)  pro

for each type

Section  2.1.1

as  a maximu

y 400 gallons

rent  dependi

rther discussi

m consists of 

a  small parac

parachute. Th

e  two drogue

he main para

he volume be

n area of app

ceX for Operati

st area, const

perating area

capsule with a

 up to four s

pressure  ves

ort  structure,

aco engines (t

system, and 

dependent  s

tered injector

fuel and oxid

ellant “dribble

imately 14,00

uperDraco en

onnected to 

ogen  tetroxid

opellant  comb

e of operation

1.1,  Proposed

um  operation

; however,  th

ng  on  the  te

on on propel

two dual  init

chute  that de

e mortar is a

e parachutes

achutes  are m

etween two r

proximately 1

ion of the Drag

2‐2

ruction of a 4

a would be  co

an  integrated

steel  landing 

sel,  primary 

,  and  a  nos

two in each o

necessary av

sets  of  prop

r to provide a

dizer from th

e” volumes. 

00 pounds  (l

ngines (eight 

the pressure 

de  (NTO) and

bination.  The

n varies and is

d  Operations

nal  propellant

he propellant

est  type  (see

llant  loads by

tiated drogue

eploys  first  in

 low velocity 

 has an area

mounted on 

radial bulkhea

10,935 ft2.  

gonFly Vehicle 

40 ft by 40 ft 

onsidered  th

d trunk (whic

legs. The Dra

heat  shield 

econe.  This 

of the four m

vionics. The p

ellant  tanks 

appropriate p

he combustio

bs) un‐fueled

total engines

vessel with t

s. 

explosive tha

a of approxim

the outside 

ads below th

at the McGreg

launch pad w

e entire McG

ch may or ma

agon capsule 

support  stru

structure  su

odules [quad

propulsion sys

for  system 

erformance f

n chamber, e

d, with a heig

s) are mounte

three mounts

at is fired to r

mately 452 sq

of  the  forwa

e side hatch.

Dragon CapsIntegrated

gor Test Site, Te

May

would be nece

Gregor  test  s

ay not be atta

 primary stru

ucture,  back 

upports  seco

drants]), prop

stem include

redundancy

for the applic

enabling oper

ght of 17  ft 

ed to a mono

s. 

release the d

quare  feet  (ft

ard  bulkhead

 Each of the 

sule with  d Trunk 

exas  

y 2014 

essary 

site as 

ached 

ucture 

shell 

ndary 

pellant 

s four 

y.  The 

ation. 

ration 

and a 

olithic 

rogue 

t2). All 

d.  The 

three 

Page 19: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

D

2

Draft Environmental 

Issuing an Experim

2.0 Proposed Actio

Assessment 

ental Permit to Spa

on and Alternatives

aceX for Operation

Exhibit 2‐1. Exi

 of the DragonFly V

isting Grasshopp

Vehicle at the McG

2‐3

per Launch Pad an

Gregor Test Site, Tex

nd DragonRider T

exas  

Test Area

May 2014 

 

Page 20: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

2.0 Proposed Action and Alternatives  2‐4  May 2014 

Deployment of  the parachutes system begins with both drogue mortars  firing simultaneously  through 

blowout panels (each panel weighs 8 lbs and is approximately 2 ft by 2ft). The panels would then fall to 

the ground within the proposed operating area. 

Proposed Operations 

As discussed above, the DragonFly RLV test program is expected to be conducted under an experimental 

permit and would consist of up to 30 annual operations, distributed between four types of operations 

(see Table 2.1‐1). Multiple  test operations could occur each day between  the hours of 7:00 a.m. and 

10:00 p.m., and would be consistent with SpaceX’s  lease with  the City of McGregor. For example,  the 

terms of the  lease prohibit SpaceX from conducting engine tests between the hours of 12:00 a.m. and 

7:00 a.m. The DragonFly RLV would be unmanned during all launch operations. However, 10 additional 

staff would be located at the McGregor test site to support DragonFly RLV operations. 

Pre‐flight and Post‐flight Activities 

Pre‐flight  and  post‐flight  activities  would  be  similar  for  each  test  type.  Pre‐flight  activities  include 

preparing the DragonFly RLV for launch and providing ground operations support for launch and landing. 

The DragonFly  RLV would  be  transported  by  truck  or  tractor‐trailer  from  its  storage  location  at  the 

McGregor test site to the launch pad. Similarly, trucks would be used to transport the propellants from 

the propellant storage area to the launch pad.  

Standard safety precautions, such as clearing the area of unnecessary personnel and ignition (including 

spark)  sources,  would  be  implemented.  The  DragonFly  RLV  would  be  fueled  with  the  appropriate 

amount of propellant for the proposed test type (see Section 2.1.1.2 – 2.1.1.5 below for a description of 

test types).  In the event of a spill or release, propellant‐loading operations would be halted. Any spills 

would be cleaned up according  to  the SpaceX’s Spill Response Procedures  for  the McGregor  test site. 

Following the propellant transfer, the propellant‐loading equipment would be removed from the launch 

area. 

During preparations for  launch, the electrical and mechanical connections of the DragonFly RLV would 

be  inspected, and  flight  control diagnostics and health  checks would be  completed  to ensure proper 

operation of electrical  systems and moving parts. The DragonFly RLV would  initiate  its  formal  launch 

sequence  (i.e.,  ignition  of  its  propulsion  system)  after  all  preparation  and  pre‐flight  operations were 

completed. 

Post‐flight  activities  include DragonFly RLV  landing  and  safing1. During  a  nominal  launch,  the  vehicle 

would land either back on the launch pad or in a predetermined targeted site within the operating area 

in  the vicinity of  launch pad. Safing activities would begin upon  completion of all  launch and  landing 

                                                            

1 Safing refers to shutting down the launch vehicle and ensuring the vehicle is in a safe condition before transporting the vehicle 

to its storage facility.  

Page 21: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

2.0 Proposed Action and Alternatives  2‐5  May 2014 

activities  and  engine  shutdown.  The  propellant  lines would  be  drained  into  a  suitable  container.  A 

ground  crew would perform and  supervise all pre‐flight,  flight, and  landing operations and would be 

familiar with the operating protocol for the specific test type. 

Flight Profile 

Flight profile refers to the take‐off (or drop), flight, and  landing of the  launch vehicle. The flight profile 

for each operation type is discussed below.  

Propulsive Assist 

For  the  propulsive  assist  test,  a  helicopter  (an  Erickson  E‐model  or  equivalent) would  arrive  at  the 

McGregor  test  site  from Waco  Regional  Airport.  The DragonFly  RLV would  then  be  tethered  to  the 

helicopter using a cable. A maximum of 300 gallons of propellant would be  loaded  into the DragonFly 

RLV for this test. The helicopter would take off with the DragonFly RLV attached and reach an altitude 

up to 10,000 ft. Once at that altitude, the DragonFly RLV would be released from the tether and three 

main  parachutes  would  be  deployed.  The  engines  would  not  fire  until  the  vehicle  descends  to 

approximately 98 ft above ground level (AGL). The engines would fire for approximately 5 seconds, and 

the RLV would make a powered  landing. This  type of operation would  last approximately 30 minutes 

from helicopter take‐off to DragonFly RLV landing.  

The test would be designed so that almost all fuel on board is used prior to landing. All fuel valves would 

shut automatically and retain any residual fuel in the capsule. 

Full Propulsive Landing 

For the full propulsive landing test, a helicopter (an Erickson E‐model or equivalent) would arrive at the 

McGregor  test  site  from Waco  Regional  Airport.  The DragonFly  RLV would  then  be  tethered  to  the 

helicopter. A maximum of 300 gallons of propellant would be  loaded  into  the DragonFly RLV  for  this 

test. The helicopter would take off with the DragonFly RLV attached and reach an altitude up to 10,000 

ft. Once at that altitude, the DragonFly RLV would be released from the tether. There would be a period 

of  free  fall and  then  the engines would  fire  for approximately 5  seconds and  the RLV would make a 

powered  landing. This type of operation would  last approximately 30 minutes from helicopter take‐off 

to DragonFly RLV landing.  

Propulsive Assist Hopping 

Approximately 400 gallons of propellant would be loaded into the DragonFly RLV for this test. During a 

propulsive  assisted  hop  test,  the  DragonFly  RLV  would  launch  from  a  launch  pad  and  ascend  to 

approximately 7,000 ft AGL (firing engines for 12.5 seconds). Two parachutes would be deployed for the 

descent,  the engines would  fire  for 12.5 seconds, and  the RLV would make a powered  landing on  the 

launch pad. This operation would last approximately 60 seconds. 

Page 22: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

2.0 Propos

Full Propu

Approxim

full  prop

approxim

throttle d

RLV woul

seconds. 

2.1.2

In order t

would  co

approxim

proposed

infrastruc

end  of  a

construct

yards) of 

trucks in b

The propo

DragonRid

No Ac2.2

Under  the

operation

the McGr

approxim

an expen

refined  p

approxim

engines, w

occurs on

currently 

conductin

DragonRid

minutes p

NEPA req

effects of

serves as 

not satisfy

onmental Assess

Experimental P

sed Action and

ulsive Hoppin

mately 400 ga

ulsive  hop  t

ately 7,000  f

down in order

d make  a  po

DragonFly La

to support th

nstruct  a  co

ately 0.32 mi

  launch  pad 

cture (i.e., the

n  existing  ac

ing on black 

concrete, wh

batches of 9 c

osed launch p

der test area.

ction Alterna

e No Action 

n of the Drag

regor  test site

ately five Me

dable  launch

petroleum  (R

ately 62,000 

with each M

n the tripod st

uses hypergo

ng hypergolic 

der  test  area

per year.   

uires agencie

f not taking a

a baseline to

y the purpose

ment 

Permit to Spac

Alternatives 

llons of prop

test,  the  Dr

ft AGL  (firing

r to descend 

owered  landi

aunch Pad 

e proposed a

ncrete  launc

ile north of th

location  wa

e tripod test 

ccess  road  a

clay. The  lau

hich would b

cubic yards. C

pad would be

.  

tive 

Alternative,  t

onFly RLV at 

e, which  inclu

erlin‐1D tests 

 vehicle  that

P‐1),  and  liq

gallons of LO

erlin‐1D engi

tand located 

olic propellan

testing in an

a  for  the  Su

es to consider

ction with th

o compare th

e and need fo

ceX for Operati

ellant would 

ragonFly  RLV

g  engines  for 

(firing engine

ng  on  the  la

activities of th

h  pad.  The  p

he Grasshopp

as  based  on

stand) and th

and  would  b

unch pad wo

be  supplied  to

Construction 

e connected 

the  FAA wou

the McGrego

ude engine  t

per week as w

t uses highly 

quid  oxygen 

OX and 38,00

ine producing

at the site (s

nts at the McG

 enclosed vac

uperDraco  en

r a “no action

e effects of t

he  impacts of

or the Propos

ion of the Drag

2‐6

be loaded in

V  would  lau

approximate

es for an add

aunch  pad.  T

he DragonFly 

proposed  lau

per launch pa

the  separati

he control ce

be  built  to  c

uld  require a

o  the McGre

of the launch

to existing in

uld not  issue 

or test site. E

esting  for  the

well as six Fa

refined kero

(LOX)  for  pr

0 gallons of R

g 146,000 po

see Exhibit 2‐

Gregor site, s

cuum chamb

ngine  develo

n” alternative

the action alt

f the Propose

ed Action as s

gonFly Vehicle 

nto the Drago

unch  from  a

ely 12.5  seco

itional appro

his  operation

y RLV under a

unch  pad wo

ad (see Exhib

ion  distance

enter. The pa

comply  with 

approximatel

gor  test  site 

h pad would b

nfrastructure 

an experime

Existing Space

e Falcon 9  la

lcon 9 Stage 

sene, also kn

ropellants.  St

RP‐1. Stage 1

ounds of  thru

1 for general

specifically at

er. Open air t

pments  for 

e in their NEP

ternative(s). T

ed Action. Th

stated above

at the McGreg

onFly RLV for 

a  launch  pad

onds).  The  en

oximate 12. 5 

n would  last 

an experimen

ould  be  40  ft

it 2‐1 for gen

from  SpaceX

ad would be c

Texas  code 

y 24,003 cub

by approxim

be expected t

(i.e., water a

ental permit 

eX activities 

aunch vehicle

1 tests per ye

nown as  rock

tage  1  of  th

1 is powered 

ust. The Falco

l location). Ad

t the Dragon 

testing is also

a  total  of  a

PA analyses an

Thus, the No 

he No Action 

e in Section 1.

gor Test Site, Te

May

this test. Du

d  and  ascen

ngines would

seconds), an

approximate

tal permit, Sp

t  by  40  ft  lo

neral location

X’s  existing 

constructed a

requirement

bic  feet  (889 

mately 99 con

to take 1–2 w

and electric) a

to SpaceX  fo

would contin

e. SpaceX ave

ear. The Falco

ket propellant

he  Falcon  9 

by nine Merl

on 9  stage  te

dditionally, Sp

Decon area, 

o conducted a

pproximately

nd to compar

Action Altern

Alternative w

.2. 

exas  

y 2014 

ring a 

nd  to 

d  then 

nd the 

ely  60 

paceX 

ocated 

). The 

major 

at the 

ts  for 

cubic 

ncrete 

weeks. 

at the 

or  the 

nue at 

erages 

on 9 is 

t‐1 or 

holds 

lin‐1D 

esting 

paceX 

when 

at the 

y  four 

re the 

native 

would 

Page 23: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

2.0 Propos

Altern2.3

In conjun

the  Drago

considera

Sp

Sp

Sp

p

Th

Th

Th

Therefore

alternativ

site.   

onmental Assess

Experimental P

sed Action and

natives Consi

ction with Sp

onFly  RLV.  H

ation:  

paceX’s curre

paceX’s ongo

paceX’s exist

rogram, 

he previously

he general un

he general “u

e,  there  are 

ve is to condu

ment 

Permit to Spac

Alternatives 

idered but No

paceX, the FA

However,  due

ent operation

ing engine te

ing  launch pa

y disturbed en

ninhabited or

uncrowded” a

no  other  re

uct suborbital

ceX for Operati

ot Carried Fo

AA considered

e  to  the  foll

al McGregor 

esting at McG

ad and  infrast

nvironment o

r sparse popu

airspace over 

easonable  alt

 launches an

 

ion of the Drag

2‐7

rward 

d assessing a

owing  reaso

test site and 

regor test sit

tructure that

of the McGreg

lation surrou

the McGrego

ternatives  to

d landings of

gonFly Vehicle 

alternative sit

ons,  alternati

lease with th

e,  

t are available

gor test site,

unding the Mc

or test site. 

o  be  evaluat

f the DragonF

at the McGreg

tes to conduc

ve  sites  wer

he City of McG

e to support 

cGregor test s

ted  in  this  E

Fly RLV from 

gor Test Site, Te

May

ct test  launch

re  dismissed 

Gregor, 

the propose

site, and 

EA.  The  pref

the McGrego

exas  

y 2014 

hes of 

from 

d test 

ferred 

or test 

Page 24: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

2.0 Proposed Action and Alternatives  2‐8  May 2014 

 

THIS PAGE INTENTIONALLY LEFT BLANK 

Page 25: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

3.0 AFFEC

This  Chap

Proposed

The level 

resources

The envir

(ROI). Eac

section.   

Resource

This EA d

the reaso

Air Qu3.1

The Earth

ionospher

defined a

onmental Assess

Experimental P

ed Environmen

CTED ENVIRO

pter  provides

 Action, as re

of detail prov

s (40 CFR §150

ronment pote

ch resource a

s Not Analyze

oes not analy

ns explained 

Coastal Re

coastal res

Wild and 

Wild and S

operationa

the Saline 

Scenic Rive

Nationwid

in  Hood  C

approxima

Farmlands

importanc

project.  P

McGregor 

urban use

Policy Act 

Secondary

induced  o

movement

personnel 

response  t

dismissed.

uality 

h’s atmosphe

re. For  the p

s at or below

ment 

Permit to Spac

nt 

ONMENT 

s  a  descriptio

equired by C

vided in this C

02.15).  

entially affect

rea discussed

ed in Detail 

yze potential 

below: 

esources – Pr

sources are n

Scenic Rivers

Scenic Rivers

al activities w

Bayou in Lou

er System 20

e Rivers Inve

County  and 

ately 64 miles

s  –  There  are

ce as defined 

revious  coor

test  site  ind

s, and are no

(FAA 2011). 

y  (Induced)  I

or  secondary 

t and growth

would  not  p

to  the direct

.  

re consists o

urposes of  th

w 3,000 ft AG

ceX for Operati

on  of  the  en

EQ regulation

Chapter is com

ted by the Pr

d in this chap

impacts to t

roposed cons

ot present. 

s – There are

s Act,  located

would occur. T

uisiana, over 3

13). Similarly

ntory (NRI) w

the  Brazos 

s north and 62

e  no  prime  o

by the Farml

rdination  wit

dicated  that  s

ot prime or u

mpacts  –  Th

impacts  to  s

, public servic

produce  a m

t effect  (refer

of  four main  l

his EA,  the d

GL, which the

ion of the Drag

3‐1

nvironmental 

ns  for  implem

mmensurate 

roposed Actio

pter has a dist

he following 

struction and

e no designat

d within  the M

The closest fe

300 miles from

y, there are no

within or near

River  on  the

2 miles west 

or  unique  fa

land Protecti

h  the  Natura

soils at  the M

unique farmla

e Proposed A

surrounding 

ce demands, 

easurable  rip

r  to  Section 

layers:  the  tr

discussion of 

 U.S. Environ

gonFly Vehicle 

resources  t

menting NEPA

with the imp

on  is referred

tinct ROI, wh

environment

d operating a

ted wild or s

McGregor  tes

ederally desig

m the McGre

o rivers listed

r the McGreg

e  western  ed

of the McGre

rmlands  or  f

on Policy Act

al  Resources

McGregor  tes

ands as defin

Action would

communities

and econom

pple  effect  o

4.10).  Theref

roposphere, s

air quality w

nmental Prote

at the McGreg

hat  would  b

A  (40 CFR Pa

portance of th

d to as the R

ich is further

tal resource 

reas are  loca

scenic  rivers, 

st site where

gnated Wild a

egor test site (

d on the Natio

gor test site. T

dge  of  Lamp

egor Test site,

farmland  of  s

t that would 

s  Conservatio

st  site are “p

ed by the Fa

d not  involve

s,  such  as  sh

ic activity. Th

of  spending  a

fore,  this  imp

stratosphere,

within  the  low

ection Agenc

gor Test Site, Te

May

e  affected  b

rts 1500 to 1

he impact on 

Region of  Influ

r described in

areas  in deta

ated  inland, w

as defined b

e constructio

and Scenic Ri

(National Wil

onal Park Ser

The Colorado

pasas  County

, respectively

statewide  or

be affected b

on  Service  fo

rior converte

rmland Prote

e  the potenti

hifts  in  popu

he influx of 10

and  re‐spend

pact  category

, mesosphere

wer  troposph

cy (EPA) accep

exas  

y 2014 

by  the 

1508). 

these 

uence 

n each 

ail, for 

where 

by  the 

n and 

iver is 

d and 

rvices’ 

 River 

y,  are 

y. 

r  local 

by the 

or  the 

ed”  to 

ection 

ial  for 

lation 

0 new 

ing  in 

y was 

e, and 

ere  is 

pts as 

Page 26: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

the nomin

level amb

from ope

ground‐le

of air dire

the mixin

mesosphe

the Drago

decrease 

temperat

from spon

The propo

two count

(refer to E

3.1.1

Under the

Part  50) 

represent

safety, to

establishe

annual  av

Commissi

are prese

CP

Carbon m

Lead 

Nitrogen 

PM10 

PM2.5 

Ozone 

Sulfur dio

Source: (EPANotes: mg/m

partsparti

EPA desig

attainmen

through F

onmental Assess

Experimental P

ed Environmen

nal height of

bient air qual

rations at or 

evel concentra

ectly above th

g height, abo

ere, and  iono

onfly  is 10,00

with altitude

ure begins  to

ntaneously ris

osed operatio

ties, McLenna

Exhibit 2‐1). 

National Am

e Clean Air A

for  specific  p

t the maximu

 protect pub

ed for polluta

verages)  are

on on Enviro

nted in Table

Criteria Pollutant 

monoxide 

dioxide 

oxide 

A 2012) m3 = milligrams per million; Piculate matter 

gnates areas 

nt for any NA

Federal, State

ment 

Permit to Spac

nt 

f  the atmosph

ity under  the

above 3,000 

ations. The m

he Earth that

ove which the

osphere are n

00  ft AGL, wh

e  in  the atmo

o  increase w

sing past the 

on of the Dra

an and Corye

mbient Air Qu

Act, the EPA e

pollutants  of 

um levels of p

lic health and

ants contribut

  established 

nmental Qua

e 3.1‐1. 

Table 3.1‐1

Ave

Rolling 3

(arithm

(arithm

s per cubic mePM10 = particul2.5 microns or

having air qu

AAQS  is based

e and/or loca

ceX for Operati

here mixing  l

e Clean Air A

ft AGL would

mixing layer (s

 is relatively 

e free tropos

not relevant  f

hich  lies with

osphere up to

ith altitude a

mixing heigh

agon RLV wou

ell. Therefore,

uality Standar

established N

concern, wh

pollution that

d welfare. Sh

ting to acute 

for  pollutan

ality (TCEQ), O

1. National Am

eraging Time 

8‐hour1‐hour

3‐month averaAnnualmetic average)1‐hour24‐hourAnnualmetic average)24‐hour8‐hour3‐hour1‐hour

eter; µg/m3 = mate matter lessr less in diame

uality within t

d on the eva

l monitoring 

ion of the Drag

3‐2

layer  in asses

Act  (CAA)  (EPA

d occur, thes

sometimes re

well mixed. T

sphere extend

for this analy

hin  the  tropo

o the mixing 

and  creates a

t (Visconti 20

uld occur in M

, the ROI for a

rds 

National Ambi

hich  are  refe

 are consider

hort‐term sta

health effect

nts  contribut

Office of Air, 

mbient Air Q

Prim

9 ppm35 pp

ge 0

)

1

) 1

0

micrograms pers than or equater

the NAAQS a

luation of am

networks.  Th

gonFly Vehicle 

ssing contrib

A 1992). Alth

e emissions w

eferred to as t

This layer ext

ds up to the 

ysis because t

sphere. Typic

height. How

an  inversion 

001). 

McGregor, Te

air quality is 

ient Air Qual

erred  to  as  c

red acceptab

ndards (1‐, 3

ts, while long

ting  to  chro

adopted the 

Quality Standa

ary Standards

m (10 mg/m3)pm (40 mg/m3)0.15 µg/m3

53 ppb 

100 ppb150 µg/m3

12.0 µg/m3 

35 µg/m3

0.075 ppmNone75 ppb

r cubic meter; al to 10 micron

s being  in “a

mbient air qu

here are two

at the McGreg

utions of em

hough  launch

would not re

the boundary

tends to a he

tropopause. 

the maximum

cally,  temper

ever, at the 

which preve

exas which is 

McLennan an

ity Standards

criteria  pollut

le, with an ad

3‐, 8‐, and 24

g‐term standa

nic  health  e

EPA‐establish

ards 

  Secon

)Sam

Sam

Sam

1

SamSam

ppb = parts pes in diameter; 

ttainment.” T

ality monitor

o TCEQ monit

gor Test Site, Te

May

missions  to gro

 vehicle emis

sult in appre

y layer) is the

eight referred

The stratosp

m  flight altitu

rature and de

mixing heigh

nts a parcel 

located in pa

nd Coryell cou

s (NAAQS) (4

tants.  The  N

dequate mar

‐hour period

ards (quarterl

effects.  The 

hed NAAQS, w

ndary Standard

None 

me as Primary

me as Primary

None me as Primary

15.0 µg/m3 

me as Primaryme as Primary0.5 ppmNone 

er billion; ppm PM2.5 = fine 

The designati

ring data coll

oring sites lo

exas  

y 2014 

ound‐

ssions 

ciable 

e layer 

 to as 

phere, 

ude of 

ensity 

t, the 

of air 

arts of 

unties 

0 CFR 

AAQS 

gin of 

s) are 

ly and 

Texas 

which 

ds 

ion of 

lected 

ocated 

Page 27: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

in McLen

collects m

Texas.  Th

temperat

for all reg

above  th

exceedan

are  in att

apply and

Stationary

fueling, a

include su

test  site o

operation

equipmen

more than

air quality

TCEQ crit

250 tons 

tons per y

3.1.2

In additio

Hazardou

control te

HAPs emi

emitted fr

other  ser

Rule, whic

of  these 

benzene, 

a second 

first rule a

The rule a

2007). 

