1
1. Review job prints. 2. Connect grounding lug (NEC Article 250). 3. Connect AC power, motor, and valves. 1. On the SCE-CPU and SCE-HVI boards unplug the five connectors pictured to the left. 2. Use MCE jumper assembly CPU- CONSTR-JPR-HY to replace the three SCE-CPU and the top SCE-HVI con- nectors (wired as shown). 3. Use MCE jumper assembly HVI- CONSTR-JPR-HY to replace the GOV/ SAFH/.. connector (wired SAFC to 2). STEP 1: POWER CONNECTIONS. STEP 2: CONSTRUCTION OPERATION ON MACHINE ROOM INSPECTION. STEP 3: CONSTRUCTION OPERATION ON CARTOP INSPECTION. 42-QR-1P26 B3 © Motion Control Engineering. www.mceinc.com. 916 463 9200. Low power or signal wires must always be in separate conduit from high power/current wires. Ground Three phase building supply SEE JOB PRINTS FOR MOTOR & VALVE CONNECTIONS 4. On the SCE-CPU board, INSP, CAR DOOR BYPASS, HOISTWAY DOOR BYPASS all UP. FLT BYPASS jumper in BYPASS position. Run Enable Run Up Insp Norm Run Down EMERGENCY STOP SCE-CPU SCE-HVI * Remove jumper wire when connecting switch. THIS INSTRUCTION WILL HELP YOU GET THE ELEMENT HYDRAULIC CONTROLLER RUNNING ON CONSTRUCTION OPERATION SCE-UPD SCE-UPD TEMPORARY RUN BOX CTEN INCP ICTU ICTD INCT* GOV SAFH SAFC* ESC 1 2 2 2LS 2LS DLN2 DLN1 GOS2 GOS1 24HWY 24FS 24CTP 1 1 1 SCE-CPU SCE-HVI CPU-CONSTR HVI-CONSTR RGOK +24V L24V 1 FRA FRS FRSA FRSM CTEN INCP ICTU ICTD INCT INA ATU ATD ABU ABD UTL USL1 USL2 DTL DSL1 DSL2 UETS DETS GOV SAFH SAFC ESC 2 If your job has optional features like emergency power or an oil pressure input, wire them or add jumpers before you run. See your job prints and/or the SYSTEM IO/Programmed Inputs menu to verify additional inputs. From To +24V INCP INCT INA RGOK UTL USL1 USL2 DTL DSL1 From To 2 SAFC 5. Power up. Verify UTILS, Construct & Bypass Faults enabled. Verify Home screen indicates BP CONSTRUCTION. REMOVE temporary jumpers before connecting actual equipment. Otherwise, circuit boards will be damaged (not covered by warranty). ALL jumpers must be removed before the car is released to passenger operation. for Construction Operation

Upload: others

Post on 13-Aug-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THIS INSTRUCTION WILL HELP YOU GET THE ELEMENT … · 2015. 9. 15. · SAFC* ESC 1 2 2 2LS 2LS DLN2 DLN1 GOS2 GOS1 24HWY 24FS 24CTP 1 1 1 SCE-CPU SCE-HVI RGOK CPU-CONSTR HVI-CONSTR

1. Review job prints.2. Connect grounding lug (NEC Article 250).3. Connect AC power, motor, and valves.

1. On the SCE-CPU and SCE-HVI boards unplug the five connectors pictured to

the left.2. Use MCE jumper assembly CPU-

CONSTR-JPR-HY to replace the three SCE-CPU and the top SCE-HVI con- nectors (wired as shown).3. Use MCE jumper assembly HVI- CONSTR-JPR-HY to replace the GOV/ SAFH/.. connector (wired SAFC to 2).

STEP 1: POWER CONNECTIONS.

STEP 2: CONSTRUCTION OPERATION ON MACHINE ROOM INSPECTION. STEP 3: CONSTRUCTION OPERATION ON CARTOP INSPECTION.

42-QR-1P26 B3© Motion Control Engineering. www.mceinc.com. 916 463 9200.

Low power or signal wires must always be in separate conduit from high power/current wires.

Ground

Three phase building supplySEE JOB PRINTS FOR MOTOR & VALVE CONNECTIONS

4. On the SCE-CPU board, INSP, CAR DOOR BYPASS, HOISTWAY DOOR BYPASS all UP. FLT BYPASS jumper in BYPASS position.

Run Enable

Run Up

Insp

NormRun Down

EMERGENCY STOP

SCE-CPU

SCE-HVI

* Remove jumper wire when connecting switch.

THIS INSTRUCTION WILL HELP YOU GET THE ELEMENT HYDRAULIC CONTROLLER RUNNING ON CONSTRUCTION OPERATION

SCE-UPD

SCE-UPD

TEMPORARY RUN BOX

CTENINCPICTUICTDINCT*

GOVSAFHSAFC*ESC

122

2LS2LS

DLN2DLN1GOS2GOS1

24HWY24FS

24CTP111

SCE-CPU

SCE-HVI

CPU-CONSTR HVI-CONSTRRGOK+24VL24V1FRAFRSFRSAFRSM

CTENINCPICTUICTDINCTINAATUATDABUABD

UTLUSL1USL2DTLDSL1DSL2UETSDETS

GOVSAFHSAFCESC2

If your job has optional features like emergency power or an oil pressure input, wire them or add jumpers before you run. See your job prints and/or the SYSTEM IO/Programmed Inputs menu to verify additional inputs.

From To+24V INCP INCT INA RGOK UTL USL1 USL2 DTL DSL1

From To 2 SAFC

5. Power up. Verify UTILS, Construct & Bypass Faults enabled. Verify Home screen indicates BP CONSTRUCTION.

REMOVE temporary jumpers before connecting actual equipment. Otherwise, circuit boards will be damaged (not covered by warranty). ALL jumpers must be removed before the car is released to passenger operation.