MSATs wo

equipmen

emission 

produce n

onmental Assess

Experimental P

ed Environmen

nan County  i

meteorologica

his  site  colle

ure, wind, an

gulated criter

e  old  24‐hou

ce that woul

tainment  for 

d is not addre

y point  sourc

nd other poin

upport equipm

operates und

n  of  five  rock

nt at the McG

n a de minim

y permit, are

eria  including

per year of C

year of PM10, 

Hazardous A

on to the amb

s Air Pollutan

echnologies (4

tted from mo

rom highway

ious health a

ch identified 

MSATs  comp

1,3 butadien

Mobile Sourc

and provided

also identified

ould be the p

nt used durin

controls. Con

negligible am

ment 

Permit to Spac

nt 

n the Waco a

al data only. T

ects  data  on 

nd solar radia

ia pollutants.

ur  NAAQS  o

d require des

NAAQS,  the 

ssed in this EA

ces of air em

nt sources su

ment, comme

der  a  TCEQ  a

ket  engine  te

Gregor test si

is level of em

e not major  s

g emissions  l

CO or nitroge

and 10 tons p

Air Pollutants

bient air qual

nts (HAPs). Th

40 CFR Parts 6

obile sources

vehicles and

and environm

21 compoun

pounds were 

e, formaldeh

ce Air Toxics 

additional re

d several eng

primary HAPs

ng  constructio

nstruction eq

mbient HAPs  i

ceX for Operati

area.   One  is 

The second sit

carbon  mo

ation (TCEQ 2

. Although th

f  15  µg/m3

signation as n

CAA General

A. 

missions at  the

uch as genera

ercial transpo

air quality pe

est  stands,  fi

te. It is a Per

missions but d

sources as de

imits. To mee

en oxides, 25 

per year of PM

lity standards

he National E

61 and 63). T

s are called M

 non‐road eq

mental effects

ds as being H

identified  as

yde, acrolein

Rule in Febru

ecommendati

gine emission

s emitted by 

on of  the  lau

uipment wou

n a  localized

ion of the Drag

3‐3

located at th

te (CAMS 103

noxide,  nitro

2013). McLen

here have bee

for  PM2.5,  th

nonattainmen

l Conformity 

e McGregor 

ators and sto

ort vehicles, a

rmit  (TCEQ 2

ive  new  fuel

mit by Rule, 

o not require

efined by  the

et these  limit

tons per yea

M2.5. 

s for criteria 

mission Stan

he majority o

Mobile Source

uipment that

s.  In 2001, E

HAPs that req

s having  the 

, acetaldehyd

uary 2007, wh

ions of compo

n certification

mobile sourc

unch pad wo

uld be operat

 area. Opera

gonFly Vehicle 

he Waco Reg

37) is located 

ogen  oxides, 

nnan and Cor

en instances 

he  area  has 

nt. Because M

Rule  (40 CFR

test  site  incl

rage tanks. M

and personal

2007).  This p

  storage  tan

which TCEQ 

e a standard (

e U.S. Clean A

ts the facility

ar of SO2 or v

pollutants, n

dards regulat

of HAPs are vo

e Air Toxics (M

t are known o

PA  issued  its

quired regulat

greatest  infl

de, and diese

hich generall

ounds having

n standards th

ces during co

ould  likely  va

ted for appro

ational equipm

at the McGreg

gional Airport

 on Mazanec 

ozone,  PM2

ryell counties

of exceedanc

not  establis

McLennan an

R Part 93, Su

ude  launch v

Mobile source

 motor vehic

permit  covers

nks,  and  asso

issues to faci

(i.e., New Sou

Air Act, and 

y’s emissions 

volatile organ

ational stand

te 188 HAPs 

olatile organi

MSATs). MSA

or suspected 

s  first Mobile

tion (EPA 200

luence on he

l particulate m

y supported 

g the greatest

hat must be i

nstruction an

ry  in  age  and

ximately two

ment,  includi

gor Test Site, Te

May

t (CAMS 5010

Road in Elm 

2.5,  sulfur  dio

 are  in attain

ce (at CAMS 

shed  a  patte

d Coryell Cou

ubpart B) doe

vehicle proce

es of air emis

les. The McG

s  construction

ociated  piping

lities that pro

urce Review) 

that meet  se

must be  less

nic compound

dards also exi

based on ava

c compounds

Ts are compo

to cause can

e Source Air T

01). A subset 

ealth  and  inc

matter. EPA i

the findings 

t impact on h

implemented

nd operations

d have  a  ran

o weeks and w

ing vehicles d

exas  

y 2014 

0) and 

Mott, 

oxide, 

nment 

1037) 

ern  of 

unties 

es not 

essing, 

ssions 

Gregor 

n  and 

g  and 

oduce 

TCEQ 

everal 

s than 

ds, 15 

ist for 

ailable 

s. 

ounds 

cer or 

Toxics 

of six 

cluded 

ssued 

in the 

ealth. 

d (EPA 

s. The 

nge of 

would 

driven 

Page 28: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

by commu

also prod

analysis. 

3.1.3

There are

the air qu

3.1.4

Greenhou

from natu

temperat

climate ch

conseque

Although 

GHGs and

Additiona

change an

Research 

of  U.S.  c

contribute

other  ind

generatio

emissions

(Melrose 

the affect

associated

in Section

SpaceX  cu

testing in 

for the Su

2.2 for ad

Noise3.2

Noise  is 

activities.

response 

and  is  inf

setting, ti

onmental Assess

Experimental P

ed Environmen

uters, is antic

uce negligibl

Stationary S

e no stationar

ality regulatio

Greenhouse

use Gases  (GH

ural processe

ure  over  the

hange associa

ences across t

not required

d climate und

ally, in Februa

nd GHG emiss

has shown th

ontributions,

es about 3 pe

ustrial  source

on  (41 percen

s  from  aircra

2010). Clima

ted environm

d with the Pr

n 5.0. 

urrently uses

an enclosed 

uperDraco en

ditional infor

e and Compat

considered  u

  Although  ex

to noise  is a

fluenced by  t

me of day, ty

ment 

Permit to Spac

nt 

cipated to be 

e ambient H

ource Permit

ry sources ass

ons for statio

e Gases 

HGs) are gas 

es and human

e past  centur

ated with this

the globe.  

d by FAA Ord

der NEPA, as 

ary 2010, the 

sions (CEQ 20

here is a dire

  the  Govern

ercent of tot

es  including  t

nt)  (GAO 200

aft  account  f

ate change re

ment is the glo

oposed Actio

s hypergolic p

vacuum cham

gine develop

rmation on Sp

tible Land Us

unwanted  or

xposure  to  v

nnoyance. Th

the  type of n

ype of activity

ceX for Operati

primarily new

APs. Therefo

tting 

sociated with

onary sources

emissions th

n activities. S

y due  to  an 

s global warm

er 1050.1E, t

documented

CEQ issued d

010).  

ct correlation

nment  Accou

al carbon dio

the  remainde

9). The  Inter

or  roughly  3

esulting  from 

obal climate (

on and the im

propellants  a

mber. Open a

ments for a t

paceX’s existi

e  

r  annoying  s

very  high  noi

he response o

noise, perceiv

y during which

ion of the Drag

3‐4

wer equipme

ore, MSATs e

h implementin

 apply. 

hat trap heat

Scientific evid

increase  in G

ming is expect

the FAA has d

  in a memor

raft NEPA gu

n between fu

ntability  Offi

oxide emissio

er of  the  tra

national Civil

3  percent  of 

GHG emissio

(EPA 2009a). 

mpact analysis

at  the Dragon

air testing is a

total of appro

ng activities a

sound  that  in

ise  levels  can

of different  i

ved  importan

h the noise oc

gonFly Vehicle 

nt that gener

missions are 

ng the Propos

t  in the atmo

dence  indicat

GHG  emissio

ed to produc

developed  in

andum dated

idance for co

el combustio

ice  (GAO)  re

ons, according

nsportation  s

l Aviation Or

all  anthropo

ons  is a cumu

Discussion o

s can be foun

n Decon  area

also conducte

oximately fou

at the McGre

nterferes  wit

n  cause  hear

ndividuals to

nce of  the no

ccurs, and se

at the McGreg

rate lower em

not conside

sed Action.  T

osphere. Thes

tes a  trend of

ons  from hum

ce negative ec

terim guidan

d January 12,

onsidering the

on and GHG e

eports  that  "

g to EPA data

sector  (20 pe

ganization es

ogenic  GHG 

ulative globa

f the estimat

d in cumulati

a, when  cond

ed at the Dra

r minutes pe

egor test site)

th  or  disrup

ring  loss,  the

o similar noise

oise,  its appr

nsitivity of th

gor Test Site, Te

May

missions and w

red  further  i

Therefore, no

se emissions 

f  increasing g

man  activities

conomic and 

nce for consid

, 2012 (FAA 2

e effects of cl

emissions. In t

"domestic  av

a," compared

ercent) and p

stimates  that

emissions  glo

l phenomeno

ted GHG emis

ive impact an

ducting hype

gonRider test

r year (see Se

ts  normal  h

e  principal  h

e events  is di

opriateness  i

he individual.

exas  

y 2014 

would 

n  this 

one of 

occur 

global 

s.  The 

social 

dering 

2012). 

imate 

terms 

viation 

d with 

power 

t GHG 

obally 

on, so 

ssions 

nalysis 

ergolic 

t area 

ection 

uman 

uman 

iverse 

in  the 

Page 29: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

The ROI f

that  could

Action.  

3.2.1

The decib

launch) to

sound, as

the period

to correla

several  n

measure 

equally w

to  low‐pit

Exhibit 3.2

(e.g., air c

some per

during an

taken ove

The  day‐n

Exposure 

period. SE

represent

a 24‐hour

penalty is

3.2.2

FAA Orde

the DNL m

 

                  

2 A noise s

noise  sens

recreation

sites. 

3 There are

the Nation

Activities c

onmental Assess

Experimental P

ed Environmen

or noise inclu

d be  impacte

Noise Metric

bel  (dB)  is a 

o a reference

s the human e

d of exposure

ate the frequ

noise  frequen

is  the  ‘A‐we

well, these me

tched  and  hi

2‐1 provides 

conditioner, v

riod of time. 

 event like a 

er extended p

night  average

Level (SEL), w

EL provides a

t the sound le

r annual ave

 applied to D

Noise Criteri

er 1050.1E, Ch

metric to dete

                       

sensitive area i

sitive  areas  in

al  areas  (inclu

e other Federa

nal Institute for

conducted und

ment 

Permit to Spac

nt 

udes the McG

ed by noise  f

cs 

ratio  that  co

e pressure (i.e

ear perceives

e to the noise

ency charact

ncy  weighting

eighted  scale

easures are a

igh‐pitched  s

a chart of A‐w

vacuum clean

Other source

vehicle pass‐

periods of tim

e  noise  leve

which is the m

a cumulative 

evel heard at 

rage day. To 

NL for nightti

ia 

hange 1, requ

ermine if sign

                   

is an area whe

nclude  residen

uding  areas wi

al agency noise

r Occupational

der the Propose

ceX for Operati

Gregor test si

from  constru

mpares  the  s

e., the quiete

s it. These inc

e, and change

eristics  from 

g  measures 

.’  Since  the 

djusted or w

sounds.  This 

weighted sou

ner) are cont

es (e.g., autom

by. Other sou

e. 

l  (DNL)  is  a 

magnitude of 

noise exposu

any given tim

account  for 

ime events (1

uires the FAA

ificant impac

ere noise inter

ntial,  educatio

ith wilderness

e standards th

l Safety and He

ed Action wou

ion of the Drag

3‐5

te and the ar

uction  and  lau

sound pressu

est sound tha

clude the act

s or fluctuati

typical noise

have  been 

human  ear  c

eighted to co

adjusted  uni

und levels from

tinuous sound

mobile, heav

unds (e.g., ur

cumulative 

a sound and 

ure of the en

me. Typically,

increased hu

10:00 p.m. to 

A to assess no

ts would occu

rferes with nor

onal,  health,  a

s  characteristic

hat pertain to 

ealth and the O

ld be in compl

gonFly Vehicle 

rea in the imm

unch‐related 

ure of  the  so

at can be hea

ual level of n

ons in noise l

e sources to 

developed.  T

cannot  perce

ompensate fo

t  is  known  a

m typical noi

ds that maint

vy truck) are t

ban daytime,

noise metric

its duration, 

ntire acoustic 

, DNL values 

uman  sensiti

7:00 a.m.).  

oise  impacts 

ur3.  

rmal activities 

and  religious 

cs), wildlife  re

hearing conse

Occupational S

iance with the

at the McGreg

mediate vicin

activities un

ound  source 

rd). A numbe

noise, the freq

levels during 

the perceptio

The  most  co

eive  all  pitch

or the human

as  the A‐weig

se sources. S

tain a consta

the maximum

, urban nightt

c  that  accoun

of all noise e

event, but  it

are expresse

vity  to noise

on noise sen

associated wit

structures  an

efuges,  and  cu

rvation (e.g., t

Safety and Hea

ese standards. 

gor Test Site, Te

May

nity of the tes

nder  the Prop

of  interest  (e

er of factors 

quencies invo

exposure. In 

on of human

ommon  frequ

hes  or  freque

n lack of sens

ghted  dB,  or

ome noise so

ant sound  lev

m sound prod

time) are ave

nts  for  the  S

events in a 24

t does not di

d as the leve

 at night, a 1

nsitive areas2

th its use. Nor

nd  sites,  and 

ultural  and  his

those establish

alth Administra

exas  

y 2014 

st site 

posed 

e.g., a 

affect 

olved, 

order 

 ears, 

uency 

encies 

sitivity 

r  dBA. 

ources 

vel for 

duced 

erages 

Sound 

4‐hour 

rectly 

l over 

10 dB 

using 

rmally, 

parks, 

torical 

hed by 

ation). 

Page 30: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

  Source  Note: d   

 

Noise  con

communit

computer

impact wo

1.5 dBA o

same time

The McG

residentia

located a

to the no

Other  no

rural/agri

waste ma

onmental Assess

Experimental P

ed Environmen

es: Derived from dBA = A‐weighte

E

ntour maps 

ty. Noise con

r model.  FAA

ould occur if 

or more at D

e period.  

regor  test  si

al  communiti

pproximately

orthwest. The

oise  sources 

cultural setti

nagement tru

ment 

Permit to Spac

nt 

Harris 1979 anded decibel 

Exhibit 3.2‐1. 

of  noise met

ntours depict 

A Order  1050

the action ca

NL 65 dBA n

ite  is  a  relat

es  to  the pro

y 5 miles to th

e McGregor t

at  or  near 

ng,  including 

ucks).  

ceX for Operati

d Federal Interag

A‐Weighted 

trics  are  use

the area wit

0.1E,  Change 

auses noise s

oise exposur

tively  isolated

oposed  launc

he northeast,

est site  is  loc

the  McGre

farm machin

ion of the Drag

3‐6

gency Committe

Sound Levels

ed  to  assess 

hin which a c

1,  guidance 

ensitive area

re when com

d  facility,  sur

ch and  landin

, and the City

cated  in a sm

egor  test  sit

nery, automo

gonFly Vehicle 

ee on Aviation N

s from Typica

the  noise  le

certain noise 

on  noise  ind

as to experien

pared  to  the

rrounded  by 

ng pad  locati

y of Oglesby,

mall  industrial

te  include  so

obiles, trains, 

at the McGreg

oise (FICAN) 199

al Sources 

evel  and  imp

level occurs,

dicates  that 

nce an increa

e existing con

agricultural 

ions are  the 

 located app

l park  in the 

ources  that 

and comme

gor Test Site, Te

May

 

97. 

act  of  noise 

, as predicted

a  significant 

ase in noise o

nditions withi

land.  The  c

City of McGr

roximately 3 

City of McGr

are  typical 

rcial vehicles

exas  

y 2014 

on  a 

d by a 

noise 

of DNL 

in  the 

losest 

regor, 

miles 

regor. 

to  a 

 (e.g., 

Page 31: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

Noise  sen

located ap

miles  to 

adjacent 

Powder C

The neare

SpaceX  cu

site.  An  a

approxim

test  site. 

simultane

periods o

test site.  

Based on 

noise con

City of M

McGregor

3.2.3

Land uses

local  zon

developm

designate

compatib

SpaceX ha

operation

engine te

the test si

 

onmental Assess

Experimental P

ed Environmen

nsitive  areas 

pproximately

the  northeas

to McGrego

Company, loca

est residence 

urrently  cond

average  sing

ately 138 dB

SpaceX  also

eously  for up

f time to app

the existing 

ntour extends

cGregor and 

r test site. 

Compatible 

s  are  frequen

ing  and  ord

ment  can  oc

ed or environm

le with the ou

as leased the 

ns on the site 

sting; the Gra

ite is also leas

ment 

Permit to Spac

nt 

near  the  pr

y 3.4 miles to 

st.  In  additio

r  Elementary

ated approxim

is approxima

ducts approx

gle  engine  te

A within  the 

o  conducts  si

p  to  180  seco

proximately 1

engine test n

s approximate

Oglesby (see

Land Use 

ntly  regulated

inances.  The

cur,  ensure 

mentally sens

utdoor noise 

McGregor te

include adm

asshopper RL

sed for livesto

ceX for Operati

roposed  laun

the northwes

on,  a  new  pr

y  and McGre

mately 2.8 mi

ately 1.3 miles

imately  five 

est  lasts  app

test site bou

ix  Falcon  9  S

onds.  These  i

148 dBA at th

noise  levels a

ely four miles

e Exhibit 3.2‐2

d by manage

ese  plans  an

consistency 

sitive uses. Co

environment

est site from t

inistrative se

LV launch pad

ock grazing, w

ion of the Drag

3‐7

nch  and  land

st, and McGre

imary  schoo

egor  High  Sch

iles from the 

s from the pr

Merlin‐1D en

roximately  1

undary and a

Stage  1  tests

infrequent  St

he test site an

and durations

s from the te

2). The exhib

ement plans, 

nd  regulation

with  surro

ompatible lan

t at the locati

the McGrego

rvices, storag

d; and Falcon

which is coord

gonFly Vehicle 

ding  pad  loca

egor High Sch

l  (grades  K‐1

hool.  The  clo

proposed lau

roposed launc

ngine  tests p

100  seconds 

approximately

s  a  year,  co

tage  1  tests 

nd approxima

s described a

est site and  in

bit represents

land use pla

ns  are  design

ounding  land

nd use means

on. 

or Industrial P

ge, and suppo

n 9 tripod test

dinated with 

at the McGreg

ations  includ

hool, located 

1st  grade)  is 

osest  busines

unch and land

ch and landin

per week at  t

and  produce

y 97 dBA wit

nsisting  of  n

increase nois

ately 107 dBA

above, the ex

ncludes resid

s the existing

ans,  compreh

ned  to  iden

d  uses,  and 

s the use of th

Park since 200

ort buildings; 

t stand. The v

launch and te

gor Test Site, Te

May

e  Oglesby  Sc

approximate

being  constr

ss  is  the  Cro

ding pad loca

ng pad locatio

the McGrego

es  noise  leve

thin 3 miles o

nine  engines 

se  levels  for 

A 3 miles from

xisting DNL 65

ential areas 

g noise  level o

hensive plans

tify  where  f

protect  spe

he land is nor

03. Current Sp

stands to co

vacant land w

esting activiti

exas  

y 2014 

chool, 

ely 4.5 

ructed 

osslink 

ations. 

ons. 

or  test 

els  of 

of  the 

firing 

short 

m the 

5 dBA 

in the 

of the 

s,  and 

future 

ecially 

rmally 

paceX 

nduct 

within 

es.  

Page 32: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

D

3

Draft Environmental 

Issuing an Experim

3.0 Affected Enviro

Assessment 

ental Permit to Spa

onment 

aceX for Operation of the DragonFly V

Exhibit 3.2‐2.

Vehicle at the McG

3‐8

. Existing Noise C

Gregor Test Site, Tex

Contours 

exas  

May 2014 

 

Page 33: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

3.0 Affected Environment  3‐9  May 2014 

The  McGregor  test  site  is  located  within  the  9,700  acre  McGregor  Industrial  Park,  which  is  the 

redeveloped  McGregor  NWIRP  (EPA  2009b).  The  NWIRP  was  closed  in  1995  and  ownership  was 

transferred  to  the  City  of McGregor  in  1996  for  development  into  an  industrial  park.  In  addition  to 

SpaceX, other  commercial/  industrial  tenants of  the  industrial park  include, but  are not  limited  to,  a 

rodeo arena, C3 Communications, Ferguson Plumbing Company, General Micrographics,  In Situ Forms, 

and McLennan County Electrical Cooperative (EPA 2009b; MDEC 2013). The zoning designation of  land 

within the McGregor Industrial Park is heavy industrial (City of McGregor 2003). 

With  the  exception  of  the  activities  at  the  Industrial  Park  described  above,  the  primary  land  use 

surrounding  the McGregor  test  site  is  agricultural  and undeveloped.  Exhibit  3.2‐3  shows  the  existing 

zoning within and adjacent  to  the McGregor  test  site as designated by  the City of McGregor  (City of 

McGregor 2003). The nearest town to the test site is Oglesby, three 3 miles to the northwest. The City of 

McGregor is five 5 miles northeast of the test site. 

Table 3.2‐1 depicts acceptable  land use compatibility associated with annual DNL. According  to Table 

3.2‐1,  residential  areas  in  the City of McGregor  and Oglesby  that  are  already  exposed  to  65 DNL or 

greater are incompatible for residential use. 

Page 34: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

onmental Assess

Experimental P

ed Environmen

Exhibit 3

ment 

Permit to Spac

nt 

.2‐3. Existing

ceX for Operati

g Zoning With

ion of the Drag

3‐10

hin and Adjac

gonFly Vehicle 

cent to the M

at the McGreg

McGregor Test

gor Test Site, Te

May

 

t Site 

exas  

y 2014 

Source: City of McG

regor 2003 

Page 35: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

3.0 Affected Environment  3‐11  May 2014 

Table 3.2‐1. Land Use Compatibility with Annual Day‐Night Average Sound Levels (DNL)   Yearly DNL Sound Level (decibels) 

Land Use  <65  65‐70 70‐75 75‐80 80‐85  >85Residential Residential, other than mobile homes and transient lodgings  Y  N1 N1 N N  NMobile home parks  Y  N N N N  NTransient lodgings  Y  N1 N1 N1 N  NPublic Use 

Schools  Y  N1 N1 N N  NHospitals, nursing homes  Y  25 30 N N  NChurches, auditoriums, and concert halls  Y  25 30 N N  NGovernment Services  Y  Y 25 30 N  NTransportation  Y  Y Y2 Y3 Y4  Y4

Parking  Y  Y Y2 Y3 Y4  NCommercial Use Offices, business and professional  Y  Y 25 30 N  NWholesale and retail‐building materials, hardware, and farm equipment  Y  Y Y2 Y3 Y4  NRetail Trade, general  Y  Y 25 30 N  NUtilities  Y  Y Y2 Y3 Y4  NCommunication  Y  Y 25 30 N  NManufacturing and Production Manufacturing, general  Y  Y Y2 Y3 Y4  NPhotographic and Optical  Y  Y 25 30 N  NAgricultural (except livestock) and forestry  Y  Y6  Y7  Y8  Y8  Y8 

Livestock farming and breeding  Y  Y6  Y7  N N  NMining and fishing, resource production extraction  Y  Y Y Y Y  YRecreational Outdoor sports arenas and spectator sports  Y  Y5  Y5  N N  NOutdoor music shells, amphitheaters  Y  N N N N  NNature exhibits and zoos  Y  Y N N N  NAmusements, parks, resorts, and camps  Y  Y Y N N  NGolf courses, riding stables and water recreation  Y  Y 25 30 N  NSource: 14 CFR Part 150, Appendix A, Table 1. The designations contained in this table do not constitute a Federal determination that any use of land covered by the program is  acceptable  or  unacceptable  under  Federal,  State,  or  local  law.  The  responsibility  for  determining  the  acceptable  and permissible  land  uses  and  the  relationship  between  specific  properties  and  specific  noise  contours  rests  with  the  local authorities.  FAA  determinations  under  part  150  are  not  intended  to  substitute  federally  determined  land  uses  for  those determined  to  be  appropriate  by  local  authorities  in  response  to  locally  determined  needs  and  values  in  achieving  noise compatible land uses.  

Key to Table 3.2‐1 Y (YES) – Land use and related structures compatible without restrictions. N (NO) – Land use and related structures are not compatible and should be prohibited. NLR – Noise Level Reduction (outdoor to indoor) to be achieved through incorporation of noise attenuation into the design and construction of the structure. 25,30 or 35 –  Land use and  related  structures generally  compatible; measures  to achieve NLR of 25, 30, or 35 dB must be incorporated into design and construction of structure.  

1Where  the community determines  that  residential or school uses must be allowed, measures  to achieve outdoor  to  indoor Noise  Level Reduction  (NLR) of  at  least  25 dB  and  30 dB  should be  incorporated  into building  codes  and be  considered  in individual  approvals.  Normal  residential  construction  can  be  expected  to  provide  a  NLR  of  20  dB,  thus,  the  reduction requirements are often stated as 5, 10, or 15 dB over standard instructions.  2Measures to achieve NLR of 25 dB must be incorporated into the design and construction of portions of these buildings where 

Page 36: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

Tathe public is3Measures tthe public is4Measures tthe public is5Land use co6Residential7Residential8Residential

  Depa3.3

The FAA m

Act  (49 U

wildlife o

on  the  N

individual

to these p

be protec

In accorda

that requ

unless no

project in

propertie

(see Secti

3.3.1

Public par

the Depar

1. Seven 

recreation

3.3.2

The ROI  f

Potential 

Preservat

onmental Assess

Experimental P

ed Environmen

able 3.2‐1. Las received, officeto achieve NLR os received, officeto achieve NLR os received, officeompatible provil buildings requil buildings requil buildings not p

rtment of Tra

must conside

U.S.C.  §  303(c

r waterfowl r

National  Reg

ls own parks,

properties, ev

cted under Se

ance with the

ires the use o

o  feasible and

cludes all po

s is the area e

on 4.2.1, Exh

Public Parks

rks, recreatio

rtment of Tra

parks and on

n area, or refu

Table 3.3‐1.

Amsler Park  

Iron Bridge N

Bewley Park  

Bluebonnet P

Kasting Park  

Legacy Park  

Mother Neff S

Oglesby Park 

Significant H

for NRHP‐list

Effects  (APE

ion Act (NHP

ment 

Permit to Spac

nt 

and Use Compe areas, noise seof 30 dB must be areas, noise seof 35 dB must be areas, noise seded special sounre an NLR of 25.re an NLR of 30.ermitted. 

ansportation 

er land use im

c)).  Section  4

refuges, or an

gister  of  Hist

 recreational

ven if such are

ction 4(f) wh

e FAA Order 

of any Section

d prudent alt

ssible plannin

encompassed

ibit 4.2‐1). 

, Recreation 

n areas, and 

ansportation A

ne Wildlife M

uge is Oglesb

 Section 4(f) 

Prop

ational Wildlife

Park  

State Park  

 

Historic Sites 

ed or eligible

E)  defined  fo

PA). The FAA 

ceX for Operati

patibility witensitive areas or e incorporated iensitive areas or e incorporated iensitive areas or nd reinforcemen. . 

Act, Section 

mpacts under 

4(f)  propertie

ny publicly or

toric  Places 

 areas, or wi

eas are open 

en it is locate

1050.1E, Cha

n 4(f) propert

ternative exis

ng to minimiz

d by the DNL 

Areas, and R

refuges that 

Act (49 U.S.C

anagement A

y Park which 

Public Parks,of the M

perty

e Managemen

e  resources p

or  cultural  r

defined the A

ion of the Drag

3‐12

h Annual Daywhere the norminto the design awhere the norminto the design awhere the normnt systems are in

4(f)  

Section 4(f) 

es  include  pu

r privately ow

(NRHP).  Wh

ldlife and wa

to the public

ed on long‐ter

ange 1, the FA

ty determined

sts  to  the us

ze harm resu

65 dBA noise

Refuges 

may be cons

. § 303(c)), an

Area  lay with

is 2.3 miles f

 Recreation AcGregor Test

t Area

protected un

resources  un

APE as the a

gonFly Vehicle 

y‐Night Averamal noise level isand constructiomal noise level isand constructiomal noise level isnstalled. 

of the Depar

ublicly  owned

wned historic 

hen  private 

terfowl refug

c. However, a

rm leased pu

AA will not a

d by the offic

e of  such  lan

lting from th

e contour det

idered Sectio

nd located in

in 6 miles of 

from the test 

Areas, and Ret Site 

Dista

5.1 Miles No

5.5 Miles So

4.5 Miles No

4.1 Miles No

5.6 Miles No

5.1 Miles No

4.3 Miles So

2.3 Miles No

nder  Section 

nder  Section 

rea encompa

at the McGreg

age Sound Les low.n of portions of s low. n of portions of s low. 

rtment of Tra

d  parks,  recr

site listed or

institutions, 

ges, Section 4

a privately ow

blic land or a 

pprove any p

cials having ju

nd and  such 

e use.  The R

ermined duri

on 4(f) proper

n the ROI are 

the test site

site.  

efuges in the 

ance/ Directio

ortheast 

outh

ortheast 

ortheast 

ortheast 

ortheast 

outh

orthwest 

4(f)  is  identi

106  of  the 

assed by the 

gor Test Site, Te

May

evels (DNL) 

f these buildings

f these buildings

ansportation 

reation  areas

r eligible for 

organization

4(f) does not 

wned property

 public easem

program or p

urisdiction the

program, an

ROI for Sectio

ing noise mod

rties, as defin

listed in Tabl

. The closest 

 Vicinity 

on 

cal  to  the Ar

National  Hi

DNL 65 dBA 

exas  

y 2014 

s where 

s where 

(DOT) 

s,  and 

listing 

ns,  or 

apply 

y may 

ment. 

roject 

ereof, 

nd  the 

on 4(f) 

deling 

ned by 

e 3.3‐

park, 

rea of 

istoric 

noise 

Page 37: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

contour d

or eligible

historical,

Histo3.4

Cultural  r

landscape

Section 10

on proper

with  the 

listed or e

for the Sta

In accorda

has deter

archaeolo

ROI  for  t

determine

Appendix 

area with

A  review 

revealed 

none of th

There are

interests 

Oklahoma

Appendix 

The  APE 

majority o

Navy  in  1

governme

complete

to be eligi

the 14 ind

and one h

1998, the

Programm

Federal o

historic  a

onmental Assess

Experimental P

ed Environmen

determined d

e for listing, i

, architectura

rical, Archite

resources  inc

es, or objects

06 of the NH

rties listed or

State Histori

eligible for list

ate of Texas. 

ance with 36 

mined an AP

ogical resourc

his  resource 

ed during no

B, Agency Co

in the APE wh

of  the  Texas

that  there  a

hem are in or

e no known T

in McLennan

a and the Ton

B, Agency Co

includes  14 

of these resou

1942  as  a m

ent  to  the  C

d. As a result

ible for inclus

dividual resou

historic distric

e U.S. Navy, T

matic Agreem

wnership. Th

architectural 

ment 

Permit to Spac

nt 

uring noise m

n the NRHP w

al, archaeolog

ctural, Archa

clude prehisto

s having histo

PA requires a

 eligible for li

c Preservatio

ting in the NR

CFR 800.4(a)

E in consider

ces as a result

area,  is  def

ise modeling 

oordination). 

here ground d

s Historic  Sit

re numerous

r near the are

Traditional Cu

 and Coryell 

nkawa Tribe o

oordination). 

previously  do

urces were pa

military  ordna

City  of McGre

t of the surve

sion in the NR

urces have be

ct from the fo

THC, City of M

ment  (PA)  to 

e PA include

properties  i

ceX for Operati

modeling (refe

within the RO

gical, and cult

aeological, an

oric  and histo

orical, archite

a Federal age

sting in the N

on Officer  (SH

RHP. The Texa

)(1), an APE n

ation of both

t of impleme

fined  as  the 

(Appendix A

Effects to arc

disturbance w

tes Atlas,  the

s previously  r

ea of the prop

ultural Proper

Counties hav

of Oklahoma

 

ocumented  a

art of the for

nce  plant.  P

egor,  a  surv

ey, 14  individ

RHP (U.S. Nav

een demolish

ormer NWIRP

McGregor, an

mitigate  the

s deed coven

n  accordanc

ion of the Drag

3‐13

er to Section 

OI. Sections 3

ural resource

nd Cultural Re

oric  archaeo

ectural, archa

ency to consid

NRHP. Compli

HPO)  if  there

as Historical C

needs to be es

h potential dir

nting the Pro

area  encom

). The THC co

chaeological r

would occur f

e NRHP  onlin

recorded  arc

posed launch 

rties identifie

ve been ident

. The FAA is i

architectural 

mer NWIRP, w

Prior  to  the  t

ey  of  the  pl

dual resource

vy 1998). How

hed. Therefor

P that were de

nd Advisory C

e  adverse  eff

nants requirin

ce  with  the 

gonFly Vehicle 

3.4). There a

.4 and 4.4 pr

es. 

esources 

logical  sites, 

eological, cu

der the effect

iance with Se

e  is a potenti

Commission (

stablished fo

rect and indir

oposed Action

passed  by  th

oncurred with

resources, ho

from installat

ne  database, 

haeological  s

pad. 

ed within the 

tified. They in

initiating con

resources  (T

which was or

transfer  of  t

lant’s  extant 

s and one his

wever, since t

re, the APE in

etermined el

Council on Hi

fect  of  the  tr

ng the preser

Secretary  of

at the McGreg

are 14 historic

rovide furthe

buildings, di

ltural, or scie

ts of its unde

ection 106 req

ial effect  to 

(THC) serves 

r the Propose

rect effects to

n. The APE, a

he  DNL  65  d

h this APE on

owever, woul

tion of the co

and  other  a

sites within  t

APE; howeve

nclude the Co

sultation wit

Table  3.4‐1;  E

riginally const

he  property 

buildings  an

storic district

the survey’s c

ncludes 10 in

igible for listi

istoric Preser

ransfer  of  th

rvation and m

f  the  Interio

gor Test Site, Te

May

c properties l

r discussion o

istricts,  struc

entific  import

ertaking (or a

quires consult

historic prop

as the SHPO 

ed Action. Th

o architectura

lso considere

dBA  noise  co

n April 7, 2014

d be limited t

ncrete launch

available  reso

the APE; how

er, two tribes

omanche Nat

h these tribe

Exhibit  3.4‐1)

tructed by th

from  the  Fe

nd  structures

t were determ

completion, fo

ndividual reso

ing in the NR

rvation execu

e  property  o

maintenance o

or’s  Standard

exas  

y 2014 

listed, 

of the 

tures, 

tance. 

ction) 

tation 

erties 

office 

e FAA 

al and 

ed the 

ontour 

4 (see 

to the 

h pad. 

ources 

wever, 

s with 

ion of 

s (see 

).  The 

e U.S. 

ederal 

s  was 

mined 

our of 

ources 

HP. In 

uted a 

out  of 

of the 

ds  for 

Page 38: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

3.0 Affected Environment  3‐14  May 2014 

Rehabilitation, and THC review of any undertaking  that has  the potential  to affect  the  integrity of  the 

NRHP‐eligible resources. 

The  other  historic  properties  in  the  APE  include  one NRHP‐listed  resource  and  two  Recorded  Texas 

Historic  Landmarks.  The  Brown‐Mann  House  in  McGregor  was  listed  in  the  NRHP  in  1987  for  its 

architectural  significance  as  an  intact  Colonial  Revival  and  Queen  Anne‐style  residence  with  a 

Sullivanesque‐style  embellishment  rare  for  domestic  architecture  in  Texas.  The  Glenn  and  Mary 

Gulledge  Crain  House  in McGregor  and  the  First Methodist  Church  of  Oglesby  are  Recorded  Texas 

Historic  Landmarks, which  are  designated  by  the  THC  for  properties  that  are  at  least  50  years  old, 

historically and architectural  significant, and possess architectural  integrity. The Crain House  is a  rare 

example  in Texas of a Shingle‐style  residence, and  the First Methodist Church of Oglesby  is a Queen 

Anne‐style church dating to 1912. 

Table 3.4‐1. NRHP‐Listed or ‐Eligible Architectural Resources in the APE Resource Name  Description Historic Status

Building 105  Telephone exchange NRHP Eligible 

Building 106  Administrative office NRHP Eligible 

Building 300  Police and fire station NRHP Eligible 

Building 404  Propulsion system laboratory NRHP Eligible 

Building 601  General storage NRHP Eligible 

Building 602  Line office and first aid NRHP Eligible 

Building 603  Change and power house NRHP Eligible 

Building 2301  Well house #1 NRHP Eligible 

Building 2308  Pump house NRHP Eligible 

Building 2309  Spare pump house NRHP Eligible 

High Explosives Magazine Historic District 

64 ammunition storage magazines (Buildings 8001 through 8064) 

NRHP Eligible 

Brown‐Mann House 1890s Colonial Revival/Queen Anne‐style residence with Sullivanesque influence 

NRHP Listed 

Crain, Glenn and Mary Gulledge House 

Circa 1892 Shingle‐style residence Recorded Texas Historic Landmark 

First Methodist Church of Oglesby  1912 Queen Anne‐style church Recorded Texas Historic Landmark 

 

 

Page 39: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

D

3

Draft Environmental 

Issuing an Experim

3.0 Affected Enviro

Assessment 

ental Permit to Spa

onment 

aceX for Operation

Exhibit 3.4‐1

 of the DragonFly V

1. Historic Resour

Vehicle at the McG

3‐15

rces within the A

Gregor Test Site, Tex

Area of Potential 

exas  

Effects 

May 2014 

 

Page 40: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

Fish, W3.5

Biological

associatio

defined a

animal (H

Although 

resources

on specie

importanc

McGregor

McGregor

noise mod

3.5.1

The McGr

Prairies E

approxim

grassland

been  sha

species w

species (T

Vegetated

generally 

grazing do

3.5.2

Wildlife re

species gr

include  b

(Sylvilagu

streams in

3.5.3

A species 

of  its  ran

foreseeab

amendme

and plant

administe

of the ESA

onmental Assess

Experimental P

ed Environmen

Wildlife, and 

  resources  i

ons are referr

as  the  resour

all et al. 1997

the  existen

s also provide

es or vegetati

ce, or are pro

r test site as 

r  test  site  an

deling (see Se

Vegetation 

regor  test  sit

cological Reg

ately  26,000

s  punctuated

ped  by  agric

with  annual  g

Texas Parks an

d areas at  th

include Berm

o not have sig

Wildlife 

esources incl

roups such a

bobwhite  qua

s  floridanus)

n the area, id

Special‐Statu

is considered

nge.  Threaten

ble future. Th

ents require t

ts,  and  critica

ers the ESA an

A requires al

ment 

Permit to Spac

nt 

Plants 

include  plant

red to as vege

ces and  cond

7).  

nce  and  pres

e aesthetic, re

on types tha

otected unde

depicted in E

nd  the  area  e

ection 4.2, Ex

te  is  located 

gion.  The Cro

0  acres.  The

d  by  high,  na

cultural  pract

grass  and  for

nd Wildlife De

e McGregor 

muda grass, n

gnificant amo

ude mammal

s mollusks or

ail  (Colinus  v

,  and  whitet

entified in Se

us Species 

d endangered

ned  species  a

e Endangere

the conservat

al habitats  in

nd designate

l Federal age

ceX for Operati

t  and  anima

etation and a

ditions prese

servation  of 

ecreational, a

t are  importa

r Federal or S

xhibit 1‐2. Th

encompassed

hibit 4.2‐1).

within  the La

oss  Timbers  a

e  Lampasas 

arrow,  and w

tices  such  as

b  species. W

epartment [T

test  site con

ative grasses 

ounts of wood

ls, reptiles, am

r  insects. Com

virginianus), m

tail  deer  (Od

ection 3.6.1, W

d if it is in da

are  defined  a

d Species Act

tion of federa

n which  they 

s critical hab

ncies to cons

ion of the Drag

3‐16

al  species  an

animal specie

nt  in an area

biological  r

nd socioecon

ant to the fu

State law or s

he ROI for wil

d by  the DNL

ampasas Cut 

and Prairies 

Cut  Plain  su

wooded mesa

  livestock  an

Woody  vegeta

TPWD] 2011a)

nsist of  range

and live oaks

dy vegetation

mphibians, bi

mmon specie

mourning  do

docoileus  virg

Water Resour

nger of extin

as  those  tha

t (ESA) of 197

ally listed thre

are  found.  T

itat for each 

sult with the 

gonFly Vehicle 

nd  the  habit

es are referre

a  that  suppo

resources  are

nomic values t

nction of the

statute. The 

ldlife and spe

L  65 dBA noi

Plain  sub‐re

Ecological Re

ub‐region  ge

a‐like  divides

nd  farming  o

ation  often  co

). 

elands and m

s. The areas o

n (FAA 2011). 

irds, and som

es that are ex

ove  (Zenaida 

ginianus).  Fis

rces (FAA 201

ction through

at  are  likely  t

73 (16 U.S.C. 

eatened and 

The U.S.  Fish

species prote

USFWS, as a

at the McGreg

tats  where 

ed to as wildl

rts  the existe

e  intrinsicall

to society. Th

e ecosystem, 

ROI for veget

ecial‐status sp

ise  contour d

egion of  the C

egion of Nort

enerally  cons

. Vegetation 

operations  by

onsists of  liv

mowed  indust

of the test sit

 

metimes inver

xpected to be

macroura), 

sh  may  be  f

11). 

hout all or a s

to  become  e

§1531 et seq

endangered 

h  and Wildlife

ected under 

applicable, be

gor Test Site, Te

May

they  occur. 

ife. Habitat c

ence of a pla

y  valuable, 

his analysis fo

of special so

tation include

pecies include

determined d

Cross Timber

th‐central  Te

sists  of  exte

in  the  regio

y  reducing  hi

ve oak  and  ju

trial areas. Sp

te subject to a

rtebrate spec

e  found  in th

eastern  cott

found  in  the 

significant am

endangered  i

q.) and subseq

species of an

e  Service  (US

the ESA. Sect

efore  initiatin

exas  

y 2014 

Plant 

an be 

ant or 

these 

ocuses 

ocietal 

es the 

es the 

during 

rs and 

exas  is 

ensive 

n  has 

istoric 

uniper 

pecies 

active 

cies or 

he ROI 

ontail 

local 

mount 

n  the 

quent 

nimals 

SFWS) 

tion 7 

ng any 

Page 41: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

3.0 Affected Environment  3‐17  May 2014 

action  that may affect a  listed species or designated critical habitat. Candidate species, which may be 

proposed  for  listing  as  threatened  or  endangered  in  the  future,  are  not  provided  any  statutory 

protection under the ESA. 

The Texas  legislature authorized the TPWD to establish a  list of threatened and endangered plant and 

animal  species,  and  to  protect  the  species.  TPWD  regulations  prohibit  the  taking,  possession, 

transportation,  or  sale  of  any  of  the  animal  species  designated  by  State  law  as  endangered  or 

threatened  without  a  permit.  Texas  laws  and  regulations  prohibit  commerce  in  threatened  and 

endangered plants and the collection of listed plant species from public land without a permit issued by 

TPWD. 

Table  3.5‐1  lists  the  Federal  and  State‐listed  threatened  or  endangered  wildlife  species  potentially 

occurring  in McLennan and Coryell counties. There are three federally  listed endangered species, nine 

State‐listed  threatened  species,  and  five  State‐listed  endangered  species  that  potentially  occur  in 

McLennan and Coryell counties. 

Table 3.5‐1. Federally and State‐Listed Threatened and Endangered Species Potentially Occurring within McLennan and Coryell Counties 

Common name (Scientific name)Status 

State Federal 

Reptiles Timber/canebrake rattlesnake (Crotalus horridus) T ‐ Texas horned lizard (Phrynosoma cornutum) T ‐ Birds Golden‐cheeked warbler (Setophaga chrysoparia) E E Peregrine falcon (Falco peregrinus)  T ‐ Whooping crane (Grus Americana)  E E Bald eagle (Haliaeetus leucocephalus)1 T ‐ Black‐capped vireo (Vireo atricapilla)2 E E Wood stork (Mycteria americana)3  T ‐ White‐faced ibis (Plegadis chihi)3  T ‐ Interior least tern (Sterna antillarum athalassos)3 E ‐ Mammals   Red wolf (Canis rufus)  E ‐ Mollusks   Smooth pimpleback (Quadrula houstonensis) T ‐ False spike mussel (Quadrula mitchelli) T ‐ Texas fawnsfoot (Truncilla macrodon) T ‐ Sources: TPWD 2011b, c; USFWS 2013 a, b.Notes: E = Endangered, T = Threatened.  1Bald and golden eagles are protected by the Bald and Golden Eagle Protection Act, which is administered by the USFWS.  The Act prohibits unauthorized capture, purchase, or transportation of the birds, their nests, or their eggs.  Any action that might disturb these species requires a permit from the USFWS. 2Listed only in Coryell County 3Listed only in McLennan County 

The potential for occurrence of any of the listed species in Table 3.5‐1 within the ROI for the Proposed 

Action  is unlikely due  to  the  absence of  suitable habitat, ongoing  agricultural  activities, maintenance 

(e.g.  mowing),  and  existing  industrial  and  operational  activities.  In  addition,  coordination  with  the 

USFWS in 2011 for the Final Environmental Assessment for Issuing an Experimental Permit to SpaceX for 

Page 42: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

Operation

federally 

However,

Experimen

Texas  ind

whooping

this  corrid

lake edge

on  the M

habitat. H

coordinat

Wate3.6

Water  re

Rivers.  Su

subsurfac

lowland a

lowland a

an annua

and are n

that addr

Fish and W

(EO) 1199

The  TCEQ

regulatory

TCEQ  adm

Legislatur

and Wild

areas, and

purpose o

exist or m

level  thro

Groundwa

District (M

Texas Pol

At the loc

3, Section

National 

communit

County, a

onmental Assess

Experimental P

ed Environmen

n  of  the  Gras

listed species

  coordinatio

ntal  Permit  t

dicated  that 

g cranes  for m

dor. Suitable 

s, small pond

McGregor  test

However, the 

ting with TPW

r Quality 

sources  inclu

urface  water

ce  water  tha

areas covered

areas  located 

l basis. As sta

not evaluated

ess water res

Wildlife Coor

90, Protection

Q  has  the  re

y programs.   

ministers  bot

re has author

life Departm

d initiate the 

of managing 

may exist in th

ough  GCDs. 

ater Conserv

McLennan Co

lutant Discha

cal level, the 

ns 22‐19  to 2

Flood  Insur

ties  that  par

re all particip

ment 

Permit to Spac

nt 

sshopper  Veh

s known to oc

n  with  the  T

to  SpaceX  for

the  test  site

migration; 95

whooping  cr

ds, marshes, a

t  site,  as  des

whooping cr

WD regarding 

ude  surface 

s  include  str

t  occupies  t

d with shallow

adjacent to 

ated in Sectio

d  in  this analy

sources. At th

dination Act;

n of Wetlands

esponsibility 

As the State

th  State  and

rized the TCEQ

ent  (TPWD) 

creation of G

the State’s g

he future.  Th

The  propos

ation District

unty).TCEQ is

arge Eliminati

McGregor, Te

22‐110, regula

rance  Progra

rticipate  in  th

pating commu

ceX for Operati

hicle  at  the M

ccur in the RO

TPWD  in  the

r Operation 

e  is  located 

5 percent of w

rane migrato

and some suit

scribed  in  Se

rane has nev

the Proposed

waters,  grou

reams,  rivers

he  space  be

w and somet

bodies of wa

on 3.0, Wild a

ysis. There a

he Federal lev

 Rivers and H

s; and EO 119

for  the  maj

e  lead agency

  federally m

Q, the Texas 

to  study,  ide

Groundwater 

roundwater r

he primary ma

sed  project 

 (Coryell Cou

s also respon

ion System (T

exas ‐ Code o

ates  floodpla

am  regulates

he  program. 

unities in the 

ion of the Drag

3‐18

McGregor  Te

OI. 

e  2011  Final 

of  the Grass

near  the  cen

whooping cra

ory  stop‐over 

table rivers (T

ection  3.6.1  b

er been obse

d Action (see 

undwater,  w

,  lakes,  pond

tween  sand,

times tempor

ater  in which 

and Scenic Ri

re several Fe

vel the Clean 

Harbors Act; W

988, Floodplai

ority  of  the 

y for water re

mandated  (as 

Water Develo

entify  and  de

Conservation

resources  in 

anagement o

falls  within 

nty) and (2) S

sible for adm

TPDES) to reg

of Ordinances

ins within  th

s  developme

The  City  of 

program. 

gonFly Vehicle 

est  Site,  Texa

Environmen

hopper  Vehic

nter  of  a  20

ane sightings

 habitat  inclu

TPWD 2011c)

below,  that m

erved at the 

Appendix B, A

etlands,  floo

ds,  estuaries,

,  clay,  and  r

rary or  interm

the ordinary

iver resource

ederal, State

Water Act (C

Wild and Sce

in Manageme

State’s  env

esources and 

mentioned 

opment Boar

elineate  prior

n Districts (GC

areas where 

of groundwate

two  separa

Southern Trin

ministering th

gulate dischar

s, Part II, Cha

he City of Mc

ent  in  mapp

McGregor, M

at the McGreg

as  indicated 

ntal  Assessme

cle  at  the M

00 mile‐wide 

s during migr

udes  shallow

).  Four small 

may  provide 

McGregor te

Agency Coord

odplains,  and

,  and  oceans

ock  formatio

mittent wate

y high water 

es are not pre

and  local  law

CWA); Safe D

enic Rivers Ac

ent.  

vironmental  w

environmen

above)  prog

rd (TWDB), an

rity  groundw

CDs) within th

critical grou

er in Texas is

ate  GCDs:  (

nity Groundw

e program an

rges of pollut

apter 22, Arti

cGregor, Texa

ped  100‐yea

McLennan  Co

gor Test Site, Te

May

that  there  a

ent  for  Issuin

McGregor  Test

corridor  use

ation occur w

w wetlands  su

ponds are lo

suitable  sto

est site. The F

dination).  

d  Wild  and  S

s.  Groundwa

ons. Wetland

rs. Floodplain

level fluctuat

esent in the r

ws and  regula

Drinking Wate

ct; Executive 

water  quality

tal protection

grams.    The 

nd the Texas 

water manage

hose areas, fo

ndwater prob

s found at the

1)  Middle  T

water Conserv

nd has create

tants (TCEQ 2

cle II. Division

as.  In addition

ar  floodplain

ounty,  and  C

exas  

y 2014 

re  no 

ng  an 

t  Site, 

ed  by 

within 

uch as 

ocated 

pover 

FAA  is 

Scenic 

ater  is 

ds  are 

ns are 

tes on 

region 

ations 

er Act; 

Order 

y  and 

n, the 

Texas 

Parks 

ement 

or the 

blems 

e local 

Trinity 

vation 

ed the 

2012). 

n 1 to 

n,  the 

ns  for 

Coryell 

Page 43: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

3.6.1

The ROI  f

Basque  R

Basque  R

(McFarlan

River  are 

intermitte

to be pote

launch pa

Exhibit 3.6

as  impair

305(b) an

Existing  a

stormwat

2010 and 

3.6.2

The ROI  f

Aquifer, w

Aquifer  is

aquifer de

McGregor

TCEQ  app

availabilit

Aquifer  g

decline, b

2011). No

Resource 

closure in

groundwa

site. Rem

2023. Sam

that cont

Facilities 

developm

for Reuse

environm

onmental Assess

Experimental P

ed Environmen

  Surface Wa

for  surface w

River  Subwate

River  flow  int

nd and Houck

located  on 

ent, and deve

entially man‐

ad, and two a

6‐1 depicts th

red waters  in

d 303(d) (TCE

activities  at  t

ter discharge 

is currently a

Groundwate

for groundwa

which  is  one

s  potable  bu

epth.  It  is use

r test site is in

plies  this  de

ty  and  qualit

generally  exce

but the rate h

o EPA designa

Conservation

n the 1990s d

ater on north

ediation of th

mpling results

aminants are

Engineering 

ment as the M

,” indicating t

ent for the an

ment 

Permit to Spac

nt 

aters (Non‐we

waters  is  the 

ershed within

to Waco  Lak

k 1999). Four 

the McGrego

elops into a p

made: two ar

are in the nor

he locations o

n  the  2012  T

EQ 2012).  

he  test  site o

(Permit #TX

active (FAA 20

er 

ater  is  the M

  of  the most

t  considered

ed by munici

n an area tha

esignation  to

ty  issues  to  t

eeded  the  re

as slowed ov

ted Sole Sour

n and Recove

documented c

ern side of th

he groundwa

s from ground

e not migratin

Command  [N

McGregor Indu

that the reme

nticipated use

ceX for Operati

etlands Surfa

McGregor  te

n  the  larger 

ke,  which  is 

ponds and a

or  test  site.

perennial stre

re located in t

rthern portion

of the stream

exas  Integrat

operate unde

R050000  issu

011).  

cGregor  test 

t  extensive  a

  hard; with 

palities as we

t has been de

o  aquifers  th

the  region.  H

echarge  rate 

er the past de

rce Aquifers a

ery Act (RCRA

contaminatio

he test site an

ter at off‐site

dwater wells 

ng  into the e

NAVFAC] 2007

ustrial Park, E

ediated cond

e (EPA 2009b

ion of the Drag

3‐19

ace Waters) 

est  site. The 

Basque  Rive

located  app

 stream that 

The  portion 

eam after it f

the southern

n of the site, 

s and ponds.

ted  Report  o

er  a  TPDES m

ued  July 22, 2

site. The Mc

and most  uti

dissolved  so

ell as  irrigatio

esignated as P

hat  have  dec

Historically,  g

of  the  aquif

ecade due to 

are found at t

A)  investigatio

n of groundw

nd the wester

e properties i

in the immed

existing  launc

7, U.S. Navy 

EPA had desig

itions of the 

b). 

gonFly Vehicle 

McGregor  te

r Watershed

roximately  1

forms the he

of  the  strea

flows off‐site

 portion of th

northeast of

No surface w

of  Surface W

multi‐sector  g

2011). The p

cGregor  test 

ilized  in  Texa

lids,  sulfate, 

on,  livestock,

Priority Grou

clining  levels

groundwater 

fer. Water  le

 changes in w

the McGrego

ons conducte

water and soi

rn side in a p

is ongoing an

diate area of t

ch pad areas 

2001; U.S. N

gnated the N

site are prote

at the McGreg

est  site  is  loc

d.  Surface wa

13  miles  nort

eadwaters of

am  on  the  s

(FAA 2011). 

he site, east o

f the Falcon 9

waters locate

ater Quality 

general  storm

ermit was  iss

site  is  locate

as.  Groundwa

and  chloride

 and domest

ndwater Man

s  that  can  p

  withdrawals

evels  in  the  a

water sources

or test site.  

ed as part of 

il. Perchlorate

lume migrati

nd expected t

the existing la

from neighb

Navy 2008; FA

NWIRP McGre

ective of hum

gor Test Site, Te

May

cated  in  the 

aters  of  the 

theast  of  the

f the South Ba

ite  is  classifi

The ponds a

of the Grassho

9 tripod test s

d on‐site are 

for  CWA  Sec

mwater perm

sued Novemb

ed over  the T

ater  in  the  T

es  increasing

tic consumers

nagement Are

pose  groundw

s  from  the  T

aquifer  are  s

s (TWDB 2013

the NWIRP f

e was identif

ng southward

to be complet

aunch pad ind

oring areas  (

AA 2011). Pr

egor site as “R

man health an

exas  

y 2014 

South 

South 

e  site 

asque 

ed  as 

ppear 

opper 

stand. 

listed 

ctions 

mit  for 

ber 3, 

Trinity 

Trinity 

g with 

s. The 

ea 10. 

water 

Trinity 

still  in 

3; FAA 

acility 

fied in 

d, off‐

ted in 

dicate 

(Naval 

rior  to 

Ready 

nd the 

Page 44: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

D

3

Draft Environmental 

Issuing an Experim

3.0 Affected Enviro

Assessment 

ental Permit to Spa

onment 

aceX for Operation

Exhibit 3.6.1

 of the DragonFly V

. Surface Water 

Vehicle at the McG

3‐20

in the Vicinity of

Gregor Test Site, Tex

f the McGregor T

exas  

Test Site 

May 2014 

 

Page 45: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

3.6.3

The ROI f

boundary

(USFWS  2

southern 

3.6.4

The Fede

floodplain

waters fro

chance of

being floo

The  ROI  f

There are

located  in

associated

These floo

Natur3.7

As  an  im

consumpt

acknowle

use  of  na

encourage

principles

sustainab

EO

EO

EO

The ROI  f

site. Exist

from a 10

fighting fi

Electric

Potable

Source: 

 

onmental Assess

Experimental P

ed Environmen

Wetlands 

or wetlands i

y  of  the McG

2013c). One 

portion of th

Floodplains 

ral Emergenc

ns.  Federal  c

om any sourc

f being  inund

oded during a

for  floodplain

e approximat

n  the  southe

d with a  trib

odplains are o

ral Resources

mpact  categor

tion  of  natu

dges that the

atural  resour

e  the  develo

s  of  sustainab

le use of natu

O 13123, Gre

O 13423, Stre

O 13514, Fed

for natural re

ing energy an

0,000 gallon t

res (SpaceX 2

Utility 

city/ Natural Ga

e Water Distrib

SpaceX 2013. 

ment 

Permit to Spac

nt 

is the McGre

Gregor  test  s

area  is  north

e site, southe

cy Manageme

ode  identifie

ce” (44 CFR Pa

dated  in a one

a one‐year pe

ns  is  the Mc

ely 44.92 acr

east  portion 

utary  to Stat

outside of the

s and Energy 

ry,  natural  re

ural  resourc

ere are no spe

rces  and  ene

opment  of  f

bility.  The  fo

ural resource

eening the Go

engthening Fe

deral Leadersh

esources and 

nd water cons

tank would a

2013). 

Table 3.7‐

as  H

bution  C

ceX for Operati

gor test site.

site  are  ident

heast  of  the 

east of the ex

ent Agency (F

es  floodplains

art 59). 100‐y

e‐year period

riod.  

Gregor  test  s

res of 100‐ye

of  the  opera

ion Creek  loc

e area of pote

Supply 

esources  and

es  and  use

ecific Federal

ergy  supply, 

acilities  that

llowing  regu

s and energy

overnment th

ederal Enviro

hip in Environ

energy supp

sumption at t

lso be used t

‐1. Utilities Su

Pro

Hudson Energy

City of McGreg

ion of the Drag

3‐21

 Two areas o

tified  on  the

Falcon  9  trip

xisting Grassh

FEMA) mainta

s  as  “any  lan

year floodplai

d. 500‐year fl

site.  Exhibit 

ear  floodplain

ating  area  an

cated  in  the 

ential launch 

d  energy  sup

  of  energy 

l requirement

it  also  emph

  exemplify  t

lations  provid

rough Efficien

nmental, Ene

nmental, Ener

ly  includes th

the McGrego

to occasional

uppliers for M

ovider 

y Services, LLC

gor water main

gonFly Vehicle 

of freshwater 

e  National W

pod  test  stan

opper Pad (E

ains data  ide

nd  area  susc

ins are furthe

oodplains ha

3.6‐1  identifi

ns associated

nd  approxima

southwest co

pad construc

pply  provides

supplies.  W

ts in place to

hasizes  that 

the  highest 

de  guidance 

nt Energy Ma

ergy, and Tran

rgy, and Econ

he  immediate

r test site is p

ly wash the l

McGregor Tes

2.4 millio

ns  1.5 millio

at the McGreg

 emergent w

Wetlands  Inve

nd.  The  seco

Exhibit 3.6‐1).

ntifying 100‐

eptible  to  be

er defined as 

ave a 0.2 perc

ies  floodplain

d with  the  So

ately  2.34  ac

orner of  the 

ction.  

s  an  evaluat

Whereas  FAA

o regulate the

it  is  the  pol

standards  of

to  Federal  a

anagement;  

nsportation M

nomic Perform

e vicinity of t

presented in T

aunch area a

st Site 

Annual Utility

on kilowatt‐ho

on gallons 

gor Test Site, Te

May

wetlands with

entory  (NWI)

ond  area  is  o

  

‐year and 500

eing  inundate

having a 1 pe

cent probabi

ns within  the

outh Bosque 

cres  of  flood

site  (FEMA 2

ion  of  a  pro

A  Order  10

e consumptio

icy  of  the  FA

f  design  incl

agencies  rega

Management 

mance.  

the McGrego

Table 3.7‐1. W

and is availab

y Usage 

our (kW‐hr) 

exas  

y 2014 

in the 

) map 

on  the 

0‐year 

ed  by 

ercent 

lity of 

e  ROI. 

River 

plains 

2013). 

oject’s 

050.1E 

n and 

AA  to 

uding 

arding 

; and 

or test 

Water 

ble for 

Page 46: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

Hazar3.8

Analysis o

solid wast

Po

p

Po

o

p

Po

p

W

e

lik

The hand

various  le

importanc

Liability A

(SARA)  a

generatio

consultati

(excluding

contained

The TCEQ

the Texas

Departme

The ROI fo

immediat

generated

McGregor

support e

currently 

2.2  for  a

testing oc

Existing  o

maintena

include ac

batteries.

onmental Assess

Experimental P

ed Environmen

rdous Materi

of the presen

te includes an

otential  to  e

hases of the p

otential  haza

peration  of 

rocedures;  

otential  to  i

roposed proj

Waste  stream

nvironmenta

kely receive t

ling and disp

evels  ranging

ce to the FAA

Act  (CERCLA),

nd  the  Com

on,  treatmen

ion  with  nat

g  petroleum

d in 49 CFR pa

Q enforces Sta

 Administrati

ent is respons

or hazardous

te  vicinity  th

d;  or  spills/re

r  test  site  ha

existing opera

uses and sto

dditional  info

ccurs in an en

operations  pr

nce  at  a  rat

cetone, oily 

  Hazardous 

ment 

Permit to Spac

nt 

als, Pollution

ce, handling,

n evaluation o

encounter  ex

project; 

ardous mater

the  propose

nterfere  with

ect site or in 

s  that would

l resources, a

the wastes. 

posal of haza

g  from  the  F

A are RCRA a

,  as  amended

mmunity  Envi

nt,  storage, 

tural  resource

)  into  the 

arts 171 throu

ate laws and 

ive Code [30 T

sible for enfo

 materials, po

hat  could  be

eleases  that 

as  the  capaci

ations related

res hypergoli

ormation  on 

closed vacuu

roduce  hazar

te  of  approxi

rages, paint 

waste  gener

ceX for Operati

n Prevention,

, storage, and

of the followi

xisting  hazard

rials  that  co

ed  facilities, 

h  any  ongoin

the immediat

d  be  generat

and the  impa

rdous materi

Federal  level 

nd the Comp

d  by  the  Sup

ronmental  R

and  disposa

es  trustees  a

environment

ugh 180. 

rules pertain

TAC], Chapte

rcing State an

ollution preve

  affected  by

may  occur  a

ity  to  store  2

d  to  the Falco

ic propellants

SpaceX’s  ex

m chamber a

rdous waste 

imately  10,00

wastes, hype

rated  at  the 

ion of the Drag

3‐22

 and Solid W

d disposal of 

ng: 

dous  materia

uld  be  trans

and  applic

ng  remediati

te vicinity; an

ted  by  the  p

acts on waste

ials, chemica

to  the  loca

prehensive En

perfund Ame

Response  Fac

al  (TSD)  of 

and  cleanup 

t.  The  Fede

ning to munic

r 330 and Ch

nd City regula

ention, and s

y  the  materi

as  a  result  of

260,000  gallo

on 9 and Gra

s (NTO and M

xisting  activit

at the Dragon

at  the McGr

00  pounds  a

ergol waste  (

McGregor  t

gonFly Vehicle 

Waste 

hazardous m

als  during  th

sported  and 

able  pollutio

ion  of  existin

nd 

project,  poten

e handling an

ls, substance

l  level.  The 

nvironmental

endments  and

cilitation  Act

hazardous  w

of  any  relea

ral  Hazardou

cipal hazardou

apter 335). T

ations for gen

olid waste is 

ials  transpor

f  implement

ons of  LOX  a

asshopper RL

MMH) at the M

ies  at  the M

nRider test are

regor  test  sit

annually.  Haz

water mixed

test  site  is  r

at the McGreg

materials, haz

he  constructi

used  during 

on  preventio

ng  contamin

ntial  for  the 

nd disposal fa

es, and waste

two  Federal 

 Response, C

d  Reauthoriz

t  of  1992.  R

wastes.  CER

ase  of  a  haz

us  Materials

us and solid w

The City of Mc

neral sanitatio

the McGrego

rted,  stored, 

ing  the  Prop

nd  102,000  g

LV  testing. Ad

McGregor tes

McGregor  test

ea.  

te  through  e

zardous  wast

 with MMH 

removed  and

gor Test Site, Te

May

ardous waste

on  and  oper

construction

on  strategies

ated  sites,  a

wastes  to  im

acilities that w

es are govern

statutes  of 

Compensation

zation Act  of 

RCRA  govern

CLA  provide

zardous  subs

s  Regulation

wastes (Title 

cGregor Sanit

on. 

or test site an

and  used;  w

posed  Action.

gallons  of RP

dditionally, Sp

st site (see Se

t  site).  Hype

engine  testing

tes  generated

or NTO), oils

d  managed  b

exas  

y 2014 

e, and 

ration 

n  and 

s  and 

at  the 

mpact 

would 

ned at 

most 

n, and 

1986 

s  the 

es  for 

stance 

s  are 

30 of 

tation 

nd the 

waste 

..  The 

P‐1  to 

paceX 

ection 

ergolic 

g  and 

d  can 

s, and 

by  an 

Page 47: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

independ

disposal o

Hazardou

site.  Prev

munitions

During th

investigat

and soils o

petroleum

actions is 

of  the  te

groundwa

migrating

Navy 200

that the r

anticipate

Solid, non

contracto

stored on

off  dump

cardboard

Light 3.9

As an  imp

associated

For  the p

landscape

areas ma

generally 

The ROI f

miles from

visual sen

noise and

park. Exis

stand, and

at  the Mc

pads, and

McGregor

vicinity. 

onmental Assess

Experimental P

ed Environmen

ent contracto

of hazardous w

s materials w

vious  NWIRP 

s grade and  f

is time, wast

tions conduct

on the site. T

m products, a

provided in S

est  site  (EPA

ater wells in t

g into the exis

8; FAA 2011)

remediated c

ed use (EPA 2

n‐hazardous w

or and dispos

‐site in 2‐cub

psters which 

d, plastic, and

Emissions an

pact category

d with a proje

purposes of  t

es  from whic

y  be  parks, 

considered le

for  light emis

m which facil

nsitivity due to

d  flames on‐s

sting structur

d associated 

cGregor  test 

d buildings  lo

r  Industrial  P

ment 

Permit to Spac

nt 

or and taken 

wastes curren

were used as 

operations  a

fertilizer grad

te explosives,

ted in the 199

he contamina

nd perchlora

Section 3.6. A

A  2009b;  FA

the immediat

sting launch p

). EPA has de

onditions of t

009b). 

wastes produ

ed of  in  the 

bic yard dump

are  emptied 

d food contain

nd Visual Imp

y,  light emiss

ect would an

his analysis, 

h  individuals 

coastlines, w

ess visually se

sions and vis

ities, lighting

o the existing

site, and  indu

es on the tes

tower which 

site  consist 

ocated at  the

Park  around  t

ceX for Operati

to a permitt

ntly occurs at

part of histor

at  the  site  c

de ammonium

 propellants,

90s for closur

ants of conce

te. A descript

A remediation

AA  2011;  NA

te area of the

pad areas from

esignated the

the site are p

uced by oper

City of Waco

psters that ar

as  needed.

ners (FAA 201

pacts 

sions and visu

noy or interfe

visual and ae

develop the

wilderness  are

ensitive.  

sual  impacts 

, and operati

g industrial ac

ustrial and  co

st site  include

is 235 ft high

of  safety  ligh

  site. Various

the  test  site,

ion of the Drag

3‐23

ted  landfill  fo

t the McGreg

ric operation

consisted  of 

m nitrate, an

 solvents, an

re of the NWI

ern included in

tion of the gr

n and capping

AVFAC  2007;

e existing lau

m neighborin

e NWIRP McG

protective of 

rations at  the

o  landfill. Pri

e emptied th

Typical  solid

11).  

ual  resources

ere with activ

esthetic  reso

ir perception

eas,  or  recre

is the McGre

ions would be

ctivities such 

ommercial bu

e the Grassh

h and can be 

hting and nig

s  light  indust

,  limiting  the

gonFly Vehicle 

or treatment 

or test site (F

s of the NWI

manufacturin

nd production

d solid waste

IRP detected 

ndustrial solv

roundwater c

g area for soil

U.S.  Navy 

nch pad indic

g areas (NAV

Gregor site as

human healt

e  test  site ar

or  to collecti

hree times pe

 wastes  gene

s provide an 

vities of peop

ources are de

ns of an area

eation  areas;

egor test site 

e visible. The

as engine an

usinesses  loc

opper RLV  la

seen for seve

ghttime  secur

trial operatio

e  sensitive  vi

at the McGreg

and disposal

FAA 2011).  

RP prior to S

ng  shells  and

n of compon

es were store

contaminatio

vents, energe

contaminatio

s is located o

2001).  Samp

cate that con

VFAC 2007; U.

s “Ready  for 

th and the en

e collected b

ion, non‐haza

r week, or in 

erated  at  the

evaluation o

ple in the vicin

efined as man

. Examples o

  industrial  o

and the vicin

e ROI is consi

d rocket test

ated  through

aunch pad, Fa

eral miles. Ex

rity  lighting a

ons are  locate

sual  resource

gor Test Site, Te

May

l. No treatme

paceX lease o

d  airplane  bo

ents  for wea

ed on the site

on of groundw

etics, heavy m

n and remed

n the wester

pling  results 

ntaminants ar

.S. Navy 2001

Reuse,”  indic

nvironment fo

by an  indepen

ardous waste

30‐cubic yard

e  test  site  in

of whether  lig

nity of the pr

n‐made or na

of visually sen

r  urban  area

nity within se

dered to hav

ting which pro

hout  the  indu

alcon 9 tripod

isting light so

at  the  test  st

ed  throughou

e  receptors  i

exas  

y 2014 

ent or 

of the 

ombs, 

apons. 

e. Site 

water 

metals, 

iation 

n side 

from 

re not 

1; U.S. 

cating 

or the 

ndent 

es are 

d roll‐

nclude 

ghting 

roject. 

atural 

nsitive 

as  are 

everal 

ve low 

oduce 

ustrial 

d test 

ources 

tands, 

ut  the 

in  the 

Page 48: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

3.10Risks 

The  CEQ 

comprehe

that envir

themselve

or  physic

effects on

and resou

and housi

EO 12898

Populatio

identifyin

environm

populatio

to Addres

reinforced

complianc

incorpora

EO 13045

agencies 

dispropor

such as: c

children e

adults; ch

able to pr

safety fea

Affected 

categorie

• Po• In• En• C

The ROI  f

McGregor

which dir

Action’s  c

geograph

onmental Assess

Experimental P

ed Environmen

Socioeconom

NEPA  imple

ensively  to  in

ronment”  (40

es to require 

al  environme

n  the human

urces associa

ing. 

8,  Federal Ac

ns, directs ea

g  and  addre

ental effects 

ons.” Subsequ

ss Environmen

d  the  direct

ce with EO 12

ating the goals

5, Protection 

to  identify  d

rtionately mo

children’s neu

eat more food

hildren’s beha

rotect themse

atures. 

environment

s: 

opulation andncome, Povernvironmentahildren’s Env

for  the  socio

r in McLenna

rect  and  seco

construction 

ic region for c

ment 

Permit to Spac

nt 

mics, Environ

ementing  reg

nclude  the na

0 CFR §1508.

preparation 

ent  effects  a

 environmen

ted with  the 

tions  to Add

ach Federal ag

essing,  as  ap

of  its progra

uent Orders a

ntal Justice in

tives  outlined

2898 and NEP

s of EO 12898

of Children 

disproportion

ore environm

urological, dig

d, drink more

avior patterns

elves; and ch

 descriptions

d Housing rty, and Emplol Justice ironmental H

economics a

n County, an

ondary or  ind

and operatio

comparative 

ceX for Operati

nmental Justic

gulations  stat

atural and ph

14). This mea

of an environ

re  interrelate

nt  (40 CFR §1

human envi

ress  Environm

gency to “ma

ppropriate,  d

ams, policies,

at the State a

n Minority Pop

d  in  EO  128

PA, also deve

8 into the NEP

from Environ

nately  high  a

ental health 

gestive, immu

e fluids, and 

s may make t

ildren’s size a

s  in  this Secti

oyment 

Health and Saf

nalysis  is Mc

nd the City of

direct effects 

on are  likely 

analysis. 

ion of the Drag

3‐24

ce, Children’s

te  that  the  h

hysical enviro

ans that econ

nmental analy

ed,  then  the

1508.14). Soc

ronment, par

mental  Justic

ake achieving 

disproportiona

, and activitie

nd Federal le

pulations and

898.  CEQ,  w

loped guideli

PA process. 

nmental Heal

and  adverse 

and  safety  r

unological, an

breath more 

hem more su

and weight m

ion are categ

fety 

Lennan Coun

f Oglesby in C

on  socioeco

to occur. The

gonFly Vehicle 

s Environmen

human  envir

onment and  t

nomic or soc

ysis. When ec

e  environmen

cioeconomics

rticularly pop

ce  in Minority

 environmen

ately  high  a

es on minorit

evel, including

d Low‐Income

which  overse

ines (CEQ 199

lth Risks and

impacts  to 

risks  than adu

nd other bod

air in propor

usceptible to 

may diminish 

gorized accor

nty, Coryell C

Coryell Count

onomic  variab

e  State of Te

at the McGreg

ntal Health R

ronment  “sha

the  relationsh

cial effects ar

conomic and

ntal  analysis 

s describes  th

pulation, emp

y Populations

tal justice pa

nd  adverse 

ty population

g DOT Order 

e Populations

ees  the  Fede

97) to assist F

d  Safety Risks

children.  Ch

ults because 

ily systems a

rtion to their

accidents bec

their protect

rding  to  the  f

County,  the  c

y. This ROI in

bles arising  fr

exas and  the

gor Test Site, Te

May

Risks and Safe

all  be  interp

hip of people

re not  intend

 social and na

will  discuss 

he basic attri

ployment,  inc

s and  Low  In

rt of its missi

human  heal

ns and  low  in

5610.2(a), Ac

s (DOT 2012),

eral  governm

Federal agenc

s,  requires  Fe

hildren  may 

of various  fa

re still develo

r body weight

cause they ar

tion from sta

following  res

cities of Waco

ncludes the a

rom  the Prop

e U.S.  serve a

exas  

y 2014 

ety 

preted 

e with 

ed by 

atural 

these 

ibutes 

come, 

ncome 

ion by 

lth  or 

ncome 

ctions 

, have 

ment’s 

cies in 

ederal 

suffer 

actors 

oping; 

t than 

re less 

ndard 

ource 

o and 

rea in 

posed 

as  the 

Page 49: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

The ROI  f

the  ROI 

McLennan

represent

construct

for compa

3.10.1

Table  3.1

vicinity of

are  locate

city  in the

Oglesby w

Based on 

than Cory

the U.S. (8

Waco wit

vacant ho

higher  pe

percentag

Jurisd

United St

Texas 

McLenna

Coryell Co

City of M

City of Og

City of WSource: USNote: 1USC

 

3.10.2

Table 3.10

2007  and

McGregor

and McLe

the  State

counties i

onmental Assess

Experimental P

ed Environmen

for environm

for  the  socio

n and Coryel

t  the  popula

ion and oper

arative analys

Population a

0‐1  summari

f the McGreg

ed  in McLenn

e vicinity of t

which has less

the 2012 da

yell County (7

87.4 people p

th a relatively

ousing units) 

ercentage  of 

ge than the U

Table 3.1

diction T(

tates 

n County 

ounty 

cGregor 

glesby1 

Waco SCB 2013a. CB 2010 Demog

Income and 

0‐2 summariz

d  2011.  Med

r, Oglesby, an

ennan County

e  of  Texas  an

in the ROI. Og

ment 

Permit to Spac

nt 

ental  justice 

oeconomic  a

l Counties,  re

ated  area  m

ration of the 

sis.  

and Housing 

izes U.S.  Cen

or test site at

nan County; O

the test site, 

s than 500 res

ata, McLenna

71.7 people p

per square mi

y  lower perce

and  the U.S

vacant  hou

.S. (USCB 201

0‐1. Current 

Total Populatio(2012 estimate

313,914,040 

26,059,203 

238,707 

77,231 

5,029 

484 

127,018 

raphic Data (USC

Employment

zes U.S. Censu

dian  househo

nd Waco are

y also have a 

nd  United  St

glesby has th

ceX for Operati

and children

analysis  and 

espectively. C

most  likely  t

Proposed Act

nsus  Bureau 

t the local, co

Oglesby  is  loc

with 2012 da

sidents.  

n County  (22

er square mil

ile). 2010 dat

entage of vac

S.  (11.4  vacan

sing  units  co

12; USCB 201

Population a

on e) 

Area(square m

3,531,90

261,231

1,037.

1,052.

21.42

0.5

88.96

CB 2012).  

us Bureau inc

old  and  per

  lower than t

higher portio

tates.  The  un

e lowest une

ion of the Drag

3‐25

n’s environme

specifically

Census Tracts

to  experienc

tion. The Sta

(USCB)  data 

ounty, and St

cated  in Cory

ata showing 

26.5 people p

le), the State 

ta shows McL

cant housing 

nt housing un

ompared  to 

3a). 

nd Housing D

a  miles) 

PoDensisqu

05.43

1.71 

10

07 

6  1

come and em

capita  incom

the State of 

on of the pop

nemploymen

employment (

gonFly Vehicle 

ental health a

includes  Cen

s 101.01 and

ce  any  pote

te of Texas s

for  populati

tate level. The

yell County. M

approximate

per square m

of Texas (96

Lennan Count

units than th

nits).  In 2010

the  whole  S

Data in the Re

opulation ity (person/ uare mile) 

87.4

96.3 

226.5

71.7 

232.8 

968 

1,402.9 

mployment da

me  for  McLe

Texas and U

pulation  livin

t  percentage

(2.6 percent) 

at the McGreg

and safety ri

nsus  Tracts  1

 39 are asses

ntial  impact

serves as the 

ion  and  hous

e Cities of W

McGregor  is t

ly 5,000 resid

mile)  is more d

.3 people per

ty, Coryell Co

he State of Te

0,  the City o

State  of  Texa

egion of InfluTotal 

Housing Units (2010)1 

131,704,730 

9,977,436 

95,124 

25,178 

1,966 

207 

51,452 

ata for the tim

ennan  County

nited States. 

g below the 

e  varies  amo

and Waco ha

gor Test Site, Te

May

sks  is  the sam

101.01  and 

ssed because

ts  caused  by

geographic r

sing  trends  i

aco and McG

the second  la

dents, follow

densely popu

r square mile

unty, Oglesby

exas (10.6 pe

f McGregor 

as  but  is  a

uence 

Vacant HouUnits (perce

total)

11.4

10.6 

8.7

10.5 

11.1 

9.2 

9.8 

me period bet

y,  Coryell  Co

Waco, McGr

poverty  leve

ong  the  citie

ad the highes

exas  

y 2014 

me as 

39  in 

e  they 

y  the 

region 

n  the 

Gregor 

argest 

wed by 

ulated 

), and 

y, and 

ercent 

had  a 

lower 

using ent of 

tween 

ounty, 

regor, 

l than 

s  and 

st (9.1 

Page 50: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

percent). 

percentag

Tab

Jurisdic

United Stat

Texas 

McLennan 

Coryell Cou

City of McG

City of Ogle

City of WacSource: USC

 

3.10.3

For the pu

Black or A

races, or 

(CEQ  199

populatio

affected a

or  appro

5610.2(a)

While not

identifiab

compariso

Table 3.1

Black/Afri

of  minori

Oglesby, 

percentag

ROI  is  als

potentiall

percentag

Ta

United Sta

Texas 

McLennan

onmental Assess

Experimental P

ed Environmen

McLennan  C

ge of unemplo

le 3.10‐2. Inc

ction H

tes 

County 

unty 

Gregor 

esby 

co CB 2013b. 

Environmen

urpose of this

African Ameri

as being of H

97).  The  CEQ

on of  the affe

area is meani

priate  unit  o

, as “any rea

t defined by t

le”  are  inte

on. The geogr

0‐3  shows  th

ican America

ity  and  Hisp

Waco,  Cens

ge points) tha

so  not  mean

y affected ar

ge of minority

able 3.10‐3. E

Jurisdictio

ates 

n County 

ment 

Permit to Spac

nt 

County  (7.2  p

oyment than 

come, PovertyMedian 

Household Income 

$52,762 

$50,920 

$41,656 

$48,920 

$37,356 

$44,375 

$31,971 

tal Justice 

s evaluation, 

ican, Asian or

Hispanic or La

Q  identifies  th

ected area ex

ngfully greate

of  geographi

adily  identifia

the CEQ, for t

rpreted  to  b

raphic region

he poverty  le

n) and Hispa

anic  populat

us  Tract  39 

an the State o

ningfully  grea

rea would no

y populations

Environmenta

on 

ceX for Operati

percent),  City

Texas or the 

y, and Emplo

Per Capita Income 

$27,915

$25,548

$21,630

$19,218

$16,649

$20,296

$18,185

minority refe

r Pacific Islan

atino origin. P

hese  groups 

xceeds 50 pe

er than the m

ical  analysis.

ble group of 

the purposes 

be  20  perce

 for comparis

vel and  the p

nic populatio

tions  in  McLe

and  Census

of Texas.   The

ater  for  thes

ot be  conside

s. 

al Justice Stat(% o

White 

72.4 

70.4 

69.8 

ion of the Drag

3‐26

y  of McGrego

United State

oyment Data PopulatioPoverty(Percen

14.

17.

21.

14.

25.

9.1

30.

ers to people 

nder, America

Persons of His

as minority 

ercent or  (2) 

minority popu

  A  low‐inco

low‐income 

of this EA, th

entage  points

son in this an

percentage o

on  in the ROI

ennan  Count

  Tract  101.0

e percentage

se  areas  wh

ered an envir

tistics for thef population)

Total Minority

27.6 

29.6 

30.2 

gonFly Vehicle 

or  (6.6  perce

es (USCB 2013

in the Regionon Below y Level ntage) 

TooL

.3 1

.0

.7

.1

.5

1

.1

 who identifi

an Indian or A

spanic and La

populations 

the minority

ulation percen

me  populati

persons who

he terms “mea

s  greater  th

alysis is the S

of  total mino

(USCB 2012;

ty,  Coryell  C

01  are  not  m

e of families li

en  compare

ronmental  ju

e Region of In) 

ya Hisp

Latino

1

3

2

at the McGreg

ent),  and Ogl

3b). 

n of Influenceotal Number of People in Labor Force 

156,456,694 

12,285,284 

113,049 

34,273 

2,000 

193 

57,364 

ed themselve

Alaska Native

atino origin m

when  eithe

y population 

ntage in the g

ion  is  define

o  live  in geog

aningfully gre

han  the  geog

State of Texas

rity populatio

; USCB 2013b

County,  the  C

meaningfully 

iving below p

d  to  the  Sta

ustice popula

nfluence, 201

anic or o Originb 

16.9 

38.2 

24.4 

gor Test Site, Te

May

lesby  had  a 

e, 2007‐2011Percent of 

ForceUnemplo

8.7

7.3

7.2

9.3

6.6

2.6

9.1

es in the Cens

e, other non‐W

may be of any

r  (1)  the min

percentage  i

general popu

ed  by  DOT 

graphic proxim

eater” and “re

graphic  regio

s. 

on  (predomin

b). The perce

City  of  McGr

greater  (ov

poverty level 

ate  of  Texas

tion based o

12 estimate 

Families BelPoverty Lev

10.5 

13.2 

15.1 

exas  

y 2014 

lower 

 Labor  

oyed 

sus as 

White 

y race 

nority 

in  the 

lation 

Order 

mity.” 

eadily 

on  of 

nately 

ntage 

regor, 

er  20 

in the 

s.  The 

on  the 

low vel 

Page 51: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

3.0 Affecte

Ta

Coryell Co

City of Mc

City of Og

City of Wa

Census Tra

Census TraSources: USCNotes: aMino

Whit 

3.10.4

Table  3.1

capacity. 

[ISD] 2013

the easte

holds you

Fridays, a

2013‐201

Industrial 

listed  in T

facilities, 

McGregor

Ogles

McG

McG

McG

McG

Isbill Sourc

Note:

 

 

onmental Assess

Experimental P

ed Environmen

able 3.10‐3. E

Jurisdictio

ounty 

cGregor 

lesby 

aco 

act 101.01 ‐ C

act 39 ‐McLenCB 2012; USCB 2ority is defined ate races. bTotal p

Children’s En

10‐4  summar

The nearest s

3; McGregor 

rn side of the

uth  rodeo ev

nd Saturdays

4  CTYRA  sea

Park betwee

Table 3.3‐1, t

playgrounds

r test site.  

Sch

sby School 

regor Prep Hig

regor High Sch

regor Primary 

regor (T.H. Jen

Junior High Scce: Oglesby Inde

McGregor In 1This primary scMcGregor Hig

ment 

Permit to Spac

nt 

Environmenta

on 

Coryell County

nnan County 2013b.  as: Black or Africpercent Hispanic

nvironmenta

izes  the  loca

school is 3.5 

ISD 2013). Th

e McGregor In

ents multiple

s starting at 6

ason  consists 

en August 20

hat are  likely

,  or  other  p

Table 3.1

hool 

gh School 

hool 

School1 

nkins) Elementa

chool pendent School dependent Schochool is currentlgh Schools. 

ceX for Operati

al Justice Stat(% o

White 

70.3 

68.3 

87.0 

59.2 

y  95.2 

87.2 

can American, Ac/Latino origin m

al Health Risk

ations  of  sch

miles northw

he Central Tex

ndustrial Park

e  times per y

6:00 p.m. on 

of  thirteen 

013 and Apri

y to be freque

places  where

10‐4. SchoolsApprDir

ary 

District 2013 ool District 2013ly under constru

ion of the Drag

3‐27

tistics for thef population)

Total Minority

29.7 

31.7 

13.0 

40.8 

4.8 

12.8 

Asian or Pacific Imay be of any ra

s and Safety 

hools  within 

west of the te

xas Youth Rod

k, approximat

year. The  rod

Thursdays an

three‐day  ev

l 2014  (CTYR

ented by chil

e  children  ar

s Near the Mcroximate Distaection from Te

3.5 miles NW

4.0 miles N

4.5 miles N

4.5 miles N

4.5 miles N

4.5 miles N

3 uction and is adja

gonFly Vehicle 

e Region of In) 

ya Hisp

Latino

1

3

1

2

9

1

slander, Americace and is report

Risks 

the  ROI,  dis

est site (Ogles

deo Associati

tely 3 miles n

deo events ar

nd Fridays, an

vents  held  at

RA 2013). The

ldren. There 

re  concentrat

cGregor Testance and est Site 

W

E

E

E

E

E

acent to the cur

at the McGreg

nfluence, 201

anic or o Originb 

17.0 

37.1 

18.8 

29.6 

9.2 

17.9 

can Indian or Alated separately.  

stance  from 

sby Independ

ion (CTYRA) A

northeast of t

re  typically h

nd 7:00 p.m. 

t  their  arena

ere are eight

are no other

ted  within  t

t Site 

Number of

17

2

40

30

59

40

rrent McGregor 

gor Test Site, Te

May

12 estimate 

Families BelPoverty Lev

12.4 

21.4 

8.9 

22.2 

7.6 

13.0 

aska Native, oth

the  test  site

ent School D

Arena is locat

the site. The 

held on Thurs

on Saturdays

  at  the McG

t parks  in  the

r schools, day

he  vicinity  o

f Students 

74 

04 

00 

95 

01 

Elementary and

exas  

y 2014 

low vel 

er non‐

e,  and 

District 

ted on 

arena 

sdays, 

s. The 

Gregor 

e ROI, 

ycares 

of  the 

 

Page 52: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

3.0 Affected Environment  3‐28  May 2014 

THIS PAGE INTENTIONALLY LEFT BLANK

Page 53: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

4.0 Environ

4.0 ENVIR

This chap

that  coul

analyses 

Chapter 2

Chapter 3

The  analy

categorie

significan

Air Qu4.1

Potential 

and propo

this  new 

implemen

more of t

4.1.1

Construct

launching

where the

itself.  The

number o

emissions

2010). On

Total cons

Co

Not

Air pollut

significant

The propo

and 2015

operation

miles, or 

onmental Assess

Experimental P

nmental Conse

RONMENTAL

ter presents 

d  result  from

presented  in

2 onto existin

3. Both direct 

ysis  in  this 

s, found  in A

ce of impacts

uality 

impacts  to a

osed operatio

launch  pad

ntation of any

he NAAQS fo

Proposed Ac

tion under  th

g  and  landing

e concrete lau

e  constructio

of workers. C

s factors and 

n road trucks 

struction emi

TableVolatile Organic ompounds 

0.01 tes:  PM10  =  p

matter 2.1 rounded

ant emission

t impact on lo

osed DragonF

. In addition,

ns.  It  is assum

24 miles per

ment 

Permit to Spac

equences 

L CONSEQUEN

an analysis of

m  implement

n  this  chapte

ng conditions

and indirect 

chapter  con

Appendix A of

s, and describ

air quality cou

ons of up to 3

for  the  pe

y of the altern

r any of the t

ction 

he Proposed 

g  the  Dragon

unch pad wo

on  is  not  exp

onstruction e

equipment p

are also  incl

issions are pr

e 4.1‐1. Estim

Nitrogen Oxides 

0.03 particulate matt.5 microns or lesd values less tha

s generated 

ocal or region

Fly RLV test la

 up to 10 sta

med  that  the

r day roundtr

ceX for Operati

NCES 

f the potentia

tation  of  the

er  overlays  t

s within  the R

impacts of co

nsiders  FAA’s

f FAA Order 1

bes the FAA’s 

uld  result  fro

30 annual sub

riod  2014  –

natives would

ime frames a

Action would

nFly  RLV.  Con

uld be poure

pected  to  last

emissions we

productivity d

uded and em

esented in Ta

ated Constru

CarbonMonoxi

0.09ter  less  than  orss in diameter. n 0.01  

by constructi

nal air quality

aunch schedu

aff would be 

 average one

rip. Commute

ion of the Drag

4‐1

al impacts up

e  Proposed  A

the  compone

ROI  for each 

onstruction an

s  guidance  o

1050.1E, whic

significance t

om  the propo

borbital launc

2015.  Signi

d directly or i

analyzed. 

d be  limited 

nstruction  ac

d, the laying 

t  for more  t

re calculated

data from Na

missions are b

able 4.1‐1. 

uction Emissio

n de 

SulfDiox

0.0r  equal  to  10 m

ion activities 

ule involves a

located at th

e‐way  comm

er emissions 

gonFly Vehicle 

pon various co

Action.  To  ev

ents  of  the 

environmen

nd operation

on  the  analy

ch  includes a

thresholds. 

osed construc

ches and land

ificant  air  qu

indirectly res

to a 1,600  ft

ctivities woul

of a gravel ba

han  10  days 

d using EPA’s 

tional Estima

based on EPA

ons for Launc

fur xide 

001

microns  in  diame

would be ve

a maximum o

e McGregor 

ute distance 

were calcula

at the McGreg

omponents o

valuate  pote

Proposed  Ac

tal  resource 

s are conside

ysis  of  envir

a description 

ction of a 1,6

dings of the D

uality  impact

ult in the exc

t2 concrete p

ld  involve  ex

ase, and the 

  and would 

NONROAD m

ator (Craftsm

A’s MOVES m

ch Pad in Ton

PM10 

0.001

eter;  PM2.5  =  fi

ery small and 

of 30 launche

test site to s

for each wo

ated using EP

gor Test Site, Te

May

of the environ

ntial  impacts

ction  describ

area present

ered in the EA

ronmental  im

of how to an

600  ft2  launc

DragonFly RLV

ts  would  oc

ceedance of o

pad  to be use

xcavating  the

pouring of th

involve  a mi

model (EPA 2

an Book Com

model (EPA 20

ns 

PM2.5 

0.001 

ne  particulate 

would not h

es per year in

upport the te

orker would 

PA’s MOVES m

exas  

y 2014 

nment 

s,  the 

bed  in 

ted  in 

A. 

mpact 

nalyze 

h pad 

V from 

cur  if 

one or 

ed  for 

e  area 

he pad 

inimal 

010a) 

mpany 

010b). 

have a 

 2014 

esting 

be 12 

model 

Page 54: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

4.0 Environmental Consequences  4‐2  May 2014 

(EPA 2010b). Due to the small number of staff required to support the operation and the short commute 

required, the air emissions associated with commuting are minor. 

Pre‐flight  activities  include  preparing  the DragonFly  RLV  for  launch  and  providing  ground  operations 

support for launch and landing. The DragonFly RLV would be transported by truck or tractor‐trailer from 

its storage location at the McGregor test site to the launch pad, which would involve the limited use of 

the vehicle over a very short distance. Similarly, two trucks would be used to transport the propellants 

from  the  propellant  storage  area  to  the  launch  pad.  SpaceX  operations  currently  occurring  at  the 

McGregor test site already use the hypergolic propellants MMH and NTO.  Transport and loading of the 

propellants  would  utilize  the  same  equipment  and  protocols  that  are  currently  in  place  for  engine 

testing using these propellants. Because of the small size of the  launch vehicle, closed system used for 

fueling, and modest fuel volume consumed per flight, minimal emissions would be generated from the 

routine pre‐flight activities, and these were not quantified. The use of these propellants for DragonFly 

RLV  testing may  result  in a  small number of  increased deliveries  from  the  supplier  to  the propellant 

storage location, but these emissions are minimal and were not quantified. 

Emissions  associated with  the  operations would  be  generated  by  the  combustion  of  the NTO/MMH 

propellant and the combustion of fuel by the helicopter that would raise the DragonFly RLV up to 10,000 

ft AGL  for  release.   The primary  combustion products of  the propellants MMH  and NTO used  in  the 

DragonFly RLV are nitrogen gas and water (Stuetzer 2013, Haas 1984); therefore, there are no significant 

criteria pollutants or GHG emissions associated with the operation of the DragonFly RLV.   

The use of a helicopter four times a year would generate minimal pollutant emissions.  Information on 

the emission factors for the H‐47 Chinook, which uses two turboshaft engines of similar horsepower as 

the  ones  used  on  the  Erickson  S‐64E,  were  used  to  estimate  the  helicopter  emissions.    Helicopter 

operations include taking off and landing from Waco Regional Airport, traveling to the SpaceX facility in 

McGregor Texas, which  is approximately 16 miles away, and attaching and  lifting the DragonFly RLV to 

3,000 ft AGL, which is the vertical threshold for assessing ground‐level pollutant impacts. 

The total annual operational emissions, which  include the helicopter operations and annual commuter 

emissions  for 10 additional SpaceX staff, are presented  in Table 4.1‐2 and represent the estimates  for 

each of the two years of testing (2014 and 2015). 

Table 4.1‐2. Estimated Annual Operation Emissions in Tons per Year (2014 and 2015) Volatile Organic 

Compounds 

Nitrogen Oxides 

Carbon Monoxide 

Sulfur Dioxide 

PM10  PM2.5 

0.01  0.02  0.03 0.001 0.01 0.01 

Notes:  PM10 = particulate matter less than or equal to 10 microns in diameter; PM2.5 = fine particulate matter 2.5 microns or less in diameter. 1 rounded value less than 0.01 

Operational air emissions are very small and would not have a significant impact on local or regional air 

quality. 

Page 55: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

4.0 Environ

4.1.2

Under  the

operation

launch pa

the additi

Noise4.2

4.2.1

Under  the

and  oper

noise wou

the Drago

of  pieces 

example, 

noise  leve

hours,  ad

construct

The  noise

propulsive

described

and 10:00

within the

1). The Dr

maximum

force (lbf)

A represe

four diffe

although 

correspon

extended 

(i.e.,  the 

Appendix 

A helicopt

assist and

year. The 

the  Drago

10,000  ft

operation

helicopte

onmental Assess

Experimental P

nmental Conse

No Action A

e No Action 

n  of  the Drag

ad at the Drag

onal emission

e and Compat

Proposed Ac

e Proposed A

ations.  Const

uld be genera

onRider area.

of  construct

the typical m

el  is  relativel

dverse  effect

ion activities 

e  analysis  as

e  assist,  full 

d  in Table 2.1

0 p.m. SpaceX

e McGregor t

ragonFly is pr

m thrust of 16

) (15,325 lbf p

entative opera

rent operatio

two  of  the  f

nding  trajecto

burn  time  a

maximum no

A.  

ter would rel

d full propulsi

helicopter w

onFly  RLV.  T

.  The  helicop

ns would gene

r noise to the

ment 

Permit to Spac

equences 

lternative 

Alternative,  t

gonFly  RLV  a

gonRider test

n of any air p

tible Land Us

ction 

Action, poten

truction  of  th

ated by const

 Noise levels

tion  equipme

maximum nois

y  low  and b

ts  from  con

would not be

sumes  a  pro

propulsive  l

‐1. All operat

X  is currently

test site: the 

ropelled by e

6,400  lbf  indi

per engine) to

ation type wa

on types. The

four  operatio

ory  follows 

and  increased

oise  scenario

lease the Dra

ve landing op

would travel 1

he  helicopte

pter would  h

erate noise, w

e overall nois

ceX for Operati

the  FAA wou

t  the McGre

t area would 

ollutants. The

tial noise  im

he  launch  pa

truction equip

 at a given re

ent  being  op

se level of an

ecause  the  c

nstruction  no

e significant.

oposed maxim

anding,  prop

tions would o

y considering 

Grasshopper

eight SuperDr

vidually, the 

o maintain sta

as developed 

 representati

on  types  incl

a  straight  ve

d maximum  a

).  For  furthe

agonFly RLV f

perations. The

16 miles from

r would  then

over  for  a  fe

which may be

se would be n

ion of the Drag

4‐3

uld not  issue 

gor  test  site

not occur. Th

erefore, there

pacts could o

ad would  be 

pment during

eceptor locat

perated  and 

n excavator at

construction 

oise  would 

mum  of  30  a

pulsive  assist

occur from a 

one of two 

r launch pad o

raco engines.

vehicle’s ma

ability.  

to account fo

ive operation

ude  only  lan

ertical  traject

altitude  to e

r discussion 

rom up to 10

ese operation

m Waco Regio

n  lift  the  Dra

ew  seconds  b

e noticeable in

negligible bec

gonFly Vehicle 

an experime

.  In  addition

he No Action 

e would be no

occur  from p

expected  to

g construction

tion would de

the  receptor

t 50 ft would 

noise would 

not  be  likel

annual  Drago

t  hopping,  an

single pad b

possible  loca

or the Drago

 Although a S

aximum thrus

or all the bas

n type include

dings.  The  re

tory  from  its

nsure  a high

of  the noise 

0,000 ft abov

ns are propos

onal Airport t

agonFly  RLV 

before  releas

n the surroun

cause the du

at the McGreg

ental permit 

,  constructio

Alternative w

o impact to r

roposed con

o  take  1–2 w

n of the conc

epend on the

r’s  distance  f

be approxim

be  tempora

y.  Noise  fro

onFly  operat

nd  full  propu

between the h

ations  for Dra

nRider test a

SuperDraco e

st  is  limited t

ic componen

es both a take

epresentative

s  pad  origin,

ly  conservati

modeling pa

e the ground

sed to occur o

o the launch 

and  ascend 

sing  the RLV

nding area.  T

ration, level, 

gor Test Site, Te

May

to SpaceX  fo

on  of  the  con

would not res

egional air qu

struction act

weeks.  Interm

crete launch p

e type and nu

from  the  site

mately 77 dBA

ry during da

om  the  prop

tions  consisti

ulsive  hoppin

hours of 7:00

agonFly opera

area (see Exhi

engine can re

to 122,600 po

ts of the prop

eoff and a lan

e  operation  t

,  and  includ

ive noise est

arameters  ref

d during prop

only four time

pad and teth

to  approxim

.  These  helic

The contribut

and tempo o

exas  

y 2014 

or  the 

ncrete 

sult in 

uality. 

ivities 

mittent 

pad at 

umber 

e.  For 

A. This 

ytime 

posed 

ing  of 

ng,  as 

0 a.m. 

ations 

ibit 2‐

each a 

ounds 

posed 

nding, 

type’s 

es  an 

imate 

fer  to 

ulsive 

es per 

her to 

mately 

copter 

ion of 

of the 

Page 56: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

4.0 Environmental Consequences  4‐4  May 2014 

helicopter noise is significantly lower than the DragonFly RLV. Therefore, the impact would be minor and 

was not included within the modeled representative operational type. 

Noise  levels generated by  the DragonFly RLV were estimated  to be approximately 116 dBA 0.3 miles 

from  the  launch pad and approximately 81 dBA 3 miles  from  the  launch pad. The combination of  the 

existing operations and the proposed DragonFly operations results in the DNL contours shown in Exhibit 

4.2‐1. 

A  significant  noise  impact  is  one  in which  the  “proposed  action will  cause  noise  sensitive  areas  to 

experience an  increase  in noise of DNL 1.5 dBA or more at or above DNL 65 dBA noise exposure when 

compared  to  the no action alternative  for  the same  timeframe.” The additional noise associated with 

the proposed DragonFly operations produces  less  than a  tenth of a dBA DNL difference. As  shown  in 

Table 4.2‐1, the Proposed Action’s DNL 65 dBA contour area is predicted to increase approximately 0.01 

percent over the No Action Alternative which equates to  less than 4 acres. The 4 acres do not  include 

any additional sensitive noise receptors.   

Table 4.2‐1. Summary of Total Contours Acreage by Scenario (Proposed Action) 

Contour  No Action Alternative 

Grasshopper Pad  Dragon Rider Site 

Level Acres 

Proposed Action Acres 

+Acres1  Percent Increase Proposed Action  Acres 

+Acres  % Increase 

65 dBA  32691  32695  4  0.01  32694  3  0.01 

70 dBA  18241  18244  3  0.02  18243  2  0.01 

75 dBA  10729  10731  2  0.02  10731  2  0.02 

80 dBA  5090  5093  3  0.06  5091  1  0.02 

85 dBA  2476  2480  4  0.16  2478  2  0.08 Note: 1Increase in land acres within the contour over the No Action Alternative noise condition.  

Page 57: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

D

4

Draft Environmental 

Issuing an Experim

4.0 Environmental 

Assessment 

ental Permit to Spa

Consequences 

aceX for Operation

Exhibit 4.2‐1. N

 of the DragonFly V

No Action Alterna

Vehicle at the McG

4‐5

ative and Propos

Gregor Test Site, Tex

sed Action Noise 

exas  

 Contours   

May 2014 

 

Page 58: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

4.0 Environ

Compatib

The Propo

This  cons

Proposed

Proposed

Park and 

changes t

Projected

McGregor

of McGre

the Falcon

pad as we

site.  Adja

Section 3

regarding

levels in r

under the

condition

4.2.2

Under  the

operation

launch  pa

Section 2

noise leve

Depa4.3

4.3.1

Public Par

The FAA m

4(f) evalu

waterfow

attributes

recreation

belonging

Proposed

refuges. T

Because  s

with pote

onmental Assess

Experimental P

nmental Conse

ble Land Use 

osed Action  i

struction  wo

  Action  wou

 Action is con

vicinity. The 

o land use pr

 noise conto

r test site lies

gor 2003). Th

n 9 Stage 1. T

ell as the ope

acent  land  us

.2.  In additio

g use of respe

esidential are

e existing con

s. Therefore, 

No Action A

e No Action 

n  of  the Drag

ad  at  the Dra

.2 would con

els or compat

rtment of Tra

Proposed Ac

rks, Recreatio

must assess  i

ation is requi

wl  refuges,  is 

s of  the publ

n area, and th

g to public pa

 Action woul

The nearest w

significant  inc

ential to incre

ment 

Permit to Spac

equences 

includes the 

uld  be  consi

uld  primarily 

nsistent with 

vicinity of  th

ractices or zon

urs are comp

s within the C

he McGregor 

Therefore, no

ration of the 

se  is  agricult

on,  SpaceX ha

ective parcels

eas in the City

ndition. The P

the Proposed

lternative 

Alternative,  t

gonFly  RLV  a

agonRider  te

ntinue at the 

tible land use 

ansportation

ction 

on Areas, and

if  land use  im

ired. A de min

defined  as  a

ic  resource. T

here would b

arks or recrea

d not result  i

wildlife manag

creases  in no

ease noise lev

ceX for Operati

construction 

istent  with  t

rely  on  exis

existing land

he  industrial 

ning would ha

pared to exist

City of McGre

test site is cu

oise associate

DragonFly RL

tural,  which 

as an existing

s of land on d

y of McGrego

Proposed Act

d Action wou

the  FAA wou

t  the McGre

st  area woul

McGregor te

under this Al

: Section 4(f)

d Refuges 

mpacts to Sec

nimis impact 

an  impact  th

The McGrego

be no physica

ation areas as

in the physic

gement area i

oise  levels ca

vels significan

ion of the Drag

4‐6

of a concret

the  current 

ting  infrastru

d use and zon

park  is  zone

ave to occur f

ting  land use

gor’s industri

urrently used 

d with the co

LV would be c

is  not  consid

g agreement

days when ro

or and Oglesb

tion would ha

ld not result 

uld not  issue 

gor  test  site

ld  not  occur.

est site. There

lternative.  

ction 4(f) prop

on public par

hat will  not  a

or  test  site  is

l use, direct t

s a result of t

al use, direct

is 5.5 miles fr

n  impair  the 

ntly may be c

gonFly Vehicle 

te  launch pad

land  use.  Op

ucture  within

ning designati

ed by  the  city

for initiation 

s for determ

ial park and i

to conduct e

onstruction of

compatible w

dered  a  nois

t with  the Ch

cket/engine t

by are not com

ave only min

in significant 

an experime

.  In  addition

.  Existing  Spa

efore, there w

perties are e

rks, recreatio

adversely  aff

s 2.3 miles  fr

taking, or tem

he Proposed 

t taking, or te

rom the test s

 value of a 4

considered a 

at the McGreg

d at the Drag

perations  as

n  the McGre

ions at the M

y as  “heavy 

of the Propo

ining compat

s zoned “hea

ngine testing

f the propose

with the existi

se‐sensitive  a

harles Graham

tests are sch

mpatible with

imal effects 

compatible l

ental permit 

,  constructio

aceX  activitie

would be no 

ither de mini

on areas, and 

fect  the  activ

rom  the near

mporary occu

 Action. Impl

emporary occ

site. 

4(f) property,

“constructive

gor Test Site, Te

May

gonRider test 

sociated  wit

egor  test  site

McGregor Indu

industrial” an

sed Action. 

tible  land use

vy industrial”

g, including te

ed concrete la

ng land use o

area  as  defin

m Cattle Com

eduled.  The 

h existing land

above the ex

and use impa

to SpaceX  fo

on  of  the  con

es,  as  describ

adverse effe

imis or  if a Se

public wildlif

vities,  feature

rest public pa

upancy of pro

ementation o

cupancy of w

, proposed ac

e use” of a Se

exas  

y 2014 

area. 

h  the 

e.  The 

ustrial 

nd no 

e. The 

” (City 

ests of 

aunch 

on the 

ned  in 

mpany 

noise 

d uses 

xisting 

acts. 

or  the 

ncrete 

bed  in 

cts to 

ection 

fe and 

es,  or 

ark or 

operty 

of the 

wildlife 

ctions 

ection 

Page 59: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

4.0 Environ

4(f)  prope

levels tha

are alread

other noi

RLV  launc

difference

Changes i

impacts  o

impacts a

Significan

Implemen

occupanc

the neare

Construct

significant

substantia

the Propo

condition

launch, bu

magnitud

Proposed

4.3.2

Under  the

operation

launch pa

the McGr

Histo4.4

4.4.1

The APE, 

Proposed

proximity

archaeolo

from cons

result  in 

DragonFly

majority 

operation

onmental Assess

Experimental P

nmental Conse

erty. As  desc

t would be o

dy exposed  t

se sources (e

ches would  p

e between th

n noise cond

on  Section  4(

re included in

nt Historic Sit

ntation of the

y of historic s

est historic pro

tive use of Se

tly  and  intro

ally impair th

osed Action w

s.  The Drago

ut the annua

e  to  curren

 Action on Se

No Action A

e No Action 

n  of  the Drag

ad at the Dra

egor test site

rical, Archite

Proposed Ac

as defined  in

 Action,  a  ne

y  to  the  exis

ogical resourc

struction und

a  negligible 

y  RLV would 

of  the  launc

ns each year, t

ment 

Permit to Spac

equences 

cribed  in  Sec

utside of the

to audible no

e.g., trains). A

produce  less

he No Action 

itions at 4(f) p

(f)  properties

n Section 4.2 

es 

e Proposed Ac

sites. The loca

operty. 

ction 4(f) pro

oduced  visua

he value of th

would be exp

onFly  RLV wo

l operations w

t  SpaceX  te

ection 4(f) hist

lternative 

Alternative,  t

gonFly  RLV  a

gonRider tes

e. Therefore, t

ctural, Archa

ction 

n Section 3.4

ew  concrete 

sting  Grassh

ces  in this are

der  the Propo

increase  in 

be  visible  fr

ch  and  landin

two propulsiv

ceX for Operati

tion  4.1.2  ab

 test site, pot

oise  from  cur

As discussed  i

  than  a  tent

Alternative a

properties wo

s would  be  d

and Appendi

ction would n

ation of the p

operties would

al  elements 

e historic pro

ected to pro

ould  be  visib

would be inte

sting  operat

toric sites wo

the  FAA wou

t  the McGre

st area would

there would b

aeological, an

),  includes 14

launch  pad 

opper  launc

ea. Therefore

osed Action. 

noise  (refer 

rom  the  histo

ng  operation

ve assist and 

ion of the Drag

4‐7

bove, Dragon

tentially at Se

rrent SpaceX 

in Section 4.2

th  of  a  dB  d

and Proposed

ould not be s

de minimis. A

x A of this EA

not result in t

proposed laun

d occur if the

that  would 

operties. As d

duce a neglig

le  from  the 

ermittent and

tions.  Theref

ould be de min

uld not  issue 

gor  test  site

d not occur. E

be no adverse

nd Cultural Re

4 NRHP‐listed

would  be  co

h  pad.  Ther

e, there woul

The  launches

to  Section  4

oric  propertie

s  would  last

two full prop

gonFly Vehicle 

nFly  RLV  test 

ection 4(f) pr

activities  (as

2, the noise  l

difference  fro

d Action DNL

ignificant; the

A  detailed  an

A. 

the physical u

nch pad is app

e proposed op

significantly

described in S

gible  increase

historic  prop

d of short du

fore,  impacts

nimis.  

an experime

.  In  addition

Existing Space

e effects to la

esources 

d or eligible h

onstructed  in 

re  are  no  k

d be no direc

s and  landing

4.2,  Noise  an

es  in  the AP

t  only  one m

pulsive landin

at the McGreg

launches m

operties. How

s described  in

evel associat

om  current  o

L contours of

erefore, pote

nalysis  of  noi

use, direct tak

proximately 0

perations incr

y  alter  the  u

Section 4.4.1,

e  in noise com

perties  in  the

ration and si

s  from  oper

ental permit 

,  constructio

eX activities 

and use unde

historical res

the DragonR

known  NRHP

ct effects to 

gs of  the Dra

nd  Compatibl

E  during  eac

minute  each. 

gs, would las

gor Test Site, Te

May

ay  generate 

wever, these 

n Section 2.2

ed with Drag

operations, w

f  less than 4 a

ential noise‐re

ise  and  assoc

king, or temp

0.75 of a mile

reased noise 

use,  characte

, operations u

mpared to ex

e APE  during

milar in scop

rations  unde

to SpaceX  fo

on  of  the  con

would contin

r this alterna

ources. Unde

Rider  test  ar

P‐listed  or  e

historic prop

agonFly RLV w

le  Land  Use)

ch  launch,  bu

Only  four  o

t 30 minutes 

exas  

y 2014 

noise 

areas 

2) and 

gonFly 

with  a 

acres. 

elated 

ciated 

porary 

e from 

levels 

er,  or 

under 

xisting 

  each 

pe and 

er  the 

or  the 

ncrete 

nue at 

tive. 

er  the 

ea,  in 

ligible 

erties 

would 

).  The 

ut  the 

of  the 

each. 

Page 60: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

4.0 Environ

Operation

was  rece

significant

be no eff

this findin

4.4.2

Under  the

operation

the McGr

the prote

be no effe

Fish, W4.5

4.5.1

Vegetatio

The  Prop

DragonRid

mowed  i

vegetatio

During  a 

predeterm

site  subje

Proposed

Wildlife 

The poten

is no anti

bodies are

Impacts  t

the McGr

landings. 

annually, 

4.2 above

would not

Special‐St

As  discus

Assessme

McGregor

onmental Assess

Experimental P

nmental Conse

ns under the 

ntly  develop

t physical fea

ects  to histo

ng of no effec

No Action A

e No Action 

n of the Drag

regor test site

ctive covena

ect to historic

Wildlife, and 

Proposed Ac

on 

posed  Action 

der  test  area

ndustrial  lan

n.  

nominal  lau

mined targete

ect  to  active 

 Action would

ntial construc

icipated perm

e in the vicini

o wildlife  fro

egor test site

Based on the

overall  impa

e, there would

t significantly

tatus Species

ssed  in  Sect

ent for Issuing

r Test Site, Te

ment 

Permit to Spac

equences 

Proposed Act

ed  and  used

atures or cha

ric properties

ct on April 7, 2

lternative 

Alternative,  t

onFly RLV at 

e. As a  lessee

nts and othe

c properties u

Plants 

ction 

includes  po

a  and  the  G

nd  (see  Secti

unch,  the  Dr

ed site within

grazing  do 

d not result in

ction of a new

manent displa

ty of the pote

om DragonFly

e such as star

e relative  infr

cts to region

d be no signif

y impact wildl

ion  3.5,  coo

g an Experime

exas indicated

ceX for Operati

tion would oc

d  for  suborb

racteristics o

s  from  imple

2014 (refer to

the  FAA wou

the McGrego

e of the city‐o

r applicable s

under this alte

otential  const

rasshopper  l

ion  3.5.1  for

ragonFly  RLV

n the operatin

not  have  sig

n significant i

w launch pad 

acement of w

ential launch 

y RLV  launch 

rtling and flus

requency of D

nal wildlife po

ficant noise im

life.  

ordination  w

ental Permit t

d that there a

ion of the Drag

4‐8

ccur intermitt

bital  testing, 

of any of the 

mentation of

o Appendix B,

uld not  issue 

or test site. E

owned prope

stipulations  i

ernative. 

truction  of  a

aunch  pad  a

r  further  des

V  would  land

ng area in the

gnificant  amo

mpacts to veg

would not ha

wildlife prese

pad, aquatic 

operations w

shing of birds

DragonFly RLV

opulations ar

mpacts from 

ith  the  USFW

to SpaceX for 

are no federa

gonFly Vehicle 

tently and fo

and  as  such

historic prop

f  the Propose

, Agency Coor

an experime

Existing Space

erty, SpaceX w

dentified  in t

a  new  1,600

are  previousl

scription),  co

d  either  back

e vicinity of la

ounts  of  woo

getation. 

ave impacts o

ent  at  the M

species wou

would be sim

s and other w

V test  launch

re not anticip

operations. T

WS  in  2011

Operation of

ally listed spe

at the McGreg

or a short dur

h,  would  not

perties. There

ed Action. TH

rdination). 

ental permit 

eX activities 

would contin

the PA. There

0  ft2  launch 

y  disturbed 

onstruction  w

k  on  the  lau

aunch pad. Th

ody  vegetatio

on terrestrial 

cGregor  test 

ld not be imp

milar  to existin

wildlife during

hes, approxim

pated.     As di

Therefore, th

1  for  the  Fin

f the Grasshop

cies known to

gor Test Site, Te

May

ation at a site

t  alter  any  o

efore, there w

HC concurred

to SpaceX  fo

would contin

ue to comply

efore, there w

pad.  Becaus

and  are  cur

would  not  im

unch  pad  or

he areas of th

on;  therefore

wildlife, and 

site. As no 

pacted. 

ng disturbanc

g test launche

mately 30  lau

scussed  in Se

e Proposed A

nal  Environm

pper Vehicle a

o occur in the

exas  

y 2014 

e that 

of  the 

would 

d with 

or  the 

nue at 

y with 

would 

e  the 

rently 

mpact 

r  in  a 

e test 

e,  the 

there 

water 

ces at 

es and 

nches 

ection 

Action 

mental 

at the 

e ROI.  

Page 61: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

4.0 Environ

Under the

north of t

occur  in  t

direct effe

The launc

existing c

but the m

annual  op

intermitte

Previous 

whooping

developed

the whoo

migration

permit, p

currently 

activities 

monitorin

have not 

must noti

until  the 

operation

monitorin

whooping

4.5.2

Under  the

operation

the McGr

alternativ

Wate4.6

4.6.1

Surface W

Construct

preparatio

launch pa

be requir

soils  or  p

onmental Assess

Experimental P

nmental Conse

e Proposed A

the existing G

the ROI are k

ects to listed 

ches and land

onditions. Th

majority of the

perations wo

ently and for 

coordination 

g cranes with

d a whooping

oping cranes’ 

n (approximat

otential  stop

monitored fo

during  the 

ng would also

been observ

ify the FAA, U

cranes have 

nal  area  of  t

ng  plan,  the 

g crane. 

No Action A

e No Action 

n of the Drag

regor test site

ve. 

r Quality 

Proposed Ac

Waters (Non‐w

tion activities

on for constr

ad would not 

ed because t

pollutants  fro

ment 

Permit to Spac

equences 

Action, a new

rasshopper R

known  to oc

species from 

dings of the D

he DragonFly 

e launch and 

ould  last  30 

a short durat

with TPWD 

hin  the  test s

g crane monit

northern mig

tely mid‐Sept

p‐over habitat

or the presen

fall  and  spr

o be  conduct

ved at  the de

USFWS, and T

left  the area

the  McGrego

FAA  has  de

lternative 

Alternative,  t

onFly RLV at 

e. Therefore, 

ction 

wetlands Sur

s related  to  t

ructing of a 1

result in dire

the construct

om  being  ca

ceX for Operati

w concrete  lau

RLV launch pa

cur at  the pr

construction

DragonFly RLV

RLV would b

landing oper

minutes  each

tion at a site, 

indicated tha

ite  (TPWD 20

toring plan to

gration (appr

ember throu

t  located wit

nce of whoop

ring  migratio

ted by Space

esignated mo

TPWD, and c

a. Based on  t

or  test  site  a

termined  tha

the  FAA wou

the McGrego

there would 

rface Waters)

he Proposed 

,600 ft2 launc

ect impacts to

tion of the pa

rried  off‐site

ion of the Drag

4‐9

unch pad wou

ad. None of th

roposed  laun

n activities ass

V would resul

be visible from

ations would

h. Operation

which is curr

at there may 

011c).    In  res

o be impleme

roximately  lat

gh late Decem

thin  the oper

ping cranes a

n  periods.  S

X  for Dragon

nitoring sites

cease activitie

he very  rare 

and  with  the

at  the  Propo

uld not  issue 

or test site. E

be no adver

)  

Action woul

ch pad at the

o surface wat

ad would dist

e  in  stormwa

gonFly Vehicle 

uld be constr

he State‐listed

nch pad  site. 

sociated with

lt in a negligi

m the surrou

d last only one

s  under  the 

ently already

be suitable s

sponse  to TPW

nted when op

te March thr

mber). Under

rational area 

pproximately

Similarly,  as 

nFly operatio

s,  if whoopin

es covered u

occurrence o

e  implement

osed  Action 

an experime

Existing Space

se effects to 

ld  include ex

e DragonRide

ers. A TPDES 

turb  less tha

ater  runoff,  t

at the McGreg

ructed approx

d species tha

Therefore,  t

h the Propose

ble increase 

nding area d

e minute eac

Proposed  Ac

y used for sub

stop‐over ha

WD  recomm

perations are

rough early Ju

r the existing

of  the McG

y 1‐2 hours p

appropriate,

ons. Although

g cranes are 

nder the exp

of whooping 

tation  of  the

would  have 

ental permit 

eX activities 

biological re

cavating, gra

r test area. C

construction

n 1 acre. To 

the  use  of  B

gor Test Site, Te

May

ximately 0.32

t have potent

here would b

ed Action.  

in noise abov

uring each  la

h. Only four o

ction would 

borbital testin

bitat  for mig

endations, Sp

e conducted d

une) and sou

 FAA experim

regor  test  sit

prior to condu

,  whooping 

h whooping  c

observed, Sp

perimental pe

cranes withi

e  whooping 

no  effect  o

to SpaceX  fo

would contin

sources unde

ding, and  fill

Construction o

n permit wou

prevent distu

Best  Manage

exas  

y 2014 

2 mile 

tial to 

be no 

ve the 

aunch, 

of the 

occur 

ng.  

rating 

paceX 

during 

uthern 

mental 

te are 

ucting 

crane 

cranes 

paceX 

ermits 

in  the 

crane 

n  the 

or  the 

nue at 

er this 

ing  in 

of the 

ld not 

urbed 

ement 

Page 62: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

4.0 Environmental Consequences  4‐10  May 2014 

Practices  (BMPs) such as sediment  traps, silt  fences, straw bales, or  fiber  rolls would be  incorporated 

into design and construction. During project operations,  stormwater discharges  from new  impervious 

surfaces of the launch pad could potentially convey stormwater with low levels of pollutants to adjacent 

wetlands  and  other  surface waters.    Typical  pollutants  could  include  sediment  and  petrochemicals.  

However,  the  Proposed  Action  would  not  substantially  alter  existing  stormwater  runoff  patterns.  

Vegetated buffers surrounding these features, which help prevent indirect impacts to or degradation of 

streams, would be maintained. 

Although  the  probability  is  low,  a  launch  failure  could  potentially  impact  surface  waters.  Potential 

impacts would be minimized and mitigated by emergency  response and  clean‐up procedures. Due  to 

minimal  surface waters  present within  the  operations  area,  and management  practices  in  place  to 

prevent releases, no adverse impacts to surface waters are expected as a result of the Proposed Action. 

Groundwater 

Construction  activities  associated  with  the  launch  pad  would  not  require  blasting  that  would  alter 

underlying  geology  and  affect  the  Trinity Aquifer.  Construction  of  the  launch  pad would  not  require 

significant  quantities  of  groundwater.  Construction  vehicles  and machinery  could  potentially  impact 

groundwater if spills or leaks occur. Storage and handling of chemicals and fuel used during construction 

activities  would  follow  SpaceX’s  Spill  Response  Procedure,  which  would minimize  the  potential  for 

accidental  releases  of  pollution  substances  from  construction  equipment.  All  construction materials 

would be carefully  stored and handled and  spills cleaned up  immediately. The  increase  in  impervious 

surface  associated  with  the  potential  launch  pad  would  be  minimal;  therefore,  no  impacts  to 

groundwater recharge capabilities would occur. 

Water  for  the McGregor  test  site  is  supplied  via  pipeline  from  a  groundwater  well  at  the  City  of 

McGregor water plant. Water demand for operations of the Proposed Action is minimal and would not 

be anticipated to significantly increase existing groundwater demand. Propellants that would be used in 

operations  for  the Proposed Action are currently  stored at  the  test  site, and are managed as per  the 

SpaceX  Spill  Response  Procedure.  Therefore,  spills  would  not  be  expected  to  enter  or  impact 

groundwater resources.  

Ongoing  groundwater  remediation  projects  are  occurring  in  nearby  areas  because  of  contamination 

originating  from  former  NWIRP  site  uses,  as  described  in  Section  3.6.  Investigations  by  the  Navy 

indicated that contaminated groundwater does not underlay or originate from the areas associated with 

the proposed  launch pad  locations or proposed  construction area  (EPA 2009b). Additionally, EPA has 

granted  the  former  NWIRP  site  a  “Ready  for  Reuse”  designation  indicating  that  the  remediated 

conditions of the site are protective of human health and the environment for the anticipated use (EPA 

2009b). 

In the event of a launch failure (for which the probability is low), any potential impacts to groundwater 

would be minimized by emergency response and clean‐up procedures.   Therefore, adverse  impacts to 

groundwater from the Proposed Action are not expected. 

Page 63: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

4.0 Environ

Wetlands

Two area

the propo

wetlands 

BMPs wo

potential 

Therefore

Floodplai

There are

located  in

100‐year 

McGregor

BMPs wo

would als

floodplain

mitigated

floodplain

4.6.2

Under  the

operation

the McGr

alternativ

Natur4.7

4.7.1

Expansion

of  a  1,60

resources

of additio

The plann

fuels  and

construct

and  relat

launch pa

resources

onmental Assess

Experimental P

nmental Conse

s of emergen

osed location 

from polluta

ould be  imple

impacts  to w

e, no adverse 

ns 

e approximat

n  the southea

floodplains  a

r test site. Th

uld be  imple

so be  implem

ns.  If  a  launc

 and minimiz

ns are expecte

No Action A

e No Action 

n of the Drag

regor  test  sit

ve. 

ral Resources

Proposed Ac

n of the exist

00  ft2  launch

s and energy.

onal energy, w

ned test launc

d  propellants

ion and main

ively minima

ad  is construc

s or energy su

ment 

Permit to Spac

equences 

nt wetlands a

for launch pa

ants and sedi

emented.  In  t

wetlands wou

impacts to w

ely 44.92 acr

ast portion o

associated w

hese floodpla

mented duri

mented  to pre

ch  failure  do

zed through e

ed from the P

lternative 

Alternative,  t

onFly RLV at 

te.  Therefore

s and Energy 

ction 

ing facilities b

  pad,  and  is

 Launches of

which would b

ches of the RL

s  as  describ

ntenance was

al  amounts  o

cted. The Pro

upply. 

ceX for Operati

re located on

ad constructi

ment carried

the event of 

uld be minim

wetlands are e

res of 100‐ye

of  the McGre

ith  a  tributa

ins are outsid

ng design an

event any rel

es  occur  dur

emergency re

Proposed Act

the  FAA wou

the McGrego

,  there woul

Supply 

based on the

s  not  expecte

f the DragonF

be provided v

LV would use

bed  in  Sectio

shing of the  l

f  concrete  a

oposed Actio

ion of the Drag

4‐11

n the McGreg

on. To minim

d  in stormwat

a  launch  fai

mized by eme

expected to o

ear  floodplain

gor  test site 

ry  to  Station

de of the are

d constructio

eases or con

ring  operatio

esponse and c

ion.  

uld not  issue 

or test site. E

d be no  adv

Proposed Ac

ed  to  signific

Fly RLV are ex

via existing ut

e a propellant

on  2.1.1  wo

aunch pad w

nd  other  nat

n  is not expe

gonFly Vehicle 

gor test site, 

mize the occur

ter runoff  fro

lure  (for whi

ergency  respo

occur as a resu

ns associated

boundary an

n  Creek  in  th

ea of the prop

on to preven

ntaminants  fr

ons,  potentia

clean‐up proc

an experime

Existing Space

verse  effects 

ction is limite

cantly  increa

xpected to re

tilities at the t

t mixture of N

ould  be  met

would consum

tural  resourc

ected  to have

at the McGreg

but no wetla

rrence of sho

om  the propo

ich  the proba

onse and  clea

ult of the Pro

d with  the  So

nd approxima

he  southwest

posed launch

t  impacts to 

rom operatio

l  floodplain 

cedures. No a

ental permit 

eX activities 

to water  res

ed to the pote

ase  demand 

equire approx

test site. 

NTO and MMH

t  without  d

me water from

ces would  be

e  significant 

gor Test Site, Te

May

ands are locat

ort‐term impa

osed constru

ability  is  low

an‐up proced

oposed Action

outh Bosque 

ately 2.34 ac

tern  corner  o

 pad constru

floodplains. 

ns  from  impa

impacts wou

adverse impa

to SpaceX  fo

would contin

sources unde

ential constru

or  use  of  na

ximately 50 k

H. The deman

ifficulty.  Pot

m the water 

e  consumed 

impact on na

exas  

y 2014 

ted at 

acts to 

ction, 

), any 

dures. 

n. 

River 

res of 

of  the 

ction. 

BMPs 

acting 

uld  be 

cts to 

or  the 

nue at 

er  this 

uction 

atural 

kW‐hr 

nd for 

tential 

truck, 

if  the 

atural 

Page 64: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

4.0 Environ

4.7.2

Under  the

operation

the McGr

supply un

Hazar4.8

4.8.1

Solid  was

associated

expected 

would be 

The Drago

materials

would be

materials 

hazardou

CFR §420

Appropria

hazardou

Response

hazards  t

Emergenc

Response

D), and Sa

Remediat

the  site. 

Sections 3

for launch

Reuse” de

and  the 

expected 

Proposed

hazardou

no advers

4.8.2

Under  the

operation

onmental Assess

Experimental P

nmental Conse

No Action A

e No Action 

n of the Drag

regor test site

der this alter

rdous Materi

Proposed Ac

ste  is  likely  t

d with the Pr

to  be  a  sign

managed and

onFly RLV pro

. NTO  and M

e  shipped  to 

associated w

s materials a

.67 for liquid 

ate engineeri

s materials  o

 Procedures 

to  employees

cy Response 

 Plan (29 CFR

anitary Sewer

tion for groun

Remediation

3.6 and 4.6,  i

h pad constru

esignation ind

environment

to have any 

  Action  wou

s materials, h

se impacts are

No Action A

e No Action 

n of the Drag

ment 

Permit to Spac

equences 

lternative 

Alternative,  t

onFly RLV at 

e. Therefore,

rnative. 

als, Pollution

ction 

to  be  produ

oposed Actio

nificant  increa

d disposed of

opulsion syste

MMH  are  cur

the McGrego

with engine m

nd wastes wo

propellants. 

ng  and admi

or wastes.  Sp

for  the McG

s  and  the  en

Plan  fulfill th

R Part 1910.12

r Accidental R

ndwater and s

n  is  also  ong

investigations

uction are not

dicating that 

t  for  the  ant

adverse impa

uld  comply  w

hazardous wa

e expected. 

lternative 

Alternative,  t

onFly RLV at 

ceX for Operati

the  FAA wou

the McGrego

 there would

n Prevention,

ced  during  t

on. The amou

ase  over  cur

f according to

em uses a pro

rrently  used 

or  test  site  in

maintenance a

ould be store

 

inistrative  co

paceX  has  ad

regor  test sit

nvironment.

he requireme

20(q)), RCRA 

Release Preve

soil contamin

going  for  gro

s  indicate tha

t contaminat

the remediat

ticipated  use

act due to pa

with  all  appl

aste manage

the  FAA wou

the McGrego

ion of the Drag

4‐12

uld not  issue 

or test site. E

d be no adve

 and Solid W

the  potentia

nt of solid wa

rent  levels  p

o existing prac

opellant mixt

and  stored  o

n DOT‐certifie

are also used 

ed and used in

ontrols would

dopted  a  Che

te  to be  follo

The  policies 

nts of the Ha

Hazardous W

ention Plan. 

nation origina

oundwater  a

at groundwat

ed. EPA has g

ted condition

e  (EPA  2009b

ast contamina

licable  Feder

ment, solid w

uld not  issue 

or test site. E

gonFly Vehicle 

an experime

Existing Space

rse effects to

Waste 

l  launch  pad

aste produced

produced  by 

ctices describ

ture of NTO a

on‐site  for  te

ed  tanker  tru

and stored o

n compliance

d be  impleme

emical  Emerg

owed  in  the e

and  proced

azardous Wa

Waste Conting

ting from pri

t  neighborin

ter and soils 

granted the f

ns of the site a

b).  Therefore

ation. Implem

ral,  State,  an

waste, and po

an experime

Existing Space

at the McGreg

ental permit 

eX activities 

o natural reso

d  constructio

d by the Prop

site  activitie

bed in Section

and MMH, wh

esting  purpos

ucks. Oils, ba

on‐site. Prope

e with Federa

ented  to avo

gency  Respo

event of a  re

ures  outlined

ste Operatio

gency Plan (40

or NWIRP use

ng  properties

underlying th

former NWIR

are protectiv

e,  the  Propo

mentation an

nd  local  regu

ollution prev

ental permit 

eX activities 

gor Test Site, Te

May

to SpaceX  fo

would contin

ources and e

on  and  opera

posed Action 

s. All  solid w

n 3.8. 

hich are haza

ses.  All  prop

atteries, and 

ellants, oils, a

al regulations

oid  releases o

nse  Plan  and

elease  to min

d  in  the  Che

ns and Emerg

0 CFR 265, Su

es has occurr

s.  As  describ

he areas prop

P site a “Read

e of human h

osed  Action  i

d operation o

ulations  rega

vention. There

to SpaceX  fo

would contin

exas  

y 2014 

or  the 

nue at 

energy 

ations 

is not 

wastes 

rdous 

pellant 

other 

and all 

at 14 

of any 

d  Spill 

nimize 

emical 

gency 

ubpart 

red on 

bed  in 

posed 

dy for 

health 

is  not 

of the 

arding 

efore, 

or  the 

nue at 

Page 65: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

4.0 Environ

the McGr

preventio

Light 4.9

4.9.1

The McGr

past testi

current  la

the test s

released o

planned. 

emissions

RLV, F9R,

seen from

during ea

Visual imp

firing wou

The Propo

pad woul

would  no

degrade t

not expec

4.9.2

Under  the

operation

the McGr

resources

4.10Risks 

This  soci

expenditu

employm

Socioecon

beneficial

growth m

This  analy

populatio

onmental Assess

Experimental P

nmental Conse

regor test site

on, and solid w

Emissions an

Proposed Ac

regor test sit

ng of the Gra

aunch operat

site, up to 30

or launched f

The DragonF

s would be sm

 and Falcon 9

m the nearby 

ch test. Light

pacts from D

uld be of shor

osed Action m

d be consiste

ot  be  a  signif

the existing v

cted to signifi

No Action A

e No Action 

n of the Drag

regor  test  sit

s under this a

Socioeconom

ioeconomic 

ures.  The  a

ent, income, 

nomic  impact

l in terms of g

management is

ysis  also  iden

ons  are  ident

ment 

Permit to Spac

equences 

e. Therefore, 

waste under t

nd Visual Imp

ction 

e  is  located  i

asshopper RLV

ions, Dragon

0 times per ye

from a launch

Fly RLV would

maller in visu

9 engine test

cities of McG

t emissions fr

ragonFly RLV

rt duration an

may require t

ent with exist

ficant  impact

visual charact

cantly impact

lternative 

Alternative,  t

onFly RLV at 

te.  Therefore

lternative.  

mics, Environ

analysis  foc

ssessment  e

and housing 

ts, particularl

gains in jobs,

ssues such as

ntifies  poten

tified  where

ceX for Operati

there would

this alternativ

pacts 

n an operatio

V, the F9R, an

Fly  launches

ear. The Drag

h pad, depend

d emit a com

al impact com

ts. Although 

regor and Og

rom engine fi

 operations w

nd launches w

the construct

ting structure

t  to  visual  re

er or quality 

t light emissio

the  FAA wou

the McGrego

e,  there wou

nmental Justic

cuses  on  po

examines  ho

characteristic

ly  impacts  su

 expenditure

s demands fo

tial  environm

  high  and  a

ion of the Drag

4‐13

 be no adver

ve.  

onal  industria

nd current te

and  landings

gonFly RLV w

ding on whic

mbustion  light

mpared to lig

DragonFly RL

glesby, engine

ring would be

would be sho

would be relat

ion of a launc

es and landsc

esources.  The

of the site a

ons or visual r

uld not  issue 

or test site. E

ld  be  no  adv

ce, Children’s

otential  incr

ow  the  Pro

cs in the ROI.

uch as  those 

s, tax revenu

r housing and

mental  justice

adverse  hum

gonFly Vehicle 

rse effects to 

al park, and t

esting of the F

s would be v

would be take

h type of test

t source  (flam

ght emissions

LV  launches m

e firing would

e more visibl

ort‐term and i

tively infrequ

ch pad. Poten

ape of the te

e  Proposed  A

nd its surrou

resources. 

an experime

Existing Space

verse  effects

s Environmen

reases  in  em

oposed  Actio

 

being evalua

ues, etc., and 

d community 

e  issues.  Imp

man  health  o

at the McGreg

hazardous m

the test site o

Falcon 9 engi

visible  for sev

en  to a speci

t described in

me) as engine

s produced by

might have t

d only occur f

e during nigh

infrequent, b

uent at a rate 

ntial construc

est site and in

Action would

ndings. The P

ental permit 

eX activities 

s  to  light  em

ntal Health R

mployment 

on  would  a

ated  in  this E

potentially a

services. 

pacts  to  env

or  environme

gor Test Site, Te

May

materials, pol

operations  in

ines. Similar t

veral miles ar

fied elevatio

n Section 2.1

es  fire. These

y the Grassho

he potential 

for 5 to 25 se

ht time opera

because the e

of 30 annual

ction of the la

ndustrial park

d  not  substan

Proposed Act

to SpaceX  fo

would contin

missions  and 

Risks and Safe

and  constru

affect  popul

EA, may be m

adverse in ter

ironmental  j

ental  effects

exas  

y 2014 

lution 

nclude 

to the 

round 

n and 

.1.2 is 

e  light 

opper 

to be 

conds 

ations. 

engine 

ly.  

aunch 

k, and 

ntially 

tion is 

or  the 

nue at 

visual 

ety 

uction 

ation, 

mixed: 

rms of 

ustice 

s  may 

Page 66: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

4.0 Environ

dispropor

was an inc

4.10.1

Populatio

The Propo

duration 

permanen

10 worke

of approx

there wou

The  City 

McLennan

The  avail

household

employee

Construct

construct

There wo

Action. Ad

Income a

The Propo

would rep

slight  incr

increased

spent on c

Although 

retail,  foo

increase i

in these in

Construct

construct

construct

expected 

would  be

Therefore

employm

onmental Assess

Experimental P

nmental Conse

rtionately affe

creased dispr

Proposed Ac

on and Housin

osed Action w

of  the  2‐ye

ntly to the RO

rs would be a

ximately 26 p

uld be no sign

of McGregor

n Counties ha

able  housing

ds  that may 

es moving into

tion of the lau

ion companie

uld be no adv

dditionally, th

nd Employme

osed Action w

present less t

rease  in emp

 earnings wo

consumer go

limited, this 

od,  and  serv

n direct emp

ndirect jobs, a

tion  of  a  lau

ion  spending

ion spending

that addition

e  expected  t

e,  constructi

ent trends. 

ment 

Permit to Spac

equences 

ect minority 

roportionate 

ction 

ng 

would require

ear  program

OI. Using an a

accompanied

people would

nificant impac

r  has  a  highe

ave a minimu

g  units  are 

move  into  th

o the ROI wo

unch pad for 

es and is not 

verse impact

here would be

ent 

would require

han one perc

ployment wou

ould be paid t

ods and servi

spending ma

ices,  resultin

ployment, the

and would no

unch  pad  m

g  would  sup

. Given the re

nal constructi

that  most  of

on  spending

ceX for Operati

or  low‐incom

environment

e the addition

.  Under  a 

average ROI 

d by approxim

d  represent  le

cts to short‐ o

er  percentage

um of 8.7 pe

adequate  to 

he ROI. There

uld be a mino

the Proposed

expected to r

s to supply a

e no impacts 

e the addition

cent of the ex

uld  translate 

to taxes, and 

ices in the RO

ay  indirectly s

ng  in  a mino

e Proposed Ac

ot be expecte

may  be  requ

pport  direct 

elatively mino

ion workers w

f  the  induce

g  would  not

ion of the Drag

4‐14

me population

tal health or s

n of 10 new e

maximum  sc

household si

mately 16 fam

ess  than 0.01

or long‐term p

e  of  available

rcent availab

accommoda

efore,  the use

or beneficial i

d Action, if ne

require new c

nd demand f

to short‐ or l

n of 10 new e

xisting ROI em

into an  incre

some would

OI.  

support exist

r  economic 

ction would b

ed to generate

ired  to  supp

construction 

or amount of

would move i

ed  jobs  woul

t  be  expect

gonFly Vehicle 

ns. Impacts to

safety risk to 

employees to

cenario,  all 

ze of 2.60 (U

mily members

1 percent of  t

population tr

e  housing  co

ble housing u

ate  the  cons

e of vacant h

impact to hou

ecessary, wou

construction 

for local hous

ong‐term pop

employees to

mployment ra

ease  in earni

d be saved an

ing jobs and 

benefit.  Give

be expected t

e associated p

port  the  Pro

jobs  and  o

f new constru

into the ROI f

ld  be  filled 

ted  to  signi

at the McGreg

o children wo

children. 

o the McGreg

new  person

USCB 2012; U

s. The total p

the ROI popu

rends. 

ompared  to  T

nits (USCB 20

servative  est

housing units

using. 

uld be contra

workers to m

sing as a resu

pulation tren

o the McGreg

ate (USCB 201

ings  in  the R

nd invested, b

income  in th

en  the  less  t

to support a 

population in

oposed  Actio

other  related

uction require

for the const

by  unemplo

ificantly  affe

gor Test Site, Te

May

ould occur  if 

gor test site fo

nnel  would 

USCB 2013a), 

opulation inc

ulation. There

Texas.  Corye

012; USCB 20

timate  of  10

s by potentia

acted through

move into the

ult of the Prop

ds. 

gor test site, w

13b). Howeve

OI. Some of 

but most wou

he ROI econo

than  0.01  pe

negligible inc

n‐migration.  

on.  The  prop

  jobs  induce

ed, it would n

ruction. Furth

yed  ROI  wo

ect  populatio

exas  

y 2014 

there 

or the 

move 

these 

crease 

efore, 

ll  and 

013a). 

0  new 

l new 

h local 

 area. 

posed 

which 

er, the 

these 

uld be 

my  in 

ercent 

crease 

posed 

ed  by 

not be 

her, it 

orkers. 

on  or 

Page 67: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

4.0 Environ

Additiona

construct

they wou

Environm

Impacts  t

low‐incom

environm

As discus

environm

Order 561

or minorit

Children’s

Impacts t

and  adve

children. 

miles  from

document

environm

emissions

related  to

impacts fr

high or ad

4.10.2

Under  the

operation

the McGr

this altern

onmental Assess

Experimental P

nmental Conse

al  taxes woul

ion spending

ld be minor d

mental Justice

to environme

me  populatio

ental conseq

sed  in Sectio

ental  justice 

10.2. Therefo

ty population

s Environmen

o children’s e

erse  environm

There are fiv

m  the propos

t  indicate  t

ental  safety 

s  standards. 

o  the Propos

rom noise or 

dverse impact

No Action A

e No Action 

n of the Drag

egor test site

native.  

ment 

Permit to Spac

equences 

d accrue  to 

 and slight in

due to the sm

ental  justice p

ons  in  the 

quences resul

on 3.10,  there

populations 

re, there wou

ns and thus no

ntal Health an

environmenta

mental  cons

ve schools, eig

sed  launch pa

hat  the  Pro

and  health. 

The  Air  Qua

ed Action wo

air pollution 

ts to children

lternative 

Alternative,  t

onFly RLV at 

e. Therefore, t

ceX for Operati

Federal, Stat

ncrease in em

all size of the

populations a

affected  env

ting from the

e are no Cen

based on  inc

uld be no disp

o adverse env

nd Safety Ris

al health and

equences  re

ght parks, an

ad  location. 

oposed  Actio

Coryell  and 

ality  analyses

ould not  cau

are expected

’s environme

the  FAA wou

the McGrego

there would b

ion of the Drag

4‐15

e, and  local 

mployment. Th

e construction

are evaluated

vironment  a

e project to d

nsus Tracts  th

come or dem

proportionate

vironmental j

sks 

d safety are e

sulting  from

d the CTYRA 

Noise  impact

on  would  ha

McLennan  C

s  summarized

use  emissions

d, the Propos

ental health o

uld not  issue 

or test site. E

be no adverse

gonFly Vehicle 

governments

hese impacts

n project and

d  in  terms of

and  the  pot

disproportion

hat are  consi

mographics as

ely high and a

justice impact

evaluated  in t

m  the  project

youth rodeo

ts analyses d

ave  no  sign

Counties  are 

d  in  Section 

s  to exceed N

sed Action wo

or safety. 

an experime

Existing Space

e effects to so

at the McGreg

s as a  result 

s would be be

 scale of hirin

f  the presenc

tential  for  h

nately affect t

idered minor

s defined by 

adverse impa

ts. 

terms of the 

t  to  disprop

o arena locate

iscussed  in S

nificant  impa

in  attainmen

4.1  indicate

NAAQS. Beca

ould not pose

ental permit 

eX activities 

ocioeconomi

gor Test Site, Te

May

of  the  increa

eneficial; how

ng. 

ce of minorit

high  and  ad

these popula

rity or  low‐in

the CEQ and

acts on low‐in

potential fo

portionately 

ed between 3

Sections 4.2 o

acts  on  child

nt  for NAAQS

es  that  opera

ause no  signi

e disproporti

to SpaceX  fo

would contin

c conditions u

exas  

y 2014 

ase  in 

wever, 

y and 

dverse 

ations. 

ncome 

d DOT 

ncome 

r high 

affect 

3 to 5 

of  this 

dren’s 

S  and 

ations 

ficant 

onate 

or  the 

nue at 

under 

Page 68: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

4.0 Environmental Consequences  4‐16  May 2014 

THIS PAGE INTENTIONALLY LEFT BLANK 

 

Page 69: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

5.0 Cumula

5.0 CUMU

Cumulativ

  The  i

added

(Fede

The CEQ 

and simila

Additiona

Environm

terms of 

Therefore

immediat

actions, in

Past,  pres

SpaceX pr

testing. P

operation

rodeo  are

industrial 

park,  incl

capacity  t

construct

The Propo

therefore

present, a

or surrou

therefore

Air Qu5.1

As discuss

in criteria

testing op

open air f

years. The

NTO, are 

planned e

notable cu

onmental Assess

Experimental P

ative Impacts 

ULATIVE IMP

ve impacts ar

mpact  on  th

d to other pa

eral or non‐Fe

regulations fu

ar actions in t

ally,  the  CEQ

ental Policy A

its ability  to 

e, a cumulativ

te area of the

n order to cap

sent,  and  rea

rograms for G

ast and pres

ns at the Park

ena,  and  agr

park.  Reaso

uding  the po

to  house  an 

ed adjacent t

osed Action d

, there would

and reasonab

nding area. T

, these resou

uality 

sed in Section

a pollutant em

perations, Spa

for a maximu

e normal  com

primarily nitr

emissions sou

umulative air

ment 

Permit to Spac

PACTS 

e defined by 

e  environme

ast, present, a

ederal) or per

urther requir

the same doc

Q  further  e

Act  that “eac

accommodat

ve effects ana

e Proposed Ac

pture these a

asonably  fore

Grasshopper 

ent actions a

k including pip

ricultural  pra

onably  forese

otential  futur

operation w

to McGregor 

does not impa

d be no cum

bly foreseeabl

The Proposed

rce areas are

n 4.1.2, the D

missions in th

aceX has beg

m total of fo

mbustion pro

rogen gas and

urces were id

r quality impa

ceX for Operati

the CEQ in 40

ent which  res

and reasonab

son undertak

e that NEPA 

ument (40 CF

xplained  in 

ch  resource, 

te additional 

alysis normal

ction, and a t

dditional effe

eseeable  futu

RLV test pro

at  the McGre

pe and plumb

ctices/cattle 

eeable  future

re  lease of  th

with  approxim

Elementary S

act natural, c

ulative  impac

le future proj

 Action is exp

e the focus of 

DragonFly RLV

he vicinity of 

gun an engine

our minutes p

oducts  that  re

d water that w

dentified in th

acts. 

ion of the Drag

5‐1

0 CFR §1508.7

sults  from  th

bly foreseeab

kes such othe

environment

FR 1508.25). 

Considering 

ecosystem a

effects, base

lly would enc

ime frame, in

ects. 

ure  actions  a

ogram and Fa

egor  Industria

bing supply d

grazing  on  u

  actions  incl

he  largest bu

mately  500  e

School and is 

ultural, or so

cts  to these 

ects at the M

pected to hav

the cumulati

V testing oper

the McGrego

e test progra

per year, and 

esult  from  th

would have n

he vicinity of 

gonFly Vehicle 

7 as: 

he  increment

ble future act

r actions. 

tal analyses a

Cumulative

nd human co

ed on  its own

compass geog

ncluding past 

at McGregor

alcon 9 Stage 

al Park and v

distribution, C

undeveloped 

ude  further 

uilding  at  the

employees.  A

scheduled to

cioeconomic 

resources wh

McGregor test

ve the most i

ive impacts a

rations would

or test site.  A

m where the

may have no

he  combustio

no effect on a

the McGrego

at the McGreg

tal  impact  of

ions regardle

address conn

e  Effects  un

ommunity mu

n time and sp

graphic boun

actions and f

r  test  site  inc

 1 engine tes

vicinity  includ

C3 Communic

  portions  of 

development

e  industrial p

A  new  prima

o be open by A

resources ev

hen combine

t site, McGreg

mpact on air

nalysis. 

d result in a v

As part of the

ey fire hyperg

o open air tes

on of  the hyp

air quality.  N

or test site th

gor Test Site, Te

May

f  the  action 

ess of what a

ected, cumul

der  the  Na

ust be analyz

pace parame

ndaries beyon

foreseeable f

clude  the  on

sting, plus th

de  the comm

cations, the C

the  test  site

t  at  the  indu

ark which ha

ry  school  is 

August 2014. 

valuated in th

d with other

gor Industrial

 quality and n

very small inc

eir ongoing e

golic propella

sting at all in 

pergols, MMH

o other exist

hat would pro

exas  

y 2014 

when 

gency 

lative, 

tional 

zed  in 

eters.” 

nd the 

future 

ngoing 

e F9R 

mercial 

CTYRA 

e  and 

ustrial 

as  the 

being 

 

his EA; 

r past, 

 Park, 

noise; 

crease 

engine 

nts  in 

some 

H and 

ing or 

oduce 

Page 70: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Enviro

Issuing an  

5.0 Cumula

Currently,

emissions

to determ

Annual GH

carbon  di

estimated

total GHG

Ta

Annual O

U.S. 2011Note: 1 EPA

The  smal

global  wa

atmosphe

sources, c

change. A

specific im

Noise5.2

The noise

to  the  typ

test progr

complete 

conjunctio

the surrou

onmental Assess

Experimental P

ative Impacts 

,  there  are 

s stemming fr

mine what lev

HG emissions

ioxide  emissi

d carbon diox

G emissions ge

able 5.1‐1. Co

Alternat

perational Emi

 Total GHG EmA 2013b 

l  quantity  of

arming  that 

ere’s concent

contribute  in

At present, n

mpacts (if any

e generated fr

pes of noise 

ram and  the 

before  the 

on with past,

unding area, 

ment 

Permit to Spac

no  formally 

rom Proposed

el of propose

s associated w

ions,  and  the

xide emission

enerated by t

omparison of 

tive 

issions 

missions 

f  GHG  emissi

would  lead  t

ration of GHG

crementally  t

o practical m

y) that this inc

rom DragonF

routinely gen

F9R  test pro

DragonFly  R

 present, and

no significant

ceX for Operati

adopted  or

d Actions. Fo

ed emissions w

with the prop

ese  are  comp

s from the Pr

the United Sta

Proposed Ac

Metri

ions  from  th

to  climate  ch

Gs, and, in co

to  the globa

methodology 

crement of w

ly launch ope

nerated at  th

ogram would 

RLV  operatio

d reasonably 

t impacts wou

ion of the Drag

5‐2

r  published 

rmulating suc

would substa

posed operati

pared  to U.S

roposed Actio

ates in 2011.

ction GHG Em

c Tons CO2 per

9.67

6,708.3 x 106

e  Proposed  A

hanges.  How

ombination w

l warming  th

exists  that w

arming would

erations woul

he McGregor 

not be addit

ns  begin.  W

foreseeable f

uld be expect

gonFly Vehicle 

NEPA  thresh

ch thresholds

antially contri

ons in each y

S.  2011 GHG 

on essentially

missions to U.

r Year  Perc

Action  alone

wever,  these 

with past and 

hat produces 

would enable

d produce loc

d be 30 times

test site. No

tive because 

When  the  Pro

future action

ted.  

at the McGreg

holds  of  sign

s is problema

bute to globa

year of testing

emissions  in

y represent z

S. 2011 GHG 

cent of U.S. 20

1.44 X

e would  not 

emissions  w

future emiss

the adverse 

e meaningful 

cally or globa

s annually an

oise  from  the

those  test p

oposed  Actio

s at the McG

gor Test Site, Te

May

nificance  for 

atic, as it is di

al climate cha

g are compos

n  Table  5.1‐1

ero percent o

Emissions1

11 GHG Emiss

X 10 ‐7 

 

cause  appre

would  increas

ions from all 

effects of cl

estimation o

lly. 

d would be s

e Grasshoppe

rograms wou

on  is  combin

regor test sit

exas  

y 2014 

GHG 

fficult 

ange. 

sed of 

1.  The 

of the 

ions 

ciable 

se  the 

other 

imate 

of  the 

imilar 

er RLV 

uld be 

ed  in 

te and 

Page 71: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

6.0 List of Preparers and Contributors  6‐1  May 2014 

6.0 LIST OF PREPARERS AND CONTRIBUTORS 

Government Preparers 

Daniel Czelusniak Affiliation: FAA Office of Commercial Space Transportation Education: BS Environmental Management, Juris Doctorate Experience: 14 years of environmental impact assessment experience 

Stacey Zee Affiliation: FAA Office of Commercial Space Transportation Education BS Natural Resource Management, MS Environmental Policy  Experience: 18 years of environmental impact assessment experience 

Cardno TEC, Inc.  

Abigail Shoff, GIS Analyst   B.S. Geography, Geographical Information Systems   Years of Experience: 3  

Cristina Ailes, Environmental Analyst B.S. Biology, Ecology and Environmental Science B.A. International Studies Years of Experience: 6 

Jaclyn Johnson, Environmental Planner, Project Manager B.S. Ecology  Years of Experience: 14 

 

Kathleen Hall, Project QA/QC Director, Senior Environmental Planner B.A. Earth and Environmental Science Years of Experience: 16 

 

Kathleen Riek, Senior Environmental Planner B.S. Biology  Years of Experience: 25 

 

Lesley Hamilton, Senior Environmental Scientist B.A. Chemistry  Years of Experience: 25 

 

Lori Thursby, Senior Architectural Historian M.A.H. Master of Architectural History  Years of Experience: 18 

  

Blue Ridge Research and Consulting, LLC 

Alex Salton, Engineer   M.S. Mechanical Engineering 

Years of Experience: 4 

Page 72: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

6.0 List of Preparers and Contributors  6‐2  May 2014 

Michael James, Senior Principal Engineer    M.S. Mechanical Engineering   Years of Experience: 14 

 

Page 73: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

7.0 References  7‐1  May 2014 

7.0 REFERENCES 

CEQ. 1997. Environmental Justice: Guidance Under the National Environmental Policy Act. December 10. http://www.epa.gov/compliance/ej/resources/policy/ej_guidance_nepa_ceq1297.pdf. Accessed November 13, 2013. 

CEQ. 2010. Memorandum for Heads of Federal Departments and Agencies, Draft NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions. February 18, 2010. 

City of McGregor. 2003. City of McGregor, Texas Official Zoning Map. Adopted by City Council on August 11, 2003. http://www.mcgregor‐texas.com/city.html. Accessed on November 13, 2013. 

Craftsman Book Company.  2010. National Estimator.   

CTYRA. 2013. Central Texas Youth Rodeo Association 2013‐2014 Rodeo Schedule. http://www.ctyra.com/Schedule.htm. Accessed November 11, 2013. 

DOT. 2012. DOT Order 5610.2(a), Actions to Address Environmental Justice in Minority Populations and Low‐Income Populations. http://www.fhwa.dot.gov/environment/environmental_justice/ej_at_dot/order_56102a/index.cfm. Accessed May 1, 2013. 

EPA .1982. Guidelines for Noise Impact Analysis. EPA 550/9‐82‐105. Office of Noise Abatement and Control, Washington, DC. April.  

EPA. 1992. Procedures for Emission Inventory Preparation Volume IV: Mobile Sources. EPA420‐R‐92‐009. December. 

EPA. 2001. Control of Emissions of Hazardous Air Pollutants from Mobile Sources; Final Rule. Federal Register 66:17230‐17273. 

EPA. 2007. Control of Emissions of Hazardous Air Pollutants from Mobile Sources; Final Rule. Federal Register 72:8428‐8570. 

EPA. 2008. United Stated Code Title 42, Chapter 85, Subchapter I, Part A, Section 7412, Hazardous Air Pollutants.  

EPA. 2009a. Technical Support Document for Endangerment and Cause or Contribute Findings for Greenhouse Gases under Section 202(a) of the Clean Air Act. Climate Change Division, Office of Atmospheric Programs, Washington, DC. December 7. http://www.epa.gov/climate change/Downloads/endangerment/Endangerment_TSD.pdf. Accessed 27 June, 2012. 

EPA. 2009b. U.S. Environmental Protection Agency Federal Facilities Restoration and Reuse Office with Region 6 Federal Facilities Section: Innovative Cleanup Leads to Navy’s First EPA Ready for Reuse Determination, Naval Weapons Industrial Reserve Plan – McGregor. EPA‐505‐F‐09‐014. November. 

EPA. 2010a. Exhaust and Crankcase Emission Factors for Nonroad Engine Modeling – Compression‐Ignition. July. 

EPA. 2010b. Motor Vehicle Emission Simulator (MOVES). August. 

EPA. 2012. National Ambient Air Quality Standards. http://www.epa.gov/air/criteria.html. Last updated December 14, 2012. Accessed November 11, 2013. 

EPA. 2013a. Regional Vulnerability Assessment Program: Definitions. http://amethyst.epa.gov/revatoolkit/Definitions.jsp#L. Accessed on January 31, 2013. 

Page 74: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

7.0 References  7‐2  May 2014 

EPA. 2013b. Inventory of U.S. Greenhouse Gas Emissions and Sinks: 1990‐2011. http://www.epa.gov/climatechange/ghgemissions/usinventoryreport.html. Accessed April 4, 2013. 

FAA. 2011. Final Environmental Assessment for Issuing an Experimental Permit to SpaceX for Operation of the Grasshopper Vehicle at the McGregor Test Site, Texas. November.  

FAA. 2012. FAA Order 1050.1E, Change 1, Guidance Memo #3, Considering Greenhouse Gases and Climate Under the national Environmental Policy Act (NEPA): Interim Guidance. January 12, 2012.Feingold, L., Harris, C., and. Gierke , H. v. 1994. "Community Annoyance and Sleep Disturbance: Updated Criteria for Assessing the Impacts of General Transportation Noise on People"," Noise Control Engineering Journal, vol. 42, pp. 25‐30, January ‐ February. 

FEMA. Zone A. http://www.fema.gov/floodplain‐management/zone. Accessed January 30, 2013. 

FICAN. 1997. Effects of Aviation Noise on Awakenings from Sleep. June. 

GAO. 2009. Aviation and Climate Change. GAO‐09‐554. Report to Congressional Committees. http://www.gao.gov/new/items/d09554.pdf. Accessed July 9, 2012. 

Haas, W.R. and Prince, S.  1984. Atmospheric Dispersion of Hypergolic Liquid Rocket Fuels, (Volume 1 of II), pages 6 and 7. November 

Hall, L.S., P.R. Krausman, and M.L. Morrison. 1997. The habitat concept and a plea for standard terminology. Wildlife Society Bulletin 25:173‐182. 

Harris, C.M. 1979. Handbook of Noise Control. McGraw‐Hill Book Co., New York, NY. 

McFarland, A.M.S., and Hauck, L. 1999. Existing nutrient sources and contributions to the Bosque River watershed. Texas Institute for Applied Environmental Research report prepared for USDA Natural Resources Conservation Service, Clean Rivers. http://compost.tamu.edu/docs/TIAER99Report.pdf. Accessed on August 17, 2011. 

McGregor Independent School District. 2013. Information regarding 2013‐2014 school year enrollment. Personal Communication with Gretchen Logan, Public Education Management System District Coordinator via phone to Cristina Ailes, Environmental Analyst, Cardno TEC, Charlottesville, VA. November 12. 

MDEC. 2013. McGregor Economic Development Corporation Industrial Park, Area L. http://www.mcgregor‐texas.com/ecodev/areal.htm. Accessed November 2, 2013.  

Melrose, A. 2010. European ATM and Climate Adaptation: A Scoping Study. Pages 195‐198 in ICAO Environmental Report 2010 – Chapter 6: Adaptation. http://legacy.icao.int/icao/en.env2010/Pubs/EnvReport2010/ICAO EnvReport10‐Ch6 en.pdf. Accessed 9 July 2012. 

National Wild and Scenic River System. 2013. Designated Rivers: Texas. 

http://www.rivers.gov/rivers/texas.php. Accessed October 4, 2012. 

NAVFAC. 2007. Naval Facilities Engineering Command. Perchlorate Remediation and Property Transfer 

Success at a Closing Federal Facility Naval Weapons Industrial Reserve Plant. McGregor, Texas. 2007 

Region 4 EPA – DoD – States Environmental Conference. June 20. 

Oglesby Independent School District. 2013. Information regarding 2013‐2014 school year enrollment. 

Personal Communication with Kay Martin, Registrar via phone to Cristina Ailes, Environmental 

Analyst, Cardno TEC, Charlottesville, VA. November 12. 

Page 75: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

7.0 References  7‐3  May 2014 

Schultz T. 1978. "Synthesis of Social Surveys on Noise Annoyance," Journal of the Acoustical Society of 

America, pp. 377‐405, August. 

SpaceX.  2013.  Use  of  existing  water  storage  tank  at  McGregor  test  site.  Personal  communication, 

between S. Davis, Chief Engineer, SpaceX, via email to J. Johnson, Associate/Environmental Planner, 

Cardno TEC, Annapolis, MD. November 26. 

Stuetzer, R.G., et al. 2013.  Optical Spectroscopy on the Hypergolic MMH/NTO Combustion in Spacecraft 

Propulsion, Figure 1, page 2.  Technical paper for the proceedings of the 5th European Conference 

for Aeronautics and Space Sciences. July. 

TCEQ. 2012. An Introduction to the Texas Surface Water Standards. 

http://www.tceq.texas.gov/waterquality/standards/WQ_standards_intro.html. Accessed January 

22, 2013. 

TCEQ. 2013. Texas Air Monitoring Information System (TAMIS). 

http://www5.tceq.state.tx.us/tamis/index.cfm?fuseaction=home.welcome. Accessed November 11, 

2013. 

TPWD. 2011a. Annotated County Lists of Rare Species: Coryell County. Accessed at 

http://www.tpwd.state.tx.us/gis/ris/es/ES_Reports.aspx?county=Coryell on November 7, 2013. Last 

updated October 10, 2011. 

TPWD. 2011b. Annotated County Lists of Rare Species: McLennan County. 

http://www.tpwd.state.tx.us/gis/ris/es/ES_Reports.aspx?county=McLennan. Last updated October 

10, 2011. Accessed November 7, 2013. 

TPWD. 2011c.  Correspondence with J. Wicker of TPWD.  Re: Draft and Final Environmental Assessments 

for Issuing and Experimental Permit to SpaceX for Operation of the Grasshopper Vehicle at the 

McGregor Test Site, Coryell county, Texas.  November 29, 2011. 

TPWD. 2013. Cross Timbers and Prairies Ecological Region. 

http://www.tpwd.state.tx.us/landwater/land/habitats/cross_timbers/ecoregions/cross_timbers.pht

ml. Accessed November 6, 2013.  

TWDB 2013. Trinity Aquifer. http://www.twdb.state.tx.us/groundwater/aquifer/majors/trinity.asp. 

Accessed November 7, 2013. 

USCB. 2012. United States Census Bureau. 2010 Demographic Profile Data, Table DP‐1, Profile of 

General Population and Housing Characteristics: 2010. http://factfinder2.census.gov. Accessed 

September 25, 2012.  

USCB. 2013a.  United States Census Bureau. State and County QuickFacts. 

http://quickfacts.census.gov/qfd/states/00000.html.  Last updated June 27, 2013 

Page 76: THIS PAGE LEFT INTENTIONALLY BLANK...0 to 1508), a e the potent.1). The succ ould issue a k, and finan ould be req ental docume round 3, SpaceX ha a has grown in Exhibit 1‐ uildings,

Draft Environmental Assessment 

Issuing an Experimental Permit to SpaceX for Operation of the DragonFly Vehicle at the McGregor Test Site, Texas   

7.0 References  7‐4  May 2014 

USCB. 2013b. United States Census Bureau. 2007‐2011 American Community Survey 5‐Year Estimates, 

Table DP03, Selected Economic Characteristics. http://factfinder2.census.gov. Accessed November 

8, 2013. 

USFWS. 2013a. Ecological Services, Southwest Region: Species Lists. 

http://www.fws.gov/southwest/es/ES_Lists_Main. Last updated March 19, 2013. Accessed April 16, 

2013. 

USFWS. 2013b. Species Profile: Golden‐cheeked Warbler (Dendroica chysoparia). 

http://ecos.fws.gov/speciesProfile/profile/speciesProfile.action?spcode=B07W. Last updated 2 

August. 

USFWS. 2013c. National Wetlands Inventory. http://www.fws.gov/wetlands/Data/State‐

Downloads.html. Accessed November 7, 2013. 

U.S. Navy. 1998. Environmental Assessment: Disposal or Retention of the Naval Weapons Industrial 

Reserve Plant (NWIRP) McGregor, Texas. November. 

U.S. Navy. 2001. Finding of Suitability to Transfer and Environmental Baseline Survey to Transfer – Area L 

Parcel NWIRP McGregor. Naval Facilities Engineering Command. North Charleston, South Carolina. 

May. Pgs. 94 

U.S. Navy 2008. Environmental Restoration Program Progress Report. Chief of Naval Operations. 

Environmental Readiness Division. Pgs. 40. 

https://portal.navfac.navy.mil/portal/page/portal/navfac/navfac_ww_pp/navfac_nfesc_pp/environ

mental/erb/resourceerb/don_er_pr2008.pdf. Accessed August 31, 2011. 

Visconti, G. 2001. Fundamentals of Physics and Chemistry of the Atmosphere. Springer‐Verlag, Berlin.